Loading...
HomeMy WebLinkAboutC2016-417 - 4/12/2016 - NA TASK ORDER NO. 2 This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and "KSA ENGINEERS" (Consultant) dated February 16, 2016 by Ordinance 030765, (Agreement). Consultant shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. TASK ORDER NO. 2 PROJECT NAME: E15234—Reconstruct East GA Apron, Areas 3 -6 1. PROJECT DESCRIPTION — This project includes the rehabilitation of the East General Aviation Apron to include the removal of existing asphalt pavement and replace with reinforced concrete, aircraft tie-downs, striping and upgrades of apron lighting. This project is being phased accordingly due to funding. 2. SCOPE OF SERVICES (Task Order No. 2) — Services to Inspect 700' Triple Box culvert underneath the East GA Apron more fully described in Exhibit A. 3. COMPENSATION—The total amount not to exceed for Task Order No. 2 only is $23,714. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF COPLUS ' - STI KSA, INC. kfri(LCVe J. . Edmonds, P. E. (Date) Mitchell L. Fo ner, P.E. (Date) Director of Engineering Services President 8875 Synergy Drive McKinney, TX 75070 (903) 236-7700 Office TASK ORDER NO. 2 Fund Name Accounting Account Activity No. Amount Unit No. Airport Grant 3020-274 550950 El 52341503020D $21,342.60 Airport CIP 3026-274 550950 E152341503026D $ 2,371.40 Total $23,714.00 2016-417 4/12/16 KSA Engineers INDEXED EXHIBIT A CITY OF CORPUS CHRISTI,TEXAS Fees for the Investigation of the Triple Box Culvert Below the East General Aviation Apron for the Runway 13-31 Extension/Displacement and Connecting Taxiways Project at the Corpus Christi International Airport I. SCOPE OF SERVICES This proposal amends the fees related to Construction Administration for the Corpus Christi International Airport RWY 13-31 Extension/Displacement and Connecting Taxiways Project for the following scope work. A. SCOPE OF WORK 1: Perform a subsurface investigation and laboratory testing for the East General Aviation (EGA)apron. 2: Perform field survey work to determine box sizes, flow line elevations of the inlet and outfall of the culvert, as well as surface elevation at 25' intervals. 3: Perform a video monitoring to determine the condition of the culvert. B. DESIGN REQUIREMENTS 1. Plans and specifications shall be in full compliance with all design and construction standards of the FAA, City of Corpus Christi, and other governing authorities, as applicable. C. TRAVEL 1. This amendment excludes travel expenses as it is assumed a. In the event that this work will require travel by KSA's PM, that would require additional compensation by the Owner. b. No other KSA staff member will be required to travel. c. All subcontractors required for data collection are local and therefore no travel is required. D. DELIVERABLES 1. This amendment includes submission of electronic copies of a draft preliminary report. 2. As requested by the FAA, this amendment also includes the submission of up to six (6) sets of ANSI D (22" x 34") plan drawings, Six (6) sets of ANSI B (11" x 17") plan drawings, and six (6) sets of a final project report. Any other requested copies will require additional compensation by the Owner. II. SCHEDULE The tasks in the scope of this amendment shall be completed in a period of three weeks from the issuance of a notice to proceed. III. FEES The Engineer proposes to provide the proposed services on a lump sum basis for an amount of $23,714.00. Task Order 02 EXHIBIT A Page 1 of 1 KSA Engineers, Inc. Project No. CRP.039 • . EXHIBIT B Master Services Agreement KSA Engineers DESCRIPTION NOT TO EXCEED AMOUNT Maximum Contract Amount $1,500,000.00 TASK ORDERS: Task 1—Design/Bid Phase Services Perimeter Fence $190,386 Task 2—Construction Administration for Runway 13-31 $23,714 Task 3—TBD TBD Task 4—TBD TBD Task 5—TBD TBD Task 6—TBD TBD Amount Remaining on Master Services Agreement $1,285,900.00