Loading...
HomeMy WebLinkAboutC2018-127 - 2/20/2018 - NA TASK ORDER 1 This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and LNV, Inc. (Consultant) dated December 19, 2017 (Motion M2017-196) (Agreement). Consultant shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. TASK ORDER NO.: 1 PROJECT NAME: 180608 MSA Facility LNV- Bond 2018 Feasibility Report 1. PROJECT DESCRIPTION The project includes assessment of the following properties: 18001C ADA Bldg Imprmts-Rec Center(s)-Oso, Lindale, Oak Park & Joe Garza 18001D ADA Building Improvements - City Hall 18016A Fire Department Driveway& Apparatus Bay Upgrades - Fire Station #3 18018A Flour Bluff Police Substation Alterations/Expansion 18022B Interior/ Exterior Upgrades - Fire Station(s) 18022F Interior/ Exterior Upgrades - City Hall 18032D Mechanical, Electrical and Fire Alarm Upgrades -Water Garden 18032G Mechanical, Electrical and Fire Alarm Upgrades -Senior& Recreation Center(s) 18037B Parking Renovations and Upgrades - City Hall 18037C Parking Renovations and Upgrades - CC Fire Department Warehouse 18037D Parking Renovations and Upgrades - Fire Stations No. 4, 6, 7, 8 and 11 180398 Roof Replacement and Upgrades - Fire Station#1 18039G Roof Replacement and Upgrades - Fire Station#16 18039H Roof Replacement and Upgrades - EMS Central 18039K Roof Replacement and Upgrades - Oso Park and Recreation Center 2. SCOPE OF SERVICES The scope of services includes a Property Condition Assessment and Feasibility Report for the listed properties. This task order is more fully described in Exhibit A. 3. COMPENSATION The total amount not to exceed for Task Order No. 1 only is $125,000.00. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OFC I LNV, INC'A003 -4. zAy/ - - Jeff H. Edm.nds, '. E. Date Ian . er, P. E. Date Director of Engineering Services President 801 Navigation, Suite 300 Corpus Christi, TX 78408 (361) 883-1984 Office (361)883-1986 Fax danl@Invinc.com FUND NAME / FUND #- ME: ACCOUNT: ACTIVITY: ST 2012 GO BD 08 3548-051 550950 E17083-01-3548-EXP 2018-127 2/20/18 18060B LNV Task Order No. 1 Page 1 of 1 LNV Inc. INDEXED TASK ORDER FUNDING REQUEST FORM CONTRACT MSA#AND TITLE: 18060A MSA Facility LNV- Bond 2018 Feasibility Report TASK ORDER PROJECT#/TITLE: 18060B MSA Facility LNV- Bond 2018 Feasibility Report TASK ORDER IS FOR WHICH PROJECT(S):SEE BELOW REQUESTING DEPARTMENT: ENGINEERING SERVICES FUND NAME/FUND#-ME: ACCOUNT: ACTIVITY: ST 2012 GO BDO8 3548-051 •550950 E17083-01-3548-EXP CONSULTANT: LNV FEE:SEE BELOW TASK ORDER#: 1 SCOPE OF WORK: PREVIOUSLY DISTRIBUTED PROJECT# FEE PROJECT NAME 18001C 58,500 ADA Bldg Imprmts-Rec Center(s)-Oso, Lindale,Oak Park&Joe Garza 18032G S9,500 Mechanical, Electrical and Fire Alarm Upgrades- Senior& Recreation Center(s) 18039K S6,500 Roof Replacement and Upgrades -Oso Park and Recreation Center 18001D 58,500 ADA Building Improvements-City Hall 18037B S8,000 Parking Renovations and Upgrades-City Hall 18022F S8,500 Interior/Exterior Upgrades- City Hall 18037C 58,000 Parking Renovations and Upgrades - CC Fire Department Warehouse 18022B S 10,500 Interior/Exterior Upgrades- Fire Station(s) 18039B S8,000 Roof Replacement and Upgrades • Fire Station#1 18016A 57,500 Fire Department Driveway&Apparatus Bay Upgrades-Fire Station#3 18039G 57,500 Roof Replacement and Upgrades- Fire Station#16 18037D 59,000 Parking Renovations and Upgrades-Fire Stations No.4, G, 7, 8 and 11 18018A 58,000 Flour Bluff Police Substation Alterations/Expansion 18032D 59,500 Mechanical, Electrical and Fire Alarm Upgrades-Water Garden 18039H 57,500 Roof Replacement and Upgrades- EMS Central 5125,000 Grand Total IPA lA lam. E70/3,L_ IP' NT NAM • SIGN, TUR : C c; / ?()I Sr DATE: EXHIBIT A Page 1 of 16 LNV Solutions Today with a Vision for Tomorrow engineers I architects I surveyors This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and LNV, Inc. dated December 19th, 2018 (Consultant). Consultant shall perform services on the project described below as provided in the Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. Task Order No.: 01; City Project#18001C LNV, Inc. Project No.: 180019.010.2 PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports (Bond 2018) TASK ORDER: ADA Building Improvements — Recreational Centers —Oso, Lindale, Oak Park & Joe Garza 1. PROJECT DESCRIPTION Visual field assessment of ADA compliance for the four recreational centers noted above. 2. SCOPE OF SERVICES Field assessments, report of findings at each facility with photos, recommended actions, and cost estimates for these recommendations. Assessments will include existing ADA parking and access to the building, main entry doors and threshold, corridors if applicable with regard to access to restrooms, all existing restrooms. 3. COMPENSATION The fee for these services will not exceed those identified and will be full and total compensation for all services outlined above, and all expenses incurred in performing these services. $8,500.00 lump sum fee will be billed monthly based on the percentage of task completion. 4. SCHEDULE Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or before March 2, 2018. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS CHRISTI LNV, INC. Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date Director of Engineering Services President 801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408 P:361-883-1984 I EXHIBIT AWww.LNVINC.COM Page 2 of 16 • LNV Solutions Today with a Vision for Tomorrow engineers architects surveyors This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and LNV, Inc. dated December 191, 2018 (Consultant). Consultant shall perform services on the project described below as provided in the Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. Task Order No.: 1, City Project#18001D LNV, Inc. Project No.: 180019.040.2 PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports (Bond 2018) TASK ORDER: ADA Building Improvements —City Hall 1. PROJECT DESCRIPTION Visual field assessment of ADA compliance for the interior and exterior (parking, access, entrances, exits, and restrooms) of the existing City Hall building 2. SCOPE OF SERVICES Field assessments, report of findings with photos, recommended actions, and cost estimates for these recommendations. Assessments will include existing ADA parking and access to the building, sidewalk, main entry doors and thresholds, corridors if applicable with regard to access to restrooms, all existing restrooms. 3. COMPENSATION The fee for these services will not exceed those identified and will be full and total compensation for all services outlined above, and all expenses incurred in performing these services. $8,500.00 lump sum fee will be billed monthly based on the percentage of task completion. 4. SCHEDULE Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or before March 2, 2018. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS CHRISTI LNV, INC. Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date Director of Engineering Services President 801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408 P:361-883-1984 I EXHIBIT AWWW.LNVINC.COM Page 3 of 16 • LNV Solutions Today with a Vision for Tomorrow engineers I architects surveyors This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and LNV, Inc. dated December 19'r', 2018 (Consultant). Consultant shall perform services on the project described below as provided in the Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. Task Order No.: 1, City Project#18016A LNV, Inc. Project No.: 180019.100.2 PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports (Bond 2018) TASK ORDER: Fire Department Driveway & Apparatus Bay Upgrades — Fire Station #3 1. PROJECT DESCRIPTION Visual field assessment of the existing driveway and apparatus bay for damages and required upgrades. 2. SCOPE OF SERVICES Field assessments. report of findings at each facility with photos, recommended actions, and cost estimates for these recommendations. Assessment will focus on primary driveways, and all apparatus bays that are part of this fire station. 3. COMPENSATION The fee for these services will not exceed those identified and will be full and total compensation for all services outlined above, and all expenses incurred in performing these services. $7,500.00 lump sum fee will be billed monthly based on the percentage of task completion. 4. SCHEDULE Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or before March 2, 2018. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS CHRISTI LNV, INC. Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date Director of Engineering Services President 801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408 P:361-8834984 I EXHIB*Awww.LNVINC.COM Page 4 of 16 LNV Solutions Today with a Vision for Tomorrow engineers architects I surveyors This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and LNV, Inc. dated December 191, 2018 (Consultant). Consultant shall perform services on the project described below as provided in the Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. Task Order No.: 1, City Project#18018A LNV, Inc. Project No.: 180019.130.2 PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports (Bond 2018) TASK ORDER: Flour Bluff Police Substation Alterations/ Expansion 1. PROJECT DESCRIPTION Visual field assessment of the existing facility for renovations and upgrades. 2. SCOPE OF SERVICES Field assessments, report of findings with photos, recommended actions, and cost estimates for these recommendations. We will look at the possibility of adding a private office along with conducting a general conditions assessment for a list of recommendations for improvements and/or upgrades to the facility. 3. COMPENSATION The fee for these services will not exceed those identified and will be full and total compensation for all services outlined above, and all expenses incurred in performing these services. $8,000.00 lump sum fee will be billed monthly based on the percentage of task completion. 4. SCHEDULE Final report submission/ presentation of findings to City of Corpus Christi—Delivered on or before March 2, 2018. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS CHRISTI LNV, ', INC. ZG./B Jeff H. Edmonds, P.E. Date Dan . - `'=r, P.E. Da e Director of Engineering Services President 801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408 P: 361-883-1984 I FEsX14181T ANWW.LNVINC.COM Page 5 of 16 LNV Solutions Today with a Vision for Tomorrow engineers I architects I surveyors This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas(City) and LNV, Inc. dated December 191', 2018 (Consultant). Consultant shall perform services on the project described below as provided in the Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. Task Order No.: 1, City Project#180228 LNV, Inc. Project No.: 180019.080.2 PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports (Bond 2018) TASK ORDER: Interior/ Exterior Upgrades—Fire Stations 1. PROJECT DESCRIPTION Visual field assessment of the existing conditions, (Interior and Exterior) of approximately sixteen (16) Fire Stations. 2. SCOPE OF SERVICES Field assessments, report of findings at each facility with photos, recommended actions, and cost estimates for these recommendations. Assessments will include the interior and exterior of each facility, and will focus only on items needing repair or replacement. 3. COMPENSATION The fee for these services will not exceed those identified and will be full and total compensation for all services outlined above, and all expenses incurred in performing these services. $10,500.00 lump sum fee will be billed monthly based on the percentage of task completion. 4. SCHEDULE Final report submission/ presentation of findings to City of Corpus Christi —Delivered on or before March 2, 2018. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS CHRISTI LNV I '1 ,/ Jeff H. Edmonds, P.E. Date Dan S. e• cker, P.E. Date Director of Engineering Services President 801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408 P:361-883-1984 EXHIBIT ANWV.LNVINC.COM Page 6 of 16 • • LNV Solutions Today with a Vision for Tomorrow engineers I architects surveyors This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and LNV, Inc. dated December 19!L.2018 (Consultant). Consultant shall perform services on the project described below as provided in the Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. Task Order No.: 1, City Project #18022F LNV, Inc. Project No.: 180019.060.2 PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports (Bond 2018) Task Order: Interior/ Exterior Upgrades —City Hall 1. PROJECT DESCRIPTION Visual assessment of the building's exterior brick and tile veneer, and assessment of interior finishes. 2. SCOPE OF SERVICES Field assessments, report of findings with photos, recommended actions, and cost estimates for these recommendations. Assessments will include exterior brick and tile building veneer. Note damaged areas and provide a recommendation for repairs. Assess the existing general condition of the interior finishes, and provide recommendations for repairs or replacement. 3. COMPENSATION The fee for these services will not exceed those identified and will be full and total compensation for all services outlined above, and all expenses incurred in performing these services. $8,500.00 lump sum fee will be billed monthly based on the percentage of task completion. 4. SCHEDULE Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or before March 2, 2018. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS CHRISTI LNV, INCA _ ,P.,4100 r!4 �*, ,,. , r Jeff H. Edmonds, P.E. Date Da . Leer, P.E. Date Director of Engineering Services President 801 NAVIGATION BLVD. I SUITE 200 1 CORPUS CHRISTI,TEXAS 78408 P:361-883-1984 I Emmy my AVWW.LNVINC.COM Page 7 of 16 • LNV Solutions Today with a Vision for Tomorrow engineers architects I surveyors This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and LNV, Inc. dated December 191'1, 2018 (Consultant). Consultant shall perform services on the project described below as provided in the Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. Task Order No.: 1, City Project#18032D LNV, Inc. Project No.: 180019.140.2 PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports (Bond 2018) TASK ORDER: Mechanical, Electrical, and Fire Alarm Upgrades —Water Garden 1. PROJECT DESCRIPTION Visual field assessment of the existing facility for renovations and possible relocation of existing equipment from below ground to above ground. 2. SCOPE OF SERVICES Field assessments, report of findings with photos, recommended actions, and cost estimates for these recommendations. We will conduct a feasibility study to determine if existing space can be "water proofed" to protect existing mechanical & electrical systems, or if relocating equipment is the best option. 3. COMPENSATION The fee for these services will not exceed those identified and will be full and total compensation for all services outlined above, and all expenses incurred in performing these services. $9,500.00 lump sum fee will be billed monthly based on the percentage of task completion. 4. SCHEDULE Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or before March 2, 2018. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS CHRISTI LNV, INC. Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date Director of Engineering Services President 801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408 P:361-883-1984 I EXHIBIT AWWw.LNVINC.COM Page 8 of 16 • LNV Solutions Today with a Vision for Tomorrow engineers architects surveyors This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and LNV, Inc. dated December 191, 2018 (Consultant). Consultant shall perform services on the project described below as provided in the Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. Task Order No.: 1, City Project#18032G LNV, Inc. Project No.: 180019.020.2 PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports (Bond 2018) TASK ORDER: Mechanical, Electrical, and Fire Alarm Upgrades —Senior & Recreational Centers 1. PROJECT DESCRIPTION Visual field assessments of the existing Mechanical, and Electrical systems for the facilities noted above. 2. SCOPE OF SERVICES Field assessments, report of findings at each facility with photos, recommended actions, and cost estimates for these recommendations. Assess condition of existing HVAC system, and primary electrical service at the panel. Verification of existing Fire Alarm systems for these facilities, and recommended upgrades if required. 3. COMPENSATION The fee for these services will not exceed those identified and will be full and total compensation for all services outlined above, and all expenses incurred in performing these services. $9,500.00 lump sum fee will be billed monthly based on the percentage of task completion. 4. SCHEDULE Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or before March 2, 2018. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS CHRISTI LNV, INC. Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date Director of Engineering Services President 801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408 P:361-883-1984 I EXHIsvir AWWW.LNVINC.COM Page 9 of 16 • LNV Solutions Today with a Vision for Tomorrow engineers I architects I surveyors This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and LNV, Inc. dated December 19`h, 2018 (Consultant). Consultant shall perform services on the project described below as provided in the Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. Task Order No.: 1, City Project#18037B LNV, Inc. Project No.: 180019.050.2 PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports (Bond 2018) TASK ORDER: Parking Renovations and Upgrades — City Hall 1. PROJECT DESCRIPTION Visual field assessment of current condition of the existing parking lots and compliance with ADA standards. 2. SCOPE OF SERVICES Field assessments, report of findings with photos, recommended actions, and cost estimates for these recommendations. Assessments will include current condition evaluation, existing ADA parking and access to the building. 3. COMPENSATION The fee for these services will not exceed those identified and will be full and total compensation for all services outlined above, and all expenses incurred in performing these services. $8,000.00 lump sum fee will be billed monthly based on the percentage of task completion. 4. SCHEDULE Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or before March 2, 2018. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS CHRISTI LNV, INC. Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date Director of Engineering Services President 801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408 P:361-883-1984 I EXHIE W AWWW.LNVINC.COM Page 10 of 16 • LNV Solutions Today with a Vision for Tomorrow engineers architects I surveyors This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and LNV, Inc. dated December 1921, 2018 (Consultant). Consultant shall perform services on the project described below as provided in the Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. Task Order No.: 1, City Project#18037C LNV, Inc. Project No.: 180019.070.2 PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports (Bond 2018) TASK ORDER: Parking Renovations and Upgrades —CC Fire Department Warehouse 1. PROJECT DESCRIPTION Visual field assessment of current condition of the existing parking lots and compliance with ADA standards. 2. SCOPE OF SERVICES Field assessments, report of findings with photos, recommended actions, and cost estimates for these recommendations. Assessments will include current condition evaluation, existing ADA parking and access to the building. 3. COMPENSATION The fee for these services will not exceed those identified and will be full and total compensation for all services outlined above, and all expenses incurred in performing these services. $8,000.00 lump sum fee will be billed monthly based on the percentage of task completion. 4. SCHEDULE Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or before March 2, 2018. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS CHRISTI LNV, INC. Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date Director of Engineering Services President 801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408 P:361-883-1984 I EX1418W AWWW.LNVINC.COM Page 11 of 16 LNV Solutions Today with a Vision for Tomorrow engineers I architects I surveyors This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and LNV, Inc. dated December 191. 2018 (Consultant). Consultant shall perform services on the project described below as provided in the Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. Task Order No.: 1, City Project#18037D LNV, Inc. Project No.: 180019.120.2 PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports (Bond 2018) TASK ORDER: Parking Renovations and Upgrades — Fire Stations #4, 6, 7, 8, & 11 1. PROJECT DESCRIPTION Visual field assessment of current condition of the existing parking lots and compliance with ADA standards. 2. SCOPE OF SERVICES Field assessments, report of findings at each facility with photos, recommended actions, and cost estimates for these recommendations. Assessments will include current condition evaluation, existing ADA parking and access to the building. 3. COMPENSATION The fee for these services will not exceed those identified and will be full and total compensation for all services outlined above, and all expenses incurred in performing these services. $9,000.00 lump sum fee will be billed monthly based on the percentage of task completion. 4. SCHEDULE Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or before March 2, 2018. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS CHRISTI LNV, INC. Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date Director of Engineering Services President 801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408 P:361-8834984 I EXHIBIT AWWW.LNVINC.COM Page 12 of 16 LNV Solutions Today with a Vision for Tomorrow engineers I architects surveyors This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and LNV, Inc. dated December 191, 2018 (Consultant). Consultant shall perform services on the project described below as provided in the Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. Task Order No.: 1, City Project #18039B LNV, Inc. Project No.: 180019.090.2 PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports (Bond 2018) TASK ORDER: Roof Replacement and Upgrades — Fire Station #1 1. PROJECT DESCRIPTION Visual field assessment of the existing roof and the interior of the fire station. 2. SCOPE OF SERVICES Field assessments, report of findings with photos. recommended actions, and cost estimates for these recommendations. This assessment will focus on the existing roof with regards to potential leaks and the assessment of the interior of the fire station to assess damages due to leaks and determine required upgrades. 3. COMPENSATION The fee for these services will not exceed those identified and will be full and total compensation for all services outlined above, and all expenses incurred in performing these services. $8,000.00 lump sum fee will be billed monthly based on the percentage of task completion. 4. SCHEDULE Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or before March 2, 2018. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS CHRISTI LNV, INC. Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date Director of Engineering Services President 801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408 P:361-883-1984 I EXHIBIT AWWW.LNVINC.COM Page 13 of 16 • LNV Solutions Today with a Vision for Tomorrow engineers I architects surveyors This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and LNV, Inc. dated December 19! , 2018 (Consultant). Consultant shall perform services on the project described below as provided in the Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. Task Order No.: 1, City Project#18039G LNV, Inc. Project No.: 180019.110.2 PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports (Bond 2018) TASK ORDER: Roof Replacement and Upgrades — Fire Station #16 1. PROJECT DESCRIPTION Visual field assessment of the existing roof and the interior of the fire station. 2. SCOPE OF SERVICES Field assessments, report of findings with photos, recommended actions, and cost estimates for these recommendations. This assessment will focus on the existing roof with regards to potential leaks and the assessment of the interior of the fire station to assess damages due to leaks and determine required upgrades. 3. COMPENSATION The fee for these services will not exceed those identified and will be full and total compensation for all services outlined above, and all expenses incurred in performing these services. $7.500.00 lump sum fee will be billed monthly based on the percentage of task completion. 4. SCHEDULE Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or before March 2, 2018. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS CHRISTI LNV, INC. Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date Director of Engineering Services President 801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408 P:361-883-1984 I EXHIBIFF AWWW.LNVINC.COM Page 14 of 16 LNV Solutions Today with a Vision for Tomorrow engineers I architects surveyors This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and LNV, Inc. dated December 191, 2018 (Consultant). Consultant shall perform services on the project described below as provided in the Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. Task Order No.: 1, City Project#18039H LNV, Inc. Project No.: 180019.150.2 PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports (Bond 2018) TASK ORDER: Roof Replacement and Upgrades — EMS Central 1. PROJECT DESCRIPTION Visual field assessment of the existing roof and the interior of the fire station. 2. SCOPE OF SERVICES Field assessments. report of findings at each facility with photos. recommended actions, and cost estimates for these recommendations. This assessment will focus on the existing roof with regards to potential leaks and the assessment of the interior of the fire station to assess damages due to leaks and determine required upgrades. 3. COMPENSATION The fee for these services will not exceed those identified and will be full and total compensation for all services outlined above, and all expenses incurred in performing these services. $7,500.00 lump sum fee will be billed monthly based on the percentage of task completion. 4. SCHEDULE Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or before March 2, 2018. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS CHRISTI LNV, INC. Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date Director of Engineering Services President 801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408 P:361-883-1984 I EXHIBVI AWwW.LNVINC.COM Page 15 of 16 I I LNV Solutions Today with a Vision for Tomorrow engineers I architects I surveyors This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and LNV, Inc. dated December 19th, 2018 (Consultant). Consultant shall perform services on the project described below as provided in the Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. Task Order No.: 1, City Project#18039K LNV, Inc. Project No.: 180019.030.2 PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports (Bond 2018) TASK ORDER: Roof Replacement and Upgrades —Oso Park and Recreation Center 1. PROJECT DESCRIPTION Visual field assessment of the existing roof at the facility noted above, along with recommended upgrades to the interior of the recreation center. 2. SCOPE OF SERVICES Field assessment, report of findings with photos, recommended actions, and cost estimates for these recommendations. This assessment will focus on the existing roof with regards to potential leaks and the assessment of the interior of the recreation center to assess damages due to leaks and determine required upgrades. 3. COMPENSATION The fee for these services will not exceed those identified and will be full and total compensation for all services outlined above, and all expenses incurred in performing these services. $6,500.00 lump sum fee will be billed monthly based on the percentage of task completion. 4. SCHEDULE Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or before March 2, 2018. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS CHRISTI LNV, INC. Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date Director of Engineering Services President 801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408 P:361-883-1984 I EXHIBIFF AWWW.LNVINC.COM Page 16 of 16