AMENDMENT NO. 11
RATIFICATION TO CONTRACT FOR
PROFESSIONAL SERVICES
The City of Corpus Christi, Texas hereinafter called "CITY", and Freese and Nichols, Inc. agree to the
following amendment to the Contract for Professional Services for Garwood Water Supply Project
(Project No. 8424), as authorized and amended by:
Original Agreement October 28, 2003 Motion No. M2003-394 $116,100.00
Amendment No. 1 October 19, 2004 Motion No. M2004-387 $285,490.00
Amendment No. 2 Ciecember 18, 2007 Motion No. M2007-334 $911,997.00
Amendment No. 3 March 11, 2009 Administrative Approval $0.00
Amendment No. 4 March 9, 2010 Motion No. M2010-051 $9,676,590.00
Amendment No. 5 November 30, 2011 Administrative Approval $0.00
Amendment No. 6 January 14, 2012 Administrative Approval $49,940.00
Amendment No. 7 April 24, 2013 Administrative Approval $49,822.00
Amendment No. 8 May 29, 2013 Administrative Approval $49,900.00
Amendment No. 9 July 30, 2013 Motion No. 2013-125 $195,664.00
Amendment No. 10 February 15, 2014 Motion No. 2014-027 $3,965,785.00
Amendment No. 11 revises the project scope for Mary Rhodes Pipeline Phase 2 (Proiect No. E10008)
to the Garwood Water Supply Project as follows:
Exhibjt "A", Section 1. Scope of Services, Part A. Basic Services 3. Design Phase and 4.Bid
Phase, shall be modified to include services for the pre-purchase of pumps and motors for the Intake
and Booster Pump Stations as specified in Amendment No. 11 Exhibit "A".
Exhibjt "A", Section 3. Fees, shall be modified as specified in Amendment No. 11 Exhibit "A" for a
revised fee not to exceed $49,000.00 (Forty-Nine Thousand Dollars and Zero Cents), for a total
restated fee not to exceed $15,350,288.00 (Fifteen Million Three Hundred Fifty Thousand Two
Hundred Eighty-Eight Dollars and Zero Cents). Monthly invoices shall be submitted in accordance
with Amendment No. 11 Exhibit "B".
All other terms and conditions of the October 28, 2003 contract and amendments between the City and
Freese and Nicho will r- .in full force and effect.
CITY0/. • - J FREESE AND NICHOLS, INC.
i`14j�!�/�/ 12- .lam *14-
Ronald le!on, (Date) Ron G zman, P.E., (Date)
City -n- ,er Principal
800 North Shoreline Blvd., Suite 1600N
1 , 3. N Corpus Christi, TX 78401
Gustavo G 'nzalez, P.E.,O (Date) (361)561-6500 Office
Assistant C y Manager, (361)561-6501 Fax
Public Works and Utilities
0-1C) ÷e -VOX
Daniel Biles, P.E., (Date)
2014-259
7/03/14 AMEND. NO. 11
Page 1 of 2
Freese and Nichols Inc. I0008 MARY RHODES PIPELINE,PHASE 2\FREESE AND NICHOLS,INC\AMENDMENT NO.11\CONTRACT.DOCX
INDEXED
RECOMMEND '
'41t? .i _, , r e-(
o.- at' f epartmen' - Date) •
APPR VED AS TO FORM
-251#
Legal Department (Datb)
APPR ED
Offic46kL44v anagement and Budget Date)
ATTEST
Rebecca Huerta, City Secretary
Project No: E10008
Fund Source No: 550950-4095-00000-E10008
Fund Name:Water 2014 CIP
Encumbrance No: E R9
AMEND. NO. 11
Page 2 of 2
EXHIBIT "A"
CITY OF CORPUS CHRISTI, TEXAS
Mary Rhodes Pipeline, Phase 2
Amendment No. 11
(City Project No. E10008)
I. Scope of Services:
A. Basic Services Scope Revision:
Add the following tasks as shown below:
3. Design Phase
Produce a bid package for the pre-purchase of pumps and motors for the Intake and Booster Pump
Stations. Work with the Purchasing, Legal and Engineering Departments to produce front-end
documents and technical plans and specifications for the pre-purchase of pumps and motors.
4. Bid Phase
Perform bid phase services including pre-bid meeting attendance, answering bidders questions, bid
opening, bid tabulation, and award recommendation for the pre-purchase of pumps and motors for the
Intake and Booster Pump Stations.
II. Schedule:
Final Design Phase October, 2013
Bid Phase February, 2014
III. Fee: The total authorized fee for all services added to the contract with through this Amendment will
be$49,000. Fees for individual additional tasks are shown in the Summary of Fees table. The table
Summary of Fees set forth on the following page will be used by the Consultant Engineer to determine
the amount to be invoiced for each task. The fee shown for each task is inclusive of all expenses as
set forth by the original contract.
Summary of Fees
TASK Description Fee
Original Contract—Phase 1
I.A.1 Screening Study of Delivery Options $116,100.00
I.A.2 Detailed Study of Delivery Options TBN
I.A.3 Pipeline Route Study TBN
I.A.4 Pipeline Surveying, Easement Acquisition, and Permitting TBN
I.A.5 Pipeline Topographic Survey and Preliminary Design TBN
AMENDMENT NO. 11
EXHIBIT"A"
Page 1 of 8
Revised March 6,2014
I.A.6 Final Design Phase TBN
I.A.7 Bid, Award, and Construction TBN
Original Contract Fee $116,100.00
Amendment No. 1 —Phase 2
2.A Detailed Study of Delivery Option 5 $152,532
2.B Detailed Study of Delivery Option 1 $64,328
2.0 Detailed Study of Delivery Option 6 $68,630
Amendment No. 1 Fee $285,490
Amendment No. 2—Phase 2A
2A-0001 Field Studies
2A.1.A —Ownership Mapping $ 20,631
2A.1.B —Risk Analysis $ -
Prepare Risk Analysis $ 5,853
Risk Analysis Workshop (in CC) $ 4,533
2A.1.0 Field survey of West Mustang Creek $ 46,922
2A.1.D —West Mustang Creek Habitat Assessment $ 34,272
2A.1.E —Coordination Re-Calib. Of Gannado Gauging Station $ 6,168
2A.1.F —Summary $ -
Prepare Task Summary $ 11,650
Task Summary Workshop (in CC) $ 8,383
Total Fee by Classification $ 138,411
2A-0002 LCRA Agreement
2A.2.A —Agreement Framework $ -
Prepare Framework $ 12,695
Submit Framework $ 431
Schedule Framework Meeting $ 451
2A.2.B —Framework Meeting (Garwood) $ 7,235
2A.2.0 —Prepare Draft LCRA Agreement $ 10,525
2A.2.D —Draft LCRA Agreement Workshop (Garwood) $ 6,366
2A.2.E Prepare Final Agreement $ 8,740
2A.2.F Task—Execute Agreement(1 meeting Austin, 1 meeting Corpus
Christi) $ 8,151
2A.2.G —Task 2 Summary $ 14,675
Total Fee by Classification $ 69,268
2A-0003 LNRA Agreement
2A.3.A —Agreement Framework $ -
Prepare Framework $ 13,025
Submit Framework $ 431
Schedule Framework Meeting $ 451
AMENDMENT NO. 11
EXHIBIT"A"
Page 2 of 8
Revised March 6,2014
2A.3.B —Framework Meeting (Edna) $ 7,191
2A.3.0 —Prepare Draft Agreement $ 10,525
2A.3.D —Draft LNRA Agreement Review Workshop (Edna) $ 7,191
2A.3.E —Regulatory Coordination (2 meetings Austin) $ 10,137
2A.3.F —Prepare Final LNRA Agreement $ 6,815
2A.3.G —Execute Agreement(1 meeting Edna, 1 meeting Austin) $ 11,360
2A.3.H —Task 3 Summary $ 14,125
Total Fee by Classification $ 81,250
2A-0004 Permitting and Agency Coordination
2A.4.A —Coord w/TPWD re: GSM Permit(2 meetings Austin) $ 3,737
2A.4.B —Coord w/TPWD re: LNRA Inflow/Release Agreement(3 meetings
Austin) $ 5,156
2A.4.0 —Coord w/TCEQ re: Bed and Banks Permit(3 meetings Austin) $ 7,104
2A.4.D —Coord w/TGLO re: Bed and Banks Permit(3 meetings Austin) $ 7,104
2A.4.E —Coordination with TCEQ and TWDB re: Regional Water Planning
(2 meetings Austin) $ 1,437
2A.4.F —Regional Water Planning Group Coordination (1 meeting Austin, 1
meeting Corpus Christi) $ 2,979
2A.4.G —Monitor LCRA/SAWS Project (2 meetings Garwood) $ 6,437
2A.4.H —USACE Coord (1 meeting Galveston) ' $ 8,253
2A.4.I —TPDES Coordination (1 meeting Austin) $ 6,566
2A.4.J —Landowner Issues and Communications (3 meetings Edna) $ 20,785
2A.4.K —Meet w/ Environmental Groups $ -
Prepare Exhibits $ 13,093
Meeting 1 $ -
Plan $ 501
Schedule $ 471
Prepare for Meeting $ 3,745
Attend Meeting (Austin) $ 2,376
Meeting 2 $ -
Plan $ 501
Schedule $ 471
Prepare for Meeting $ 3,745
Attend Meeting (Austin) $ 2,376
Meeting 3 $ -
Plan $ 501
Schedule $ 471
Prepare for Meeting $ 3,745
Attend Meeting (Edna) $ 3,591
2A.4.L —Task 4 Summary $ 16,070
AMENDMENT NO. 11
EXHIBIT"A"
Page 3 of 8
Revised March 6,2014
•
Total Fee by Classification $ 121,216
2A-0005 Permitting Activities
2A.5.A —Bed and Banks Permit Application $ -
Prepare Permit $ 20,655
Submit Permit $ 6,360
Agency Review $ 8,115
Permit Approval $ 5,203
2A.5.B —Prepare Amendment to TPWD/LNRA Inflow& Release Agreement $ -
Develop Amendment Framework $ 3,815
Meet with LNRA and TPWD to develop amendment outline (1
mtg Edna) $ 4,441
Develop Draft Amendment $ 4,075
Meet with LNRA and TPWD to review Draft Amendment(1 mtg
Edna) $ 4,441
Prepare Final Amendment $ 3,735
Obtain Written Approval (1 mtg Austin, 1 mtg Edna) $ 6,540
2A.5.0 —Water Right Amendment Application $ -
Prepare Permit $ 10,815
Submit Permit $ 961
_ Agency Review $ 4,210
_ Permit Approval $ 1,023
2A.5.D —Monitor Permit Application Status $ 2,045
2A.5.E —Regulatory Agency Coord During Permit App Process $ 2,945
2A.5.F —Develop Supporting Info for Region N Amendment $ 5,130
2A.5.G —Coordinate Region N Amendment(2 meetings CC) $ 11,475
2A.5.H —Amend Water Conservation/Drought Management Plan $ -
Prepare Draft Amendment $ 3,408
Plan Workshop (CC) $ 4,533
Submit Draft Amendment $ 1,120
City Review of Draft Amendment $ -
Review Workshop (CC) $ 4,533
City Review Complete $ -
Incorporate City Comments/Prepare Final Amendment $ 3,535
City Council Approval of Final Amendment(CC) $ 4,533
2A.5.F —Task 5 Summary $ 15,227
Total Fee by Classification $ 142,870
2A-0006 Conceptual Facility Design
2A.6.A —GIC Facility Requirement Workshop $ 330
Schedule Workshop $ 681
Conduct Workshop (Garwood) $ 6,393
AMENDMENT NO. 11
EXHIBIT"A"
Page 4 of 8
Revised March 6,2014
2A.6.B —Concept Design of GIC Canal System Improvements $ 4,800
2A.6.0 —Concept Design of West Mustang Creek Div. Structure $ 4,800
2A.6.D —Design Review Workshop $ _
Schedule Workshop $ 681
Conduct Workshop (Garwood) $ 6,393
2A.6.E —W. Mustang Creek Gauging Facility Workshop $ 6,900
Schedule Workshop $ 681
Conduct Workshop (Edna) $ 4,193
2A.6.F —Concept Design, W. Mustang Creek Gauging Facility $ 3,960
2A.6.G —W. Mustang Creek Gauging Facility Workshop $ -
Schedule Workshop $ 681
Conduct Workshop (Edna) $ 6,393
2A.6.H —Task Summary $ 10,275
Total Fee by Classification $ 57,164
2A-0007 Mary Rhodes Pipeline Assessment
2A.7.A —Data Collection and Review $ 8,648
2A.7.B —Facilities Site Visit $ 23,266
2A.7.0 —Task Kickoff Workshop (Corpus Christi) $ 8,605
2A.7.D —Pump Station Assessment $ 17,008
2A.7.E —SCADA System Assessment $ 11,840
2A.7.F —Operational Integration of Garwood Water $ 6,200
2A.7.G —Alternatives Identification and Screening $ 27,613
2A.7.H —Alternative Control Strategies $ 11,335
2A.7.I —Recommended Mary Rhodes Pipeline Improvements $ 6,205
2A.7.J —Task 7 Summary $ -
Prepare Summary $ 16,200
Attend Workshop $ 5,768
Total Fee by Classification $ 142,686
2A-0008 Task 8— Phase 2A Report
2A.8.A —Prepare Draft Report $ -
Prepare Report $ 25,656
Submit Draft Report to City for Review $ 1,292
City Review of Draft Report $ -
City Review Complete $ -
2A.8.B —Prepare Draft Report Presentation $ 7,112
2A.8.0 —Draft Report Workshop (Corpus Christi) $ 9,169
2A.8.D —Draft Report Comments Meeting (Corpus Christi) $ 9,169
2A.8.E —Prepare Final Report $ 10,321
2A.8.F —Final Report Presentation (up to 3 meetings in Corpus Christi) $ 34,669
AMENDMENT NO. 11
EXHIBIT"A"
Page 5 of 8
Revised March 6,2014
•
$ 97,388
2A-0009 Project Management
2A.9.AOBC1 Task 9.A—Project Schedule $ 10,060
2A.9.BOBC2 Task 9.B—Progress Reports and Invoices $ 23,342
2A.9.COBC3 Task 9.0—Phase 3 Scoping $ 28,343
Total Fee by Classification $ 61,744
Amendment No. 2 Fee $ 911,997
Amendment No. 3
2A-0005 Task 5 - Permitting Activities (Deleted in its Entirety) $ -142,870
2A-0008 Task 8—Phase 2A Report(Deleted in its Entirety) $ -97,388
3-00010 Task 10 -Garwood Alignment Study Scope of Work
3-0010.1 Data Collection $ 49,709
3-0010.2 Preliminary Hydraulic Study $ 21,975
3-0010.3 Preliminary Environmental Review $ 60,294
3-0010.4 Preliminary Route Analysis $ 45,364
3-0010.5 Final Route Analysis $ 62,916
Amendment No. 3 Fee $ 0
Amendment No. 4
1 Study Phase $ 0
2 Preliminary Phase $ 1,514,814
3 Design Phase $ 3,068,522
4 Bid Phase $ 102,000
5 Construction Phase $ 1,200,000
A- 1 Permitting $ 267,414
A—2 ROW Acquisition Survey $ 350,000
A-3 Topographic Survey $ 891,165
A—4 Subsurface Utility Exploration $ 286,000
A—5 Aerial Photography $ 23,750
A—6 Corrosion Engineering $ 122,768
A—7 Surge Analysis $ 104,181
A—8 Geotechnical Investigation $ 312,737
A—9 Archeological Investigation $ 184,650
A— 10 Hydraulic Modeling $ 37,398
A— 11 ROW Acquisition $ 1,060,601
A— 12 Construction Observation Services $ TBD
A— 13 Start-Up Services $ TBD
AMENDMENT NO. 11
EXHIBIT"A"
Page 6 of 8
Revised March 6,2014
A— 14 O&M Services $ 150,590
A— 15 Warranty Phase $ TBD
A— 16 Provide SCADA Documentation $ TBD
Amendment No. 4 Fee $ 9,676,590
Amendment No. 5
2 Preliminary Phase $ 0
3 Design Phase $ 183,179
4 Bid Phase $ 82,814
A- 1 Permitting $ 53,696
A- 3 Topographic Survey $ 37,035
A—4 Subsurface Utility Exploration $ -121,045
A—8 Geotechnical Investigation $ 18,749
A—9 Archeological Investigation $ -87,808
A— 10 Hydraulic Modeling $ 36,102
A— 11 ROW Acquisition $ -202,722
Amendment No. 5 Fee $ 0
Total Fee $10,990,177
Amendment No. 6
2 Preliminary Phase $ 2,340
A— 11 ROW Acquisition $ 47,600
Amendment No. 6 Fee $ 49,940
Total Fee $11,040,117
Amendment No. 7
Study Phase $ $49,822
Amendment No. 7 Fee $ $49,822
Total Fee $ 11,089,939
Amendment No. 8
A-4 Subsurface Utility Exploration $ 49,900
Amendment No. 8 Fee $ 49,900
Total Fee $ 11,139,839
Amendment No. 9
3 Design Phase
Monthly Meetings $ 14,554
60% and 90% Review Meetings/Workshops $ 10,943
Develop Sequence of Operations/Control Narratives $ 22,080
Integration, Verification, and Validation (IW) Specs $ 20,315
AMENDMENT NO. 11
EXHIBIT"A"
Page 7 of 8
Revised March 6,2014
•
Coordination with Electrical Subcontractor $ 5,378
Integration of Mary Rhodes Phase 1 with Phase 2 $ 15,206
5 Construction Phase
Answer RFI's $ 2,588
Construction Meetings/Site Visits $ 30,708
Review Shop Drawings $ 10,876
Control Meetings with Contractor(System Integrator) $ 12,911
Factory Acceptance Testing (FAT) $ 17,271
Start-up/Checkout of Controls $ 20,315
Site Acceptance Testing $ 12,519
Amendment No. 9 Fee $ 195,664
Total Fee $ 11,335,503
Amendment No. 10
12 Construction Management Services $ 3,965,785
Amendment No. 10 Fee $ 3,965,785
Total Fee $15,301,288
Amendment No. 11
3 Design Phase $ 20,000
4 Bid Phase $ 29,000
Amendment No. 11 Fee $ 49,000
Total Fee $ 15,350,288
AMENDMENT NO. 11
EXHIBIT"A"
Page 8 of 8
Revised March 6,2014
tone Srto
Payment Rows*
COMPLETE PROJECT NAME Revised 07/27409
Project No.XXXX
Invoice No. 12345
invoice Date:
Total Amount Previous Total Percent
Basic Services: Contract Amd No. 1 Amd No. 2 Contract invoiced invoice invoice Complete
Preliminary Phase $1,000 $0 $0 $1,000 $0 $1,000 $1,000' 100% •
Design Phase 2,000 1,000 0 3,000 1,000 500 1,500 50%
Bid Phase 500 0 250 750 0 0 0 0% •
Construction Phase 2,500 0 1,000 3,500 0 0 0 0%
Subtotal Basic Services $6,000 $1,000 $1,250 $8,250 $750 $1,500 $2,500 30%
Additional Services:
Permitting $2,000 $0 $0 $2,000 $500 $0 $500 25%
Warranty Phase 0 1,120 0 1,120 0 0 0 0%
Inspection 0 0 1,627 1,627 0 0 0 0%
Platting Survey TBD TBD TBD TBD TBD TED TBD 0%
0& M Manuals TBD TBD TBD TBD TBD TBD TBD 0%
SCADA TBD TBD TBD TBD TBD TBD TBD 0%
Subtotal Additional Services $2,000 $1,120 $1,627 $4,747 $500 $0 $500 11% .
Summary of Fees .
Basic Services Fees $6,000 $1,000 $11250 $8,250 $750 $1,500 $2,500 30%
Additional Services Fees 2,000 1,120 1,627 4,747 500 0 500 11%
Total of Fees $8,000 $2,120 $2,877 $12,997 $1,250 $1,500 $3,000 23%
c
R
.a
•
CTS OF CORPUS CHRISTI
DISCLOSURE OF INTEREST
City ofChristi Ordinance 17112 as amended,requires all persons or firms Acing to do
business Corpusith the City to provide the followinginformatlon. Everyymust ,
If the is not applicable, answer with''NA", Sc.reverse Filing
Certifications end definitions.
COMPANY NAME: Freese and Nichols
P.O.BOX: N/A
STREET ADDRESS: saw i Shoreline fid' an,: Corpus Christy ZIP: nal
FIRM IS; 4. Caporation 2. Partnership 8 3, Sole Owner 0
DISCLOSURE QUESTIONS
If additional specs is necessary+,please use the reverse side of thisor attach separate sheet.
I. State the names of each employee" of the Citi;of Corpusplhaving an "ownership
interest"constituting 3%or more of the ownership in the above named"firm.
Name Job Title and City
Department(if known)
2. State die names of each"official"of the City of Corpus Christi having an"ownership interest"
constituting 3%or more of the ownership in the above named"firm."
Name V-)/Par
Title
3. State the names of each"board member"of the City of Corpus Christi having an"ownership
interest"constituting 3%or more of the ownership in the above named"firm.
Name Board, Commission or
1%-)Ate
Committee
4. State die names of each employee or officer of a"consultant" for the City of Core Christi
who worked on any matter related to the subject of this contract and has an ownership
interest"constituting 3%or more of the ownership in the above named"firm."
Name /rair Consultant
p a p
FILING REQUIREMENTS
If a person who requests official action on a matter knowsthat the uested action will confer an
economic benefit on any City official or employee that is le from the effect that the
action will have on members of the public in general ora substantial segment thereof,you shall
disclose that fact in a signed writing to the City official,employee or body that has been
requested to act in the natter,unless the interest of the City,oDeist or employee in the matter is
The disclosure sha11 also be made in a signed writing filed with the City Secretary.
tgritcysittordinance Section 2-349 OM
CERTIFICATION
I certify that all information provided is true and correct as of the date of this statement,that I
have not_la owingly withheld disclosure of any infomation , and that supplemental
statements will be promptly submitted to the City of Corpus�exas as changes occur.
Certifying Person: Ron Comm,P.E. Title: Principal
erne sr min
Signature of Certify Date:
Person.
DEFINITIONS
a. "Board member." A member of any board, commission, or committee appointed by the
City Council of the City of Corpus Christi,Texas.
b. "Economic benefit". An action that is likely to affect an economic interest if it is likely to
have an effect on that interest that is distinguishable from its effect on members of the public
in general or a substantial segment thereof.
c. "Employee." Any person employed by the City of Corpus Christi,Texas either on a full or
part-time basis,but not as an independent contractor.
d. "Firm." Any entity operated for economic gain, whether professional, industrial or
commercial,and whether established to produce or deal with a product or service, including
but not limited to, entities operated in the form of sole proprietorship, as self-employed
person,partnership,corporation,.Wint stock company,.Wint venture,receivership or trust,and
entities which for purposes of taxation are treated as non-profit organizations.
e. "Official." The Mayor, members of the City Council, City Manager, Deputy City
Manager, Assistant City Managers, Department and Division Heads, and Municipal Court
Judges of the City of Corpus Christi,Texas.
f. "Ownership Interest." Legal or equitable interest,whether actually or constructively held,
in a firm, including when such interest is held through an agent, trust, estate, or holding
entity. "Constructively held"refers to holdings or control established through voting trusts,
proxies,or special terms of venture or partnership agreements."
g. "Consultant"Any person or firm, such as engineers and architects, hired by the City of
Corpus Christi for the purpose of professional consultation and recommendation.