Loading...
HomeMy WebLinkAboutC2018-028 - 1/25/2018 - NA • • TASK ORDER NO. 10 This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi. Texas (City) and -Garver, LLC." (ENGINEER) dated February 16, 2016 by Ordinance 030765, (Agreement). ENGINEER shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. TASK ORDER NO. 10 PROJECT NAME: El 5221 - CCIA Air Operations Area Perimeter Fence Replacement 1. PROJECT DESCRIPTION—The project scope includes removal and replacement of existing perimeter fencing with high security fencing, new high-speed security gates and controls. concrete footings. wildlife barrier. and driveways. fiber optics, electrical cables, and other miscellaneous improvements. 2. SCOPE OF SERVICES (Task Order No. 10) — The scope of services includes additional construction phase services for the installation of new perimeter fence and gates, and infrastructure improvements related to access control, lighting, and closed-circuit television at the Corpus Christi International Airport, in excess of the original contract. This task order is more fully described in Exhibit A. 3. COMPENSATION — The total amount not to exceed for Task Order No. 10 only is S141.665.60. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and ect. CITY OF CO ' • -ISTI GARVER, LLC. 1/70, �� , eff H. Edmonds, P.E. (Da e) Frank Mclllwain. P.E. (Date) Director of Engineering Services 3010 Gaylord Parkway, Suite 190 Frisco, TX 75034 (972) 377-7540 Office TASK ORDER NO. 10 Fund Name Accounting Account Activity No. Amount Unit No. Airport CIP Grants 3020-274 550950 E152211543020C j $ 127,499.04 Airport Capital Reserve 3018-274 550950 E15221 1543018C $14,166.56 Total $141,665.60 2018-028 1/25/18 Task Order No. 10 Garver LLC Page 1 of 1 INDEXED • GARVER APPENDIX A SCOPE OF SERVICES CITY OF CORPUS CHRISTI CORPUS CHRISTI, TEXAS 2.1 General Generally, the scope of services includes additional construction phase services for the installation of new perimeter fence and gates, and infrastructure improvements related to access control. lighting, and closed circuit television at the Corpus Christi International Airport, in excess of the original contract. 2.2 Additional Construction Phase Services During this phase of work. Garver will accomplish the following, as it pertains to additional time needed in excess of the original construction contract time: 1. Prepare for and attend utilities coordination meetings. 2. Attend progress/coordination meetings with the Owner/Contractor. 3. Consult with and advise the Owner during the construction period. Garver will submit. when requested by the Owner. written reports to the Owner on the progress of the construction including any problem areas that have developed or are anticipated to develop. In addition, Garver shall supply to Owner such periodic reports and information as may be required by the FAA. 4. Issue instructions to the Contractor on behalf of the Owner and issue necessary clarifications (respond to RFIs) regarding the construction contract documents. 5. Review the Contractor's progress payment requests based on the actual quantities of contract items completed and accepted. and will make a recommendation to the Owner regarding payment. Garver's recommendation for payment shall not be a representation that Garver has made exhaustive or continuous inspections to (1) check the quality or exact quantities of the Work, (2) to review billings from Subcontractors and material suppliers to substantiate the Contractor's right to payment: or (3) to ascertain how the Contractor has used money previously paid to the Contractor. 6. Maintain a set of working drawings and prepare and furnish record drawings. 7. Provide full-time resident construction observation services for an additional 1,275 hours for work past the originally estimated construction contract time. (The original construction contract time was for a 325-calendar-day construction contract performance time with 30 days after substantial completion for a total of 355 calendar days and the original fee was based on an average of 52 hours per week, during the construction contract performance time (51 weeks) with an additional 48 hours for post construction activities. excluding $24,961.20 (366 RPR hours) that was moved administratively to Construction Materials Testing.) If the construction time extends beyond the time established in this agreement or if the Owner wishes to increase the time or frequency of the observation, the Owner will pay Garver an additional fee agreed to by the Owner and Garver 8. When authorized by the Owner, prepare change orders or supplemental agreements. as appropriate, for ordering changes in the work from that originally shown on the Plans and Specifications. If re-design or substantial engineering is required in the preparation of these documents, payment for extra services involved will be made in addition to the payment provided in basic engineering services. Appendix A-Scope of Services 1 of 3 Airport Operations Area Perimeter Fence Garver Project No. 15181171 Exhibit A Page 1 of 4 • Construction observation services will be provided by Garver's Resident Project Representative, who will provide or accomplish the following: • Consult with and advise the Owner during the construction period. • Coordinate with the firm providing construction materials quality assurance testing under separate contract with the Owner. Coordinate with this firm to insure that all material tests required for construction are scheduled and accomplished in a manner that will not delay the Contractor unnecessarily and will meet specification requirements as to location and frequency. • Maintain a file of quantities incorporated into the work, test reports. certifications, shop drawings and submittals, and other appropriate information. • Maintain a project diary which will contain information pertinent to each site visit. • Prepare requests for monthly and final payments to the Contractor. • Provide information for preparation of record drawings of the completed project. • Submit FAA Form 5370-1, Construction Progress and Inspection Report. or equivalent form to the appropriate FAA field office. as necessary. The frequency of submittal shall be established at the preconstruction conference. • Administer the"Construction Management Plan prepared by Garver. • Assist the Owner in the observation of Contractor's operations for proper classification of workers. and review of Contractor's payrolls as necessary to determine compliance with the prevailing wage rates. In performing construction observation services, Garver will endeavor to protect the Owner against defects and deficiencies in the work of the Contractor(s); but Garver does not guarantee the performance of the Contractor(s), nor is Garver responsible for the actual supervision of construction operations. Garver does not guarantee the performance of the contracts by the Contractors nor assume any duty to supervise safety procedures followed by any Contractor or subcontractor or their respective employees or by any other person at the job site. However, if at any time during construction Garver observes that the Contractor's work does not comply with the construction contract documents. Garver will notify the Contractor of such non-compliance and instruct him to correct the deficiency and/or stop work, as appropriate for the situation. Garver will also record the observance, the discussion. and the actions taken. If the Contractor continues without satisfactory corrective action. Garver will notify the Owner immediately. so that appropriate action under the Owners contract with the Contractor can be taken. 2.3 Extra Work The following items are not included under this agreement but will be considered as extra work: 1. Redesign for the Owner's convenience or due to changed conditions after previous alternate direction and/or approval, or beyond that furnished in the Final Design submittal. 2. Submittals or deliverables in addition to those listed herein. 3. Design of any utility requiring relocation. 4. Retaining walls or other significant structural design. 5. Preparation of a Storm Water Pollution Prevention Plan (SWPPP), including filing of a notice of intent or notice of termination. The construction contract documents will require the Contractor to prepare, maintain, and submit a SWPPP to TCEQ. Appendix A- Scope of Services 2 of 3 Airport Operations Area Perimeter Fence Garver Project No. 15181171 Exhibit A Page 2 of 4 Extra Work will be as directed by the Owner in writing for an additional fee as agreed upon by the Owner and Garver. 2.4 Schedule Garver shall begin work under this Agreement within ten (10) days of a Notice to Proceed from the Owner. Appendix A-Scope of Services 3 of 3 Airport Operations Area Perimeter Fence Garver Project No. 15181171 Exhibit A Page 3 of 4 • APPENDIX B CITY OF CORPUS CHRISTI AIRPORT OPERATIONS AREA PERIMETER FENCING ADMINISTRATIVE AMENDMENT NO. 2 FEE SUMMARY Title II Services Construction Mateda/s Testing(Rock Enpine.Ang) $47,265.20 Resident Rcjecr Representative(JOT Inspection Services)) 8238.10840 Construction Support Services $195,258.00 Project Close OM Samoan 510,000.00 Subtotal for Title I Services $455,825.80 The revised total estimated fees above have been adjusted by the following reallo®tions' Item Re-Allocation Amount Construction Suppet Services Project Manager Increase Fee By(204 hours) $33,680.00 CMI Manager Increase Fee By(34 hours) $4,780.00 Electrical Manager Increase Fee By(196 hours) $19,040.00 LIT Support Increase Fee By(68 hours) $7,278.00 Relent Project RepreaeMative Increase Fee By(1.128 hours) $78,928.60 $141,665.60 L2015451.1111-cCLA Operngen.Area Notate,Peparcennatosasornatst Trak Cc&2 MPS and Clow out s.n, .MGleeax e-15181171 GUMS'FmepealS..(TO 2. Amend 2)20160141 Exhibit A Page 1 of 4 EXHIBIT B Master Services Agreement Garver Engineers DEWPTION NOT TO EXCEED AMOUNT Maximum Contract Amount Original(February 16,2016) $1,500,000.00 Maximum Contract Amount Original Renewal One(December 22,2017) $1500000.00 Total Maximum Contract Amount $3,00Upoo.0o Task 1—Design and Bid Phase Services for the Perimeter Fence Replacement and Improvements Project 1E15221) $298.71&00 Task 2—Construction Phase&Dose out Phase Services for the Perimeter Fence Repiacement and Improvements Project (EuS221) $346964,00 Task 2,Amendment 1-Decrease Resident Project Rep and increase Construction Materiab testing,No Value $0.00 Task 3—Surveying Design and Bid Phase Services for Rehab of Taxiway Kilo(E16451) $166,40000 Task a—Surveying,Design and Bid Phase Services for Air Carrier Ramp and East GA Apron(E15223&615234) 5279,100.00 Task 5—Construction Phase&Close out Phase Services for Taxiway Kilo 1E16451) $361,774.00 Task 6—Taxiway K FireSuppression Incident(617071) $34,50000 Task 7—Construction Phase,Testing and Close Out for East GA&Terminal Apron(615223&E15234) $585,00000 Task B-Design and Bid Phase sankesfor Terminal Apron Reconstruction Il(617112)and East GA Apron(617113) $286,o00.00 Task 9-Design Services for CCU Service Animal Relief Areas(SARA)—(180S6A) $24,900.00 Task 10-Additional Construction Phase Services for the Perimeter Fence Replacement(615221) $141,665.60 Total Task Orders $2 52&819.60 Amount Remaining on Master Services Agreement $474.13040