Loading...
HomeMy WebLinkAboutC2016-166 - 2/9/2016 - Approved CSJ#0916-00-067 District#CRP 16 Code Chart 64#09800 Project: Spur 3 Roadway Federal Highway Administration CFDA#20.205 Not Research and Development STATE OF TEXAS § COUNTY OF TRAVIS § LOCAL TRANSPORTATION PROJECT ADVANCE FUNDING AGREEMENT For A On-System STP-MM/Rehabilitation Project THIS Local Project Advance Funding Agreement(LPAFA) is made by and between the State of Texas, acting by and through the Texas Department of Transportation, called the "State", and the City of Corpus Christ, acting by and through its duly authorized officials, called the "Local Government." WITNESSETH WHEREAS, a Master Agreement between the Local Government and the State has been adopted and states the general terms and conditions for transportation projects developed through this LPAFA; and, WHEREAS, the Texas Transportation Commission passed Minute Order Number 114213 that provides for the development of, and funding for, the Project described herein; and, WHEREAS, the Governing Body of the Local Government has approved entering into this LPAFA by resolution or ordinance dated February 9, 2016, which is attached to and made a part of this agreement as Attachment A for the development of the Project. A map showing the Project location appears in Attachment B, which is attached to and made a part of this agreement. NOW, THEREFORE, in consideration of the premises and of the mutual covenants and agreements of the parties, to be by them respectively kept and performed as hereinafter set forth, it is agreed as follows: AGREEMENT 1. Period of the Agreement The period of this LPAFA is as stated in the Master Agreement, without exception. 2. Termination of this LPAFA Termination of this LPAFA shall be under the conditions as stated in the Master Agreement. This LPAFA may be terminated by the State if the Project is inactive for thirty-six (36) months or longer and no expenditures have been charged against federal funds. 3. Amendments Amendments to this LPAFA shall be made as described in the Master Agreement, without exception. 2016-166 Page 1 of 8 Revised 02/26/2016 02/09/16 Ord. 030757 TXDOT INDEXED CSJ#0916-00-067 District#CRP 16 Code Chart 64#09800 Project: Spur 3 Roadway Federal Highway Administration CFDA#20.205 Not Research and Development 4. Scope of Work The scope of work for this LPAFA is described as installation of roadway operation and maintenance improvements in the City of Corpus Christi along the Spur 3 Corridor (Ennis Joslin Road) from SH 358 (SPID) to Ocean Drive. The improvements will consist of a dedicated turning lane, the interconnection of traffic signalization along the corridor, surveillance field equipment, and new and upgraded traffic signals. 5. Right of Way and Real Property Right of way and real property shall be the responsibility of the Local Government as stated in the Master Agreement, without exception. 6. Utilities Adjustment of utilities will be provided by the Local Government as required and as stated in the Master Agreement, without exception. 7. Environmental Assessment and Mitigation Environmental assessment and mitigation will be carried out as stated in the Master Agreement. Additionally, before the advertisement for bids, the Local Government shall provide to the State written documentation from the appropriate regulatory agency or agencies that all environmental clearances have been obtained. 8. Compliance with Texas Accessibility Standards and ADA Compliance with Texas Accessibility Standards and the Americans with Disabilities Act (ADA) will be as stated in the Master Agreement, without exception. 9. Architectural and Engineering Services Architectural and engineering services will be provided by the Local Government as stated in the Master Agreement. The Local Government is responsible for performance of any required architectural or preliminary engineering work. For projects on the state highway system, the design shall, at a minimum conform to applicable State manuals. For projects not on the state highway system, the design shall, at a minimum, conform to applicable American Association of State Highway and Transportation Officials design standards. The State may review and comment on the work as required to accomplish the public purposes of the State. The Local Government will cooperate fully with the State in accomplishing these local public purposes to the degree permitted by State and Federal law. 10. Construction Responsibilities Construction responsibilities will be carried out by the Local Government as stated in the Master Agreement. 11. Project Maintenance Project maintenance will be undertaken as provided for in the Master Agreement, without exception. AFA-LPAFA_ShortGen.doc Page 2 of 8 Revised 02/26/2016 CSJ #0916-00-067 District#CRP 16 Code Chart 64#09800 Project: Spur 3 Roadway Federal Highway Administration CFDA#20.205 Not Research and Development 12. Local Project Sources and Uses of Funds A. A Project Budget Estimate is provided in Attachment C. The State and the Federal Government will not reimburse the Local Government for any work performed before the federal spending authority is formally obligated to the Project by the Federal Highway Administration. After federal funds have been obligated, the State will send to the Local Government a copy of the formal documentation showing the obligation of funds including federal award information. The Local Government is responsible for one hundred percent (100%) of the cost of any work performed under its direction or control before the Federal spending authority is formally obligated. B. If the Local Government will perform any work under this contract for which reimbursement will be provided by or through the State, the Local Government must complete training before federal spending authority is obligated. Training is complete when at least one individual who is working actively and directly on the Project successfully completes and receives a certificate for the course entitled Local Government Project Procedures and Qualification for the Texas Department of Transportation. The Local Government shall provide the certificate of qualification to the State. The individual who receives the training certificate may be an employee of the Local Government or an employee of a firm that has been contracted by the Local Government to perform oversight of the Project. The State in its discretion may deny reimbursement if the Local Government has not designated a qualified individual to oversee the Project. C. A Source of Funds estimate based on the Transportation Improvement Program (TIP) is also provided in Attachment C. Attachment C shows the percentage and estimated dollar amount to be contributed to the project by federal, state, and local sources. The parties agree that the LPAFA may be amended from time to time as required to meet the funding commitments based on revisions to the TIP, Federal Project Authorization and Agreement (FPAA), or other federal document. D. The Local Government is responsible for all non-federal and non-state funding, unless otherwise provided for in this agreement or through amendment of this agreement. Where a Special Approval has been signed by the State, the Local Government shall only in that instance be responsible for overruns in excess of the amount to be paid by the Local Government. E. Prior to the performance of any engineering review work by the State, the Local Government will pay to the State the amount specified in Attachment C. At a minimum, this amount shall equal the Local Government's funding share for the estimated cost of preliminary engineering for the project. At least sixty (60) days prior to the date set for receipt of the construction bids, the Local Government shall remit its remaining financial share for the State's estimated construction oversight and construction costs. F. Whenever funds are paid by the Local Government to the State under this Agreement, the Local Government shall remit a check or warrant made payable to the "Texas Department of Transportation." The check or warrant shall be deposited by the State and managed by the State. Funds may only be applied by the State to the Project. If after final Project accounting any excess funds remain, those funds may be applied by the State to the Local Government's contractual obligations to the State under another advance funding agreement with approval by appropriate personnel of the Local Government. G. If any existing or future local ordinances, commissioners court orders, rules, policies, or other directives, including but not limited to outdoor advertising billboards and storm water drainage AFA-LPAFA_ShortGen.doc Page 3 of 8 Revised 02/26/2016 CSJ#0916-00-067 District#CRP 16 Code Chart 64#09800 Project: Spur 3 Roadway Federal Highway Administration CFDA#20.205 Not Research and Development facility requirements, are more restrictive than State or Federal Regulations, or if any other locally proposed changes, including but not limited to plats or replats, result in increased costs, then any increased costs associated with the ordinances or changes will be paid by the Local Government. The cost of providing right of way acquired by the State shall mean the total expenses in acquiring the property interests either through negotiations or eminent domain proceedings, including but not limited to expenses related to relocation, removal, and adjustment of eligible utilities. H. When a Special Approval has been signed by the State so that the Local Government bears the responsibility for paying cost overruns, the Local Government shall make payment to the State within thirty (30) days from receipt of the State's written notification of those amounts. I. The state auditor may conduct an audit or investigation of any entity receiving funds from the State directly under this contract or indirectly through a subcontract under this contract. Acceptance of funds directly under this contract or indirectly through a subcontract under this contract acts as acceptance of the authority of the state auditor, under the direction of the legislative audit committee, to conduct an audit or investigation in connection with those funds. Any entity that is the subject of an audit or investigation must provide the state auditor with access to any information the state auditor considers relevant to the investigation or audit. J. Payment under this contract beyond the end of the current fiscal biennium is subject to availability of appropriated funds. If funds are not appropriated, this contract shall be terminated immediately with no liability to either party. K. The Local Government is authorized to submit requests for reimbursement by submitting the original of an itemized invoice in a form and containing all items required by the State no more frequently than monthly and no later than ninety (90) days after costs are incurred. If the Local Government submits invoices more than ninety (90) days after the costs are incurred, and if federal funding is reduced as a result, the State shall have no responsibility to reimburse the Local Government for those costs. 13. Document and Information Exchange The Local Government agrees to electronically deliver to the State all general notes, specifications, contract provision requirements, and related documentation in a Microsoft®Word or similar document. If requested by the State, the Local Government will use the State's document template. The Local Government shall also provide a detailed construction time estimate including types of activities and month in the format required by the State. This requirement applies whether the Local Government creates the documents with its own forces or by hiring a consultant or professional provider. At the request of the State, the Local Government shall submit any information required by the State in the format directed by the State. 14. Incorporation of Master Agreement Provisions This LPAFA incorporates all of the governing provisions of the Master Agreement in effect on the date of final execution of this LPAFA, unless an exception has been made in this agreement. 15. Insurance If this Agreement authorizes the Local Government or its contractor to perform any work on State right of way, before beginning work the entity performing the work shall provide the State with a fully executed copy of the State's Form 1560 Certificate of Insurance verifying the existence of coverage in the amounts and types specified on the Certificate of Insurance for all persons and AFA-LPAFA_ShortGen.doc Page 4 of 8 Revised 02/26/2016 CSJ#0916-00-067 District#CRP 16 Code Chart 64#09800 Project: Spur 3 Roadway Federal Highway Administration CFDA#20.205 Not Research and Development entities working on State right of way. This coverage shall be maintained until all work on the State right of way is complete. If coverage is not maintained, all work on State right of way shall cease immediately, and the State may recover damages and all costs of completing the work. 16. Debarment Certification The parties are prohibited from making any award at any tier to any party that is debarred or suspended or otherwise excluded from or ineligible for participation in Federal Assistance Programs under Executive Order 12549, "Debarment and Suspension." By executing this Agreement, the Local Government certifies that it and its principals are not currently debarred, suspended, or otherwise excluded from or ineligible for participation in Federal Assistance Programs under Executive Order 12549 and further certifies that it will not do business with any party, to include principals, that is currently debarred, suspended, or otherwise excluded from or ineligible for participation in Federal Assistance Programs under Executive Order 12549. The parties to this contract shall require any party to a subcontract or purchase order awarded under this contract to certify its eligibility to receive federal funds and, when requested by the State, to furnish a copy of the certification. 17. Cost Principles and Office of Management and Budget (OMB) Audit Requirements In order to be reimbursed with federal funds, the parties shall comply with the Cost Principles established in 2 CFR 200 that specify that all reimbursed costs are allowable, reasonable, and allocable to the Project. 18. Notices All notices to either party shall be delivered personally or sent by certified or U.S. mail, postage prepaid, addressed to that party at the following address: Local Government: State: City of Corpus Christi Director of Contract Services Attn: City Manager Texas Department of Transportation P.O. Box 9277 125 E. 11th Street Corpus Christi, TX 78469-9277 Austin, Texas 78701 All notices shall be deemed given on the date delivered in person or deposited in the mail, unless otherwise provided by this agreement. Either party may change the above address by sending written notice of the change to the other party. Either party may request in writing that notices shall be delivered personally or by certified U.S. mail, and that request shall be carried out by the other party. 19. Civil Rights Compliance The Local Government shall comply with the regulations of the U.S. Department of Transportation as they relate to non-discrimination (49 CFR Part 21 and 23 CFR Part 200), and Executive Order 11246 titled "Equal Employment Opportunity," as amended by Executive Order 11375 and supplemented in the Department of Labor Regulations (41 CFR Part 60). AFA-LPAFA_ShortGen.doc Page 5 of 8 Revised 02/26/2016 CSJ#0916-00-067 District#CRP 16 Code Chart 64#09800 Project: Spur 3 Roadway Federal Highway Administration CFDA#20.205 Not Research and Development 20. Disadvantaged Business Enterprise (DBE) Program Requirements A. The parties shall comply with the Disadvantaged Business Enterprise Program requirements established in 49 CFR Part 26. B. The Local Government shall adopt, in its totality, the State's federally approved DBE program. C. The Local Government shall set an appropriate DBE goal consistent with the State's DBE guidelines and in consideration of the local market, project size, and nature of the goods or services to be acquired. The Local Government shall have final decision-making authority regarding the DBE goal and shall be responsible for documenting its actions. D. The Local Government shall follow all other parts of the State's DBE program referenced in TxDOT Form 2395, Memorandum of Understanding Regarding the Adoption of the Texas Department of Transportation's Federally-Approved Disadvantaged Business Enterprise by Entity, and attachments found at web address http://ftp.dot.state.tx.us/pub/txdot-info/bop/dbe/mou/mou attachments.pdf. E. The Local Government shall not discriminate on the basis of race, color, national origin, or sex in the award and performance of any U.S. Department of Transportation (DOT)-assisted contract or in the administration of its DBE program or the requirements of 49 CFR Part 26. The Local Government shall take all necessary and reasonable steps under 49 CFR Part 26 to ensure non-discrimination in award and administration of DOT-assisted contracts. The State's DBE program, as required by 49 CFR Part 26 and as approved by DOT, is incorporated by reference in this agreement. Implementation of this program is a legal obligation and failure to carry out its terms shall be treated as a violation of this agreement. Upon notification to the Local Government of its failure to carry out its approved program, the State may impose sanctions as provided for under 49 CFR Part 26 and may, in appropriate cases, refer the matter for enforcement under 18 U.S.C. 1001 and the Program Fraud Civil Remedies Act of 1986 (31 U.S.C. 3801 et seq.). F. Each contract the Local Government signs with a contractor (and each subcontract the prime contractor signs with a sub-contractor) must include the following assurance: The contractor, sub-recipient, or sub-contractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this agreement, which may result in the termination of this agreement or such other remedy as the recipient deems appropriate. 21. Federal Funding Accountability and Transparency Act Requirements A. Any recipient of funds under this Agreement agrees to comply with the Federal Funding Accountability and Transparency Act (FFATA) and implementing regulations at 2 CFR Part 170, including Appendix A. This agreement is subject to the following award terms: http://www.gpo.gov/fdsys/pkq/FR-2010-09-14/pdf/2010-22705.pdf and http://www.gpo.gov/fdsys/pkq/FR-2010-09-14/pdf/2010-22706.pdf B. The Local Government agrees that it shall: 1. Obtain and provide to the State a System for Award Management (SAM) number (Federal Acquisition Regulation, Part 4, Sub-part 4.11) if this award provides more than $25,000 in AFA-LPAFA_ShortGen.doc Page 6 of 8 Revised 02/26/2016 CSJ #0916-00-067 District#CRP 16 Code Chart 64#09800 Project: Spur 3 Roadway Federal Highway Administration CFDA#20.205 Not Research and Development Federal funding. The SAM number may be obtained by visiting the SAM website whose address is: https://www.sam.gov/portal/public/SAM/ 2. Obtain and provide to the State a Data Universal Numbering System (DUNS) number, a unique nine-character number that allows the Federal government to track the distribution of federal money. The DUNS number may be requested free of charge for all businesses and entities required to do so by visiting the Dun & Bradstreet (D&B) on-line registration website http://fedgov.dnb.com/webform; and 3. Report the total compensation and names of its top five (5) executives to the State if: i. More than 80% of annual gross revenues are from the Federal government, and those revenues are greater than $25,000,000; and ii. The compensation information is not already available through reporting to the U.S. Securities and Exchange Commission. 22. Single Audit Report A. The parties shall comply with the requirements of the Single Audit Act of 1984, P.L. 98-502, ensuring that the single audit report includes the coverage stipulated in 2 CFR 200. B. If threshold expenditures are met during the Local Government's fiscal year, the Local Government must submit a Single Audit Report and Management Letter (if applicable) to TxDOT's Audit Office, 125 E. 11th Street, Austin, TX 78701 or contact TxDOT's Audit Office at http://www.txdot.gov/inside-txdot/office/audit/contact.html. The expenditure threshold for fiscal years beginning prior to December 31, 2014 is $500,000; the expenditure threshold for fiscal years beginning on or after December 31, 2014 is $750,000. C. If expenditures are less than the threshold during the Local Government's fiscal year, the Local Government must submit a statement to TxDOT's Audit Office as follows: "We did not meet the $ expenditure threshold and therefore, are not required to have a single audit performed for FY D. For each year the project remains open for federal funding expenditures, the Local Government will be responsible for filing a report or statement as described above. The required annual filing shall extend throughout the life of the agreement, unless otherwise amended or the project has been formally closed out and no charges have been incurred within the current fiscal year. 23. Signatory Warranty Each signatory warrants that the signatory has necessary authority to execute this agreement on behalf of the entity represented. AFA-LPAFA_ShortGen.doc Page 7 of 8 Revised 02/26/2016 CSJ #0916-00-067 District#CRP 16 Code Chart 64#09800 Project: Spur 3 Roadway Federal Highway Administration CFDA#20.205 Not Research and Development THIS AGREEMENT IS EXECUTED by the State and the Local Government in duplicate. / TH • ALG V M 3 - F � Approved as to form: Sire i z.�. • sistant City Attorney For City Attorney Typed or Printed Name D► o� PUBLAC— We '..1.4S Title Date WEST: REBECCA HUERTA CITY SECRETARY THE STAT F TEXAS Kenneth Stewart Director of Contract Services Texas Department of Transportation 7g/./ Date +cs Urd 157 n COUNCIL i(p fir, SECR Irkfil 11P AFA-LPAFA_ShortGen.doc Page 8 of 8 Revised 02/26/2016 • CSJ#0916-00-067 District#CRP 16 Code Chart 64#09800 Project: Spur 3 Roadway Federal Highway Administration CFDA#20.205 Not Research and Development ATTACHMENT A RESOLUTION OR ORDINANCE ORDINANCE APPROPRIATING FUNDS IN THE AMOUNT OF$100,000 AND AUTHORIZING THE CITY MANAGER OR DESIGNEE TO EXECUTE AN INTERLOCAL COOPERATION AGREEMENT WITH TEXAS A I M UNIVERSITY-CORPUS CHRISTI flAMU-CC):TO EXECUTE AN ADVANCE FUNDING AGREEMENT WITH THE TEXAS DEPARTMENT OF TRANSPORTATION(TXDOT)WITH A REQUIRED PAYMENT TO TXDOT iFI THE AMOUNT OF $18,120: AND TO EXECUTE MASTER SERVICE AGREEMENT WITH MALDONADO-BURKETT INTELLIGENT TRANSPORTATION SYSTEMS, LLP (MELTS) IN AN AMOUNT NOT TO EXCEED SS47,27517 FOR THE DESIGN OF TRAFFIC IMPROVEMENTS CITYWIDE. BE IT ORDAINED BY THE CiTY COUNCIL OF THE CiTY OF CORPUS CHRISTI, TEXAS: SECTION 1. The FY 2016 Capital Improvement Budget adopted by Ordinance No 030621 is amended to add $100,000 in anticipated revenues to Fund 3530 from a contribution from Texas ASM University-Corpus Christi for part of the City's share of traffic improvements along Spur 3 Corridor(Ennis Joslin Road)from SH 358(SPED)to Ocean[hive. SECTION 2. Revenues and expenditures in the amount of$100,000 are increased in the FY 2016 Capital Improvement Budget adopted by Ordinance No 030621. SECTION 3. The City Manager or designee is authorized to execute an Irgertocal Cooperation Agreement with Texas A&M Urrverslty-Corpus Ciristi (TAMU-CC) for traffic improvements at the Intersection of Ennis Joslin Road and Islander Way and traffic signal improvements at Ennis Joslin Road and Nib Drive. SECTION 4, The City Manager or designee is authorized to execute an Advance Funding Agreement with the Texas Department of Transportation(TXDOT)for traffic improvements along Spur 3 Corridor(Ennis Joslin Road)from SH 358(SPID)to Ocean Drtv+e.with the local participation in the amount of$224,120 with $13,720 due now, $4.400 due before oonstruttion starts, and a local-estimated construction share of $206,000. SECTION 5.The City Manager or designee is authorized to execute a Master Services Agreement between the City of Corpus Christi and Maldonado-Burkett Intelligent Transportation Systems.U.P in the amount of$547,275.87 for professional engineering services for Bond 2014 Traffic Signal Improvements throughout the City of Corpus Christi bogeying with traffic improvements along Spur 3 Corridor from SPID to Ocean Drive. This Is a not-to-emceed. multi-year professional services contract with a drtriigtratively approved task orders. ATTESTT OF CORPUS CHRIST] Rebecca Muerte Nelda Martinez City Secretary Mayor 030757 INDEXED AFA-LPAFA_ShortGen.doc Page 1 of 5 Attachment A CSJ#0916-00-067 District#CRP 16 Code Chart 64#09800 Project: Spur 3 Roadway Federal Highway Administration CFDA#20.205 Not Research and Development ATTACHMENT A RESOLUTION OR ORDINANCE That the foregoing ordinance was read for the first time and passed to As second reading on this the ^day of . r A+ 1)16,by The following vote- Nelda Martinez t � �:� Chad Maga Carolyn Vaughn Colleen McIntyre Rudy Garza iL+_' Lillian Riojas /,. i Brian Rosas i.. Mark Scott _ Lucy Rubio fry That flip fcregoiig ordinance was read for The second time and passed finally on this the Y. •t'day of 5tilyttR.0 [)16.by the following vote: Nelda Martinez Chad Magill . Carolyn Vaughn Colleen McIntyre Rudy Garza I/+ Lillian Riojas �.r� Brian Rosas l Mark Scott i ar Lucy Rubio 1 1 PASSED AND APPROVED,this the I day of 671t{a y, 6. ATTEST THE CITY OF CORPUS CHRISTI Zeicaki ",+L ' -7.uerta Nelda Marti City Secretary Mayor 0307)7 AFA-LPAFA_ShortGen.doc Page 2 of 5 Attachment A CSJ#0916-00-067 District#CRP 16 Code Chart 64#09800 Project: Spur 3 Roadway Federal Highway Administration CFDA#20.205 Not Research and Development ATTACHMENT A RESOLUTION OR ORDINANCE CITY of CORPUS CHRISTI CERTIFICATION OF FUNDS (City Chau Ankle IV,Sections 7&8) I.the Din dor of Finandrl Services of the Cry of Corpus Ditttsel Tis(or hisMer A ly authorised representative),hereby certify lo the City Coun i and other appropriate officers that the money required for the dement fteeai yobs portion of tie ocr*ad.#Oreamant obapetion or a overture dssQ*id below is In the Treasury to the credit of the Fund specified below,from when It is to be drawn,and has not been appropided for any other pnrpme. Future payments are subject to annual appropriation by the City Coundl First Reading for the City Council Misting of Marson 211.2.14 Second Reading for the City Council Meeting of Fsbrusrr a.2a16 Ordinance appropriating funds in the amount of$100,000 and authorizing the City Manager or designee to axwrrh an intadocal Cooperation Agreement with Texas A iUnivorSity-Corpus Y Aittfi4C);to execute an Advance Funding nt with the Tams Department of Trompp atop TX(TXDOT))with a required payment to TJX the amount of$18,120;and to execute Mosier Service Agreement vrih Maidonado.Burkott Inieliigent Tra spct tatlon Systems,UP(AMTS)in an amount not b exceed 3547,275.87 for the design of traffic improvements d ywide_ Amount Required:mum Fund Name Accoundng Account Activity No. AmountUnit No. F Sorest OP Forte 3530061 _.._.1'eo61 Si 00,000 Tow 1100,000 Car98eatlet orf Fonds R.m ad = 'P Director of Financial Services ,IAN 2 2 2016 Why 4 �lRMY/��Wrb -a dry 7 AFA-LPAFA_ShortGen.doc Page 3 of 5 Attachment A • • CSJ#0916-00-067 District#CRP 16 Code Chart 64#09800 Project: Spur 3 Roadway Federal Highway Administration CFDA#20.205 Not Research and Development ATTACHMENT A RESOLUTION OR ORDINANCE CITY OF CORPUS CltiilSTM CERTIFICATION OF FUNDS (City Cherbw Ankle IV,sections 7 I) I,the Director of Finandel Services of the City of Corpus Cfate&Teras(or hisAher duly authorized representative).hereby certify to the City Council and other appropriate officers that the money required for the current Ifacst year's portion of the contract.agrssnwnt obligation or expenditure daunted below Is in the Treasury to the credit of the Fund spaded below,from which It it to be drawn,and has not been approprieled for any other purpose. Faiene payments are subject to annual appropriation by the City Council. Fist Reading for the City Council Meeting of stream 21,Mil Second Reeding for the City Caston Msstiap of'Orally a.2016 Ordinance appropriating funds in the amounn of 6100,000 and authorising the City Manager or designee to execute an Inhterbc&Cooperation Agreement with Texas A&IA University- Corpus Christi(TAMU-OC):to execute an Advance Funding Agreement with the Texas Department of Transportation(TXDOT)with a required payment to TXDOT In the amount of#111.120;and to execute Mader Senios Agreement with Maldonado-8urkalt IniNigahl Transportation Systeme,LIP MOTS)In an amount not to exceed 6547,275.57 for the design of traffic Improvements citywide. Amount Required$11.120 Fund Name Accounting A Nes all Activity No. Amount UnitStreet 2015 GO CP Fred 3551-061 550950 E15165 01 3551 $15,12000 .,.K..,_-..,...,.,,... EXP Total i $16,12000� Director of Financial Semites Dale: Jay?Y 2i1i /t-08.17 AFA-LPAFA_ShortGen.doc Page 4 of 5 Attachment A CSJ#0916-00-067 District#CRP 16 Code Chart 64#09800 Project: Spur 3 Roadway Federal Highway Administration CFDA#20.205 Not Research and Development ATTACHMENT A RESOLUTION OR ORDINANCE CITY OF CORPUS CHRISTI CERTIFICATION OF FUNDS (City Charter Article IV.Sections 7 a a) I.the Director of Financial Services of the City of Corpus Christ Texas(or heather duly cum d rispnamm t t hereby for the ewer*)). certify A yeeriportionn City the Council other appropriate officers that Ow money required below n the Treasuryagreement.to or expenditure dseaibed In to the credit of Me Fund speciled Mimi.from which It is to be draw,and has not been appropdalsd for any other purpose Future payments we subject to annual appropriation by the City Cowwii. First Reading for the City Council Meeting of sigguarvikell Second Ring for the City Council Meeting ofaj4=Ub Ordinance approprfaing funds in the amount of$100,000 and authorizing the City Manager or designee to execute an trttertocal Cooperation Agreement with Texas A&M University- Corpus Christi(TAMU-CC);to execute an Advance Funding Agreement with the Texas Demeanor*of Transportation(TXDOT)with a required payment to TXDOT In the amount of $15,120;and to execute Master SaMofa Agreement with Maktonade aurkett Inielipent Transportation Systems.LLP(MBITS)In an amount not to exceed$547,275.117 for the design of traffic improvements citywide. Amount Required:1547.275.57 Fund Name Accou►flag Account Activity No. Amount Uak No. Street 2015 GO CIP Fund 3551-051 S54050 E15165 P 3551 5547,27587 $547.275.87 c._..,.— ----dvu ,. .y,.. Direc Date r JAi ivy �s-U22 AFA-LPAFA_ShortGen.doc Page 5 of 5 Attachment A CSJ #0916-00-067 District#CRP 16 Code Chart 64#09800 Project: Spur 3 Roadway Federal Highway Administration CFDA#20.205 Not Research and Development ATTACHMENT B PROJECT LOCATION MAP OCEAN DRIVE ANEW TRAFFIC SIGNAL DEDICATED Sr5 RIGHT TURN LANE NEW TRAFFIC SIGNAL LOCATION MAP Nor so- SH 358 cal SPUR 3 CORRIDOR ( ENNIS JOSLIN) EXHIBIT'A' ROADWAY OPERATION AND MAINTENANCE IOF..ORaInIS DEPARTMENT so SH 358 (SPID) TO OCEAN DRIVE PAGE:1 OF 1 „=. AFA-LPAFA_ShortGen.doc Page 1 of 1 Attachment B CSJ #0916-00-067 District#CRP 16 Code Chart 64#09800 Project: Spur 3 Roadway Federal Highway Administration CFDA#20.205 Not Research and Development ATTACHMENT C PROJECT BUDGET ESTIMATE AND SOURCE OF FUNDS Costs will be allocated based on 80% Federal funding and 20% Local Government funding until the federal funding reaches the maximum obligated amount. The Local Government will then be responsible for 100% of the costs. Description total Estimated Federal State Local Cost Participation Participation Partici.ation % Cost % Cost % Cost Engineering (by Local $20,000 r0% $0 0% $0 100% $20,000 Government) Construction (by Local $1,030,000 ▪80% $824,000 0% $0 20% $206,000 Government) Subtotal $1,050,000 $824,000 $0 $226,000 Environmental Direct State $2,744 0% $0 0% $0 100% $2,744 Costs Right of Way Direct State $2,744 ▪0% $0 0% $0 100% $2,744 Costs Engineering Direct State $5,488 0% $0 0% $0 100% $5,488 Costs Utility Direct State Costs $2,744 0% $0 0% $0 100% $2,744 Construction Direct State $4,400 0% $0 0% $0 100% $4,400 Costs Indirect State Costs $59,122 0% $0 100% $59,122 0% $0 15.74% Subtotal $77,242 $0 $59,122 $18,120 • TOTAL $1,127,242 $824,000 1$59,122 I$244,120 Initial payment by the Local Government to the State: $13,720.00 Payment by the Local Government to the State before construction: $4,400.00 Estimated total payment by the Local Government to the State $18,120.00 This is an estimate. The final amount of Local Government participation will be based on actual costs. AFA-LPAFA_ShortGen.doc Page 1 of 1 Attachment C • FD Op 2120> � s Cs