HomeMy WebLinkAboutC2016-129 - 4/6/2016 - NA CITY OF CORPUS CHRISTI AMENDMENT NO. 1 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas, a Texas home-rule municipal corporation ("City") and HDR Engineering, Inc. ("Architect/Engineer—A/E"),agree to the following amendments to the Contract for Professional Services for South Alameda Street from Avers Street to Louisiana BOND 2012 (Project No. 12091): Original Contract January 29, 2013 Motion No. M2013-013 $575,957.00 In the Original Contract, Exhibit"A", Section I. Scope of Services shall be amended as set forth in the attached Amendment No.1, Exhibit"A". In the Original Contract, Section III., shall be amended based on the modified scope of services in the attached Amendment No. 1, Exhibit "A" for a fee not to exceed $12,600.00, for a total restated fee not to exceed $588,557.00. All other terms and conditions of the January 29, 2013 Contract for Professional Services between the City and Consultant,and of any amendments to that contract,which are not specifically addressed herein shall remain in full force and effect. CI C ri-P C - TI HDR ENGINEERING, INC. Let II �� Valer H. Gra P. . i ' • Dat- Arthur Colwell, P. E. Date Executive Director of ublic Works Managing Principal 555 N. Carancahua, Suite 1600 Corpus Christi, TX 78401 (361)696-3300 Office arthurcolwell@hdrinc.com APPROVED AS TO LEGAL FORM ,7 ��c . 2016.03.1810:11:23-05'00' ' Assistant City Attorney Date ATTEST14-/- RECEIVED City Secretary Date MAR 1 4 206 ENGINEERING SERVICES Project Number E12091 Accounting Unit 3549-051 Account 550950 2016-129 4/06/16 ND 2012 :091 S ALAMEDA-AYERS TO LOUISIANA BOND ISSUE 20121RE-DESIGN12015-1001 AMENDMENT TO CONTRACT PROFESSIONAL HDR Engineering Inc. REV 10/1/15 INDEXED February 16, 2016 Rev. 05 February-1-5;2016—rev:-04 January-1-€ 01-6— Rev-03 December-1 -2015--Rev-02 Aug �+yQ t-28iz015 Rev. 01- August- 1- 20 5 Rov-00 203063 Mr. Jeff Edmonds, P.E., Director of Engineering Services City of Corpus Christi 1201 Leopard Street Corpus Christi, TX 78401 RE: Amendment 1 Alameda Street from Ayers Street to Louisiana Avenue (Bond 2012) E12091 Dear Mr. Edmonds, This contract amendment proposal letter is to recount and outline the various additional design services that have become necessary for the subject project over the last 12 months, and the associated fees for each respective additional task. Engineering Services and HDR first met on October 15, 2014 to discuss potential cost saving measures. At that time, the plans and specifications were substantially complete in accordance with the approved Final Engineering Letter Report. A number of cost saving measures were identified regarding utilities, pavement material, and street section. A second meeting was held on November 12, 2014 to identify which cost savings measures to implement. The street section (surface improvements within the Right-of-Way) decision was put on hold due to upcoming City Council bike lane discussions impacting this, and other, projects. Progress on the other cost saving measures with respect to utilities was also put on hold at this time. The bike lane discussion with City Council stretched through multiple council meetings and into the first quarter of 2015, and culminated with a direction from Council to keep the proposed bike lanes in the street pavement. After the first quarter of 2015, HDR was instructed by Mr. Jerry Shoemaker to proceed with developing and submitting a contract amendment for proceeding with the identified cost saving measures while keeping the bike lanes in the street. Additionally, in July 2015. Mr. Chris Hale arranged for a coordination meeting to be held between the consultants that have street improvement projects that converge at Six-Points to discuss project timing, coordination of improvements, and potential street-scaping improvements at Six-Points. The HDR project team participated in the coordination meeting at City Hall on July 29, 2015, and also participated in subsequent hdrinc.com 555 N.Carancahua,Suite 1600,Corpus Christi,TX 78401-0849 Texas P.E. Firm Registration No.754 (361)696-3300 AMD. NO. 1 EXHIBIT"A" Page 1 of 6 Mr.Jeff Edmonds February 16,2016 Page 2 of 6 meetings with City Staff at the project site to discuss what street-scaping improvements could be utilized. These additional meetings and design changes necessitated further revisions to the contract amendment and, in-turn,further negotiations. Finally, a public meeting was held on November 9, 2015 to present the various street section alternatives to the stakeholders. The overwhelming majority of stakeholders in attendance expressed their preference for the 3- lane section with the off-street cycle tracks and sidewalks. The HDR project team has since been given direction by Mr. Hale to proceed accordingly. The Alameda cost saving measures and design revisions are summarized below: Pavement(Task 1) The City is requesting HDR to modify the plans, specifications, and bid form to accommodate a base bid for asphalt pavement and an alternate bid for rigid pavement. The base bid form and alternate bid form will each contain all associated project bid line items. Water(Task 2) The City requested HDR remove the water stub-outs at the side streets. The stub-outs were intended for future connection when/if the City removes/abandons the existing lines in the rear easements. The proposed waterline in Alameda will remain 12 inches per the Water Master Plan. Wastewater(Task 2) The City is requesting HDR remove the wastewater stub-outs at the side streets. The stub-outs were intended for future connection when/if the City removes/abandons the existing lines in the rear easements. The proposed Cured-in-Place Pipes(CIPP)of the trunk main will remain in the plan set. Gas(Task 2) The City is requesting HDR remove the gas line casings intended for crossings across Alameda Street.This will require close coordination between the contractor and the City Gas Department for installation of new gas lines crossing Alameda.The new gas lines will need to be installed to miss the storm sewers, existing and proposed water lines and the existing sanitary sewer line. Roadway Section and Storm Water(Task 3&4) In general,this modification impacts all roadway and intersection details. The primary revision to the proposed street section is that the bike lanes will be removed from the street 555 N.Carancahua.Suite 1600,Corpus Christi,TX 78401-0849 Texas P.E.Firm Registration No.754 (361)696-3300 AMD. NO. 1 EXHIBIT"A" Page 2 of 6 Mr.Jeff Edmonds February 16.2016 Page 3 of 6 pavement and placed behind the back of curb in the form of a cycle track. This will reduce the back-of-curb to back-of-curb width from 54ft to 40ft. One design consideration to be aware of when utilizing a narrower street section, however, is that the existing storm sewer trunk main,which is behind the north-bound curb and gutter, is being kept in place and utilized. Therefore, it is ideal for the new storm drain inlet risers to be installed in approximately the same offset locations as the existing inlets they're replacing. So,with that understanding, by moving the curb and gutter 7ft closer to the centerline, accommodations need to be made to get the storm water from the gutter to the inlet risers. After considering various configurations, HDR proposes utilizing flumes covered with 6in thick reinforced concrete(likely precast)covers to convey the storm water from the gutter to the inlet riser 7ft behind the curb. The addition of the cycle tracks adjoined to the 5ft sidewalks will require specific detailed design efforts in routing them through the corridor with existing encroachments and ramp alignments and configurations at each intersection. These unique ramp configurations will require custom detailed designs not yet seen or utilized in Corpus Christi. Revised Traffic Control Plan and Construction Phasing(Task 5) Due to the pavement reduction width of 14 feet,the traffic control plans will require revisions. The reduced pavement width impacts how much pavement is available for traffic during construction. The following item was initially proposed to be completed as part of this contract amendment; however, it was discussed at the fee negotiation meeting on August 21, 2015 that this item would be eliminated from the contract amendment for the following reasons: • Streetscaping—it was determined that the street layout of Alameda between 6-Points and Clifford Street will remain as originally proposed with only the center raised median being removed. 555 N.Carancahua,Suite 1600.Corpus Christi,TX 78401-0849 Texas P.E. Firm Registration No.754 (361)696-3300 AMD. NO. 1 EXHIBIT"A" Page 3 of 6 • Mr.Jeff Edmonds February 16,2016 Page 4 of 6 The fees associated with the requested additional engineering services discussed above are as follows: 1. Pavement Bid Items $1,600 a. Develop alternative HMAC pavement cross-section (1 sheet) b. Revise Bid Form 2. Water,Wastewater,and Gas Revisions $8,700 a. Revise Street&Storm Plan&Profile sheets(4 sheets) b. Revise Water,Wastewater, and Gas Plan&Profile sheets(9 sheets) c. Revise Water,Wastewater, and Gas Cross Sections(7 sheets) 3. Roadway Section and Storm Water Revisions $28,000 a. Revise Roadway Corridor from STA10+50 to STA39+50 b. Design drainage inlet flumes c. Develop flume detail d. Revise Street&Storm Plan &Profile sheets(7 sheets) e. Revise Street& Storm Sections(5 sheets) f. Revise Typical Roadway Sections(1 sheet) g. Revise Water,Wastewater, and Gas Plan&Profile sheets(8 sheets) h. Revise Water,Wastewater, and Gas Sections(9 sheets) i. Revise Signing&Striping Sheets(10 sheets) j. Revise SWPPP Sheets(6 sheets) k. Revise TCP Sheets(6 sheets) 4. Cycle Track/Shared-Use Path Alignment&Detailing $13,200 a. Design Cycle Track Alignment b. Design shared use path ramps for continuous movement(cyclists to have right- of-way ightof-way to cross traffic on cross streets) c. Revise Street& Storm Plan& Profile sheets(5 sheets) d. Revise Street&Storm Sections(4 sheets) e. Revise Typical Roadway Sections(1 sheet) f. Revise Water,Wastewater, and Gas Plan&Profile sheets(5 sheets) g. Revise Water,Wastewater, and Gas Sections(7 sheets) h. Revise Signing & Striping Sheets(7 sheets) i. Revise SWPPP Sheets(5 sheets) j. Revise TCP Sheets(6 sheets) 5. Revise Traffic Control Plan $15,500 a. Revise TCP to account for narrower proposed street section (15 sheets) i. Two TCP's will be explored: an asymmetrical spit phase TCP or a complete detour between Southern St. and Cole St. Both plans will require extensive coordination with the RTA and CCISD. A complete detour will require extensive coordination with City Traffic Department. 555 N.Carancahua,Suite 1600,Corpus Christi,TX 78401-0849 Texas P.E.Firm Registration No.754 (361)696-3300 AMD. NO. 1 EXHIBIT"A" Page 4 of 6 • Mr.Jeff Edmonds February 16,2016 Page 5 of 6 6. Revise OPCC $3,100 a. Update Quantity Take-Off b. Utilize updated unit prices c. Develop Base Bids for both pavement materials 7. Quality Assurance/Quality Control Review $8,900 a. 100% Review Submittal b. Final Submittal c. QA/QC Reviews 8. Additional Public Meeting(November 9, 2015) $3,000 a. Public Meeting Preparation b. Public Meeting Attendance 9. Reimbursable Direct Costs $400 a. Printing, Etc. TOTAL=$82,400 The HDR team proposes to utilize Construction Administration funds($69,800)from the original contract, in addition to a$12,600 Amendment to fund this$82,400 Contract Amendment. The Construction Administration funds($69,800) must be replenished prior to HDR project team members rendering Construction Administration services. The reallocation of said funding portions of the contract will allow for an expedited execution of the subject Contract Amendment to minimize project delays. As part of the proposed contract funding reallocation, it is understood that efforts necessary to execute an Amendment to replenish the Construction Administration services will be carried out in a timely manner so as not to delay the Construction Administration services at the time project construction. In summary, execution of this Contract Amendment is for the approval of: Reallocation of Contract Funds: • Construction Administration Phase funds $69,800 Sub-Total of Reallocated Contract Funds=$69,800 Requested Additional Fees $12,600 Total Add'I Fees Required for Alaemda St Contract Amendment No. 1 =$12,600 See table in enclosed Exhibit"C". 555 N.Carancahua,Suite 1600,Corpus Christi,TX 78401-0849 Texas P.E. Firm Registration No.754 (361)696-3300 AMD. NO. 1 EXHIBIT"A" Page 5 of 6 Mr. Jeff Edmonds February 16, 2016 Page 6 of 6 The proposed time to completion for the revised scope of work described above is 16 weeks from notice to proceed. The HDR team stands ready to complete the work outlined above as soon as we receive approval from you for the contract amendment. Please feel free to contact us at any time to discuss as necessary. Sincerely, HDR ENGINEERING, INC. Samuel Saldivar, Jr., P.E. Civil Program Leader Arthur B. Colwell, P.E. Vice President Managing Principal SSJ/j Ig CC: Jerry Shoemaker, P.E. —Senior Program Manager, Engineering Services Chris Hale, P.E. — Project Manager Enclosure: Engineering Fee Estimate Exhibit"C" Texas P.E Firm Registration No 75== 555 N.Carancahua.Suite 1600.Corpus Christi.TX 78401-0849 (361)696-3300 AMD. NO. 1 EXHIBIT "A" Page 6 of 6 Basic Services: Preliminary Phase Design Phase Bid Phase Construction Phase Subtotal Basic Services Additional Services: Permitting Warranty Phase Inspection Platting Survey 0 & M Manuals SCADA Subtotal Additional Services Summary of Fees Basic Services Fees Additional Services Fees Total of Fees COMPLETE PROJECT NAME Project No. XXXX Invoice No. 12345 Invoice Date: Sample form for: Payment Request Revised 07/27/00 Total Amount Previous Total Percent Contract Amd No. 1 Amd No. 2 Contract Invoiced Invoice Invoice Complete $1,000 $0 $0 $1,000 $0 $1,000 $1,000 100% 2,000 1,000 0 3,000 1,000 500 1,500 50% 500 0 250 750 0 0 0 0% 2,500 0 1,000 3,500 0 0 0 0% $6,000 $1,000 $1,250 $8,250 $750 $1,500 $2,500 30% $2,000 $0 $0 $2,000 $500 $0 $500 25% 0 1,120 0 1,120 0 0 0 0% 0 0 1,627 1,627 0 0 0 0% TBD TBD TBD TBD TBD TBD TBD 0% TBD TBD TBD TBD TBD TBD TBD 0% TBD TBD TBD TBD TBD TBD TBD 0% $2,000 $1,120 $1,627 $4,747 $500 $0 $500 11% $6,000 $1,000 $1,250 $8,250 $750 $1,500 $2,500 30% 2,000 1,120 1,627 4,747 500 0 500 11% $8,000 $2,120 $2,877 $12,997 $1,250 $1,500 $3,000 23% Amendment 1- South Alameda Street from Ayers Street to Louisiana Avenue Project No. E12091 Basic Services: 1. Preliminary Phase 2. Design Phase 2.b. Re -Design 3. Bid Phase 4. Construction Administration Phase Subtotal Basic Services Additional Services: 1. Permit Preparation 2. ROW Acquisition Survey 3. Topographic Survey and Parcel Descriptions* 4. Environmental Issues* 5.a. Public Involvement (2 meetings)* 5.b. Public Involvement (Comprehensive App) 5.c. Public Invovlement (Additional Tactics) 6.a. Subsurface Utility Investigation 6.b. Televise Inspection of Utilities 7. Construction Observation Services 8. Start Up Services 9. Warranty Phase Subtotal Additional Services Summary of Fees Basic Services Fees Additional Services Fees otal of Fees .XD =3 CD al. - jz o _o Contract Amd No. 1 Total Contract $63,492.00 $63,492.00 $215,200.00 $215,200.00 $0.00 $82,400.00 $82,400.00 $14,500.00 $14,500.00 $69,800.00 -$69,800.00 $0.00 $362,992.00 $12,600.00 $375,592.00 $5,000.00 $5,000.00 $24,495.00 $24,495.00 $86,480.00 $86,480.00 $0.00 $0.00 $4,800.00 $4,800.00 TBD TBD TBD TBD TBD TBD $58,190.00 $58,190.00 $30,000.00 $30,000.00 TBD TBD TBD N/A N/A N/A $4,000.00 $4,000.00 $212,965.00 $0.00 $212,965.00 $362,992.00 $12,600.00 $375,592.00 $212,965.00 $0.00 $212,965.00 $575,957.00 $12,600.00 $588,557.00 Exhibit C