CITY OF CORPUS CHRISTI
AMENDMENT NO. 2 to
CONTRACT FOR PROFESSIONAL SERVICES
The City of Corpus Christi. Texas, a Texas home-rule municipal corporation ("City")and CP&Y, Inc.
("Consultant"), agree to the following amendments to the Contract for Professional Services for Cefe
Valenzuela Landfill Disposal Cell Interim Cover(Project No. E11061):
Original Contract January 22, 2013 Ordinance No. 029728 ' _ $475,465.00
j Amendment No. 1 September 26, 2016 Administrative Approval $4,000.00
In the Original Contract, Exhibit"A", Section I. Scope of Services shall be amended as set forth in the
attached Amendment No. 2, Exhibit"A".
In the Original Contract, Section Ill shall be amended based on the modified scope of services in the
attached Amendment No. 2, Exhibit"A"for a fee not to exceed$5,000.00.for a total restated fee not to
exceed $484,465.00.
All other terms and conditions of the January 22,2013 Contract for Professional Services between the
City and Consultant, and of any amendments to that contract, which are not specifically addressed
herein shall remain in full force and effect.
CITY • CORPU'\C -I TI CP&Y, INC.
IILA z///& -
Vali- H. Gra P.E. (,(p Date David ays Date
Exe• tive Dire• or .f Public or s CFO/Principal
I\ 1820 Regal Row, Suite 200
Dallas, TX 75235
(214)638-0500 Office
APPROVED AS TO LEGAL FORM
0,()Akv, Miry' _4)Aimee Alcorn-Reed
2016.12.13 17:58:58-06'00'
Assistant City Attorney Date
ATTEST
e to04 1.44(c-C/
Ci Secretary Date
Project No. E11061
Accounting Unit: 3365-033
Account 550950
Activity: E11061013365EXP
Account Category: 50950
Fund Name. Sanitary Landfill 2008 CIP
Encumbrance No
2016-633 SOLID WASTE1E11061-CEFE VALENZUE LA LANDFII L DISPOSAI.CELLS INTERIM COVERIAREV tdt/1MENOMEN'5 NO 211
12/21/16
CP&Y Inc. INDEXED
•
p8tyi Partners for a Better Quality of Life
December 5, 2016
Lawrence Mikolajczyk
Director of Solid Waste Services
City of Corpus Christi
P.O. Box 9277
Corpus Christi, TX 78469
Re: Proposal for Professional Engineering Services
Cefe F. Valenzuela Landfill Design and Permitting Services for Borrow Pit and Pond
Amendment#2 to E11061
Dear Mr. Mikolajczyk:
As requested by the City of Corpus Christi, CP&Y, Inc. (CP&Y)is pleased to present the following Proposal
for the design and permitting of borrow pit and pond at Cefe F. Valenzuela Landfill, as Amendment#2 to
contract E11061.
I. SCOPE OF SERVICES
➢ Permit Modification Application
• Prepare a non-notice permit modification in accordance with the Texas Commission
on Environmental (TCEQ) Title 30 Texas Administrative Code (TAC) 305.70(1) The
purpose of the permit modification is to incorporate a new soil borrow pit that will be
subsequently developed into a pond. This modification will be shown on all the site
plan drawings in the Site Development Plan (SDP) and in an update to the fire
prevention plan in Site Operating Plan (SOP) to include the pond availability to
supplement site fire-fighting capability.
• Prepare the necessary TCEQ forms to accompany the permit modification application.
• After the permit modification has been prepared, CP&Y will submit a draft to the City
for review and comments. Once comments are received, CP&Y will updated the permit
modification to incorporate any additional information and prepare a complete
application to submit to the state. (City will be responsible for paying the $150
application fee to TCEQ.)
• CP&Y will prepare a response for any additional comments that TCEQ may have in
order to get final approval.
➢ Pond Design
• Review groundwater levels in the area where the pond is to be constructed to ensure
that excavation will not be below groundwater level.
• Prepare pond excavation plans to provide to the City.
II. DELIVERABLES
➢ Non-notice permit modification to TCEQ in accordance with 30 TAC 305.70(j).
> Pond excavation plans Exhibit A
Page 1 of 2
1820 Regal Row
Dallas,Texas 75235
214.638.0500•214.638.3723 fax
www.cpyi.com -
III. FEE ESTIMATE
We are requesting that the City of Corpus Christi authorize CP&Y to complete the above
task for a total lump sum fee of$5,000.00.
We appreciate the opportunity to continue assisting the City of Corpus Christi with solid waste
projects to ensure the Cefe F. Valenzuela Landfill provides adequate and efficient disposal
capacity for the City and that it remains in regulatory compliance.
Sincerely,
William R. Hindman, P.E.
Project Manager
Cc: Tony Benevides, Landfill Superintendent
Ivan Luna, Assistant Director of Solid Waste Services
Brian Bresler, P.E, City Engineer.
Exhibit A
Page 2 of 2
Partners for a Better Quality of Life c p&y
Basic Services:
Preliminary Phase
Design Phase
Bid Phase
Report Phase
Construction Phase
Subtotal Basic Services
Additional Services:
Permitting
Warranty Phase
Inspection
Platting Survey
Reporting
O & M Manuals
SCADA
Subtotal Additional Services
Summary of Fees
Basic Services Fees
Additional Services Fees
Total of Fees
PROJECT NAME
Project No. EXXXXX
Invoice No. 12345
Invoice Date:
Total Amount Previous Total Percent
Contract Amd No. 1 Amd No. 2 Contract Invoiced Invoice Invoice Complete
$0
$0
$0
$0
$0
$0
$0
0%
0
0
0
0
$0
0
0
0%
0
0
0
0
0
0
0
0%
0
0
0
0
0
0
0
0%
0%
0
0
0
0
0
0
0
$0
$0
$0
$0
$0
$0
$0
0%
$0
$0
$0
$0
$0
$0
$0
0%
0
0
0
0
0
0
0
0%
0
0
0
0
0
0
0
0%
0
0
0
0
0
0
0
0%
0
0
0
0
0
0
0
0%
TBD
TBD
TBD
TBD
TBD
TBD
0
0%
TBD
TBD
TBD
TBD
TBD
TBD
TBD
0%
$0
$0
$0
$0
$0
$0
$0
0%
$0
$0
$0
$0
$0
$0
$0
0%
0
0
0
0
0
0
0
0%
$0
$0
$0
$0
$0
$0
$0
0%