HomeMy WebLinkAboutC2018-065 - 4/10/2018 - Approved • t ' CITY OF CORPUS CIIRLSTI c �s c,, o, ENGINEERING SERVICES r CHANGE OI1tDER . =J CHANGE ORDER NO: 7 CHANGE ORDER DATE: 1/5/2018 PRWF.CT: 0 N.Stevens Water Treatment Plaid High Service Pump Bldg 67 PROJECT NUMDER: E11066 CONTRACTOR: PLW Cmlayun P.nmc> ORIGINAI.CONTRACT TIME: 1(Y,)CD's ENGINEER: LNV,his -- Make the following odditiom,modifications or deletions to the work described in the(Mutt-rid Documents: Qty Unit Unit Prke Total I Etoacn Corgrol addmon for Clea.wrll 02 and Creek hem 1 LS S 152.429.43 S 182,629A3 Add Thirty(30)Calendar Days to Contract Tune ------ NET TOTAL OF THIS CHANGE ORDER: S 182,629.43 Why snot this Change neces:.u): It became evident during commotion that there wit excessive etos,on on recent excavation and sloping of the fill macetml mound the existing elearwell llus excavation was tequretl to construct the new High Service Pimp Station Soil utilized during backfill of the cle.vwell doting is original con.0uction,experienced erosion well beyond design expectations diming construction of the II gh Service Pump Station foundation.TCus sva<not anticipated and n new erosion control mensure design cva:required to permanently Vabdire the slope How can similar changes be asoldcd in the future? Additional soil bet rots and test dieing design could have avoided die need lot this change but ran die costs associated The compensation agreed upon in this Change Order is full.complete midfinal payment fin all cove the Comma.,'nay incur ns n rein/of or rel.rtirrg to lois change whether said coats are Annoy'',unknown, foremen or unfnrseen at this tins.,including without limitation,one cont for delay.esteuded rn•erheud,ripple or impact cost,or any udder effect un changed or unchanged work as n math o/this Change Order. Otiginal Connect Amount S 21,650.000.0 Previously Approved Change(fide:Amount S - 185.949.26 Proposed(.panne(Mkt Amount S 182,629.43 Revised Contract Amount S__. 22,018,578.69 Pacers of'total Change Orders(meli:ding this CO) 1.70 Orrg.rsil Comma Time for Substantial Completion _ _- 1065 CD's Notice to Proceed Date 1113/2016 Otigi rut Sitbs'.vtiai Completion Dade _ 9/3/2019 Previously At'p:oved Change Other Tune 22 CD's , Additional Time on This Change Order JO CD's Revised Contract Tune for Substantial Completion 1117 CD's Rcvricd Substantial Completion Da:e ____ 10/25/2019 REVIEWED 1W:ENV.Inc. REQUESTED til':PLW Cailacue Partners Al Na January 09,2018 Engineer Date Contmetot Enna Lof'$il ice President Date CITY OF CORPUS CIIRIStI RIND:4096-061 RECOMMENDED RV: , ate".it es . ,/. - ."1111. I /1 /6 AC('(1l!NT:550910 Ernesto Dc La Gast ' / I to A(:TIVIT'':E11066-01-4096-EXP coo... .ton m.•.rcmcm - . RECOMMENDED Dv. /Drill( .A -4 t-//1 • APPROVED ROVE:n in' NA Jeffr y'?dni ends,P.E. ate Valente II.(:ray.P.E. Dale 1 ectnr of Engineering Services Executive Ocectm of Public Works ItE(:OMSIENDED Illi: Electronic Approval 1/11/18 APPROVED DI': NA Eddie Houlihan.Director Dole Mark Van Vleck Dote '•1.vngenrnl and Bilges As•nlant City\lis:r' RECOMMENDED til': ���Z�►�S- / 1-12-18 APrnovFD DV: NA • 2018-065 of I Date Slark C Rose Date 4/10/18 ATTEST: 42.61,VM1-(-- : mx,arrZQi ^f��1TNO RLtti i M2018-047 R ECCA HUERTA . PLW Cadagua Partners CITY SECRETARY !T COUNCIL.. /0 / r/ INDEXED' CrrarrAvill 6 PEPPER-LAWSON WATERWORKS October 13,2017 City of Corpus Christi 13101 Leopard Street Corpus Christi,TX Attn: Kent Power Re: RFP No. 8 ON Stevens HSPS#3 CC Job No. E I 1 066 Mr. Power, Pepper-Lawson Waterworks LLC(PLW)proposes to complete this request as directed for the Lump Sum price of $182,629.43 .This proposal is for the work associated with Erosion control for CW#2 and creek berm Thirty(30)additional days will be required to perform this work. Please find the attached PLW cost summary and associated reference material for your review and acceptance. If you have any questions or need additional information,please do not hesitate to call. Regards, Pepper Lawson-Cadagua Partners Matt Molacek Project Manager File: 1401626-13.3 Page 1 • t City of Corpus Christi RFP No.: 8 ON Stevens HSPS#3 Date: 10/13/17 CC Job No.E11066 PLW Job No.: EHIO Erosion control for CW#2 and creek berm Score of Work French drain system along the south and east sides of CW#2 to redirect runoff to the stormwater grate inlet located to the southeast corner of CW#2 Erosion control mat to be installed on the berm located to the Southside of CW#2 to ensure any incoming runoff to this arca is prevented from eroding the berm. Down by the creek surrounding the stormwater outfall,Rock rip rap to be installed to prevent any further erosion to the north wall of the creek Non-Taxed Labor Material Subcontract Taxed Mail/Equip Item Unit it Tutal Unit 'Intal t'nit 'total !'nit Total No. Description Qcv l nit Cost Cost Cost (osi Cost Cost Cost ('ost I Install drain pipe - - - - 2 Excavation and backfilling(7 men x 70 his) 490.00 hrs 35.02 17,159.80 - - - 3 Install 12'perforated pipe(5 men x 50 hrs) 250.00 hrs 35.02 8,755.00 - 4 Install 12"SDR pipe(3 men x 20 his) 60.00 hrs 35.02 2,101.20 - - - 5 Furnish 12"pipe 1.00 Is - 5,591.39 5,591.39 - - 6 Install Rip Rap over 12"pipe(5 men x 15 hrs) 75.00 his 35.02 2,626.50 - - - 7 Clean up on section C(4 men x 10 hrs) 40.00 his 35.02 1,400.80 - 8 - - - - 9 Landlok 300 - - - - 10 Fine grade,excavation and backfilling(5 men x 40 200.00 hrs 35.02 7,004.00 - - - I I Furnish landlok 300 1.00 Is - 18,053.04 18,053.04 - 12 Install landlok 300(5 men x 40 hrs) 200.00 his 35.02 7,004.00 - - 13 Hydroseeding 1.00 Is - - 1.950 00 1 X950 00 - 4 - - - 15 Install Rip Rap - - 16 Excavate and clean up(5 men x 20 hrs) 100.00 hrs 35.02 3,502 00 - - 17 Install filter fabric(2 men x 10 hrs) 20.00 hrs 35.02 700 40 - - - 18 Rip Rap(3 men x 20 hes) 60.00 hrs 35.02 2,101 20 - 19 - - - 20 Grass Maintenance - - - - 21 Water grass(1 men x 20 days x 2 hrs) 40.00 hrs 35.02 1.400 80 - - 22 Water truck 1.00 mont - 100 00 100.00 - 7.100 00 300 00 23 - - - 24 Material - - - - 25 4x I2 stone(8 to 12 crushed concrete) 200.00 ton - 35.50 7,100.00 - 26 Pea gravel 100.00 ton - 26.50 2,650.00 27 3x5 stone 200.00 ton - 35.50 7,100.00 - 28 Geotextile 3.00 ea - 385.97 1,157.91 29 Wedge anchors 500.00 ea - 3.98 1.990.00 - - 30 Grout 5.00 ea - 25.00 125.00 - - 31 - - - 32 Equipment - - 33 Mini excavator 24"bucket 1 00 mont - - - 4,250.00 4,250.00 35 Skid steer 100 mont - - - 4.800.00 4,800.00 36 Compactor 54" 200 day - . - 440.00 880.00 37 Compactor plate 10 00 day - - - 225.00 2,250.00 38 Water truck 10.00 day - - - 500.00 5,000.00 39 Fork lift 1.00 day - - - 483.00 483.00 40 Small equipment 1.00 Is - - - 4.000.00 4,000.00 41 Freight 8.00 ca - - 350 00 2,800.00 42 . - - - 43 Foreman(1 men 200 hrs) 200.00 his 37.30 7,460 01) - - 44 - - 45 - - - - Direct Cost Subtotal 61,215.70 43,867.34 1.950.00 31,763.00 Small Toolsrni,2% 1,224.31 877 35 n/a 635,26 Safety Materials,Equipment,&Training(/5% 3,060.79 n/a n/a n/a Tax Gu 8.25% n/a n'a o/a 2,620.45 Subtotal 2 65,500.80 44,744.69 1.950.00 35,018.71 Fee n;15%L.M.E&fee h 5%for Sub 9,825.12 6.711.70 97.50 5,252.81 Subtotal1 75,325.92 51,456.39 2,047.50 40.271.51 Warranty ,r.4% 3,013.04 2,058.26 8190 1,610.86 Bonds iD 2% 1,506.52 1,029.13 40.95 805.43 Insurance'u 2" 1,506.52 1.029.13 40.95 805.43 Subtotal 4 81,351.99 55,572.90 2.211.30 43,493.23 Total of all..,, oon; 182,629.43 Page 2 Run Date 9/22/17 CORE & MAIN LP Entered by: GSA SAN ANTONIO-E TX 13790 Judson Rd San Antonio TX 78233 Telephone: 210-657-1632 Fax: 210-657-2321 9/22/17 Bid ID: 4689652 ON STEPHENS FRENCH DRAIN PIPE Page 1 Sell Net Extended Line Quantity Per Description Price Price CORE & MAIN 7620 GRISSOM ROAD SAN ANTONIO, TEXAS 78251 PHONE: 210-684-1150 FAX: 210-684-5521 * AND * 13790 JUDSON ROAD SAN ANTONIO, TEXAS 78233 PHONE: 210-657-1632 FAX: 210-657-2321 PROJECT: ON STEPHENS LOCATION: CORPUS CHRISTI , TX BID DATE: ENGINEER: BID PER SPECIFICATION ****************************** ** PVC PIPE QUOTED HEREIN ** ** IS OFFERED SUBJECT TO ** ** AVAILABILITY. PRICING ** ** IS SUBJECT TO CHANGE. ** Run Date 9/22/17 CORE & MAIN LP Entered by: GBA SAN ANTONIO-E TX 13790 Judson Rd San Antonio TX 78233 Telephone: 210-657-1632 Fax: 210-657-2321 9/22/17 Bid ID: 4689652 ON STEPHENS FRENCH DRAIN PIPE Page 2 Sell Net Extended Line Quantity Per Description Price Price Bid Item 1 FRENCH DRAIN PIPING 440 500 FT 12 ADS N-12 PERF PIPE W/SOCK 7 .25 3, 625 . 00 450 70 FT 12X14 ' SDR26 HW SWR PIPE (G) 8 .78 614 .60 470 1 EA 1264AN 12X12 ADS N-12 HDPE TEE 132 .28 132.28 480 1 EA 12945T 12 ADS N-12 ST 45 BEND 78 . 18 78 . 18 W/DIMPLES, NO GASKET REQUIRED 490 5 EA 1266AA 12 ADS PREM SPLIT CPLG 19. 79 98 . 95 N-12 ST 500 1 EA 1269AG 12 NYLO WT BELL ADPTER 117. 10 117. 10 SDR35 Hid Item Sub-total: 4,666.11 Bid Item 2 (3) 12 CLEAN OUT ASSEMBLY 520 3 EA 1281AN 12X6 ADS N-12 HDPE WYE 159 . 89 479.67 530 6 EA 1266AA 12 ADS PREM SPLIT CPLG 19 .79 118.74 N-12 ST 540 2 EA 1267AA 12 ADS HDPE END CAP 43 .16 86. 32 550 3 EA 0669AG 6" ADS BELL/SEWER ADAPT 21 . 58 64 . 74 SDR35 SINGLE WALL S60 3 EA 6 HW SWR SDR26 45 GXG 21 . 86 65 .58 570 3 EA 6 SDR35 CLEANOUT ADPT HXF L/PL 16.06 48. 18 580 3 EA 6 PVC SWR CLEANOUT PLUG MIPT 10.37 31 . 11 590 14 FT 6X14 ' SDR26 HW PVC SWR PIPE G 2 .21 30 . 94 Bid Item Sub-total: 925.28 Subtotal: 5,591.39 Tax: .00 Bid Total: 5,591.39 SOUTHERN CRUSHED CONCRETE SCC Corpus Christi Office SCC Plant Location 540 N.Water Street Suite 600 230 Flato Road Corpus Christi Texas 78401 Corpus Christi Texas 78405 Phone(361)446-4602 Dispatch (361)299-6299 Customer/A&E Firm: Pepper Lawson Waterworks Owner/POC: Livermore(346)315-8239 BID DATE: October 12, 2017 Project: O.N. Stevens WTP Project Location: !2960 Leopard St. Corpus Christi,TX. 78410 WE ARE PLEASED TO PROVIDE THIS QUOTATION FOR THE ITEMS DESCRIBED BELOW. ITEM DESCRIPTION QUANTITY PRICE PER TON Delivered 1 Rip Rap 200 $35.50 FOB Project Site Specially Sized Exclusions: Price valid thru December 31, 2017 Delivered prices are subject to freight increase dependent on fuel cost increase. Any Increase in freight costs will be passed on to purchaser. Please note,slight variances should be expected in specially sized materials. Best Regards, Crag, ,4gurlar SOUTHERN CRUSHED CONCRETE Corpus Christi Area Business Manager 500 N. Water Street Suite 600 Corpus Christi Texas 78401 Cell: (361)446-4602 Email: caguilar@scctx.com P.O. Box 1269 Aransas Pass,TX 78335 (361)775-0065 Fax:(361)775-2676 9/22/17 Pepper Lawson Waterworks, LLC 1600 NE Loop 410, Suite 104 San Antonio,TX 78209 Attn: Brad Livermore Re: Materials Price Quote—O.N. Stevens Water Treatment Plant—Corpus Christi,TX Dear Mr. Livermore: Please accept the following price quote for the above-referenced project: 3/8"Pea Gravel - $26.50/tn This price will be honored through December 31,2017. January 1,2018,an increase not to exceed of$3.00/cy may be necessary due to increased raw material costs. Thank you for the opportunity to quote this and future projects with your company. We appreciate your business. Sincerely, Shelton Posey Live Oak Ready Mix, LLC Corpus Christi Page 1 of 2 2556 Agnes Street 09/22/2017 07:21 Corpus Christi TX 78405 Tel:(361)883-0921 Fax:(361)883-0519 Quotation -- Sold-To-Party : 114546 Information quotation Number 20444130 Quotation Created Date 09/15/2017 Customer Number 114546 Ship-To-Party : 5246268 Inside Saleman Vicente Villegas Outside Saleman Dustin Deleon Validity Start Date 09/15/2017 Validity End Date 10/15/2017 Notes from the Customer: Item Material Quantity Price Per Unit Amount 10 GEOTEXTILES 24 EA 752.21 $ 1 EA 18,053.04 LandLok 300 8.5'x120' 20 GEOTEXTILES 3 EA 385.97 $ 1 EA 1,157.91 Terratex SD 15'x 360' 30 PWC- I- 70 FT 26.50 $ -------1 FT -17866:00- 12"SDR26 14' Pipe 40 RAW-07323 100 EA 397.92 $ 100 EA 397.92 POWERSTUD 304SS 1/2 X 4 1/2 (50/BX) --50 ANCHORS- 42 EA -- 11.85 $----------1--FA ------- 49.7.70 1/8"x 1-1/2"x 12'Aluminum Flat Bar 60 PIPE 125 EA 1 FA 8" PVC Pipe Sch 40 20' Bell End 70 RIPC ' 4 EA 35.99- $ 1 EA 143.96 8"PVC Cap 00 PIPE 8" PVC"Y" • Corpus Christi Page 2 of 2 2556 Agnes Street 09/22/2017 07:21 Corpus Christi TX 78405 Tel:(361)883-0921 Fax:(361)883-0519 Quotation Items total: 27.455.35 Freight: 189.55 Total Amount: $ 27,644.90 Signature Date Product mains NotesProduct Note 3.102 Re: ADS Drain Guard and Sock Date: March 1, 2002 Solutions to Tough Siltation Problems Now Advanced Drainage Systems offers you two ways to meet tough siltation challenges head on. These synthetic wrap materials combine with ADS corrugated polyethylene pipe to give an extra-strong, tough screen that stabilizes soils and keeps water flowing. 06f . Both feature opening sizes that have proven effective for moving water without blockage in a wide range of soils.The entire length of drain is covered, and corrugations are t < spanned by the materials, maintaining t - effective inlet areas which promote rapid drainage. • • DRAIN GUARD /Jp ADS SOCK protective wrap ••-r^— �' drain envelope For drainage installations that require a For jobs where the protective covering tough, durable screen under normal is subjected to unusually rough install- handling conditions: lation and handling conditions: « . DRAIN GUARD® .SOCK protective wrap, a complete, one-step drainage sys- a flexible drain envelope that meets the needs of a tern for sandy and other problem soils, installed with wide range of soil conditions, installed with conven- conventional drainage equipment. tional drainage equipment. Choose the ADS Synthetic envelope that's right for each job. S. DRAIN GUARD° 1117FIDS.SOCK For normal routine installations. For more rough-and-tumble installations. Manufactured of 100% nylon, tough and durable A polyester machine-knitted envelope that provides DRAIN GUARD WEIGHS just 0.85 ounce per the needed water entry and sediment protection. square yard.The material's unique bonding SOCK weighs approximately three ounces per process gives you an ultraporous filter that restrains square yard.SOCK stretches to fit snugly over the and stabilizes the soil, yet allows free entry of pipe and gives the extra protections required by water. rough handling conditions. 4640 TRUEMAN BLVD. HILLIARD, OH 43026 (800)821-6710 http://www.ads-pipe.com TECHNICAL INFORMATION DRAIN GUARD ADS SOCK Material Nylon Polyester (100%) _(100%) Fabric Spun Bond _ Knitted _ _ Fiber size (denier per filament) --_- - 5 100 to 200 Weight (ounces per square yard) 0.85 2.5 to 3.5 (ATSM D 3776) Burst Strength (pounds per square inch) 28 100-135 (ATSM D 3786) Air Permeability (CFM per square foot) 650 700 (ATSM D 737) _ Equivalent Opening Size (Army Corps of Engineers) 50 30 to 40 (W 02215) Water Flow Rate (gal/min/ft') 163 ---- (ATSM D 4491) Melt Temperature 218'C 258'C (ATSM D 3786) (425'F.) (496"F.) If either Drain Guard or Sock is not scheduled for immediate installation,it should be protected from sunlight's UV Rays Drain Guard is normally bagged in UV resistant bags for shipping. 'Nominal values for Drain Guard and Sock Filter material. For applications in agriculture, highway construction and the building industry, ADS has the synthetic drain envelope for every job. • ' Each is strong, non-biodegradable and gives you the ex- cellent filtering and soil stabilizing characteristics you _�._-� - need. Both DRAIN GUARD and ADS SOCK perform -� �: _ : • equally well in the ground for the life of your drainage in- t' .E • "'a stallation. And, because these materials are factory 1 installed on ADS pipe, you'll save valuable labor costs in ‘;-. _ ^-4 the field. STANDARD FEATURES ADS DRAIN GUARD AND SOCK synthetic wrap materials — `•`_<'',•• 'A admit fine silt and clay; restrain ` sands and coarse silts — non-toxic, - - t ., non-irritating — inert in soil — non- ., „�,,�,. Y ';' ` ' , t " • biodegradable — resist alkalis and 4" e ' + , acids —will not rot — not affected ._ „'"' '1r if i by freezing or thawing — continu- l ouslengths up to 5000'— available 4. 0 ' - . for drainage pipe sizes from 3" to ,- 24"diameter— factory applied, ^'` • ready for installation — lower labor costs in the field. _ 114Applicable Specifications _ SCS Engincenng Standards Code 606— : - ASTM D 6707—ASTM F405--ASTM F667— 4. ' ASTM F449—AASHTO M252,M294 . • • Productforzry ,, . , tui ,,,, !sl'otes Product Note 3.109 • Re: Standard.Pipe Perforations 3-24" I.D. Singe Wall Pipe Date: December, 2003 Nominal Slot Length or I.D. Perforation Diameter Slot Width Perforation In.(mm) Type Max.In.(mm) Max.In.(mm) Configuration 3 (75) Slot 0.984(25) 0.118(3) AB 4(100) Slot 0.984(25) 0.118(3) CD 5 (125) Slot 0.984(25) 0.118 (3) CD 6(150) Slot 0.984(25) 0.118(3) CD 8 (200) Slot 1.181 (30) 0.118(3) CD 10(250) Slot 1.181 (30) 0.118(3) CD 12 (300) Slot 2.756(70) 0.118(3) CD 12(300) Circular 0.394(10) — E 15(375) Circular 0.394(10) — E 18(450) Circular 0.394(10) — E 24(600) Circular 0.394(10) — F Perforation Configurations AB (SLOT) E (CIRCULAR) A B A E 43. 45• I it I/ \I i OM 71- iill 2at180• 2 ot 180 (9o• Fran A) B 6 at 60' E CD (SLOT) F (CIRCULAR) C D C F F sr 43• I -h )11( I II II MII 3 of 120• 3 at 120• B B at 45• F (60• From C) NOTE 1: ADS pipe is perforated for water entry with slots or circular perforations.The perforations are uniformly spaced along the length and circumference of the pipe. NOTE 2: Unless otherwise specified,ADS pipe is manufactured to comply with the perforation requirements specified in the following industry standards:ASTM F405,ASTM F667,AASHTO M252,AASHTO M294,and NRCS Code 606. NOTE 3: A SPECIAL PRODUCT REQUEST FORM is required for non-standard perforations. 4640 TRUEMAN BLVD., HILLIARD,OH 43026 (800)821-6710 http://www.ads-plpe.com 'EMSVii- tz.� i TECHNICAL NOTE TN 1.01 Dual Wall HDPE Perforation Patterns December 2011 Introduction Perforated pipe plays an integral role in many applications of HDPE pipe. Generally, perforated pipe is used to accelerate the removal of subsurface water in soils or to allow storm water to percolate into the soil.Currently,two classifications of perforations are specified in the AASHTO material specifications for HDPE pipe: Class I,and Class II. Class I perforations are commonly used in combination storm/underdrain systems while Class II incorporates subsurface drainage and detention/retention systems.Both classes are explained in more detail in the AASHTO materials specifications(M294 and M252).AASHTO M252 covers pipe diameters 3-through 10-inch(75-250 mm) while M294 covers 12-inch through 60-inch(300-1500 mm). Standard Perforation Patterns AASHTO Class II Perforation The following terminology for perforations is derived from the applicable AASHTO specification. Differences between the specifications are covered in the table below. Class II perforations shall be located in the outside valleys of the corrugations,be circular and/or slotted and evenly spaced around the circumference and length of the pipe.The perforations shall be located in the outside valleys of the corrugations.The water inlet area shall be no less than 0.945 in2/ft(20 cm2/m)for pipe diameters 4-through 10-inch(100-250mm), 1.42 in2/ft (30 cm2/m)for pipe diameters 12-through 18-inch(300-450 mm)and 1.89 in2/ft(40 cm2/m)for pipe diameters larger than and equal to 24 inches(600 mm). Table 1 below represents ADS standard perforation patterns for AASHTO Class II. Maximum Slot Maximum Minimum Nominal I.D. Perforation Length or Slot Width Inlet Area Type Diameter in mm in mm in mm in'/ft em'fm 4 100 Slot 0.875 22 0.125 3 1.0 21 6 150 Slot 0.875 22 0.125 3 1.0 21 8 200 Slot 1.18 30 0.125 3 1.0 21 10 250 Slot 1.18 30 0.125 3 1.0 21 12 300 Circular 0.313 8 - - 1.5 32 15 375 Circular 0.313 8 - - 1.5 32 18 450 Circular 0.313 8 - - 1.5 32 24 600 Circular 0.313 8 - - 2.0 42 30 750 Circular 0.375 9.5 - - 2.0 42 36 900 Circular_ 0.375 9.5 - - 2.0 42 42 1050 Circular 0.375 9.5 - - 2.0 42 48 1200 _ Circular 0.375 9.5 - - 2.0 42 54 1350 Circular 0.375 9.5 - - 2.0 42 60 1500 Circular 0.375 9.5 - - , 2.0 42 4640 TRUEMAN BLVD. HILLIARD,01143026 (800)821.6710 www.ads-pipe.com 1 ATN10 i BADS 2011 1111111A36. Figure 1 AASHTO Class II Perforation Patterns Note:Actual pattern may vary by region, however all patterns meet the AASHTO and ASTM minimum requirements for the open inlet area. 4" — 10- PIPE DIAMETERS 120' I Y f 3 AT 120' ROTATED EVERY VALLEY 12" — 18" PIPE DIAMETERS 6' ** NUMBER OF HOLES AROUND ** NUMBER OF HOLES AROUND CIRCUMFERENCE VARIES BASED ON CIRCUMFERENCE VARIES BASED ON DIAMETER AND REGION ** DIAMETER AND REGION ** [2 4640 TRUEMAN BLVD. HILLIARD,OH 43026 (800)821-6710 wwwsdspipe.com ATN101 0 ADS 2011 EMS 4 24" PIPE DIAMETERS 45°1 30" PIPE DIAMETERS 45° 45°`- i � r 44 2 AT EVERY 45° '" NUMBER OF HOLES AROUND CIRCUMFERENCE VARIES BASED ON DIAMETER AND REGION" 4640 TRUEMAN BLVD. HILLIARD,OH 43026 (800)821-6710 wwiv.ads-pipe.co i 3 ATN101 PADS 2011 • s • r 3 IMIS• : - • f••'-: 36" - 60" PIPE DIAMETERS 45' 2 AT EVERY 45° 4 4640 TRUEMAN BLVD. HILLIARD,OH 43026 (800)821-6710 www.ads-pipe.com ATN101 40 ADS 2011 O. _ O F.) • z o o T., P4 W a H 0 H H P. C ✓ - Q u alu C r:1 cu O C O z y 0. Q F ¢ u V' o o z Z c 15 ._ - 0 O x c 0 p a _ ,. 0 Marto SALES ORDER Order Creation Date (/17/2017 Sales Order it 00648479 REVISED Customer Number 509981 Job# 5099810022 Customer Name PEPPER LAWSON CONSTRUCTION Expiration Date 12/31/2017 Address 4555 KATY HOCKLEY CUT OFF RD Customer Contact City.State.Zip KATY TX 77493-782 Customer Phone County Customer Fax Customer Mobile Project Name Customer JohH lob Name ONSWTP Water Treatment Plant Customer PO 41 P2R Address 13101 Leonard St. Estimated Delivery Date Transportation Mode T City.State.Zip CORPUS CHRIST TX 78410 Delivered Y County NUECES Activation Date 1/172017 Tax Exempt V Unit of Product Haul Unit/ Hired Total Per Plant Plant Name Pnalact ID Dego-bourn Quantity Mmure Price Rale Y' !---------- - ---- - Extended 941J P rd Hill 0190 SUR Q(NI Ton 0 0 HALT AST 54403 IIoITmm Pit 3366 CITYCALICHE 15000 Ton 1 2,'10000 HE - 54415 Rohdoxn 2310 J>3 800 Ton j.01 Hx9511 G4 AI ON 54415 lieb9oun 39S4 TYAGRADE 200(p Ton 25 75 5.15000 I RAST=. *^^Denotes a Complex.Multtp lc Combined l lout which does not show price detail Estimated Total(Excluding'Tax) £8,737.50 Hued ID!0tX.fh-e Remarks Accepted Date. Salesperson: Josh Bracke Accepted By: Signature: IMS ACKNOWLEDGEMENT OF YOUR ORDER IS FOR QUANTITIES AND AT PRICES INDICATED ABOVE ANY TAXES WILL RE ADDITIONAL TRANSPORTATION CHARGES ARE BASED ON RATES NOW IN EFFECT AND Wit i.HE ADJUSTED IN ACCORDANCE WITH ANY CHANGES HEREAFTER WEIGHTS WILL RE DETERMINED S'I'RIC'IIY IN ACCORDANCE WITH RAIL OR TRUCK SCALE WEIGH TS WITHOUT ANY ALLOWANCE FOR MOISTURE OR SPECIFIC GRAVI IV VARIATIONS AN AGREEMENT MAY BE NECESSARY AS TO TIME or at tleNWNT3 TO FIT IN wlrt I JILCK ORDERS THEN R SOMA' S _LNS BEYOND OUR CONTROL IN THEEVEN I MATERIAL S ARE UNSATISFACTORY,OUR LIABILITY IS LIMITED TO FURNISHING REPLACEMENT MATERIAL SHIPMENTS ARF SUBJECT TO CREDIT APPROVAL TEAMS ARE NGr 30 DAYS Printed I? 8:42:20AM 922i2017 CMMMSaIesOrder.rpt ti 4 PYRAMAT® Product Data 4� PYRAMAT®25 TRM PYRAMAT® 25 turf reinforcement mat (TRM) is a three-dimensional, lofty, woven polypropylene geotextile that is available in green which is specially designed for erosion control applications on steep slopes and vegetated waterways. The matrix is composed of polypropylene monofilament yarns featuring X3® technology woven into a uniform configuration of resilient pyramid-like projections. The material exhibits very high interlock and reinforcement capacity with both soil and root systems, demonstrates superior UV resistance, and enhances seedling emergence. PYRAMAT® 25 conforms to the property values listed below' and is manufactured at a Propex facility having achieved ISO 9001:2008 certification. Propex performs internal Manufacturing Quality Control (MQC) tests that have been accredited by the Geosynthetic Accreditation Institute - Laboratory Accreditation Program (GAL-LAP). PROPERTY I TEST METHOD I ENGLISH I METRIC ORIGIN OF MATERIALS %U.S.Manufactured Inputs 100% 100% %U.S.Manufactured 100% 100% PHYSICAL Mass/Unit Area 2 ASTM D-6566 7.5 o7/yd' 254 g/m2 Thickness 2 ASTM D-6525 0.25 in 6.4 mm Light Penetration(%Passing)3 ASTM 06567 35% 35% Color Visual Green or Tan MECHANICAL Tensile Strength 2 ASTM D-6818 2000 x 1800 lbs/ft 29.2 x 26.3 kN/m Elongation 2 ASTM 0-6818 20 x 20% 20 x 20% Resiliency 2 ASTM D6524 70% 70% Flexibility4 ASTM D6575 0.195 in-lb 225,000 mg-cm ENDURANCE UV Resistance%Retained at 1,000 hrs 4 ASTM 04355 90% 90% W Resistance%Retained at 3,000 hrs 4 ASTM 0-4355 90% 90% PERFORMANCE Velocity(Vegetated)4'a Large Scale 20 ft/sec 6.1 m/sec Shear Stress(Vegetated)4.5 Large Scale 12 Ib/ft2 575 Pa Mannings n(Unvegetated)4'6 Calculated 0.028 0.028 Seedling Emergence 4 ASTM 07322 255% 255% ROLL SIZES 8.5 ft x 120 ft 2.6 m x 36.6 m 15.0 ftx120ft 4.6mx36.6m Norse The orrv..m values!Wed„ban a,e weneve 02/0.8r2017 and are subject m change-Jnnnt neer. 2 average ro.I nl rrts(MAIM.are ulNatd as dieWeal Mryutw standarp neaatrms. 9oosbraly,1 yields a 97 7%degree of mntldene that any ambles taken from oual M ascurarce resting me exceed IM value reported marnem peerage Hoe lue(nwAln.mlwlned as me pp®r plus erre staeoara dev.yes AAsaorb.It roes a 93n Jagw ur„NJ,that any ample t-ee during quality assurance netrp ren. meet rote valise/ran rsoical M eene.r.r.e,„reieret,and shear stress has Iran oirteined mm w yes 1 .- r s .v.yem... d..navrva .. ee.new ..uua .aer wrua I . .20 mv w.nmeryo mita for are Pq epdvt J by other msn&a[d2r pease contact„mop ta not r further,rtormason 6 y 6alaaaednn as totalvaluesfropmm arygeesasle luck channel channel I ln,ng ten pcWans wM flowm a depth orb 12 inches. `' G^ ENGINEERED EARTH ARMORING SOLUTIONSTM Pr 00:ner DONS www.propexglobal.com Proper Operating Company,LLC-4019 Industry Drive Chattanooga,IN 37416'ph 800 6211273 r ph 423 855 1466 _:ANDY ne WY.n a .PrIPOMAr PITROTAO. r rpvo"•ue regmte.ed uwemans of Proee Operating foreparry _ rt bode ey Pan,.for a W 7017 Peweeryvmng Campam IL g 815 Buxton Street 1 NAnston Salem,NC 127101 HANES PH:888.23945391 FAX:336747.1652 A.:fryir< ""^""' www.HanesGeo.com TerraTex® SD TerraTex®SD is a nonwoven geotextile made up of polypropylene fibers.These fibers are needled to form a stable and durable network such that the fibers retain their relative position.It is non-biodegradable and resistant to most soil chemicals,acids,and alkali with a pH range of 3 to 12.TerraTex®SD is manufactured to meet or exceed the following minimum average roll values: Unless noted ethennse,all values are minimum average roll values(MAWVI. pIOeEAly TESEMETIC° ENGLISH METRIC Weight(Typical)l ASTM D5261 4.0 o1/yd2 136 vm2 Grab Tensile //STM04632 1001bs 0.446 kN Grab Elongation ASTM 04632 50% 50% Trapezoid Tear ASTM 04533 50 lbs 0.222 kN CBR Puncture ASTM D6241 300 lbs 1.324N Permittivity1 ASTM D4491 2.00 sect 2.00 sect Water Flow Rate 1 ASTM 04491 140 gem/h2 5,689 Lo/m2 ADS 1.2 ASTM 04751 70 US Std.Steve 0212 mm UV Resistance ASTM 04355 70%@ 500 hrs 70%@5o0 hrs i Al the time of manulatlming.Handling.storage.and shipping may change these propedies. 2 Value represents matimum average roll value. DISCLAIMER:Descriptions regarding the products described herein are based solely upon information provided by the manufacturer and are IXovi]ed Io inlormational purposes only.NOTHING CONTAINED HEREIN SHOULD BE CONSTRUED AS CREATING AN EXPRESSED OR IMPLIED WARRANTY,INCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS,EACH OF WHICH IS HEREBY DISCLAIMED.THERE ARE NO WARRANTIES THAT EXTEND BEYOND THE DESCRIPTION ON THE FACE HEREOF.The final determination as to the suitability Of any product of Hanes Geo Components In any particular application rests solely with the user Hanes Geo Components reserves the fight to alter or modify its products and descriptions at any time without notice. 1/71201e • • Livermore, Bradley From: Robert Ferguson <robert@houstonhydroseeding.com> Sent: Monday, September 18,2017 10:57 AM To: Livermore, Bradley Subject: Hydroseeding Solution Brad, As discussed,the price for 2500 SY or 22,500 SF' 17ooMr the standard TXDOT Mix ratio of Bermuda @50 lbs per acre, 2000 lbs of mulch per acre and 150 lbs of Fertilizer per acre.Since you are using the LandLok 300 product,we would spray Hydroseeding, and you would then apply the LandLok protection on top.This is normally best practice, but please check with whoever is doing the LandLok to confirm. If you double the seed ratio to increase density,please add an additionalV'1:10D Client: Brad Livermore Corpus Christi Area 346-315-8239 Thanks, O.) • __ _ - - — )1 a • I 1 ;i..7).. :AMA I L 'y ir,t 1 .ir- 1(1 a / ' ROCKRIP P.SECTION I 'i11 'eN'l . 11g_,,, q „,„-,, ,,,,,, I 11; e i M i ,�• • vv'rri-w.irr.y.�, 4/14 ' 1�'� 1 v.'.. Go. >a ••..•....�.............. V..r.VV...V�.... � r.. *_ Nii1 O O ....................................................: ... .-,-.-,- C a OIg t O STORM WATER OUTFALL OiWNAGEIMPROVEMENTS • ...... - . . u o I O CIEARWELL 2 DRAINAGE IMPROVEMENTS O.. W _,' (Mrr m,a.0 PI 21 [frw[ ' Pw.n.a Pw.n n) C •j ® .W Mal=WU 00110 ii 17 0 p y�A011. .asu Y.... .w..R. Mia. MGTa AM 10■N W ff. WM i 7 C • ,.i.iiil i u r - .m..I.-. _r IrrI r� =� I� ;uE V [Par V., c °o` M>u G rii� SECTIONS TRENCH SECTION �Y �Y--�� =w s. C I p 1 u e Ti"� MC Of flip II _ A 7,,! . 11=' �. . I �W ILII ,i �` - ----„::-....n. • Y T r .•-•;!"4;11 .r i z rrn. ._ 111 �r - '.rte.; >^n;�� _0 _1 °.ro.war+f 00,1001/mt0 )O•:•. I °..o w..v-rt o `, 2 ;;A„,....,.. � _ ;=1.. tzt0. °oma° lC=1 ...tee M'� P 11A1=11Pu`-••-7�.---. .r.o....o a..... .r.arw..m Ma.00 I ran 61 b1 =11.11, 0r1.1:111111 .....�.°° 1011.011 We"'°..°°. ..�.. r— L 01. t( 00•1040 re 001R00 i WiR-150 h SECTIONS =1I1 '� SECTION 8 SECTKKIC 41100/1111•n,as .o.<m , . . .......••• 00 0,00,3234,01.0 nay ar oseca cm=raw or gem.IMO CM .....t=.....a..47:a.743.1141.='.:1 7:.:7.7..ri.... "....•..- ,...,___,..-- 'r:r.''...2"...==.n7rZog.-1-........7.17=z,-=:===1:,1:414.•• '411111111 - , ....... .......,...................,.3 woe........... ..4111111111110*.--_„00...____--,___.. . .2,E1A.:„. 00 •3=3::::...a.,.......0.1003......=:=Ma•ra.:0.....23:2::••••:Ta.. •Y* ellat1L. .M•ar.•:•27•••••••••r,or.r...M..2:30.••••••••..••••••••.•. .0.X0 , .11111111111 -.. .':iii-ff 113441 . , .74=17.47::-----=:"---4-7-1--1.---rwo=71:77,4%:•27:17'' ca.ftre sou t ',' ':01" i _,.,,..-..“ 30..030 3.01.0 1 il , u iiikA4.4? ' ...,,,,,::::-`"::7,i-F ' Virl•ma.:17 Imo se.•a•mu no......rw ......... , I :1 ••000•am.o away.000000•••...moo•••000rsamo•••••••••...• 'EX:c-e7:7-::-.CF..:,--'-'•-7..1.-7 g:V.-7,Yert.:P.K.:-:.'12 7---F..7.!7 ....WIIPIPI,,,. --...-:.•....:::::- ___,. ir27.4-•1-i-±,• I t I —1:-1•1---7442-1.-=Jr%.T."11"..,:rit-70 rTh 7-.1 Z•?'...g.-::::--:• tr•Ow=or cow. ••••-•,. - ,L,1„1,-,!;_.i2472.7 Tr-, 30 •*".'I At. . •=:.r..3.::::=7,....r.".='IZAZA"Za=c7.4":=7:::r:::Val*, '''''',.-,-L2127-'4-]'T!'1.:7-:414'7" 1 1 1111 .-,Inlant=41 nvi-r-- '7,147.÷1=:'4 Z.»:WI=rialaillfir:"... 4.....:77.i. ••••.40Taii4iii,---' -••"-•-e.w.ri;vv.-, a zli •••,-•-,,r_ =!....virr.4.riirl."EtliVi.,-=---—--•---,-- _rigit4rity_r_zu p....T •••••.-1.11)1h; : :IIII_ L7 .--.---,_.1.4.•21: i •=.-1.1.-.::,-.T.:.=.=v....Tut:In-="--------- 0.0.3.0 0,.0.XO 0 0 T.00. .:34.-•-:1:3.44.74:03.= •V•17'4L1-3-,-=-0.-1-1-:- A 'ForeAri2"."•=r`.....AL C.,"14::=7:17=:1":"......Tir'.....=.:1 /14.zz,. "7.ic.:7; ':-..r.4.-7.?=.-- ==rmar.r41.7=:. IV•.0) 13. ......E. OW 0 XVI 10341 MO. . ‘.0 2 0,wk. : °{••A'.•::.2 i •74=41=ig:Mik4.."1.+•••••Y:iir:••F°44...7:32.....0::= •i . "'• '- '=fee:417=1,7•••"'''"*".*''''''''''''''''""''''•''''''''''''''."'' 1 i I I await, ........ 013 OM. MO•KOK 0000X0 '4 pi ei ... 1 0 a 1 111=11,1 g in I 1,1' ki i - 11 In ! uIII ....- , IVT.Z.VALAIIIMTLA2F22.2•=e4re........SFA:7•27.C:=“11•4=4.15•• ; .12‘...a.A•2 a moot.we..onirrs...opt.....,••••..Z""'"' Pea ON,0 - ' ' ' . , '21 al i 7.-,-...7.7.7-ri.---- --.:..-...:-.7.---ze,--ex:r.::;:a=v4.-:•4:,..7: -dm i , ,....>. •z •-• aiwanalTigir" ,30.0,10.3 3,01,.... ;C 0, ; • :.'''''707"'-"::::::::7.--—— -1•15:!;• T mi E „, So4241:7:4":74:zak"l'..7:12.2tarE' rt la. .=we•••ken No gm•••••...••••••••••••••mom.••••••••••••••gm.••••...•••••••• 'Eua•2"7.24:417€1751R1...71•WC:77.14:42"rili74i2""goa' 0.07 ORS AO DOM 30 0[00 3 0400,3000 0.3300 roux s 5:.• ,..,1; V5:ri al use.OM I •7....-:-.---.:=:.--...=:..•=•:1::-.-••=•••••---•-- eq 0! 1 I I .0.fa AVA ..s...... Ay , il •2417•11••7/4 r,"":4•,112Lar'••••••=2:i•W faC14:42:=Et F.,:7..-= 1 MI Krrt, 0 VW OR Wm ox. 13 WO i ii 8 g I •=— --+ 1 —V ROI I I Ma COI .0 g 2 2 , .. •• 7* :f$24..".274.2.425 4,ire.:4.:•*=.."2=25:2`42'•"""'"'"'". '''''''''' !'60( i i____A., In d i CC I , q NNW '..aia . 1 III Aill. 4 -..--==:::-.......--.I.=:-.-....:,:=7:4====alre=:=Z:F7' le- ' — .,,,,,,..• i seenpat a 254 ;• rt.-7f--7-44;:4F-'--7747.-Akiftlif:..7-=.77-15:- I . i .. ,--.--) _ -,,,.r.. -..,z.e..... _••••••••••• 11 2.....'4.T••?....iam•••• •:.:117:22,7=---4.: -:.-.-:-=". ... .3 300111.00 PRO OM X WTR-450 11 MO" 0.ORTON arm MAI•INOwnl,OM fa OM M.0 POW a 40.3.Oa OMR I are•Wiev•111.61 • • E11066 CHANGE ORDER NO.6- BACKUP DOCUMENTATION From:Kent Power Sent:Monday, December 18,2017 10:42 AM To:Arnie Wojtasczyk<AmieW@cctexas.com> Subject: FW: RFP#8 Erosion Control for CW#2 and creek berm Arnie Oh,forgot something with my last transmission. Be sure to include a copy of the design drawings,and this email along with contractor's cost breakdown. We will need all backup to submit to Council for approval. Let me know if you have any questions. THANKS ! KENT POWER 210.889.8143 From: Kent Power Sent:Monday, December 18,2017 10:39 AM To:Arnie Wojtasczyk<AmieW@cctexas.com> Cc:Victor Vargas[Engineering)<VictorV2@cctexas.com>;Arturo Hernandez<ArturoH2@cctexas.com>; Ernesto De La Garza<ErnestoDLG@cctexas.com> Subject: FW: RFP#8 Erosion Control for CW#2 and creek berm Arnie Need a change order for this. After contractor signatures,this must be approved by Council so a copy with signatures will have to be transmitted to Alex in Engineering. Let me know if you have any questions. KENT 1 LS Erosion Control addition for Clearwell#2 and Creek Berm $ 182,629.43 $182,629.43 WHY: It became evident during construction that there was excessive erosion on recent excavation and sloping of the fill material around the existing clearwell. This excavation was required to construct the new High Service Pump Station. Soil utilized during backfill of the clearwell during its original construction, experienced erosion well beyond design expectations during construction of the High Service Pump Station foundation. This was not anticipated and a new erosion control measure design was required to permanently stabilize the slope. HOW TO AVOID: Additional soil borings and test during design could have avoided the need for this change but not the costs associated. From:Grady Atkinson [mailto:gatkinson@Invinc.com) Sent:Monday, November 20,2017 10:51 AM To:Kent Power<KentP@cctexas.com>;Alex Barabanov<AlexBa@cctexas.com> Cc: Marcus Naiser<mnaiser@Invinc.com>;Victor Vargas[Engineering)<VictorV2@cctexas.com>;Arturo Hernandez<ArturoH2@cctexas.com>;Jiangang Deng<JiangangD@cctexas.com>; Ernesto De La Garza <ErnestoDLG @cctexas.com> Subject: FW: RFP#8 Erosion Control for CW#2 and creek berm Kent/Alex, Attached is PLW's proposed cost for the addition of CW2 and creek erosion control to be added to their scope of work. LNV reviewed PLWs initial proposal and provided comments which have been addressed by PLW in the email below. I want to note that I'm ok with allowing larger stone to be used in lieu of the size specified in our design only if it is at a cheaper price. The larger stone will enhance protection of the berm down at the creek. I'm also ok with allowing 12"pipe in lieu of 8"only if it is at a cheaper price. The larger pipe size will increase the handling capacity of the drainage system proposed. I took a look at the existing wedge anchors during a site visit last week and some do look to be in a poor condition. That said and in regards to PLWs response below, I would expect some of the existing wedge anchors to be replaced. An exact number will not be known until they begin installation,so it's up to the City on how this item needs to be addressed initially. All in all,the big ticket item on this proposal is labor/equipment costs(approximately 70%of the cost). Materials are approximately 30%of the proposal cost. In my experience, I typically see labor/equipment percentage of cost around the 50%range as well as the material percentage of cost. Evaluation of the time estimated in the proposal for the work at hand seems reasonable,so it's hard to argue labor overweighting the cost. The only thing that can be looked at further would be to compare the labor unit rates to PLWs certified payroll,which Construction Services has in hand. Other than that, I have no additional comments and so I am submitting to the City for approval. If there are any questions or you would like to discuss,please don't hesitate to contact me. Sincerely, Grady Atkinson, PE Project Manager LNV engineers I architects I surveyors 801 Navigation Blvd,Suite 300 Corpus Christi,Texas 78408 P 361-883-1984 F 361-883-1986 www.LNVINC.com From:Oliver Santisteban,Abel [mailto:aoliver@pepperlawson.com] Sent: Friday,October 13,2017 12:59 PM To:Grady Atkinson<gatkinson@Invinc.com> Cc:Arturo Hernandez<ArturoH2@cctexas.com>;Ruben Barrera [Engineering]<RubenB@cctexas.com>;Molacek, Matt<mmolacek@pepperlawson.com>; Davenport,John<jdavenport@pepr erlawson.com>;Livermore, Bradley <blivermore@pepperlawson.com>;Kent Power<kentp@cctexas.com>;Jiangang Deng<JiangangD@cctexas.com>; Alex Barabanov<AlexBa@cctexas.com> Subject: FW: RFP#8 Erosion Control for CW#2 and creek berm Grady, Please find below our response in blue and see attached RFP#8 with those changes. Thanks From:Grady Atkinson[mailto:gatkinson@Invinc.com] Sent:Thursday,October 12,2017 10:22 AM To:Oliver Santisteban,Abel<aoliver@pepperlawson.com> Cc:Arturo Hernandez<ArturoH2@cctexas.com>;Ruben Barrera[Engineering]<RubenB@cctexas.com>;Molacek, Matt<mmolacek@peuperlawson.com>;Davenport,John<jdavenport@pepperlawson.com>;Livermore, Bradley <blivermore@pepperlawson.com>; Kent Power<KentP@cctexas.com>;jiangangd@cctexas.com;Alex Barabanov <AlexBa@cctexas.com> Subject: RE: RFP#8 Erosion Control for CW#2 and creek berm Abel, Below is our comments to submitted RFP-8—Erosion Control for CW#2 and Creek Berm. Please review these comments and address at your earliest convenience. 1. Item 10(Page 2)—Fine grade,excavation and backfilling($7,004) Comment:The Landlok 300 is being proposed in a location that is already proposed to be graded in the original set of plans. Please provide explanation on why additional grade,excavation and backfilling is required.After the installation of the drain pipe there will be pea gravel from the existing drain mixed with dirt we dig up on this scope of work. The area will need to be regraded to a clean flat surface there is also excavation and backfill at the toe of the trench(figure 3 drawing C18B)That is not included in item 2. 2. Item 22&38(Page 2)—Water Truck($15,000) Comment:The unit rate for a water truck is reasonable for a day rate rental in this area;however, it is specified to be used for a total of 30 days. That said,it is typical that a reduced rate is provided when rented for an extended period(such as renting by the month or week in lieu of a day to day basis). Please provide rental quote and/or explanation supporting the$500 unit rate. Please provide the same information for Items 33 and 35 as they are proposed for 20 days as well.Considering a monthly rental(1 • month instead of 20 days),we can reduce the price for the water truck to$7,300, Mini excavator to $4,250 and skid steer to$4,800. 3. Item 25(Page 2)—4x12 Stone(if available) Comment: Please confirm 4x12 Stone"is available"at the cost of$35.5 per ton.The only product we can find in a small order is 8"to 12"crushed concrete.That price is good 1 to 2 weeks lead time is required.It would come from Southern Crushed Concrete.The product will be crushed concrete.See attached quote. I did find stone in San Antonio$100 a ton. 4. Item 29(Page 2)—Wedge Anchors($3,980) Comment: Please provide purpose for the wedge anchors and confirm if they are needed or not. If not needed,please remove item and associated cost from the proposal.The existing metal bracket looks in good shape but I'm not sure every nut will be able to be removed off every stud.Some or most may need to be cut off and new ones added. If you are agree we can consider 50%of new anchors in a safe position. 5. Item 40(Page 2)—Small Equipment&Consumables($4,000) Comment: Please provide detail on what all equipment is included in the item"small equipment"with detailed cost breakdown for each equipment included.Generator 20 days($705),Water pump 20 days ($657),Air compressor chip and hummer 10 days($886),Eye level 20 days($894)and consumables ($768). 6. Item 43(Page 2)—Foreman($7,460) Comment: It appears man-hour costs are already provided for each individual scope of work. Please provide detailed explanation for purpose of Item 43.It will be for the supervision,as you can see we haven't added any general condition for those works. 7. (Page 4)—French Drain Pipe Cost Proposal Comment: Please provide explanation for why 12"perforated pipe is quoted in lieu of 8"as specified in the drawings and the cost difference between the two sizes.8"perforated pipe was not available from any of our venders.To buy 8"drill and rap the pipe was much higher with the labor included.The 12"is a stock Item next size down was 4"or 6" but we never had it quoted. 8. Item 40(Page 6)—Powerstud 304SS''/:X 4''A(50/BX) Comment: Please provide detail for the purpose of this item.This would be the concrete anchor used to hold the Batten or metal strip on the wall if the others are not reusable. If there are any questions, please don't hesitate to contact me. Sincerely Grady Atkinson, PE Project Manager LNV engineers I architects I surveyors 801 Navigation Blvd,Suite 300 Corpus Christi,Texas 78408 P 361-883-1984 F 361-883-1986 www.LNVINC.com From:Oliver Santisteban,Abel [mailto:aoliver@pepperlawson.com] Sent:Wednesday,October 4,2017 10:20 AM To:Grady Atkinson<gatkinson@Invinc.com>; Kent Power<KentP@cctexas.com> Cc:Arturo Hernandez<ArturoH2@cctexas.com>;Ruben Barrera[Engineering]<RubenB@cctexas.com>;Molacek, Matt<mmolacek@pepperlawson.com>;Davenport,John<jdavenport@pepperlawson.com>;Livermore, Bradley <bl ivermore@ pepperlawson.com> Subject:RFP#8 Erosion Control for CW#2 and creek berm Kent, Please find the attached PLW cost summary and associated reference material for your review and acceptance. If you have any questions or need additional information,please do not hesitate to call. Thanks Abel Oliver. Lillian Gunter From: Christine Garza [Budget] Sent: Thursday,January 11, 2018 4:51 PM To: Lillian Gunter Subject: Approve:Change Order#7 - E11066- O.N.Stevens Water Treatment Plant High Service Pump Bldg#3 -APPROVAL NEEDED (UPI COUNCIL) 1