Loading...
HomeMy WebLinkAboutC2014-437 - 12/1/2014 - NA CITY OF CORPUS CHRISTI AMENDMENT NO. 10 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas hereinafter called "City", and LNV, Engineering hereinafter called "Engineer", agree to the following amendments to the Contract for Engineering Services for Staples Street (BOND 2008) Phase 1 from Brawner to Barracuda (Proiect No. 6468) Phase 2 from Barracuda to Gollihar(Proiect No. 6469), as authorized and administratively amended by: Original Contract May 18, 2010 Motion No. M2010-118 $1,892,273.00 Amendment No. 1 November 5, 2010 Administrative Approval $44,700.00 Amendment No. 2 December 4, 2010 Administrative Approval $32,400.00 Amendment No. 3 March 8, 2011 Motion No. M2011-063 $94,754.00 Amendment No. 4 September 20, 2011 Administrative Approval $25,176.00 Amendment No. 5 December 6, 2011 Administrative Approval $29,500.00 Amendment No. 6 January 17, 2012 Motion No. M2012-011 $758,964.00 Amendment No. 7 May 22, 2012 Motion No. M2012-098 $98,560.00 Amendment No. 8 July 29, 2013 Administrative Approval $27,200.00 Amendment No. 9 August 26, 2013 Administrative Approval $23,046.00 Staples Street (BOND 2008) Phase 1 from Brawner to Barracuda (Project No. 6468) is amended as follows: BASIC SERVICES Construction Phase Services 1. Construction Phase Services were provided for the duration of the project. Scope of work consisted of additional work required for change orders throughout the project due to additional work items out of the original scope; for a Lump Sum Fee of$8,780.00 ADDITIONAL SERVICES Construction Observation Services 2. Additional Construction Observation Services provided for the project due to contract time extensions and additional work on the project. The original contract consisted of only 14 months; for a Lump Sum Fee of$18,310.00 Section 3. Fees, Part C. Summary of Fees is amended as specified in Exhibit "B" Summary of Fees. Monthly invoices will be submitted in accordance with Exhibit "C". All other terms and conditions of the May 18, 2010 contract between the City and Engineer, and of any amendments to that contract which are not specifically addressed herein shall remain in full force and effect. 2014-437 INDEXED 12/01/14 AMD. NO. 10 LNV Engineering Page 1 of 2 _7\6469 STAPLES STREET PHASE 2 BARRACUDA PLACE TO GOLLIHAR RD\AMD 10 LNV AMD NO 10 DOC • • • CITY C RPUS STI LNV , E IN 9 23 4/ Gustavo G nzalez, P.E (Date) D-n S. Leyendecker, P.E. Da e) Assistant ity Manager, 'resident 801 Navigation, Suite 300 Corpus Christi, TX 78408 RE •MM • DEd (361) 883-1984 Office 1\I I C I l[(-04-(41-- [ i (361) 883-1986 Fax I:rie H. Gray. E. (Date In -rim Executive Director of Public Works VilL Operating Depa ent (Da ) A ROVED AS TO LEGAL FORM � (4ikz (tS /CI egal Department (Date) APPROVED Project No. 6468 doldelio— Fund Source No. 550950-3548-052-170077 ��'�� by �� Fund Name: Street CIP Bond 2008 O ick of Management and Budget (Da" I Encumbrance No. ATTEST Psik."--CO• al.."-J2r". Rebecca Huerta, City Secretary AMD. NO. 10 Page 2 of 2 K:\ENGINEERING DATAEXCHANGE\ANGIEM\STREET\6469 STAPLES STREET PHASE 2 BARRACUDA PLACE TO GOLLIHAR RD\AMD 10 LNV\AMD NO 10 DOC . . . LNV Solutions Today with a engineers I architects I contractors Vision for Tomorrow March 4,2014 Ms.Natasha Fudge,P.E. Acting Assistant Director of Capital Construction Projects City of Corpus Christi P.O. Box 9277 Corpus Christi,Texas 78469-9277 Re: Amendment to Professional Services Contract Staples Street(Bond Issue 2008) Phase I —Brawner Parkway to Barracuda Place(No. 6468) Phase 2—Barracuda Place to Gollihar Road(No. 6469) Amendment No. 10—Construction Phase and Construction Observation Services Phase 1-Brawner Pkwy.To Barracuda Dear Ms.Fudge: Please allow this letter to serve as our formal request to amend our contract to include Basic and Additional Services as detailed in the attachments for the above referenced project. The fee for the additional services of Construction Phase and Construction Observation associated with this amendment is $27.090.00 for a total revised contract amount of$3,053,663.00. This amendment consists of additional services provided to our Staples Street Phase 1 contract. This amendment consists of providing additional Construction Phase and Construction Observation Services due to the extensions of construction time on the project and additional work added to the scope of work. An additional 168 calendar days were awarded to the Contractor during the construction phase via change orders for additional work within the project limits and some outside the project limits. The original contract for the Construction Phase (Original A/E Contract) and Construction Observation Services (Amendment No. 7) only consisted of providing services for a 14 month construction project. At project close out a total of 498 calendar days were used on the project for the Construction Phase. If you have any questions,please feel free to give me a call. Sincerely, NV BP ;, F 66 . D :n S.Leyendecker,P.E. 'resident / AMD. NO. 10 801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 78408 EXHIBIT"A" OFFICE 361.883.1984 I FAX 361.883.1986 I WWW.I.NVINC.COM Page 1 of 1 SUMMARY OF FEES I I ORIGINAL CONTRACT AMD.NO.1 AMD.NO.2 _ AMD.NO.3 AMD.NO.4 Staples Street,Phase 1 -Brawner to Barracuda(Project No.6468) I I Street Storm Water_ Water Wastewater Total Street Storm Water Street Street Basic Services 1 Preliminary Design Phase $87,274.80 $48,001.14 $5,818.32 $4,363.74 $145,458.00 $0.00• $0.00_ $0.00 $0.00 2 Design Phase 162,912.96 89,602.13 10,860.86 8,145.65 271,521.60, 0.00 0.00 0.00 0.00 3 Bid Phase 8,727.48 4,800.11 581.83 436.37 14 545.80 0.00 0.00 0.00 0.00 • 4 Construction Phase 28,364.76 15,600.62 1,890.98 1,418.24 47,274.60 0.00 0.00 0.00 0.00 Subtotal Basic Services 287,280.00 158,004.00 19,152.00 14,364.00 478,800.00 0.00 0.00 0.00 0.00 II _ Additional Services 1 Permit Prep TDLR 8,500.00 0.00 0.00 0.00 8,500.00 0.00 0.00 0.00 0.00 TCEQ-TPDES 0.00 1,500.00 0.00 0.00 1,500.00 0.00 0.00 0.00 0.00 USAGE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Subtotal Permit Prep 10,000.00 0.00 0.00 0.00 0.00 2 Right of Way Acquistition 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3 Topographic Survey 34,243.00 14,319.80 6,848.60 6,848.60 62,260.00 0.00 0.00 0.00 0.00 4 Construction Observation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 Warranty Phase 2,580.00 1,620.00 660.00 1,140.00 6,000.00 0.00 0.00 0.00 0.00 6 Public Meetings 6,450.00 4,050.00 1,650.00 2,850.00 15,000.00 0.00 0.00 0.00 0.00 7 Sanitary Sewer Investigation 0.00 0.00 0.00 146,500.00 146,500.00 0.00 0.00 0.00 0.00 8 Subsurface Utility Exploration 0.00 27,225.00 27,225.00 27,225.00 81,675.00 0.00 0.00 0.00 0.00 9 Franchise Utility Coordination 5,000.00 5,000.00 5,000.00 5,000.00 20,000.00 0.00 0.00 0.00 0.00 10 Off-Site Drainage 0.00 125,000.00 0.00 0.00 125,000.00 0.00 0.00 0.00 0.00 11 CCTV Existing Drainage Syst 0.00 0.00 0.00 0.00 0.00 0.00 16,200.00 0.00 0.00 12 Landscaping Design 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13 Hike and Bike Des qn 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services 56,773.00 178,714.80 41,383.60 189,563.60 466,435.00 0.00 16,200.00 0.00 0.00 II Total Authorized Fee 344,053.00 336,718.80 60,535.60 203,927.60 945,235.00 0.00 16,200.00 0.00 0.00 1I ORIGINAL CONTRACT AMD.NO.1 AMD.NO.2 AMD.NO.3 AMD.NO.4 Staples Street,Phase 2-Barracuda to Gollihar(Project No.6469) I I Street Storm Water Water Wastewater _ Total Street Storm Water Street Street Basic Services 1 Preliminary Design Phase 99,439.20 54 691.56 6,629.28 4,971.96 165,732.00 0.00 0.00 0.00 0.00 2 Design Phase 185,619.84 102,090.91 12,374.66 9,280.99 309,366.40 32,086.00 0.00 0.00 15,992.00 3 Bid Phase 9,943.92 5,469.16 662.93 497.20 16,573.20 0.00 0.00 0.00 0.00 4 Construction Phase 32,319.84 17,775.91 2,154.66 1,615.99 53,866.40 12,614.00 0.00 0.00 0.00 Subtotal Basic Services 327,322.80 180,027.54 21,821.52, 16,366.14 545,538.00 44,700.00 0.00 0.00 15,992.00 Il . _Additional Services _ rn 1 Permit Prep y e% > TDLR 8,500.00 0.00 0.00 0.00 8,500.00 0.00 0.00 0.00 0.00 cla _ 0 TCEQ-TPDES 0.00 1,500.00 0.00 0.00 1,500.00 0.00 0.00 0.00 0.00 W z USAGE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 p -I 0 Subtotal Permit Prep 10,000.00 0.00 0.00 0.00 0.00 Q' 00 0 SUMMARY OF FEES I ORIGINAL CONTRACT AMD.NO.1 _ AMD.NO.2 AMD.NO.3 AMD.NO.4 2 Right of Way Acquistition 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3 Topographic Survey 38,054.50 15,913.70 7,610.90 7,610.90 69,190.00 0.00 0.00 0.00 0.00 4 Construction Observation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 94,754.00 0.00 5 Warranty Phase 2,580.00 1,620.00 660.00 1,140.00 6,000.00 0.00 0.00 0.00 0.00 6 Public Meetings 6,450.00 4,050.00 1,650.00 2,850.00 15,000.00 0.00 0.00 0.00 0.00 7 Sanitary Sewer Investigation 0.00 0.00 0.00 88,000.00 88,000.00 0.00 0.00, 0.00 0.00 8 Subsurface Utility Exploration _ 0.00, 22,770.00 22,770.00 22,770.00 68,310.00 0.00, 0.00, 0.00 7,776.00 . 9 Franchise Utility Coordination 5,000.00 5,000.00 5,000.00, 5,000.00 20,000.00 0.00 0.00 0.00 1,408.00 10 Off-Site Drainage 0.00 125,000.00, 0.00 0.00 125,000.00 0.00 0.00 0.00 0.00 11 CCTV Existing Drainage Syst 0.00 0.00 0.00 0.00 0.00 0.00 16,200.00 0.00 0.00 12 Landscaping Design 0.00 0.00 0.00 0.00 0.00 0.00 0.00_ 0.00 0.00 13 Hike and Bike Design 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services 60,584.50 175,853.70 37,690.90 127,370.90 401,500.00 0.00 16,200.00 94,754.00 9,184.00 II Total Authorized Fee 387,907.30 355,881.24 59,512.42 143,737.04 947,038.00 44,700.00 16,200.00 94,754.00 25,176.00 II Combined Total I I Street Storm Water Water Wastewater Total Street Storm Water Street Street Basic Services 1 Preliminary Design Phase 186,714.00 102,692.70 12,447.60 9,335.70 311,190.00 0.00 0.00 0.00 0.00 2 Design Phase 348 532.80 191,693.04_ 23,235.52 17,426.64 580,888.00 32,086.00 0.00 0.00 15,992.00 3 Bid Phase , 18,671.40 10,269.27 1,244.76 933.57 31,119.00 0.00 0.00 0.00 0.00 4 Construction Phase 60,684.60 33,376.53 4,045.64 3,034.23 101,141.00 12,614.00 0.00 0.00 0.00 Subtotal Basic Services 614,602.80 338,031.54 40,973.52 30,730.14 1,024,338.00 44,700.00 0.00 0.00 15,992.00 Il _ Additional Services 1 Permit Prep TDLR 17,000.00 0.00 0.00 0.00 17,000.00 0.00 0.00 0.00 0.00 TCEQ-TPDES 0.00 3,000.00 0.00 0.00 3,000.00 0.00 0.00 0.00 0.00 USACE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Subtotal Permit Prep 20,000.00 0.00_ 0.00 0.00 0.00 2 Right of Way Acquistition 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3 Topographic Survey 72,297.50 30 233.50 14,459.50 14,459.50 131,450.00 0.00 0.00 0.00 0.00 4 Construction Observation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 94,754.00 0.00 5 Warranty Phase 5,160.00 3,240.00, 1,320.00 2,280.00 12,000.00 0.00 0.00 0.00 0.00 6 Public Meetings 12,900.00 8,100.00 3,300.00 5,700.00 30,000.00 0.00 0.00 0.00 0.00 7 Sanitary Sewer Investigation 0.00 0.00 0.00 234,500.00 234,500.00 0.00 0.00 0.00 0.00 8 Subsurface Utility Exploration 0.00 49,995.00 49,995.00, 49,995.00 149,985.00 0.00 0.00 0.00 7,776.00 9 Franchise Utility Coordination 10,000.00 10,000.00 10,000.00 10,000.00 40,000.00 0.00 0.00 0.00 1,408.00 10 Off-Site Drainage 0.00 250,000.00 0.00 0.00 250,000.00 0.00_ 0.00 0.00 0.00 11 CCTV Existing Drainage Syst 0.00 0.00 0.00 0.00 0.00 0.00 32,400.00 0.00 0.00 12 Landscaping Design 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13 Hike and Bike Design 0.00_ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00, Subtotal Additional Services _ 117,357.50 354,568.50 79,074.50 316,934.50 867,935.00 0.00 32,400.00 94,754.00 9,184.00 TotallAuthorized Fee $731,960.30 $692,600.04 $120,048.02 $347,664.64 $1,892,273.00 $44,700.00 $32,400.00 $94,754.00 $25,176.00 - 171 > 05/18/10 11/05/10 12/04/10 03/08/11 09/20/11 co 2 0 Motion No.M2010-118 Admin Approv Admin Approv M2011-063 Admin Approv N '71 ZO o) 9 8 SUMMARY OF FEES AMD.NO.5 AMD.NO.6 AMD.NO.7 AMD.NO.8 AMD.NO.9 AMD.NO.10 Staples Street,Phase 1 -Brawner to Barracuda(Project No.6468) I I Water Storm Water , Street Street _ Street Water Total Street Street Basic Services 1 Preliminary Design Phase $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00, $87,274.80 2 Design Phase 29,500.00 158,523.20 0.00 0.00 9,462.00 13,584.00 23,046.00 0.00 172,374.96 3 Bid Phase 0.00 6,340.80 0.00 0.00 0.00 0.00 0.00 0.00 8,727.48 4 Construction Phase 0.00 46,711.20 0.00 0.00 0.00 0.00 0.00 8,780.00 37,144.76 Subtotal Basic Services 29,500.00 211,575.20 0.00 0.00 9,462.00 13,584.00 23,046.00 8,780.00 305,522.00 II _ Additional Services 1 Permit Prep TDLR 0.00 4,102.40 0.00 0.00 0.00 0.00 0.00 0.00 8,500.00 TCEQ-TPDES 0.00 4,567.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 USACE 0.00 8,256.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Subtotal Permit Prep 0.00 16,926.40 0.00, 0.00 0.00 0.00 0.00 0.00 2 Right of Way Acquistition 0.00 36,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3 Topographic Survey 0.00 42,272.80 0.00 0.00 0.00 0.00 0.00 0.00 34,243.00 4 Construction Observation 0.00 126,818.40 98,560.00 0.00 0.00 0.00 0.00 18,310.00 116,870.00 5 Warranty Phase 0.00 5,284.00 0.00 0.00 0.00 0.00 0.00 0.00 2,580.00 6 Public Meetings 0.00 19,600.00 0.00 0.00 0.00_ 0.00 0.00 0.00 6,450.00 7 Sanitary Sewer Investigation 0.00 36,800.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 Subsurface Utility Exploration 0.00 49,600.00 0.00 0.00, 0.00 0.00 0.00 0.00 0.00 9 Franchise Utility Coordination 0.00 12,694.40 0.00 0.00 0.00 0.00 0.00 0.00 5,000.00 10 Off-Site Drainage 0.00, 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11 CCTV Existing Drainage Syst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12 Landscaping Design 0.00 24,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13 Hike and Bike Design 0.00 25,600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services 0.00 395,596.00 98,560.00 0.00 0.00 0.00 18,310.00 173,643.00 Total Authorized Fee 29,500.00 607,171.20 98,560.00 0.00 9,462.00 13,584.00 23,046.00 27,090.00 479,165.00 AMD.NO.5 AMD.NO.6 AMD.NO.7 AMD.NO.8 AMD.NO.9 AMD.NO.8 Staples Street,Phase 2-Barracuda to Gollihar(Project No.6469) I I Water Storm Water Street _ Street Street Water Total Street Street Basic Services 1 Preliminary Design Phase 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 99,439.20 2 Design Phase 0.00 39,630.80+ 0.00 0.00 0.00 0.00 0.00 0.00 233,697.84 3 Bid Phase 0.00 1,585.20, 0.00 0.00 0.00 0.00 0.00 0.00 9,943.92 4 Construction Phase 0.00 11,677.80 0.00, 0.00 0.00 0.00 0.00 0.00 44,933.84 Subtotal Basic Services 0.00 52,893.80 0.00 0.00 0.00 0.00 0.00, 0.00 388,014.80 Additional_ Services _ -n M > 1 Permit Prep 2 0 TDLR 0.00_ 1,025.60 0.00 0.00 0.00 0.00 0.00 0.00 8,500.00 ca TCEQ-TPDES 0.00 1,141.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 W USACE 0.00 2,064.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 p ! 0 Subtotal Permit Prep 0.00 4,231.60 0.00 0.00 0.00 0.00 0.00 0.00 o) 6 8 SUMMARY OF FEES I AMD.NO.5 AMD.NO.6 AMD.NO.7 AMD.NO.8 AMD.NO.9 AMD.NO.10 2 Right of Way Acquistition 0.00 9,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3 Topographic Survey 0.00 10,568.20 0.00 0.00 0.00 0.00 0.00 0.00 38,054.50 4 Construction Observation 0.00 31,704.60 0.00 27,200.00 0.00 0.00 0.00 0.00 121,954.00 5 Warranty Phase 0.00 1,321.00 0.00 0.00, 0.00 0.00 0.00 0.00 2,580.00 6 Public Meetings 0.00 4,900.00 0.00 0.00 0.00 0.00 0.00 0.00 6,450.00 7 Sanitary Sewer Investigation 0.00 9,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 Subsurface Utility Exploration 0.00 12,400.00 0.00 0.00 0.00 0.00 0.00 0.00 7,776.00 . 9 Franchise Utility Coordination 0.00 3,173.60 0.00 0.00 0.00 0.00 0.00 0.00 6,408.00 10 Off-Site Drainage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11 CCTV Existing Drainage Syst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12 Landscaping Design 0.00 6,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13 Hike and Bike Design 0.00 6,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services 0.00 98,899.00 0.00 27,200.00 0.00 0.00 0.00 0.00 191,722.50 Il Total Authorized Fee 0.00 151,792.80 0.00 27,200.00 0.00 0.00 0.00 0.00 579,737.30 I Combined Total I IWater Storm Water Street _ Street Street Water Total Street Street Basic Services 1 Preliminary Design Phase 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 186,714.00 2 Design Phase 29,500.00 198,154.00, 0.00 0.00 9,462.00 13,584.00 23,046.00 0.00 406,072.80 3 Bid Phase 0.00 7,926.00 0.00 0.00 0.00 0.00 0.00 0.00 18,671.40 4 Construction Phase 0.00 58,389.00_ 0.00 0.00 0.00 0.00 0.00 8,780.00 82,078.60 Subtotal Basic Services 29,500.00 264,469.00 0.00 0.00 9,462.00 13,584.00 23,046.00 8,780.00 693,536.80 II _ Additional Services 1 Permit Prep TDLR 0.00 5,128.00 0.00 0.00 0.00 0.00 0.00 0.00 17,000.00 TCEQ-TPDES 0.00 5,709.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 USACE 0.00 10,321.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Subtotal Permit Prep 0.00 21,158.00 0.00 0.00 0.00 0.00 0.00 0.00 17,000.00 2 Right of Way Acquistition 0.00 45,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3 Topographic Survey 0.00 52,841.00 0.00 0.00 0.00 0.00 0.00 0.00 72,297.50 4 Construction Observation 0.00 158,523.00 98,560.00 27,200.00 0.00 0.00 0.00 18,310.00 238,824.00 5 Warranty Phase 0.00 6,605.00 0.00 0.00 0.00 0.00 0.00 0.00 5,160.00 6 Public Meetings 0.00 24,500.00 0.00 0.00 0.00 0.00 0.00 0.00 12,900.00 7 Sanitary Sewer Investigation 0.00 46,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 Subsurface Utility Exploration 0.00 62,000.00 0.00 0.00 0.00 0.00 0.00 0.00 7,776.00 9 Franchise Utility Coordination 0.00 15,868.00 0.00 0.00 0.00 0.00 0.00 0.00 11,408.00 10 Off-Site Drainage 0.00 0.00 0.00 0.00 0.00, 0.00 0.00 0.00 0.00 11 CCTV Existing Drainage Syst 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12 Landscaping Design 0.00 30,000.00 0.00 0.00 0.00 0.00, 0.00 0.00 0.00 13 Hike and Bike Design 0.00 32,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services 0.00 494,495.00 98,560.00 27,200.00 0.00 0.00 0.00 18,310.00 365,365.50 II Total Authorized Fee $29,500.00 $758,964.00 $98,560.00 $27,200.00 $9,462.00 $13,584.00 $23,046.00 $27,090.00 $1,058,902.30 . M D 12/06/11 01/17/12 05/22/12 07/29/13 08/26/13 co = G Admin Approv M2012-011 M2012-098 Admin Approv Admin Approv Admin Approv A W Z p q 0 cb m 8 SUMMARY OF FEES I I TOTAL Staples Street,Phase 1-Brawner to Barracuda(Project No.6468) I I Storm Water Water Wastewater Total Basic Services 1 Preliminary Design Phase $48,001.14 $5,818.32 $4,363.74 $145,458.00 2 Design Phase 248,125.33 53,944.86 8,145.65 482,590.80 3 Bid Phase 11,140.91 581.83 436.37 20,886.60 • 4 Construction Phase 62,311.82 1,890.98 1,418.24 102,765.80 Subtotal Basic Services 369,579.20 62,236.00 14,364.00 751,701.20 I I Additional Services 1 Permit Prep TDLR 4,102.40 0.00 0.00 12,602.40 TCEQ-TPDES 6,067.20 0.00 0.00 6,067.20 USACE 8,256.80 0.00 0.00 8,256.80 Subtotal Permit Prep 2 Right of Way Acquistition 36,000.00 0.00 0.00 36,000.00 3 Topographic Survey 56,592.60 6,848.60 6,848.60 104,532.80 4 Construction Observation 126,818.40 0.00 0.00 243,688.40 5 Warranty Phase 6,904.00 660.00 1,140.00 11,284.00 6 Public Meetings 23,650.00 1,650.00 2,850.00 34,600.00 7 Sanitary Sewer Investigation 36,800.00 0.00 146,500.00 183,300.00 8 Subsurface Utility Exploration 76,825.00 27,225.00 27,225.00 131,275.00 9 Franchise Utility Coordination 17,694.40 5,000.00 5,000.00 32,694.40 10 Off-Site Drainage 125,000.00 0.00 0.00 125,000.00 11 CCTV Existing Drainage Syst 16,200.00 0.00 0.00 16,200.00 12 Landscaping Design 24,000.00 0.00 0.00 24,000.00 13 Hike and Bike Design 25,600.00 0.00 0.00 25,600.00 Subtotal Additional Services 590,510.80 41,383.60 189,563.60 995,101.00 Il Total Authorized Fee 960,090.00 103,619.60 203,927.60 1,746,802.20 II TOTAL Staples Street,Phase 2-Barracuda to Gollihar(Project No.6469) I I Storm Water Water Wastewater Total Basic Services 1 Preliminary Design Phase 54,691.56 6,629.28 4,971.96 165,732.00 2 Design Phase 141,721.71 12,374.66 9,280.99 397,075.20 3 Bid Phase 7,054.36 662.93 497.20 18,158.40 4 Construction Phase 29,453.71 2,154.66 1,615.99 78,158.20 Subtotal Basic Services 232,921.34 21,821.52 16,366.14 659,123.80 II ,111, Additional Services 1 Permit Prep fm x 3 TDLR 1,025.60 0.00 0.00 9,525.60 co = D TCEQ-TPDES 2,641.80 0.00 0.00 2,641.80 . W z USACE 2,064.20 0.00 0.00 2,064.20 • C P Subtotal Permit Prep CO o SUMMARY OF FEES I TOTAL 2 Right of Way Acquistition 9,000.00 0.00 0.00 9,000.00 3 Topographic Survey 26,481.90 7,610.90 7,610.90 79,758.20 4 Construction Observation 31,704.60 0.00 0.00 153,658.60 5 Warranty Phase 2,941.00 660.00 1,140.00 7,321.00 6 Public Meetings 8,950.00 1,650.00 2,850.00 19,900.00 7 Sanitary Sewer Investigation 9,200.00 0.00_ 88,000.00 97,200.00 8 Subsurface Utility Exploration 35,170.00 22,770.00 22,770.00 88,486.00 . 9 Franchise Utility Coordination 8,173.60 5,000.00 5,000.00 24,581.60 10 Off-Site Drainage 125,000.00 0.00 0.00 125,000.00 11 CCTV Existing Drainage Syst 16,200.00 0.00 0.00 16,200.00 12 Landscaping Design 6,000.00 0.00 0.00 6,000.00 13 Hike and Bike Design 6,400.00 0.00 0.00 6,400.00 Subtotal Additional Services 290,952.70 37,690.90 127,370.90 647,737.00 Total Authorized Fee 523,874.04 59,512.42 143,737.04 1,306,860.80 Combined Total I I Storm Water Water Wastewater Total Basic Services 1 Preliminary Design Phase 102,692.70 12,447.60 9,335.70 311,190.00 2 Design Phase 389,847.04 66,319.52 17,426.64 879,666.00 3 Bid Phase 18,195.27 1,244.76 933.57 39,045.00 4 Construction Phase 91,765.53 4,045.64 3,034.23 180,924.00 Subtotal Basic Services 602,500.54 84,057.52 30,730.14 1,410,825.00 Additional Services 1 Permit Prep TDLR 5,128.00 0.00 0.00 22,128.00 TCEQ-TPDES 8,709.00 0.00 0.00 8,709.00 USACE 10,321.00 0.00 0.00 10,321.00 Subtotal Permit Prep 24,158.00 0.00 0.00 41,158.00 2 Right of Way Acquistition 45,000.00 0.00 0.00 45,000.00 3 Topographic Survey 83,074.50 14,459.50 14,459.50 184,291.00 4 Construction Observation 158,523.00 0.00 0.00 397,347.00 5 Warranty Phase 9,845.00 1,320.00 2,280.00 18,605.00 6 Public Meetings 32,600.00 3,300.00 5,700.00 54,500.00 7 Sanitary Sewer Investigation 46,000.00 0.00 234,500.00, 280,500.00 8 Subsurface Utility Exploration 111,995.00 49,995.00 49,995.00 219,761.00 9 Franchise Utility Coordination 25,868.00 10,000.00 10,000.00 57,276.00 10 Off-Site Drainage 250,000.00 0.00 0.00 250,000.00 11 CCTV Existing Drainage Syst 32,400.00 0.00 0.00 32,400.00 12 Landscaping Design 30,000.00 0.00 0.00 30,000.00 13 Hike and Bike Design 32,000.00 0.00 0.00 32,000.00 Subtotal Additional Services 881,463.50 79,074.50 316,934.50 1,642,838.00 Total Authorized Fee $1,483,964.04 $163,132.02 $347,664.64 $3,053,663.00 . um▪ = v o• -0 -IZ ° o Sample form for: COMPLETE PROJECT NAME Payment Request Revised 07/27/00 Project No. XXXX Invoice No. 12345 Invoice Date: Total Amount Previous Total Percent Basic Services: Contract Amd No. 1 Amd No. 2 Contract Invoiced Invoice Invoice Complete Preliminary Phase $1,000 $0 $0 $1,000 $0 $1,000 $1,000 100% Design Phase 2,000 1,000 0 3,000 1,000 500 1,500 50% Bid Phase 500 0 250 750 0 0 0 0% Construction Phase 2,500 0 1,000 3,500 0 0 0 0% Subtotal Basic Services $6,000 $1,000 $1,250 $8,250 $750 $1,500 $2,500 30% Additional Services: Permitting $2,000 $0 $0 $2,000 $500 $0 $500 25% Warranty Phase 0 1,120 0 1,120 0 0 0 0% Inspection 0 0 1,627 1,627 0 0 0 0% Platting Survey TBD TBD TBD TBD TBD TBD TBD 0% O & M Manuals TBD TBD TBD TBD TBD TBD TBD 0% SCADA TBD TBD TBD TBD TBD TBD TBD 0% Subtotal Additional Services $2,000 $1,120 $1,627 $4,747 $500 $0 $500 11% Summary of Fees Basic Services Fees $6,000 $1,000 $1,250 $8,250 $750 $1,500 $2,500 30% Additional Services Fees 2,000 1,120 1,627 4,747 500 0 500 11% Total of Fees $8,000 $2,120 $2,877 $12,997 $1,250 $1,500 $3,000 23% go Co = v - --63 z Oh O - no • 11.1.1:2 SUPPLIER NUMBER TO BE ASSIGNED BY CII Y PURCHASING DIVISION CITY OF CORPUS CHRISTI corpuuss City DISCLOSURE OF INTEREST Chnsti City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business with the City to provide the following information. Everyquestion must be answered. If the question is not applicable, answer with "NA". See reverse side for Filing Requirements, Certifications and definitions. COMPANY NAME: LNV,INC. P.O.BOX: N/A CORPUS 78408 STREET ADDRESS: 801 NAVIGATION,SUITE 300 CITY: CHRISTI ZIP: FIRM IS: I. Corporation r✓ 2. Partnership 3. Sole Owner ❑ 4. Association 5. Other _ DISCLOSURE QUESTIONS If additional space is necessary, please use the reverse side of this page or attach separate sheet. 1. State the names of each `employee" of the Cityof Corpus Christi having an "ownership interest"constituting 3%or more of the ownership in the above named"firm.' Name Job Title and City Department(if known) t•I/A 2. State the names of each "official"of the City of Corpus Christi having an"ownership interest" constituting 3%or more of the ownership in the above named"firm." Name Title 3. State the names of each "board member" of the City of Corpus Christi having an "ownership interest"constituting 3%or more of the ownership in the above named"firm." Name Board, Commission or Committee Ai/P, 4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi who worked on any matter related to the subject of this contract and has an `ownership interest"cons luting 3%or more of the ownership in the above named"firm." Name Consultant FILING REQUIREMENTS If a person who requests official action on a matter knows that the requested action will confer an economic benefit on any City official or employee that is distinguishable from the effect that the action will have on members of the public in general or a substantial segment thereof,you shall disclose that fact in a signed writing to the City official,employee or body that has been requested to act in the matter,unless the interest of the City official or employee in the matter is apparent. The disclosure shall also be made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2-349(d)] CERTIFICATION I certify that all information provided is true and correct as of the date of this statement, that I have not knowingly withheld disclosure of any information requested; and that supplemental statements will be promptly submitted to the City of Corpus Christi,Texas as changes occur. Certifying Person: DAN S.LEYENDE R,P.E. Title: PRESIDENT (Type or Print) Signature of Certifying • y , Date: Person: DEFINITIONS a. "Board member." A member of any board, commission, or committee appointed by the City Council of the City of Corpus Christi,Texas. b. "Economic benefit". An action that is likely to affect an economic interest if it is likely to have an effect on that interest that is distinguishable from its effect on members of the public in general or a substantial segment thereof. c. "Employee." Any person employed by the City of Corpus Christi,Texas either on a full or part-time basis,but not as an independent contractor. d. "Firm." Any entity operated for economic gain, whether professional, industrial or commercial, and whether established to produce or deal with a product or service, including but not limited to, entities operated in the form of sole proprietorship, as self-employed person, partnership, corporation,joint stock company,joint venture, receivership or trust,and entities which for purposes of taxation are treated as non-profit organizations. e. "Official." The Mayor, members of the City Council, City Manager, Deputy City Manager, Assistant City Managers, Department and Division Heads, and Municipal Court Judges of the City of Corpus Christi,Texas. f. "Ownership Interest." Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent, trust, estate, or holding entity. "Constructively held" refers to holdings or control established through voting trusts, proxies,or special terms of venture or partnership agreements." g. "Consultant."Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the purpose of professional consultation and recommendation.