HomeMy WebLinkAboutC2016-511 - 10/24/2016 - NA AMENDMENT NO.41 TO AGREEMENT For PROFESSIONAL SERVICES This AGREEMENT is between the City of Corpus Christi, Texas, a Texas home-rule municipal corporation, "CITY", acting through its duly authorized City Manager or designee ("City Engineer"), and KSA Engineers,Inc. of Longview,Texas,acting through its duly authorized representative who is Mitchell L. Fortner, President, (ENGINEER),which agree as follows: 1. DECLARATIONS. "CITY" desires to engage °ENGINEER" to provide services in connection with City's project, described as follows: Reconstruct East GA Apron(Project No. El 52341 "Project". 2. SCOPE OF WORK. "ENGINEER"shall provide services for the PROJECT in accordance with the accompanying Letters, Scope of Services,and Fee attached as"Exhibit A". 3. FEE. The"CITY"agrees to pay the"ENGINEER"for services provided in accordance with Exhibit "A", Scope of Services, and Fee under this AGREEMENT, a total fee not to exceed $0.00 (in figures), (Zero Dollars and No Centsl (in words) for a total revised fee not to exceed $6,842,744.00 (in figures), (Six Million Eight Hundred Forty Two Thousand Seven Hundred Forty Four Dollars and No Cents)(in words). 4. OWNERSHIP OF DOCUMENTS. All documents including contract documents(plans and specifications), record drawings, contractor's field data and submittal data will be the sole property of the City and may not be used again by the A/E without the express written consent of the Director of Capital Programs. However,the AYE may use standard details that are not specific to this project. CITY OF CO; " -ISTI KSA ENGINEERS,INC. /024(4) ID„10. 2,0* alerie H. Gray, P.E (Date itchell L Fort er (Date) ted Executive Director of Public Works President 140 E.Tyler, Suite 600 Longview,TX 75601 (903)236-7700 APPROVED AS TO LEGAL FORM �n . I Aimee Alcorn-Reed [�� //�* 2016.10.14 10:20:06-05'00' Assistant City Attorney (Date) For City Attorney K(ENGINEERING OATAEXCHANGEICLAR:SSARAIRPORT\E 15234-RECONSTRUCT EAST GA APRON AREAS 3.6UKSA AMt.DMEAT NO 4(AMENDMENT NO.4I NSA ENGINEERS.DOCX 2016-511 10/24/16 KSA Engineers Inc. INDEXED • ATTEST ,c____L-ezey',. Attir-k CITY SECRETARY Project No. E11047, E12156B and El 5234 Airport CIP Funding source: AU Account Activity Account Amount 3020-274 550970 E110471503020C 50970 (170,508.76) 3026-274 550970 E110471503026C 50970 (18,945.42) 3020-274 550920 E110471503020C 50920 (5,576.01) 3026-274 550920 E110471503026C 50920 (619.53) 3020-274 550970 E12156B1503020D 50970 (389.92) 3026-274 550970 E12156B1503026D 50970 (43.34) 3020-274 550920 E12156B1503020D 50920 (61,861.86) 3026-274 550920 E12156B1503026D 50920 (6,873.53) ($264,818.37) 3020-274 550970 E152341503020C 50970 193,050.00 3026-274 550970 E152341503026C 50970 21,450.00 3020-274 550920 E152341503020C 50920 45,286.53 3026-274 550920 E152341503026C 50920 5,031.84 $264,818.37 Net Total: 0.00 Encumbrance Number: K:\ENGINEERING DATAEXCHANGE\CLARISSAJ AJRPORT\E15234-RECONSTRUCT EAST GA APRON AREAS 3-6\KSA AMENDMENT NO.41\AMENDMENT NO.41- KSA ENGINEERS.DOCX EXHIBIT A CITY OF CORPUS CHRISTI,TEXAS Construction Administration Phase and Closeout Phase Service Fees for the Rehabilitate East General Aviation Apron, Phase I Project at the Corpus Christi International Airport I. SCOPE OF SERVICES This proposal provides scope, schedule, and budget estimates for Construction Administration Phase and Closeout Phase services related to the Rehabilitate East General Aviation Apron, Phase I Project at the Corpus Christi International Airport(City of Corpus Christi Project No. E15234). This proposal is provided on the basis of construction of the Base Bid and Additive Alternate No. 1. Proposed fees and information provided in association with Rock Engineering &Testing Laboratories (RETL); and LNV, Inc. (LNV). The Engineer shall provide the following services: A. SCOPE OF WORK Fee Reallocation from KSA's existing contract to provide Construction Administration (CA) for Runway 13-31 extension/displacement, taxiways reconfiguration and NAVAIDS access project to the Rehabilitate East General Aviation Apron, Phase I Project for Construction Administration Services. The services provided will include: 1. Resident Project Representative Services as described in Exhibit A-1. 2. Provide Construction Materials Testing Services, as required. The Engineer proposes to adjust the following fee reallocations: Item Re-allocation Amount Budgets:Construction Administration Services for Rehabilitate East General Aviation Apron, Phase I Project Construction Material Testing Increase Fee By $ 50,318.37 Resident Project Representative Increase Fee By $ 214,500.00 $264,818.37 Source of Funds: Construction Administration services for the Runway 13-31 extension/ displacement, taxiways reconfiguration and NAVAIDS Access Project(KSA Amendment 40) Project Manager Reduce Fee By $ (10,000.00) Project Manager Travel Reduce Fee By $ (11,000.00) Resident Project Representative Reduce Fee By $ (125,000.00) Admin Assistant Reduce Fee By $(18,818.37) Construction Materials Testing Reduce Fee By $(100,000.00) ( $264,818.37) Amendment 41 EXHIBIT A Page 1 of 1 KSA Engineers, Inc. Project No. CRP.039 • II. SCHEDULE The Construction Phase will commence with the execution of this Amendment and will terminate upon written recommendation by the Engineer for final payment to the Contractor. Construction Phase services are estimated to be completed 325 calendar days after Notice to Proceed with Construction has been provided to the Contractor. The Closeout Phase will commence upon Completion of the Construction Phase. Closeout Phase services are estimated to be completed within 90 days of written authorization by the Owner to proceed with Closeout Phase services. III. FEES The Engineer proposes to provide Construction Administration Phase services for the Rehabilitate East General Aviation Apron, Phase I project on a time and materials basis funded through re- allocation of funds from the existing contract to provide Construction Administration Services for the Runway 13-31 extension /displacement, taxiways reconfiguration and NAVAIDS access project. The not to exceed budget of$6,842,744.00 will remain unchanged. Amendment 41 EXHIBIT A Page 2 of 1 KSA Engineers, Inc. Project No. CRP.039 EXHIBIT A-1 RESIDENT PROJECT REPRESENTATIVE I. RESIDENT PROJECT REPRESENTATIVE 1. The Engineer shall furnish a Resident Project Representative (RPR) to assist the Engineer in observing progress and quality of the Work. The RPR may provide full time representation or may provide representation to a lesser degree. 2. Through the RPR's observations of the Contractor's work in progress and field checks of materials and equipment, the Engineer shall endeavor to provide further protection for the Owner against defects and deficiencies in the Work. However, the Engineer shall not, during such RPR field checks or as a result of such RPR observations of the Contractor's work in progress, by the RPR, supervise, direct, or have control over the Contractor's work, nor shall the Engineer (including the RPR) have authority over or responsibility for the means, methods, techniques, sequences, or procedures selected or used by any contractor, for security or safety at the Site, for safety precautions and programs incident to any contractor's work in progress, or for any failure of a contractor to comply with Laws and Regulations applicable to such contractor's performing and furnishing of its work. The Engineer (including RPR) neither guarantees the performances of any contractor nor assumes responsibility for any contractor's failure to furnish and perform the Work in accordance with the Contract Documents. In addition, the specific limitations set forth in Exhibit C as incorporated in the contract are applicable. 3. The duties and responsibilities of the RPR are limited to those of the Engineer in the Agreement with the Owner and in the Contract Documents, and are further limited and described as follows: a. General:The RPR is the Engineer's representative at the Site, will act as directed by and under the supervision of the Engineer, and will confer with the Engineer regarding the RPR's actions. 1) The RPR's dealings in matters pertaining to a Contractor's work in progress shall in general be with the Engineer and the Contractor. 2) The RPR's dealings with Subcontractors shall only be through or with the full knowledge and approval of the Contractor. 3) The RPR shall generally communicate with the Owner only with the knowledge of and under the direction of the Engineer. b. Schedules: Review the progress schedule, schedule of Shop Drawing and Sample submittals, and schedule of values prepared by a Contractor and consult with the Engineer concerning acceptability. c. Conferences and Meetings: Attend meetings with the Contractor, such as preconstruction conferences, progress meetings, job conferences and other project-related meetings, and prepare and circulate copies of minutes thereof. d. Liaison: 1) Serve as the Engineer's liaison with the Contractor. Working principally through the Contractor's authorized representative or designee, and assist in providing information regarding the intent of the Contract Documents. 2) Assist the Engineer in serving as the Owner's liaison with the Contractor when the Contractor's operations affect the Owner's on-Site operations. AMEND.NO.41 EXHIBIT A-1 Page 1 of 4 KSA Engineers, Inc. Project No.CRP.039 • 3) Assist in obtaining from the Owner additional details or information, when required for proper execution of the Work. e. Interpretation of Contract Documents: Report to the Engineer when clarifications and interpretations of the Contract Documents are needed and transmit to the Contractor clarifications and interpretations as issued by the Engineer. f. Shop Drawings and Samples: 1) Record date of receipt of Samples and approved Shop Drawings. 2) Receive Samples which are furnished at the Specific Project Site by the Contractor, and notify the Engineer of availability of Samples for examination. 3) Advise the Engineer and the Contractor of the commencement of any portion of the Work requiring a Shop Drawing or Sample submittal for which RPR believes that the submittal has not been approved by the Engineer. g. Modifications:Consider and evaluate Contractor's suggestions for modifications in Drawings or Specifications and report such suggestions, together with the RPR's recommendations, to the Engineer. Transmit to the Contractor in writing decisions as issued by the Engineer. h. Review of Work and Rejection of Defective Work: 1) Conduct on-Site observations of the Contractor's work in progress to assist the Engineer in determining if the Work is in general proceeding in accordance with the Contract Documents. 2) Report to the Engineer whenever the RPR believes that any part of the Contractor's work in progress will not produce a completed project that conforms generally to the Contract Documents or will imperil the integrity of the design concept of the completed Specific Project as a functioning whole as indicated in the Contract Documents, or has been damaged, or does not meet the requirements of any inspection, test or approval required to be made; and advise the Engineer of that part of work in progress that the RPR believes should be corrected or rejected or should be uncovered for observation, or requires special testing, inspection or approval. i. Inspections, Tests, and System Start-ups: 1) Consult with the Engineer in advance of scheduled inspections, tests, and systems start- ups. 2) Verify that tests, equipment, and systems start-ups and operating and maintenance training are conducted in the presence of appropriate the Owner's personnel, and that the Contractor maintains adequate records thereof. 3) Observe, record, and report to the Engineer appropriate details relative to the test procedures and systems start-ups. 4) Accompany visiting inspectors representing public or other agencies having jurisdiction over a Specific Project, record the results of these inspections, and report to the Engineer. j. Records: 1) Maintain at the Site orderly files for correspondence, reports of job conferences, reproductions of original Contract Documents including all change orders,field orders,work change directives, addenda, additional Drawings issued subsequent to the execution of the AMEND.NO.41 EXHIBIT A-1 Page 2 of 4 KSA Engineers, Inc. Project No. CRP.039 • Construction Contract, the Engineers clarifications and interpretations of the Contract Documents, progress reports, Shop Drawing and Sample submittals received from and delivered to the Contractor, and other Specific Project-related documents. 2) Prepare a daily report or keep a diary or log book, recording the Contractors hours on the Site, weather conditions, data relative to questions of change orders, field orders, work change directives, or changed conditions, Site visitors, daily activities, decisions, observations in general, and specific observations in more detail as in the case of observing test procedures; and send copies to the Engineer. 3) Record names, addresses, fax numbers, e-mail addresses, web site locations and telephone numbers of all Contractors, Subcontractors, and major Suppliers of materials and equipment. 4) Maintain records for use in preparing project documentation. 5) Upon completion of the Work, furnish original set of all RPR Specific Project documentation to the Engineer. k. Reports: 1) Furnish to the Engineer periodic reports as required of progress of the Work and of the Contractors compliance with the progress schedule and schedule of Shop Drawing and Sample submittals. 2) Draft and recommend to the Engineer proposed change orders, work change directives, and Field Orders. Obtain backup material from the Contractor. 3) Furnish to the Engineer and the Owner copies of all inspection, test, and system startup reports. 4) Immediately notify the Engineer of the occurrence of any Site accidents, emergencies, acts of God endangering the Work, damage to property by fire or other causes, or the discovery of any Constituent of Concern. I. Payment Requests: 1) Review applications for payment with the Contractor for compliance with the established procedure for their submission and forward with recommendations to the Engineer, noting particularly the relationship of the payment requested to the schedule of values, Work completed, and materials and equipment delivered at the Site but not incorporated in the Work. m. Certificates, Operation and Maintenance Manuals: 1) During the course of the Work, verify that materials and equipment certificates, operation and maintenance manuals and other data required by the Specifications to be assembled and furnished by a Contractor are applicable to the items actually installed and in accordance with the Contract Documents, and have these documents delivered to the Engineer for review and forwarding to the Owner prior to payment for that part of the Work. n. Completion: 1) Participate in visits to the Project to assist in determining Substantial Completion, assist in the determination of Substantial Completion and the preparation of lists of items to be completed or corrected. AMEND. NO.41 EXHIBIT A-1 Page 3 of 4 KSA Engineers, Inc. Project No. CRP.039 • • • 2) Participate in a final visit to the Project in the company of the Engineer, the Owner, and the Contractor and prepare a final list of items to be completed and deficiencies to be remedied. 3) Observe whether all items on the final list have been completed or corrected and make recommendations to the Engineer concerning acceptance. 4. Resident Project Representative shall not: a. Authorize any deviation from the Contract Documents or substitution of materials or equipment (including"or-equal"items). b. Exceed limitations of Engineer's authority as set forth in this Agreement. c. Undertake any of the responsibilities of a Contractor, subcontractors, suppliers, or a Contractor's superintendent. d. Advise on, issue directions relative to, or assume control over any aspect of the means, methods, techniques, sequences or procedures of the Contractor's work. e. Advise on, issue directions regarding, or assume control over security safety practices, precautions and programs in connection with the activities or operations of the Owner or the Contractor. f. Participate in specialized field or laboratory tests or inspections conducted off-site by others except as specifically authorized by the Engineer. g. Accept Shop Drawing or Sample submittals from anyone other than the Contractor. h. Authorize the Owner to occupy a Specific Project in whole or in part. AMEND.NO.41 EXHIBIT A-1 Page 4 of 4 KSA Engineers, Inc. Project No. CRP.039 • Exhibit B FEE SCHEDULE KSA Engineers,Inc. CONTRACT FOR PROFESSIONAL A/E SERVICES CITY OF CORPUS CHRISTI FOR CORPUS CHRISTI INTERNATIONAL AIRPORT CORPUS CHRISTI, TEXAS Original Contract TASK FEE Task Order No. 1 — Preparation of Environmental Assessment $161,649.00 Task Order No. 2—AGIS Airspace Analysis and Data Submittal/Upload $286,416.00 Task Order No. 3— Runway 17-35 Extension/Displacement and $566,000.00 Connecting Taxiway Project Task Order No. 4/1000'— Runway 13-31 Extension/Displacement and $720,000.00 Connecting Taxiway Project Task Order No. 4A/600' — Runway 13-31 Extension/Displacement and $148,000.00 Connecting Taxiway Project Task Order No. 5—Taxiway Utilization Study $80,196.00 Total Original Project Fees $1,962,261.00 Amendment No. 1 Topographic Survey, Plats, Metes & Bounds for Right of Way Acquisition for Access to Relocated Approach Lighting System for Runway 17 $ 5,577.50 (Supplement to Task Order No. 2) Amendment No. 2 Task Order No. 6- North General Aviation Apron $49,400.00 Amendment No. 3 Task Order No. 7- Pinson Road & Employee Parking Drainage $24,150.00 Improvements Amendment No. 4 Additional Desktop Biological and Jurisdictional Waters Evaluation $4,028.45 (Supplement to Task Order No. 1) Amendment No. 5 Infield Taxiway Connectors/Runway 17-35 Project (Supplement to Task Order No. 3) $100,000.00 Amendment No. 6 Infield Taxiway Connector/Runway 17-35 Project $40,000.00 (Supplement to Task Order No. 3) Amendment No. 7 AMEND. NO.41 EXHIBIT"B" Page 1 of 4 • • Infield Taxiway Connectors/Runway 13-31 Project (Supplement to Task Order No. 4) $201,800.00 Amendment No. 8 Revise Environmental Assessment and Perform Environmental Due Diligence Audit (EDDA)for NAVAID Relocations $16,010.00 (Supplement to Task Order No. 1) Amendment No. 9 Task Order No. 8- Construction Administration Fees for RWY 17-35 $1,000,000.00 Extension/Displacement and Connecting Taxiways Project Amendment No. 10 AGIS Attribute Revisions for the Truncation of RWY 13 Extension from $8,573.25 1600' to 1000' (Supplement to Task Order No. 2) Amendment No. 11 Civil, Electrical and NAVAID Design Revisions for the Truncation of RWY $20,000.00 13 Extension from 1600' to 1000' (Supplement to Task Order No. 4) Amendment No. 12 Taxiway Utilization Study Update for the Truncation of RWY 13 Extension $2,300.00 from 1600' to 1000' (Supplement to Task Order No. 5) Amendment No. 13 Task Order No. 9— Phases 1 & 2 Reconstruction of East General $121,050.00 Aviation Apron (Areas 1 & 2) Amendment No. 14 Task Order No. 10— East General Aviation Apron Extension $140,000.00 Amendment No. 15 Task Order No. 11 — East General Aviation Apron Wash Rack $25,000.00 Amendment No. 16 Task Order No. 12—Gate 10B Replacement $6,549.25 Amendment No. 17 Task Order No. 8- Construction Administration Fees for RWY 17-35 0.00 Extension/Displacement and Connecting Taxiways Project -Adjustment to Amendment No. 9— E11122, E11046 Amendment No. 18 Task Order No. 8- Construction Administration Fees for RWY 17-35 0.00 Extension/Displacement and Connecting Taxiways Project -Adjustment to Amendment No. 9— E11046, Testing Amendment No. 19 Task Order No. 8— Repackaging Task Orders 4, 10,11; E11047 10,000.00 AMEND. NO.41 EXHIBIT"B" Page 2 of 4 • • Amendment No. 20 Repackage the bid documents of the Runway 17/35 project Extension/ $4,300.00 Displacement and Connecting Taxiway, E11046A Amendment No. 21 Construction Administrative Services for Gate 10B Construction Project $31,038.60 E13062 Amendment No. 22 Water Distribution Modeling Associated with 48"TM Closure at CCIA $9,500.00 Amendment No. 23 Multi-User Flight Information Display System (MUFIDS) Modifications at $36,000.00 CCIA Amendment No. 24 17-35 Runway NavAids additional scope to provide Environmental Due $5,800.00 Dilligence Audit(EDDA)waivers Amendment No. 25 Gate 10B—Additional Scope of Construction Admin and Inspection $7,371.50 Services Amendment No. 26 17-35 Runway Additional Survey Scope $2,300.00 Amendment No. 27 13/31 Runway Additional Field Investigation by RETL. $9,315.00 Amendment No. 28 17/35 Runway Extension/Displacement and Connecting Taxiways $49,680.56 Amendment No. 29 Enhanced Safety Improvements in State Highway 44 Right of Way $48,465.00 Amendment No. 30 Construction Administration Phase and Close Out Service Fees for the $2,724,339.60 Runway 13-31 Extension/Displacement and Connecting Taxiways Project Amendment No. 31 Additional Design Components to the Runway 13-31 $74,803.00 Extension/Displacement and Connecting Taxiways Project Amendment No. 32 Additional Design phase services to Runway 17 MALSR Sta 12 & 14 $24,884.00 Safety Mitigation AMEND. NO.41 EXHIBIT"B" Page 3 of 4 • Amendment No. 33 Environmental Services for Runway 13-31 $16,190.00 Amendment No. 34 Construction Administration Services for Runway 13-31 $19,700.00 Amendment No. 35 Reallocation and Additional Construction Administration Fees for the Runway 17- 35 Extension/Displacement and Connecting Taxiways -$55.71 Project Amendment No. 36 Development of Utility Easement including Metes and Bounds descriptions for AEP Primary service for the Runway 13-31 Extension / $4772.00 Displacement and Connecting Taxiways Project at the Corpus Christi International Airport Amendment No. 37 Repackage Design Documents and Bidding Phase Services for the Runway 18 MALSR Station 12 and 14 Access Safety and Site $10,000.00 Improvements Project Amendment No. 38 Additional scope, schedule and budget for the design of Access Rd to $27,341.00 East GA Apron Reallocation and Additional Construction Administration Fees for the $0.00 Runway 17-35 Extension/Displacement and Connecting Taxiways Project Reallocation of funds for Construction Admin Fees from E11047 RW 13- $0.00 31 to E11046B MALSR Station 12 and 14 Safety and Site Imps Construction Management Services for East GA Apron, E15234 $0.00 Amended Total Fee $6,842,744.00 ADDITIONAL CONTRACTS Sanitizer Installation Design Total Fee $19,680.00 Jetway Bridge Holding Position Markings & Diversion Aircraft Parking Layout Total Fee $16,925.00 Blast Study for Aircraft Powering In and Out of East RON Positions and Add Aircraft Jet Engine Ingestion Zone Markings to the Holding Position Markings at Gates 1, 3B and 6A AMEND. NO.41 EXHIBIT"B" Page 4 of 4 • Total Fee $11,672.50 Resident Project Representative for Sanitizer Installation Total Fee $4,500.00 AMEND. NO.41 EXHIBIT"B" Page 5 of 4 Basic Services: Preliminary Phase Design Phase Bid Phase Construction Phase Subtotal Basic Services Additional Services: Permitting Warranty Phase Inspection Platting Survey 0 & M Manuals SCADA Subtotal Additional Services Summary of Fees Basic Services Fees Additional Services Fees Total of Fees COMPLETE PROJECT NAME Project No. XXXX Invoice No. 12345 Invoice Date: Sample form for: Payment Request Revised 07/27/00 Total Amount Previous Total Percent Contract Amd No. 1 Amd No. 2 Contract Invoiced Invoice Invoice Complete $1,000 $0 $0 $1,000 $0 $1,000 $1,000 100% 2,000 1,000 0 3,000 1,000 500 1,500 50% 500 0 250 750 0 0 0 096 2,500 0 1,000 3,500 0 0 0 0% $6,000 $1,000 $1,250 $8,250 $750 $1,500 $2,500 30% $2,000 $0 $0 $2,000 $500 $0 $500 25% 0 1,120 0 1,120 0 0 0 096 0 0 1,627 1,627 0 0 0 096 TBD TBD TBD TBD TBD TBD TBD 096 TBD TBD TBD TBD TBD TBD TBD 0% TBD TBD TBD TBD TBD TBD TBD 0% $2,000 $1,120 $1,627 $4,747 $500 $0 $500 11% $6,000 $1,000 $1,250 $8,250 $750 $1,500 $2,500 3096 2,000 1,120 1,627 4,747 500 0 500 11% $8,000 $2,120 $2,877 $12,997 $1,250 $1,500 $3,000 23%