Loading...
HomeMy WebLinkAboutC2016-115 - 3/28/2016 - NA , 1 CITY OF CORPUS CHRISTI AMENDMENT NO. 2 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi,Texas, a Texas home-rule municipal corporation (YCity )11 and Martinez,Guy&Mavbikt Um.("Consultant"), agree to the following amendments to the Contract for Professional Services for Carroll Lane from Houston to McArdle BOND 2014(Project No. El 3097): Original Contract February 11, 2014 Ordinance No. 030087 $534,420.00 Amendment No. 1 March 2, 2016 Administrative Approval $33,530.00 In the Original Contract, Exhibit"A", Section I. Scope of Services shall be amended as set forth in the attached Amendment No. 2, Exhibit"A". In the Original Contract, Section III shall be amended based on the modified scope of services in the attached Amendment No. 2, Exhibit "A" for a fee not to exceed $13,500.00, for a total restated fee not to exceed $581,450.00. All other terms and conditions of the February 11, 2014 Contract for Professional Services between the City and Consultant, and of any amendments to that contract,which are not specifically addressed herein shall remain in full force and effect. CITY OF CARPC ` - TI A TINEZ,GUY& YBIK, INC. LQ) - ._ 1 1 7 �/t� A 12t3Aifho V H. Gray, E. Date icardo Marti ez, E. Date Ex- utive Director of '•ublic Works resident 6000 S. Sta I Street., Suite 207 Corpus Christi, TX 78413 361-814-3070 Office APPROVED AS TO LEGAL FORM Aimee Alcorn-Reed 2016.03.2416:58:43-05'00' Assistant City Attorney Date ATTEST RQica- e..4-11APAI 4--/7/I City Secretary Date Project No. E13097 Accounting Unit: 3494-043 Account 550950 Activity: El 3097013494EXP ti Account Category: 50920 2016-115 Fund Name: Storm Water CIP 2012A Rev. Bonds 3/28/16 Encumbrance No. Martinez Guy& Maybik Inc. INDEXED /CARROLL FROM HOUSTON TO MCARDLE BOND ISSUE 20141AMENOMENT 2 MGM,2015-1001 AMENDMENT TO CONTRACT MARTINEZ,GUY &MAYBIK,INC. ENGINEERS&SURVEYORS 6000 S.Staples Suite 207 February 2,2016 Corpus Christi,Texas 78413 361-814-3070 •Fax 1-888-653-5510 Corpus Christ Houston Eagle Pass/Del Rio Asa Ruben T. Perez,Jr.,P.E. Project Manager-MGM, Inc. 6000 South Staples St,Suite 207 Corpus Christi,Texas 78413 Chris Hale, P.E. Project Manager-City of Corpus Christi Engineering Services P.O. Box 9277 Corpus Christi,Texas 78469 SUBJECT: Carroll Lane from Houston to McArdle(Bond 2014) Project No.E13097 Amendment No.2 Dear Mr. Hale, As a result of the City's directive given subsequent to the project's Public Meeting held on January 25, 2016, please accept this letter as our proposal to perform the additional professional services desired in developing the Carroll Lane from Houston to McArdle project. Additional Work Description and Backa round information MGM requests this amendment due to additional scope of work created by the directive given by City Staff, in coordination with Corpus Christi Metropolitan Planning Organization (CCMPO) Staff, as a result of the Public Meeting held on January 25, 2016. The new directive relates to on-street parking lanes along Carroll Lane as they relate to bicycle facilities. Prior to the Public Meeting, MGM had reached the 60% submittal stage for the work included in Amendment No. 1, which included a different configuration for parking lanes and bicycle facilities along the project corridor(on-street parking lanes on both sides of Carroll Lane, and a 9' wide tied shared use bicycle/pedestrian path on each side of the roadway). The directive given subsequent to the Public Meeting changed the roadway typical section configuration to include on-street parking on only one side of the roadway, and a 10' untied shared use bicycle/pedestrian path on each side with a 2' buffer between the back of curb and path. This change caused additional scope of services as described below: AMD. NO. 2 EXHIBIT"A" Page 1 of 5 .. s Additional Scope of Services: 1. Preliminary Phase • No additional services 2. Design Phase • Stormwater Design Adiustments- In conjunction with the pavement width change required to change the typical section as described above, the stormwater design requires corresponding adjustments to match the new roadway width. Inlet locations and length of pipe runs affect the hydraulic design. • Revision of Plan Sheets- The change of street typical section requires each plan sheet to be revised to appropriately identify the street elements in plan view. Plan & Profile sheets, Stormwater Sheets, Typical Section Sheets, Traffic Control Plan Sheets, SW3P Sheets, and various other sheets and details must be revised due to the pavement width change. 3. Bid Phase • No additional services 4. Construction Phase • No additional services ADDITIONAL SERVICES Schedule: Please note any changes to the schedule. 1. Preliminary Phase Submittal Due No change 2. Design Phase: 30%Submittal Due No change 60%Submittal Due February 29, 2016 100%Bid Documents Due May 6,2016 3. Bid Phase June 3, 2016 4. Construction Phase Until Final Acceptance by City AMD. NO.2 EXHIBIT"A" Page 2 of 5 p v' Summary of A/E Fees Original Amendment Amendment Basic Services Fees Contract No. 1 No. 2 Total 1. Preliminary Phase $117,640.00 $0.00 $0.00 $117,640.00 2. Design Phase $193,100.00 $27,960.00 $13,500.00 $221,060.00 3. Bid Phase $10,810.00 $0.00 $0.00 $10,810.00 4. Construction Administration Phase $61,570.00 $0.00 $0.00 $61,570.00 Subtotal Basic Services Fees $383,120.00 $27,960.00 $13,500.00 $424,580.00 Additional Services Fees 1. Permit Preparation $14,120.00 $0.00 $0.00 $14,120.00 2. ROW Acquisition Survey None $0.00 $0.00 None Anticipated Anticipated 3.Topographic Survey and Parcel $57,350.00 $5,570.00 $.00 $62,920.00 Descriptions 4. Environmental Issues $2,110.00 $0.00 $0.00 $2,110.00 5. Public Involvement $12,300.00 $0.00 $0.00 $12,300.00 6. Subsurface Utility Investigation ' $57,320.00 . $0.00 $0.00 $57,320.00 7. Construction Observation Services To Be $0.00 $0.00 To Be Determined Determined 8.Warranty Phase $8,100.00 $0.00 $0.00 $8,100.00 Sub-Total Additional Services Fees $151,300.00 $5,570.00 $0.00 $156,870.00 Authorized Total Authorized Fee $534,420.00 $33,530.00 $13,500.00 $581,450.00 Ordinance Admin Approval Admin 030087 (Pending, Approval 2/11/2014 Submitted (Current Approved By: 1/18/2016) Request) i incer=1y, / J ' L inn Officer Entitle, to E er C% racts Ricardo Martinez, -.E. President, MGM, . AMD. NO.2 , EXHIBIT"A" Page 3 of 5 CARROLL LANE FROM HOUSTON TO MCARDLE Project No. E13097 BOND ISSUE 2014 SUMMARY OF FEES Original Contract Amendment No. 1 Street Wastewater Storm Water Water Total Street Wastewater Storm Water Water Total Basic Services Fees 1 Preliminary Phase $58,820.00 $15,293.20 $29,410.00 $14,116.80 117,640.00 $0.00 $0.00 $0.00 $0.00 $0.00 2 Design Phase 96,550.00 25,103.00 48,275.00 23,172.00 193,100.00 13,980.00 3,634.80 6,990.00 3,355.20 27,960.00 3 Bid Phase 5,405.00 1,405.30 2,702.50 1,297.20 10,810.00 0.00 0.00 0.00 0.00 0.00 4 Construction Administration Phase 30,785.00 8,004.10 15,392.50 7,388.40 61,570.00 0.00 0.00 0.00 0.00 0.00 Subtotal Basic Services Fees 191,560.00 49,805.60 95,780.00 45,974.40 383,120.00 13,980.00 3,634.80 6,990.00 3,355.20 27,960.00 Additional Services Fees (Allowance) 1 Pemit Preparation 14,120.00 0.00 0.00 0.00 14,120.00 0.00 0.00 0.00 0.00 0.00 2 ROW Acquisition Survey 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3 Topographic Survey and Parcel Descriptions 28,675.00 7,455.50 14,337.50 6,882.00 57,350.00 2,785.00 724.10 1,392.50 668.40 5,570.00 4 Environmental lssues 1,055.00 274.30 527.50 253.20 2,110.00 0.00 0.00 0.00 0.00 0.00 5 Public Involvement 6,150.00 1,599.00 3,075.00 1,476.00 12,300.00 0.00 0.00 0.00 0.00 0.00 6 Subsurface Utility Investigation 28,660.00 7,451.60 14,330.00 6,878.40 57,320.00 0.00 0.00 0.00 0.00 0.00 7 Construction Observation 0.00 0.00 0.00 0.00 TBD 0.00 0.00 0.00 0.00 0.00 8 Warranty Phase 4,050.00 1,053.00 2,025.00 972.00 8,100.00 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees Author 82,710.00 17,833.40 34,295.00 16,461.60 151,300.00 2,785.00 724.10 1,392.50 668.40 5,570.00 Total Authorized Fee 274,270.00 67,639.00 130,075.00 62,436.00 534,420.00 16,765.00 4,358.90 8,382.50 4,023.60 33,530.00 Ordnance No. 030087 2/11/2014 Administrative Approval 3/2/2016 CARROLL LANE FROM HOUSTON Project No. E13097 BOND ISSUE 2014 SUMMARY OF FEES Basic Services Fees Preliminary Phase Design Phase Bid Phase Construction Administration Phase Subtotal Basic Services Fees 1 2 3 4 Add tional Services Fees (Allowance) Pemit Preparation ROW Acquisition Survey 1 2 Topographic Survey and Parcel Descriptions Environmental Issues Public Involvement Subsurface Utility Investigation Construction Observation Warranty Phase Subtotal Additional Services Fees Autho 3 4 5 6 7 8 Total Authorized Fee Amendment No. 2 Total Street 1 Wastewater 1 Storm Water' Water 1 Total $0.00 $0.00 $0.00 $0.00 $0.00 $117,640.00 13,500.00 13,500.00 234,560.00 0.00 0.00 0.00 0.00 0.00 10,810.00 0.00 0.00 0.00 0.00 0.00 61,570.00 0.00 0.00 13,500.00 0.00 13,500.00 424,580.00 0.00 0.00 0.00 0.00 0.00 14,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 62,920.00 0.00 0.00 0.00 0.00 0.00 2,110.00 0.00 0.00 0.00 0.00 0.00 12,300.00 0.00 0.00 0.00 0.00 0.00 57,320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,100.00 r 0.00 0.00 0.00 0.00 0.00 156,870.00 0.00 0.00 13,500.00 0.00 13,500.00 581,450.00 Administrative Approval