CITY OF CORPUS CHRISTI
AMENDMENT NO. 2
CONTRACT FOR PROFESSIONAL SERVICES
The City of Corpus Christi,Texas, a Texas home-rule municipal corporation (YCity )11 and Martinez,Guy&Mavbikt
Um.("Consultant"), agree to the following amendments to the Contract for Professional Services for Carroll Lane
from Houston to McArdle BOND 2014(Project No. El 3097):
Original Contract February 11, 2014 Ordinance No. 030087 $534,420.00
Amendment No. 1 March 2, 2016 Administrative Approval $33,530.00
In the Original Contract, Exhibit"A", Section I. Scope of Services shall be amended as set forth in the attached
Amendment No. 2, Exhibit"A".
In the Original Contract, Section III shall be amended based on the modified scope of services in the attached
Amendment No. 2, Exhibit "A" for a fee not to exceed $13,500.00, for a total restated fee not to exceed
$581,450.00.
All other terms and conditions of the February 11, 2014 Contract for Professional Services between the City and
Consultant, and of any amendments to that contract,which are not specifically addressed herein shall remain in full
force and effect.
CITY OF CARPC ` - TI A TINEZ,GUY& YBIK, INC.
LQ) - ._ 1 1 7 �/t� A 12t3Aifho
V H. Gray, E. Date icardo Marti ez, E. Date
Ex- utive Director of '•ublic Works resident
6000 S. Sta I Street., Suite 207
Corpus Christi, TX 78413
361-814-3070 Office
APPROVED AS TO LEGAL FORM
Aimee Alcorn-Reed
2016.03.2416:58:43-05'00'
Assistant City Attorney Date
ATTEST
RQica- e..4-11APAI 4--/7/I
City Secretary Date
Project No. E13097
Accounting Unit: 3494-043
Account 550950
Activity: El 3097013494EXP
ti
Account Category: 50920
2016-115 Fund Name: Storm Water CIP 2012A Rev. Bonds
3/28/16 Encumbrance No.
Martinez Guy& Maybik Inc. INDEXED
/CARROLL FROM HOUSTON TO MCARDLE BOND ISSUE 20141AMENOMENT 2 MGM,2015-1001 AMENDMENT TO CONTRACT
MARTINEZ,GUY
&MAYBIK,INC.
ENGINEERS&SURVEYORS
6000 S.Staples Suite 207
February 2,2016 Corpus Christi,Texas 78413
361-814-3070 •Fax 1-888-653-5510
Corpus Christ Houston Eagle Pass/Del Rio Asa
Ruben T. Perez,Jr.,P.E.
Project Manager-MGM, Inc.
6000 South Staples St,Suite 207
Corpus Christi,Texas 78413
Chris Hale, P.E.
Project Manager-City of Corpus Christi Engineering Services
P.O. Box 9277
Corpus Christi,Texas 78469
SUBJECT: Carroll Lane from Houston to McArdle(Bond 2014)
Project No.E13097
Amendment No.2
Dear Mr. Hale,
As a result of the City's directive given subsequent to the project's Public Meeting held on
January 25, 2016, please accept this letter as our proposal to perform the additional
professional services desired in developing the Carroll Lane from Houston to McArdle project.
Additional Work Description and Backa round information
MGM requests this amendment due to additional scope of work created by the directive given
by City Staff, in coordination with Corpus Christi Metropolitan Planning Organization (CCMPO)
Staff, as a result of the Public Meeting held on January 25, 2016. The new directive relates to
on-street parking lanes along Carroll Lane as they relate to bicycle facilities.
Prior to the Public Meeting, MGM had reached the 60% submittal stage for the work included
in Amendment No. 1, which included a different configuration for parking lanes and bicycle
facilities along the project corridor(on-street parking lanes on both sides of Carroll Lane, and a
9' wide tied shared use bicycle/pedestrian path on each side of the roadway). The directive
given subsequent to the Public Meeting changed the roadway typical section configuration to
include on-street parking on only one side of the roadway, and a 10' untied shared use
bicycle/pedestrian path on each side with a 2' buffer between the back of curb and path. This
change caused additional scope of services as described below:
AMD. NO. 2
EXHIBIT"A"
Page 1 of 5
.. s
Additional Scope of Services:
1. Preliminary Phase
• No additional services
2. Design Phase
• Stormwater Design Adiustments- In conjunction with the pavement width change
required to change the typical section as described above, the stormwater design
requires corresponding adjustments to match the new roadway width. Inlet locations
and length of pipe runs affect the hydraulic design.
• Revision of Plan Sheets- The change of street typical section requires each plan
sheet to be revised to appropriately identify the street elements in plan view. Plan &
Profile sheets, Stormwater Sheets, Typical Section Sheets, Traffic Control Plan
Sheets, SW3P Sheets, and various other sheets and details must be revised due to
the pavement width change.
3. Bid Phase
• No additional services
4. Construction Phase
• No additional services
ADDITIONAL SERVICES
Schedule: Please note any changes to the schedule.
1. Preliminary Phase Submittal Due No change
2. Design Phase: 30%Submittal Due No change
60%Submittal Due February 29, 2016
100%Bid Documents Due May 6,2016
3. Bid Phase June 3, 2016
4. Construction Phase Until Final Acceptance by City
AMD. NO.2
EXHIBIT"A"
Page 2 of 5
p
v'
Summary of A/E Fees
Original Amendment Amendment
Basic Services Fees Contract No. 1 No. 2 Total
1. Preliminary Phase $117,640.00 $0.00 $0.00 $117,640.00
2. Design Phase $193,100.00 $27,960.00 $13,500.00 $221,060.00
3. Bid Phase $10,810.00 $0.00 $0.00 $10,810.00
4. Construction Administration Phase $61,570.00 $0.00 $0.00 $61,570.00
Subtotal Basic Services Fees $383,120.00 $27,960.00 $13,500.00 $424,580.00
Additional Services Fees
1. Permit Preparation $14,120.00 $0.00 $0.00 $14,120.00
2. ROW Acquisition Survey None $0.00 $0.00 None
Anticipated Anticipated
3.Topographic Survey and Parcel $57,350.00 $5,570.00 $.00 $62,920.00
Descriptions
4. Environmental Issues $2,110.00 $0.00 $0.00 $2,110.00
5. Public Involvement $12,300.00 $0.00 $0.00 $12,300.00
6. Subsurface Utility Investigation ' $57,320.00 . $0.00 $0.00 $57,320.00
7. Construction Observation Services To Be $0.00 $0.00 To Be
Determined Determined
8.Warranty Phase $8,100.00 $0.00 $0.00 $8,100.00
Sub-Total Additional Services Fees $151,300.00 $5,570.00 $0.00 $156,870.00
Authorized
Total Authorized Fee $534,420.00 $33,530.00 $13,500.00 $581,450.00
Ordinance Admin Approval Admin
030087 (Pending, Approval
2/11/2014 Submitted (Current
Approved By: 1/18/2016) Request)
i
incer=1y,
/
J ' L
inn Officer Entitle, to E er C% racts
Ricardo Martinez, -.E.
President, MGM, .
AMD. NO.2 ,
EXHIBIT"A"
Page 3 of 5
CARROLL LANE FROM HOUSTON TO MCARDLE
Project No. E13097
BOND ISSUE 2014
SUMMARY OF FEES
Original Contract
Amendment No. 1
Street
Wastewater
Storm Water
Water
Total
Street
Wastewater
Storm Water
Water
Total
Basic Services Fees
1
Preliminary Phase
$58,820.00
$15,293.20
$29,410.00
$14,116.80
117,640.00
$0.00
$0.00
$0.00
$0.00
$0.00
2
Design Phase
96,550.00
25,103.00
48,275.00
23,172.00
193,100.00
13,980.00
3,634.80
6,990.00
3,355.20
27,960.00
3
Bid Phase
5,405.00
1,405.30
2,702.50
1,297.20
10,810.00
0.00
0.00
0.00
0.00
0.00
4
Construction Administration Phase
30,785.00
8,004.10
15,392.50
7,388.40
61,570.00
0.00
0.00
0.00
0.00
0.00
Subtotal Basic Services Fees
191,560.00
49,805.60
95,780.00
45,974.40
383,120.00
13,980.00
3,634.80
6,990.00
3,355.20
27,960.00
Additional Services Fees (Allowance)
1
Pemit Preparation
14,120.00
0.00
0.00
0.00
14,120.00
0.00
0.00
0.00
0.00
0.00
2
ROW Acquisition Survey
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3
Topographic Survey and Parcel
Descriptions
28,675.00
7,455.50
14,337.50
6,882.00
57,350.00
2,785.00
724.10
1,392.50
668.40
5,570.00
4
Environmental lssues
1,055.00
274.30
527.50
253.20
2,110.00
0.00
0.00
0.00
0.00
0.00
5
Public Involvement
6,150.00
1,599.00
3,075.00
1,476.00
12,300.00
0.00
0.00
0.00
0.00
0.00
6
Subsurface Utility Investigation
28,660.00
7,451.60
14,330.00
6,878.40
57,320.00
0.00
0.00
0.00
0.00
0.00
7
Construction Observation
0.00
0.00
0.00
0.00
TBD
0.00
0.00
0.00
0.00
0.00
8
Warranty Phase
4,050.00
1,053.00
2,025.00
972.00
8,100.00
0.00
0.00
0.00
0.00
0.00
Subtotal Additional Services Fees Author
82,710.00
17,833.40
34,295.00
16,461.60
151,300.00
2,785.00
724.10
1,392.50
668.40
5,570.00
Total Authorized Fee
274,270.00
67,639.00
130,075.00
62,436.00
534,420.00
16,765.00
4,358.90
8,382.50
4,023.60
33,530.00
Ordnance No. 030087
2/11/2014
Administrative Approval
3/2/2016
CARROLL LANE FROM HOUSTON
Project No. E13097
BOND ISSUE 2014
SUMMARY OF FEES
Basic Services Fees
Preliminary Phase
Design Phase
Bid Phase
Construction Administration Phase
Subtotal Basic Services Fees
1
2
3
4
Add tional Services Fees (Allowance)
Pemit Preparation
ROW Acquisition Survey
1
2
Topographic Survey and Parcel
Descriptions
Environmental Issues
Public Involvement
Subsurface Utility Investigation
Construction Observation
Warranty Phase
Subtotal Additional Services Fees Autho
3
4
5
6
7
8
Total Authorized Fee
Amendment No. 2
Total
Street 1 Wastewater 1 Storm Water' Water 1
Total
$0.00
$0.00
$0.00
$0.00
$0.00
$117,640.00
13,500.00
13,500.00
234,560.00
0.00
0.00
0.00
0.00
0.00
10,810.00
0.00
0.00
0.00
0.00
0.00
61,570.00
0.00
0.00
13,500.00
0.00
13,500.00
424,580.00
0.00
0.00
0.00
0.00
0.00
14,120.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
62,920.00
0.00
0.00
0.00
0.00
0.00
2,110.00
0.00
0.00
0.00
0.00
0.00
12,300.00
0.00
0.00
0.00
0.00
0.00
57,320.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8,100.00
r
0.00
0.00
0.00
0.00
0.00
156,870.00
0.00
0.00
13,500.00
0.00
13,500.00
581,450.00
Administrative Approval