Loading...
HomeMy WebLinkAboutC2016-508 - 10/19/2016 - NA I I i • CITY OF CORPUS CHRISTI AMENDMENT NO. 2 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas, a Texas home-rule municipal corporation ("City") and LJA Enoineerine. Inc. ("Consultant"), agree to the following amendments to the Contract for Professional Services for Gollihar Road Improvements from Kostorvz Road to Weber Road BOND 2014(Prosect No. E13088&El 3089): Original Contract March 18, 2014 Ordinance No. 030125 $2,009,621.00 Amendment No. 1 June 13, 2016 Administrative Approved $0.00 In the Original Contract, Exhibit"A", Section I. Scope of Services shall be amended as set forth in the attached Amendment No. 2, Exhibit"A". In the Original Contract, Section III shall be amended based on the modified scope of services in the attached Amendment No. 2, Exhibit"A"for a fee not to exceed$49.990,for a total restated fee not to exceed$2,059.611. All other terms and conditions of the March 18, 2014 Contract for Professional Services between the City and Consultant,and of any amendments to that contract,which are not specifically addressed herein shall remain in full force and effect. CITY OF CORPUS CHRISTI LJAGI E 0 . (.1 �, I O/�9 /jtí, 10-05-2016 Margie C. Rose /�- Date Patrick D.Veteto, P. . Date City Manager Vice President 820 Buffalo Street Corpus Christi,TX 78401 361-887-8851 Office RECOMMENDED /0149/ Mark Va VI te Assist= t City Man, _e (07/411/4 1 lr '7",`:, 0/4, Va 7= H. Gray, ".E. Date Ex= ' e Director of P blic Wo s Operating Departildi Date 2016-508 10/19/16 LJA Engineering Inc. MOB GOLL HAR FROM WEBER TO CARROLL BOND 2014NMENDMENT 2 LJAM20151001 AMENDMENT TO CONTRACT RINDEXED APPROVED AS TO LEGAL FORM (f/ufvutic - (0011(4Assistant ity Attorney Date APPROVED ,( Ay .\ I of /bill/ Office of Management and ; .dget Date ATTEST i\ e./. /e„ e_&e, ir--- _, (o(<4 4" 6 , City Secretary Date Fund Name Accounting Unit Account No. Activity No. Account Amount Category Street CIP Bond 2014 3551-051 550950 E13088013551EXP 50950 $24,995 Street CIP Bond 2014 3551-051 550950 E13089013551EXP 50950 $24,995 Total $49,990 K\ENGINEERING DATAEXCNANGE1AWGIEMISTREET\E13088 GOLLIHAR FROM WEBER TO CARROLL BOND 20141AMENDMENT 2 LJA12015 1001 AMENDMENT TO CONTRACT PROFESSIONAL SERVICES.DOC REV.1011115 LJA Engineering, Inc. LJA 820 Buffalo St. Phone 361.887,8851 Corpus Christi,IX 78401 Fax 361.887 8855 www tjaengineering corn TOPE Ne F-1386 TBPLS N4 10016600 September 29, 2016 City of Corpus Christi Engineering Services P. O. Box 9277 Corpus Christi, Texas 78469-9277 Attn: Mr. J. H. Edmonds, P.E. Director of Engineering Services Re: Engineering Services Agreement Between City of Corpus Christi and LJA Engineering, Inc. Gollihar Road Improvements— Project No(s) E13088 & E13089 Revised Contract Amendment No. 2— Additional Services LJA Project No. C007-14003 Dear Mr. Edmonds: I. SCOPE OF WORK We have prepared Contract Amendment No. 2 (CA2) to our Gollihar Road Improvements NE Contract. CA2 covers significant manhour overruns in the preparation of the revised construction documents through the submittal of the revised 100% Submittal Package. LJA's Contract Amendment No. 1 for the preparation of the revised construction documents (DESIGN) provided for 1,486 manhours. LJA spent 2,555 manhours preparing the revised 100% Submittal Package resulting in overrunning the negotiated DESIGN fee by $92,337. CA2 also covers the additional efforts required to prepare and submit the Sealed Submittal Package totaling $78,965.36. The additional efforts include the following: - Revisions to the construction plans for City changes to the previously approved gas installation method; - Revisions to the construction plans for City changes to the previously approved cycle track improvements; - Revisions to the construction plans for changes to the previously approved RTA improvements; - Revisions to the construction plans for changes to the proposed utility designs of connecting projects (Naismith and MGM); - Preparation of an estimated construction schedule; - Efforts required to address City comments on the Revised 100% Submittal Package; - Revisions to the Contract Documents; - Performance of QA/QC on revisions to the construction documents; - Attendance of additional Traffic Control and Coordination meetings (4 Meetings Max); and - Preparation and submittal of the Sealed Submittal Package. AMD NO 2 EXHIBIT'A' Page 1 of 4 Mr.J.H. Edmonds, P.E. City of Corpus Christi September 29,2016 CA2 adds Additional Service: Prepare One (1) Utility Easement for the creation of one (1) utility easement at the northwest corner of Gollihar Road and Carroll Lane for the placement of the proposed traffic signal control cabinet. CA2 also adds Additional Service: Prepare Record Drawings. Under the Original Contract, Record Drawings were to be prepared as part of Construction Phase services. Contract Amendment No. 1, however, reallocated most of the Construction Phase funds to cover the cost of CA1, and Construction Phase services were removed from the Contract, except for preparing Record Drawings. CA2 reallocates the remaining Construction Phase funds to cover the cost of CA2, so an individual line item was added to provide funds for preparing Record Drawings at the end of construction. Lastly, CA2 adds Additional Service: Construction Phase Assistance (Time and Materials) and reallocates the remaining fee balance of $34,028.96 from the Original Contract plus an additional $49,990.00 to provide a total of $84,018.96 for this new contract line item. With CA1, funds from the Original Contract Basic Service: Construction Administration Phase were reallocated to cover efforts required in CA1, and Construction Phase services were removed from the Contract. The estimated construction duration for this Project is 30 months to final completion. LJA anticipates that it will require approximately$117,000 to provide required Construction Phase Services over 30 months. The $84,018.96 will provide LJA with funds for Construction Phase Assistance efforts through a significant portion of the construction duration. Depending upon the level of effort required of LJA during construction, a future contract amendment may be required to provide additional funds to provide Construction Phase Assistance to the end of the Project. II. CONTRACT CONDITIONS LJA will perform the above-described work for the fees established below. Any engineering efforts requested outside of the stated scope of work will require another amendment to the contract and additional fees. LJA understands that the City intends to contract separately for additional SUE efforts to locate existing AT&T and other 3`d party utilities within the Project area that were not included in the Original Contract SUE scope of work. LJA further understands that these additional SUE efforts will occur after the construction documents are finalized and sealed and before construction begins. As such, LJA will finalize the construction documents using the SUE data collected to date and using the location of the existing AT&T duct banks as shown on the record information provided to LJA by AT&T. Any revisions to the construction documents after delivery of the Sealed Submittal Package will require additional fees. III. BASIS OF COMPENSATION & SCHEDULE OF PAYMENT LJA proposes to perform the above-described scope of work for the fees shown below: - Basic Service: Design Phase $ 171,302.36 - Add'I Service: Prepare One (1) Utility Esmt. $ 1,500.00 - Add] Service: Prepare Record Drawings $ 15,000.00 - Add'l Service: Constr. Phase Assist. (T&M) $ 84,018.96 - Total Additional Fees $271,821.32 AMD NO. 2 R:ICLIENTS\CITV OF CC-7\14003.Gotlihar Roaa Improvemenls\Engineering Contract Amendments\Amendment No. EXHIBIT `A' 2\Ltr.JEdmonds.Gollihar.Exh A CA42.09.29-16 ACMINISTRATIVE.docx Page 2 of 4 Mr.J.H. Edmonds, P.E. City of Corpus Christi September 29,2016 The current contract contains $221,831.32 in unused funds. LJA proposes to reallocate all of those funds towards the costs of CA2, which will leave $49,990.00 to be funded by this contract amendment as shown on the attached Summary of Fees. Invoices shall be prepared, submitted and paid on a monthly basis in accordance with the Original Contract. Invoices will be based upon engineering efforts spent at the time of invoicing. IV. SCHEDULE LJA will commence the above-described work upon receipt of an executed copy of this Contract Amendment and a Notice to Proceed from the City. The Design Phase services to provide sealed construction documents are estimated to require approximately 4 weeks to complete. Contract Amendment No. 2 documents are attached. We appreciate the opportunity to provide these engineering services to you. If you have any questions regarding this Contract Amendment, or need any additional information, please do not hesitate to contact me at (361) 887-8851. Best Regaiiip 111,..__ 91- Z9-/ D. Sco'Jones, P.Ep Date Corpus Christi Off', Manager 0 Patric D. a eto, PE Date Vice President DSJ/PDV/dcr Attachments AMD NO. 2 R:\CLIENTS\CITV OF CC-7\14003-Gollihar Road Improvements\Engineering Contract Amendmenls\Amendment No EXHIBIT'A 2\LIr.JEdrnonds.GoNihar Exh A CA82.09-29.16 ADMINISTRATIVE.docx Page 3 of 4 GOLLIHAR ROAD IMPROVEMENTS KOSTORYZ ROAD TO WEBER ROAD(2014 BOND ISSUE) Project No(s)El 3088&E13089 SUMMARY OF FEES ORIGINAL Fees CONTRACT AMD.NO.1 AMD.NO.2 TOTAL Basic Services Fees 1 Preliminary Phase $131,415.00 $0.00 $0.00 $131,415.00 2 Design Phase $864,510.00 $157253.68 5171,302 36 51,193,066.041 3 Bid Phase $34,950.00 $0.00 SO 00 534.950.00' 4 Construction Administration Phase 5198,150.00 ($165,353.68 50.00 Subtotal Basic Services Fees 51,229,025.00 -$8,100.00 $138,506.04 S1,359,431.D4 Additional Services Fee(Allowance) 1. Permitting TDL ation(Authorizedt S3 $0.00 SO 2. Right-of-Way t- r(ROW)Acquis t on Survey(Authorized) $20,000.00 _`-, $0.00 (520,000 0: 53,16.0000 3. Topographic Survey&ROW Verification(Authonzed) $110,630.00 $0.00 $0.00 S110,630.00 4 Environmental Issues(Hazardous Materials Encountered During Construction) 55.000.00 $0.00 ($5,000.00), $0.00 5 Subsurface Utility Engineering(S U E)(Authorized) 547.370.00 $0.00 $0.00 $47,370.00 6 Public Meetings&Committee Presentations(4 Meetings Total)(Authorizedi $25 900.00 SO 00 $0.00 $25,900.00 7 Construction Observation Services 50.00 SO 00 $0.00 $0.00 8 Warranty Phase S3 450 00 50.0D _($3,45000) $0.00 9 Drainage Analysis of Gollihar Drainage Basin(Authorized) $68.700_00 SO.00 $0.00 $68,700.00 10. Drainage Topographic Survey(Authorized) $63,660.00 $0.00 $0.00 $63,660.00 11. Evaluation of Existing Box Culvert (Authonzed) $91,495.00 50.00 50.00 $91,495.00 12. Concrete Cores of Existing Box Culvert(Authorized) _$44,971.00 $0.00 _ $0.01 S44,971 00 13. Design Repairs to the Existing Box Culvert(Authorized) $25,000.00 $0.00 $0.00 S25,000.00 14. Design Removal&Replacement of the Existing Box Culvert $0.00 S0.00 $0.00 S0.00 15. Geotechnical Investigations and Recommendations(Authorized) 547,805.00 $0.00 $0.00 S47,805.00 16. Traffic Analysis&Modeling $32,700 00 $0 00 $0.00 $32 700.00 17. Signal Design Modifications at Carroll Lane(Authorized) S30,225.00 $8,100.00 $0.00 $38,325.00 18 Signal Design Modifications at Kostoryz Road 530.225 00 SO 00 i$30,225.00), 50.00 19. Construction Progress Meetings $47,520.00 50.00 (547,52000) 50.00 20. Additional 6-Months of Construction Administration Services&Progress Meetings $57,840 00 $0.00 (S57,840.00) $0.00 --- -_ _ _ 21. Phase 1 Environmental Assessment of Project Area 510.000.00 $0.00 ($70,000 00) $0.00 22 Value Engineering Proposal Review S15,000.00 50 00 (515 000 6-0) S0.00, 23. Prepare One(1)Utility Easement $0.00 $0.00 $1.500.00 $1.500.00, 24. Prepare Record Drawings SO 00 50.00 5 000.00 515.000.00 25 .) Construction Phase Assistance(T&M)(Authorized) $0.00 50.00 $84.01B. $84,018.96 Subtotal Additional Services Fees 5780,596.00 58,100.00 -$88,516.04 5700,179.96) Total Fees $2,009,621.00 $0.00 549,990.00 52,059,611.00, bilkiLad j2 JJftQ D5 ax1�, 3 . CTED Lk, \r 1D LTYLC t ID o t.c AMD NO.2 EXHIBIT'A' Page 4 of 4