Original Contract February 11, 2014 Ordinance No. 030084 $604,670.00
In the Original Contract, Exhibit"A", Section I. Scope of Services shall be amended as set forth in the attached
Amendment No.1, Exhibit"A".
In the Original Contract, Section III., shall be amended based on the modified scope of services in the attached
Amendment No. 1, Exhibit"A"for a fee not to exceed$2,800.00,for a total restated fee not to exceed$607,470.00.
All other terms and conditions of the February 11, 2014 Contract for Professional Services between the City and
Consultant,and of any amendments to that contract,which are not specifically addressed herein shall remain in full
force and effect.
CITY ' C+R•U C T 4111" - HDR ENGINEERING,INC.
11 - ,4- 11APn ei0//t/e164
Val- = H. Gray, P.E. ' ((p 'at- Arthur Colwell, P. E. Date
=xec:ive Direc or of 'ublic Works Managing Principal
555 N. Carancahua, Suite 1600
Corpus Christi, TX 78401
(361) 696-3300 Office
a rth u rcolwel l @ hd ri n c.co m
APPROVED AS TO LEGAL FORM
.72016.03.18 10:09:03-05'00'
Assistant City Attorney Date
ATTEST
Nelte,c,e,l-L2Acce. 4.-/-7/1‘
City Secretary Date
Project Number E13094
Accounting Unit 3551-051
Account 550950
Activity E13094013551 EXP
2016-130 IND 2014
4/06/16
094 STAPLES FROM ALAMEDA TO MORGAN BOND ISSUE 2014'AMD 1 ADDITIONAL DESIGN SERVICES12015-1001 AMENDMENT TO
HDR Engineering Inc. REV.10/1/15 INDEXED
February 16, 2016 Rev 03
February 15-20-1-6--Rev-O2
January--1-82046 Rev-0-1-
December-48-3--2015—Rev-00
227931
Mr. Jeff Edmonds, P.E., Director of Engineering Services
City of Corpus Christi
1201 Leopard Street
Corpus Christi, TX 78401
RE: Amendment 1
Staples Street from Alameda Street to Morgan Avenue (Bond 2014) E13094
Dear Mr. Edmonds,
This contract amendment proposal letter is to outline the work efforts required to facilitate the
directives to implement a 4-lane striping configuration and to preserve the existing curb and
gutters and sidewalks in the subject project, and the associated fees for the additional work.
HDR proposed a 3-lane section with bike lanes and on-street parking, in the approved Final
Engineering Letter Report, along with reconstruction of the existing curb and gutter and
sidewalk to best accommodate said 3-lane section, and to streamline and optimize the storm
drain system. This design was carried all the way through the 60% Design Submittal and to
the current state of completion which is just shy of 100%. However, after a series of multiple
public workshops discussing the 3-lane and 4-lane alternatives, the stakeholders expressed
their preference for the 4-lane alternative and City Council has directed to implement a striping
configuration accordingly. With the determination to keep the corridor configured as a 4-lane
street with on-street parking and no bike lanes, and the adjacent reconstruction project of
Staples Street from Morgan Ave to IH37 is preserving the existing curb and gutters and
sidewalks, Mr. Chris Hale has directed the HDR team to proceed with utilizing the existing curb
and gutters and sidewalks.
Maintaining the existing curb and gutters and sidewalks will require significant engineering and
design changes to the street plan and profile, storm sewer system, underground utilities, and
striping and signage plans. The work for these changes is summarized below:
hdrinc.com
555 N.Carancahua,Suite 1600,Corpus Christi,TX 78401-0849
Texas P.E. Firm Registration No.754
(361)696-3300
AMD. NO. 1
EXHIBIT "A"
Page 1 of 5
•
•
Mr.Jeff Edmonds
February 16,2016
Page 2 of 5
Street Plan and Profile
The proposed Street Plan and Profile will need to be revised to match the existing lip-to-lip
widths and existing curb and gutter profile. Additional details will need to be developed
and provided to accommodate HMAC pavement between existing curbs and for doweling
Rigid pavement into existing curbs.
Storm Sewer System
The proposed Storm Sewer system will need to be redesigned to have a trunk main
alignment beneath the street, as opposed to beneath the curb as originally proposed. The
Storm Sewer system will also need to be redesigned to have inlets and laterals placed at
the existing street profile sags. These design revisions will necessitate re-modeling of the
drainage system. Additional details will need to be developed and provided for removal
and replacement of curb and gutter and sidewalk to replace inlets.
Underground Utilities
The proposed waterline improvements will need to be revised to be placed beneath the
street, instead of beneath the curb as originally proposed. The relocation of the proposed
waterline will necessitate relocation of the proposed sanitary sewer trunk main to maintain
adequate separation.The adjustment to said alignments will also require adjustments to
laterals. The redesigned storm drain system also necessitates performing a new conflict
resolution exercise regarding the proposed waterline, proposed sanitary sewer and
proposed storm sewer improvements. Additional details will need to be developed and
provided for providing service connections beneath the existing curb and gutter and
sidewalk.
Striping and Signage
The proposed striping and signage will be revised to meet the 4-lane requirement with on-
street parking and no on-street bike lanes.
555 N.Carancahua,Suite 1600,Corpus Christi,TX 78401-0849 Texas P.E.Firm Registration No.754
(361)696-3300
AMD. NO. 1
EXHIBIT"A"
Page 2 of 5
•
Mr.Jeff Edmonds
February 16,2016
Page 3 of 5
The fees associated with the requested additional engineering services discussed above are
as follows:
1. Street Plan and Profile Revisions $40,000
a. Revise TCP Sheets(6 sheets)
b. Revise Demolition Sheets(3 sheets)
c. Revise Typical Pavement Sections(1 sheet)
d. Revise Street&Storm Plan&Profile sheets(6 sheets)
e. Revise and Add Street&Storm Sections(3 sheets)
f. Produce additional Street& Storm Sections(2 sheets)
g. Revise Water,Wastewater, and Gas Plan& Profile sheets(8 sheets)
h. Revise Water,Wastewater, and Gas Cross Sections(2 sheets)
i. Revise Signage and Striping sheets(7 sheets)
j. Revise SWPPP sheets(4 sheets)
k. Additional Pavement Details (1 sheet)
2. Storm Sewer System Revisions $26,900
a. Redesign trunk main and laterals
b. Re-model drainage system
c. Revise Street&Storm Plan&Profile sheets(5 sheets)
d. Revise Street& Storm Sections(3 sheets)
e. Revise Water,Wastewater, and Gas Plan&Profile sheets(5 sheets)
f. Revise Water,Wastewater, and Gas Cross Sections(2 sheets)
g. Revise SWPPP sheets(3 sheets)
h. Additional Storm Sewer Details(1 sheet)
3. Water,Wastewater,and Gas Revisions $27,100
a. Redesign Sanitary Sewer Trunk Main
b. Redesign Waterline
c. Revise Street& Storm Plan&Profile sheets(5 sheets)
d. Revise Street&Storm Sections(3 sheets)
e. Revise Water,Wastewater, and Gas Plan & Profile sheets(5 sheets)
f. Revise Water,Wastewater, and Gas Cross Sections(2 sheets)
g. Additional Service Connections Details(1 sheet)
4. Striping and Signage Revisions $5,400
a. Revise Typical Pavement Sections(1 sheet)
b. Revise Signage and Striping sheets(7 sheets)
5. Traffic Control Plan $4,800
a. Revise TCP to accommodate revised utility alignments(6 Sheets)
555 N.Carancahua,Suite 1600,Corpus Christi,TX 78401-0849 Texas P.E.Firm Registration No.754
(361)696-3300
AMD. NO. 1
EXHIBIT"A"
Page 3 of 5
Mr.Jeff Edmonds
February 16,2016
Page 4 of 5
6. Revise OPCC $3,100
a. Update Quantity Take-Off
b. Utilize updated unit prices
c. Develop Base Bids for both pavement materials
7. Reviews &QC $4,000
a. Additional QA/QC Reviews
8. Additional Public Meetings(3) $1,900
a. Public Meeting Preparation
b. Public Meeting Attendance
9. Reimbursable Direct Costs $400
a. Postage, Printing, Etc.
TOTAL=$108,800
The HDR team proposes to utilize Construction Administration funds($77,000)and Traffic
Signal Design funds($29,000)from the original contract, in addition to a $2,800 Amendment to
fund this$108,800 Contract Amendment.
The Construction Administration funds($77,000)must be replenished prior to HDR project
team members rendering Construction Administration services. The Traffic Signal Design
funds($29,000)will not require replenishment, as that task has been previously determined to
be unnecessary because the traffic signal at the intersection Staples Street and Elizabeth
Street was determined to be unwarranted. The reallocation of said funding portions of the
contract will allow for an expedited execution of the subject Contract Amendment to minimize
project delays. As part of the proposed contract funding reallocation, it is understood that
efforts necessary to execute an Amendment to replenish the Construction Administration
services will be carried out in a timely manner so as not to delay the Construction
Administration services at the time project construction.
In summary, execution of this Contract Amendment is for the approval of:
Reallocation of Contract Funds:
• Construction Administration Phase funds $77,000
• Traffic Signal Design Phase funds $29,000
Sub-Total of Reallocated Contract Funds=$106,000
Requested Additional Fees $2,800
Total Add'I Fees Required for Staples St Contract Amendment No. 1 =$2,800
See table in enclosed Exhibit"C".
555 N.Carancahua,Suite 1600,Corpus Christi.TX 78401-0849 Texas P.E.Firm Registration No.754
(361)696-3300
AMD. NO. 1
EXHIBIT"A"
Page 4 of 5
Mr. Jeff Edmonds
February 16, 2016
Page 5 of 5
The proposed time to completion for the revised scope of work described above is 20 weeks
from notice to proceed. The HDR team stands ready to complete the work outlined above as
soon as we receive approval from you for the contract amendment. Please feel free to contact
us at any time to discuss as necessary.
Sincerely,
HDR ENGINEERING, INC.
Samuel Saldivar, Jr., P.E. Arthur B. Colwell, P.E.
Civil Program Leader Managing Principal
SSJ/jlg
CC:
Jerry Shoemaker, P.E. — Senior Program Manager, Engineering Services
Chris Hale, P.E. — Project Manager
Enclosure:
Engineering Fee Estimate
Exhibit"C"
Texas P E. Firm Reg,stration No 754
555 N.Carancahua. Suite 1600,Corpus Christi.TX 78401-0849
(361)696-3300
AMD. NO. 1
EXHIBIT "A"
Page 5 of 5
Basic Services:
Preliminary Phase
Design Phase
Bid Phase
Construction Phase
Subtotal Basic Services
Additional Services:
Permitting
Warranty Phase
Inspection
Platting Survey
O & M Manuals
SCADA
Subtotal Additional Services
Summary of Fees
Basic Services Fees
Additional Services Fees
Total of Fees
MMOMMMMMMI
ccI
D P
o,- .4o
. w.4
COMPLETE PROJECT NAME
Project No. XXXX
Invoice No. 12345
Invoice Date:
Sample form for:
Payment Request
Revised 07/27/00
Total Amount Previous Total Percent
Contract Amd No. 1 Amd No. 2 Contract Invoiced Invoice Invoice Complete
$1,000
$0
$0
$1,000
$0
$1,000
$1,000
100%
2,000
1,000
0
3,000
1,000
500
1,500
50%
500
0
250
750
0
0
0
0%
2,500
0
1,000
3,500
0
0
0
0%
$6,000
$1,000
$1,250
$8,250
$750
$1,500
$2,500
30%
$2,000
$0
$0
$2,000
$500
$0
$500
25%
0
1,120
0
1,120
0
0
0
0%
0
0
1,627
1,627
0
0
0
0%
TBD
TBD
TBD
TBD
TBD
TBD
TBD
0%
TBD
TBD
TBD
TBD
TBD
TBD
TBD
0%
TBD
TBD
TBD
TBD
TBD
TBD
TBD
0%
$2,000
$1,120
$1,627
$4,747
$500
$0
$500
11%
$6,000
$1,000
$1,250
$8,250
$750
$1,500
$2,500
30%
2,000
1,120
1,627
4,747
500
0
500
11%
$8,000
$2,120
$2,877
$12,997
$1,250
$1,500
$3,000
23%
Amendment 1- Staples Street from Alameda to Morgan Avenue
Project No. E13094
Basic Services:
1. Preliminary Phase
2. Design Phase
2.b. Re -Design
3. Bid Phase
4. Construction Administration Phase
Subtotal Basic Services
Additional Services:
1. Permit Preparation
2. ROW Acquisition Survey
3. Topographic Survey and Parcel Descriptions*
4. Environmental Issues*
5. Public Involvement*
6. Subsurface Utility Investigation
7. Construction Observation Services
8. Warranty Phase
9. Landscaping Design
10. Traffic Signal Warrant Analysis*
11. Traffic Signal Design*
12. Review of Construction Value Engineering
Subtotal Additional Services
Summary of Fees
Basic Services Fees
Additional Services Fees
otal of Fees
Contract
Amd No. 1
Total Contract
$98,952.00
$98,952.00
$238,046.00
$238,046.00
$0.00
$108,800.00
$15,700.00
$15,700.00
$77,000.00-67,000.04
$0.00
$429,698.00
$31,800.00
$352,698.00
$5,000.00
$5,000.00
$18,789.00
$18,789.00
$53,671.00
$53,671.00
$6,000.00
$6,000.00
$4,626.00
$4,626.00
$40,756.00
$40,756.00
TBD
TBD
TBD
$4,430.00
$4,430.00
$0.00
$0.00
$5,500.00
-,--C3-000.0
$5,500.00
$29,000.00c$29"
$0.00
$7,200.00
$7,200.00
$174,972.00
-$29,000.00
$145,972.00
$429,698.00
$31,800.00
$461,498.00
$174,972.00
-$29,000.00
$145,972.00
$604,670.00
($2;800:41
$607,470.00
Exhibit C