HomeMy WebLinkAboutC2016-047 - 2/12/2016 - NA CITY OF CORPUS CHRISTI AMENDMENT NO. 3 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas, a Texas home-rule municipal corporation ("City") and LJA Engineering, Inc. ("Consultant"), agree to the following amendments to the Contract for Professional Services for Williams Drive Improvements Phase 3 (Project No. E11116): Original Contract February 21, 2012 Motion No. 2012-038 $959,995.00 Amendment No. 1 October 15, 2013 Administrative Approval $3,000.00 • Amendment No. 2 January 20, 2015 Administrative Approval $0.00 In the Original Contract, Exhibit "A", Section I. Scope of Services shall be amended as set forth in the attached Amendment No. 3, Exhibit "A". In the Original Contract, Section III shall be amended based on the modified scope of services in the attached Amendment No. 3, Exhibit "A" for a fee not to exceed $0.00, for a total restated fee not to exceed $962,995.00. All other terms and conditions of the February 21, 2012 Contract for Professional Services between the City and Consultant, and of any amendments to that contract,which are not specifically addressed herein shall remain in full force and effect. Gl CI OF • • 'PY I RISTI 9'--M/,'' ' LJA N�IN R G, I V I rie H. Gr: P.E at Patrick . etet P. . Dae Executive Director o Public'Works Vice President 820 Buffalo Street Corpus Christi, TX 78401 RECOMMENDED 361-887-8851 Office ___ 2—"--1-2-,1(71 ,6) -- Z--r/ Operating Deparment at APPROVED AS TO LEGAL FORM akau_A W-e-e 11,,-Ate-c:x Assistant City Attorney Date APPRO ED . l til,— 4 c1 1, Offic of anagement Ily and Budget ATTEST I 3( /14 2016-044 7 2/12/16 Date WILLIAMS DRIVE IMPROVEMENTS PHASE 3\AMENDMENT 3 LJA\2015-1001 AMENDMENT TO CONTRACT PROFESSIONAL LJA Engineering Inc. REV 10/1/15 INDEXED • LJA Engineering, Inc. LJA 820 Buffalo St Phone 361 887 8851 Corpus Christi TX 78401 Fax 361 887 8855 w:w ijaenyrneerrng corn TBPE Nc F 1386 TBPLS No 10016600 November 6, 2015 City of Corpus Christi Engineering Services P. O. Box 9277 Corpus Christi, Texas 78469-9277 Attn: Mr. Chris Hale, P.E. Project Manager Re: Engineering Services Agreement Between City of Corpus Christi and LJA Engineering, Inc. Williams Drive Improvements Phase 3— Staples Street to Airline Road City Project No: E11116 Revised Contract Amendment No. 3 — Add'I Construction Administration Funds LJA Project No. C007-12010 Dear Mr. Hale: I. TIME & MATERIALS CONSTRUCTION ADMINISTRATION BUDGET As requested, we have prepared this contract amendment to remove Basic Services: CONSTRUCTION PHASE and create Additional Services: CONSTRUCTION PHASE ASSISTANCE, a Time and Materials contract line item to provide the City with assistance, as requested, during construction. With the creation of Additional Service: CONSTRUCTION PHASE ASSISTANCE, all requirements of Basic Services: CONSTRUCTION PHASE are removed from the Contract, including provision of a Certificate of Completion and preparation of Record Drawings. With this contract amendment, LJA also proposes to create an Additional Service for the preparation of Record Drawings at the completion of construction. Under Additional Services: CONSTRUCTION PHASE ASSISTANCE, LJA will provide assistance to the City during construction, as requested. Requests for services shall be submitted to LJA via email from City staff (Construction Inspection or Engineering Services), including Calendar Meeting Requests. Verbal requests for services must be followed by an email to LJA prior to action being taken by LJA. Receipt of email requests, or Calendar Meeting requests, from City Staff shall be considered by LJA as Authorization to Proceed on the requested services. Services provided under this line item shall be invoiced to the City monthly based upon the attached Table 1 —Rate Schedule and shall include time spent during the invoicing period. If it is apparent that additional efforts will be required beyond the estimated Contract budget after 75% of the estimated budget for this Line Item has been spent, LJA will prepare a Contract Amendment for additional fees based upon an estimate of the amount of effort remaining to complete the Project. Work will not proceed beyond the approved budget. The following services are excluded from this Contract: a) Preparation of change orders; b) Review of shop drawings. (This does not exclude review of material submittals, if requested.); c) Review/approval of Contractor pay requests; and d) Preparation of a Certificate of Completion at the end of the Project. AMD. NO. 3 EXHIBIT "A" Page 1 of 3 Mr.Chris Hale, P.E. Williams Drive Improvements Phase 3 November 6, 2015 Revised Contract Amend. No.3 (City Project No: E11116) Under Additional Services: PREPARATION OF RECORD DRAWINGS, LJA will provide the following services: Review Contractor-provided construction red-line" drawings. Prepare Project record drawings and provide a reproducible set and electronic file (AutoCAD r.14 or later) within two (2) months of final acceptance of the project. All drawings shall be CADD drawn using dwg format in AutoCAD, and graphics data will be in dxf format with each layer being provided in a separate file. Attribute data will be provided in ASCII format in tabular form. All electronic data will be compatible with the City GIS system. II. BASIS OF COMPENSATION LJA proposes to perform CONSTRUCTION PHASE ASSISTANCE services on a Time and Materials basis with an estimated budget of$105,000. LJA proposes to perform PREPARATION OF RECORD DRAWINGS services for a Fixed Fee of $11,000. To create the funds for these two (2) new Additional Services, LJA proposes to reallocate funds from Basic Services: CONSTRUCTION PHASE and Additional Services: CONSTRUCTION OBSERVATION SERVICES as shown in the attached Amendment No. 3, Exhibit "A" Summary of Fees, thereby making this a zero dollar contract amendment. III. SCHEDULE OF PAYMENT Invoices shall be prepared, submitted and paid on a monthly basis in accordance with the original contract. Invoices will be based upon engineering efforts spent at the time of invoicing. IV. OWNERSHIP OF DOCUMENTS Original documents and construction plans belong to, and remain the property of the Client, provided that the Engineer has received full compensation due, in consideration of which it is mutually agreed that the Client will use them solely in connection with the Project, except with the express consent of the Engineer. The Engineer may retain reproducible copies of such documents. Originals of the recorded plat and field books remain the property of the Engineer and the Client may request copies be made at his expense. Contract Amendment No. 3 documents are attached. We appreciate the opportunity to provide these engineering services to you. If you have any questions regarding this Contract Amendment, or need any additional information, please do not hesitate to contact me at (361) 887-8851. Best Regards, _ Patrick . et to, .E. Date Vice Presidet >t D. Sco t pones, P.E. Date Project Manager PDV/DSJ/dcr Attachment AMD. NO. 3 EXHIBIT "A" Page 2 of 3 WILLIAMS DRIVE IMPROVEMENTS PHASE 3 STAPLES STREET TO AIRLINE ROAD (Project No. E11116) SUMMARY OF FEES ORIGINAL Fees CONTRACT AMD.NO.1 AMD.NO.2 AMD.NO.3 TOTAL Basic Services 1 Preliminary Pnase 581.272.00 $0.00 50 00 $3 00 $81,272.00 2 Design Phase 5290.117.00 50.00 53 00 5000 5290.117 00 3 Bid Phase 512,128.00 50.00 30 00 53 03 512,128.00 4 Construction Phase 581.060.00 50.00 5.3 00 $21.060 00 Subtotal Basic Services Fee 5464,577.00 $0.00 50.00 -$60,000.00 5404,577.00 Additional Services(Allowance) 1 Permitting(Authorized) TxDOT Permitting(Authorized) 58 720.00 SO 00 50.00 53.00 58.720.00 TDLR Registration(Authorized) $3.580.00 $0.00 $000 33 00 53.580.00 2 Right-of-Way(ROW)Venlication Survey(Authorized) 510.960,00 50.00 50 00 SO 00 510 960.00 3 Topograph c Survey(Authorized) 540.440.00 50.00 50.00 50,00 $40,440.00 4 Subsurface Utility Exploration(S.U.E.)(Authorized) 5.17.440.00 $0.00 SO 00 SO.00 547.440 00 5 Public Meetings(4 Meetings)(Authorized) $16.960.00 S0.00 $0.00 50 00 516.960.00 6 Environmental Issues(Authorized) 553.963.00 $0.00 50.00 50.00 553,983.00 7 Construction Observation Services 5249.600.00 $0.00 7 $105.820.00 8 Warranty Phase(Authorized) 52.210.00 50.00 50.00 $0.00 $2.210.00 9 Existing Box Culvert Evaluation 8 Rehabilitation(Authorized) 540 920.00 $0.00 50.00 50.00 S40,920.00 10. Drainage Study(Authorized) $17,705.00 $0.00 50.00 50.00 S17,705,00 11 Sturmwater Pollution Prevention Plan(Authorized) $2,920.00 $0.00 50.00 $0.00 52,920.00 12 Additional Wastewater Design in Airline Road Intersection (Authorized) $0.00 $3,000.00 50.00 50.00 $3.000.00 13. Revise Construction Documents to Add Project Alternates (Authorized) $0.00 S0.00 $74,240.00 $0.00 574.240.00 14. Re-Bid Phase(Authorized) 50.00 50.00 $13.540.00 50.00 S13,540.00 15. Construction Phase Assistance(Authorized) SO 00 $0.00 $0.00 $105.000.00 S105.000.00 16 Preparation of Record Drawings(Authorized) $0.00 SO 00 $0.00 511.000.00 S11,000.00 Subtotal Additional Services Fee $495,418.00 $3,000.00 $0.00 $60,000.00 5558,418.00 Total Foes $959,995.00 53,000.00 S0.00 $0.00 $962.995.00 AMD. NO. 3 EXHIBIT "A" Page 3 of 3