This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus
Christi, Texas (City) and LNV, Inc. (Consultant) dated December 19, 2017 (Motion M2017-196) (Agreement).
Consultant shall perform services on the project described below as provided in this Task Order and in the
Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution,
this Task Order shall supplement the Agreement as it pertains to the project described below.
TASK ORDER NO.: 1
PROJECT NAME: 180608 MSA Facility LNV- Bond 2018 Feasibility Report
1. PROJECT DESCRIPTION The project includes assessment of the following properties:
18001C ADA Bldg Imprmts-Rec Center(s)-Oso, Lindale, Oak Park & Joe Garza
18001D ADA Building Improvements - City Hall
18016A Fire Department Driveway& Apparatus Bay Upgrades - Fire Station #3
18018A Flour Bluff Police Substation Alterations/Expansion
18022B Interior/ Exterior Upgrades - Fire Station(s)
18022F Interior/ Exterior Upgrades - City Hall
18032D Mechanical, Electrical and Fire Alarm Upgrades -Water Garden
18032G Mechanical, Electrical and Fire Alarm Upgrades -Senior& Recreation Center(s)
18037B Parking Renovations and Upgrades - City Hall
18037C Parking Renovations and Upgrades - CC Fire Department Warehouse
18037D Parking Renovations and Upgrades - Fire Stations No. 4, 6, 7, 8 and 11
180398 Roof Replacement and Upgrades - Fire Station#1
18039G Roof Replacement and Upgrades - Fire Station#16
18039H Roof Replacement and Upgrades - EMS Central
18039K Roof Replacement and Upgrades - Oso Park and Recreation Center
2. SCOPE OF SERVICES The scope of services includes a Property Condition Assessment and
Feasibility Report for the listed properties. This task order is more fully described in Exhibit A.
3. COMPENSATION The total amount not to exceed for Task Order No. 1 only is $125,000.00.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement
remain in full force and effect.
CITY OFC I LNV, INC'A003 -4. zAy/ - -
Jeff H. Edm.nds, '. E. Date Ian . er, P. E. Date
Director of Engineering Services President
801 Navigation, Suite 300
Corpus Christi, TX 78408
(361) 883-1984 Office
(361)883-1986 Fax
danl@Invinc.com
FUND NAME / FUND #- ME: ACCOUNT: ACTIVITY:
ST 2012 GO BD 08 3548-051 550950 E17083-01-3548-EXP
2018-127
2/20/18
18060B LNV Task Order No. 1
Page 1 of 1
LNV Inc.
INDEXED
TASK ORDER FUNDING REQUEST FORM
CONTRACT MSA#AND TITLE: 18060A MSA Facility LNV- Bond 2018 Feasibility Report
TASK ORDER PROJECT#/TITLE: 18060B MSA Facility LNV- Bond 2018 Feasibility Report
TASK ORDER IS FOR WHICH PROJECT(S):SEE BELOW
REQUESTING DEPARTMENT: ENGINEERING SERVICES
FUND NAME/FUND#-ME: ACCOUNT: ACTIVITY:
ST 2012 GO BDO8 3548-051 •550950 E17083-01-3548-EXP
CONSULTANT: LNV FEE:SEE BELOW
TASK ORDER#: 1
SCOPE OF WORK: PREVIOUSLY DISTRIBUTED
PROJECT# FEE PROJECT NAME
18001C 58,500 ADA Bldg Imprmts-Rec Center(s)-Oso, Lindale,Oak Park&Joe Garza
18032G S9,500 Mechanical, Electrical and Fire Alarm Upgrades- Senior& Recreation Center(s)
18039K S6,500 Roof Replacement and Upgrades -Oso Park and Recreation Center
18001D 58,500 ADA Building Improvements-City Hall
18037B S8,000 Parking Renovations and Upgrades-City Hall
18022F S8,500 Interior/Exterior Upgrades- City Hall
18037C 58,000 Parking Renovations and Upgrades - CC Fire Department Warehouse
18022B S 10,500 Interior/Exterior Upgrades- Fire Station(s)
18039B S8,000 Roof Replacement and Upgrades • Fire Station#1
18016A 57,500 Fire Department Driveway&Apparatus Bay Upgrades-Fire Station#3
18039G 57,500 Roof Replacement and Upgrades- Fire Station#16
18037D 59,000 Parking Renovations and Upgrades-Fire Stations No.4, G, 7, 8 and 11
18018A 58,000 Flour Bluff Police Substation Alterations/Expansion
18032D 59,500 Mechanical, Electrical and Fire Alarm Upgrades-Water Garden
18039H 57,500 Roof Replacement and Upgrades- EMS Central
5125,000 Grand Total
IPA lA lam. E70/3,L_
IP' NT NAM
•
SIGN, TUR : C
c; / ?()I Sr
DATE:
EXHIBIT A Page 1 of 16
LNV Solutions Today with a
Vision for Tomorrow
engineers I architects I surveyors
This Task Order pertains to a Master Services Agreement for Professional Services by and between
City of Corpus Christi, Texas (City) and LNV, Inc. dated December 19th, 2018 (Consultant). Consultant
shall perform services on the project described below as provided in the Task Order and in the
Agreement. This Task Order shall not be binding until it has been properly signed by both parties.
Upon execution, this Task Order shall supplement the Agreement as it pertains to the project
described below.
Task Order No.: 01; City Project#18001C
LNV, Inc. Project No.: 180019.010.2
PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports
(Bond 2018)
TASK ORDER: ADA Building Improvements — Recreational Centers —Oso, Lindale, Oak Park &
Joe Garza
1. PROJECT DESCRIPTION
Visual field assessment of ADA compliance for the four recreational centers noted above.
2. SCOPE OF SERVICES
Field assessments, report of findings at each facility with photos, recommended actions, and
cost estimates for these recommendations. Assessments will include existing ADA parking
and access to the building, main entry doors and threshold, corridors if applicable with regard
to access to restrooms, all existing restrooms.
3. COMPENSATION
The fee for these services will not exceed those identified and will be full and total
compensation for all services outlined above, and all expenses incurred in performing these
services. $8,500.00 lump sum fee will be billed monthly based on the percentage of task
completion.
4. SCHEDULE
Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or
before March 2, 2018.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the
Agreement remain in full force and effect.
CITY OF CORPUS CHRISTI LNV, INC.
Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date
Director of Engineering Services President
801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408
P:361-883-1984 I EXHIBIT AWww.LNVINC.COM Page 2 of 16
•
LNV
Solutions Today with a
Vision for Tomorrow
engineers architects surveyors
This Task Order pertains to a Master Services Agreement for Professional Services by and between
City of Corpus Christi, Texas (City) and LNV, Inc. dated December 191, 2018 (Consultant). Consultant
shall perform services on the project described below as provided in the Task Order and in the
Agreement. This Task Order shall not be binding until it has been properly signed by both parties.
Upon execution, this Task Order shall supplement the Agreement as it pertains to the project
described below.
Task Order No.: 1, City Project#18001D
LNV, Inc. Project No.: 180019.040.2
PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports
(Bond 2018)
TASK ORDER: ADA Building Improvements —City Hall
1. PROJECT DESCRIPTION
Visual field assessment of ADA compliance for the interior and exterior (parking, access,
entrances, exits, and restrooms) of the existing City Hall building
2. SCOPE OF SERVICES
Field assessments, report of findings with photos, recommended actions, and cost estimates
for these recommendations. Assessments will include existing ADA parking and access to the
building, sidewalk, main entry doors and thresholds, corridors if applicable with regard to
access to restrooms, all existing restrooms.
3. COMPENSATION
The fee for these services will not exceed those identified and will be full and total
compensation for all services outlined above, and all expenses incurred in performing these
services. $8,500.00 lump sum fee will be billed monthly based on the percentage of task
completion.
4. SCHEDULE
Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or
before March 2, 2018.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the
Agreement remain in full force and effect.
CITY OF CORPUS CHRISTI LNV, INC.
Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date
Director of Engineering Services President
801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408
P:361-883-1984 I EXHIBIT AWWW.LNVINC.COM Page 3 of 16
•
LNV Solutions Today with a
Vision for Tomorrow
engineers I architects surveyors
This Task Order pertains to a Master Services Agreement for Professional Services by and between
City of Corpus Christi, Texas (City) and LNV, Inc. dated December 19'r', 2018 (Consultant). Consultant
shall perform services on the project described below as provided in the Task Order and in the
Agreement. This Task Order shall not be binding until it has been properly signed by both parties.
Upon execution, this Task Order shall supplement the Agreement as it pertains to the project
described below.
Task Order No.: 1, City Project#18016A
LNV, Inc. Project No.: 180019.100.2
PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports
(Bond 2018)
TASK ORDER: Fire Department Driveway & Apparatus Bay Upgrades — Fire Station #3
1. PROJECT DESCRIPTION
Visual field assessment of the existing driveway and apparatus bay for damages and required
upgrades.
2. SCOPE OF SERVICES
Field assessments. report of findings at each facility with photos, recommended actions, and
cost estimates for these recommendations. Assessment will focus on primary driveways, and
all apparatus bays that are part of this fire station.
3. COMPENSATION
The fee for these services will not exceed those identified and will be full and total
compensation for all services outlined above, and all expenses incurred in performing these
services. $7,500.00 lump sum fee will be billed monthly based on the percentage of task
completion.
4. SCHEDULE
Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or
before March 2, 2018.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the
Agreement remain in full force and effect.
CITY OF CORPUS CHRISTI LNV, INC.
Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date
Director of Engineering Services President
801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408
P:361-8834984 I EXHIB*Awww.LNVINC.COM Page 4 of 16
LNV
Solutions Today with a
Vision for Tomorrow
engineers architects I surveyors
This Task Order pertains to a Master Services Agreement for Professional Services by and between
City of Corpus Christi, Texas (City) and LNV, Inc. dated December 191, 2018 (Consultant). Consultant
shall perform services on the project described below as provided in the Task Order and in the
Agreement. This Task Order shall not be binding until it has been properly signed by both parties.
Upon execution, this Task Order shall supplement the Agreement as it pertains to the project
described below.
Task Order No.: 1, City Project#18018A
LNV, Inc. Project No.: 180019.130.2
PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports
(Bond 2018)
TASK ORDER: Flour Bluff Police Substation Alterations/ Expansion
1. PROJECT DESCRIPTION
Visual field assessment of the existing facility for renovations and upgrades.
2. SCOPE OF SERVICES
Field assessments, report of findings with photos, recommended actions, and cost estimates
for these recommendations. We will look at the possibility of adding a private office along with
conducting a general conditions assessment for a list of recommendations for improvements
and/or upgrades to the facility.
3. COMPENSATION
The fee for these services will not exceed those identified and will be full and total
compensation for all services outlined above, and all expenses incurred in performing these
services. $8,000.00 lump sum fee will be billed monthly based on the percentage of task
completion.
4. SCHEDULE
Final report submission/ presentation of findings to City of Corpus Christi—Delivered on or
before March 2, 2018.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the
Agreement remain in full force and effect.
CITY OF CORPUS CHRISTI LNV, ',
INC.
ZG./B
Jeff H. Edmonds, P.E. Date Dan . - `'=r, P.E. Da e
Director of Engineering Services President
801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408
P: 361-883-1984 I FEsX14181T ANWW.LNVINC.COM Page 5 of 16
LNV Solutions Today with a
Vision for Tomorrow
engineers I architects I surveyors
This Task Order pertains to a Master Services Agreement for Professional Services by and between
City of Corpus Christi, Texas(City) and LNV, Inc. dated December 191', 2018 (Consultant). Consultant
shall perform services on the project described below as provided in the Task Order and in the
Agreement. This Task Order shall not be binding until it has been properly signed by both parties.
Upon execution, this Task Order shall supplement the Agreement as it pertains to the project
described below.
Task Order No.: 1, City Project#180228
LNV, Inc. Project No.: 180019.080.2
PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports
(Bond 2018)
TASK ORDER: Interior/ Exterior Upgrades—Fire Stations
1. PROJECT DESCRIPTION
Visual field assessment of the existing conditions, (Interior and Exterior) of approximately
sixteen (16) Fire Stations.
2. SCOPE OF SERVICES
Field assessments, report of findings at each facility with photos, recommended actions, and
cost estimates for these recommendations. Assessments will include the interior and exterior
of each facility, and will focus only on items needing repair or replacement.
3. COMPENSATION
The fee for these services will not exceed those identified and will be full and total
compensation for all services outlined above, and all expenses incurred in performing these
services. $10,500.00 lump sum fee will be billed monthly based on the percentage of task
completion.
4. SCHEDULE
Final report submission/ presentation of findings to City of Corpus Christi —Delivered on or
before March 2, 2018.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the
Agreement remain in full force and effect.
CITY OF CORPUS CHRISTI LNV I '1
,/
Jeff H. Edmonds, P.E. Date Dan S. e• cker, P.E. Date
Director of Engineering Services President
801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408
P:361-883-1984 EXHIBIT ANWV.LNVINC.COM Page 6 of 16
•
•
LNV Solutions Today with a
Vision for Tomorrow
engineers I architects surveyors
This Task Order pertains to a Master Services Agreement for Professional Services by and between
City of Corpus Christi, Texas (City) and LNV, Inc. dated December 19!L.2018 (Consultant). Consultant
shall perform services on the project described below as provided in the Task Order and in the
Agreement. This Task Order shall not be binding until it has been properly signed by both parties.
Upon execution, this Task Order shall supplement the Agreement as it pertains to the project
described below.
Task Order No.: 1, City Project #18022F
LNV, Inc. Project No.: 180019.060.2
PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports
(Bond 2018)
Task Order: Interior/ Exterior Upgrades —City Hall
1. PROJECT DESCRIPTION
Visual assessment of the building's exterior brick and tile veneer, and assessment of interior
finishes.
2. SCOPE OF SERVICES
Field assessments, report of findings with photos, recommended actions, and cost estimates
for these recommendations. Assessments will include exterior brick and tile building veneer.
Note damaged areas and provide a recommendation for repairs. Assess the existing general
condition of the interior finishes, and provide recommendations for repairs or replacement.
3. COMPENSATION
The fee for these services will not exceed those identified and will be full and total
compensation for all services outlined above, and all expenses incurred in performing these
services. $8,500.00 lump sum fee will be billed monthly based on the percentage of task
completion.
4. SCHEDULE
Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or
before March 2, 2018.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the
Agreement remain in full force and effect.
CITY OF CORPUS CHRISTI LNV, INCA _ ,P.,4100
r!4 �*, ,,. , r
Jeff H. Edmonds, P.E. Date Da . Leer, P.E. Date
Director of Engineering Services President
801 NAVIGATION BLVD. I SUITE 200 1 CORPUS CHRISTI,TEXAS 78408
P:361-883-1984 I Emmy my AVWW.LNVINC.COM Page 7 of 16
•
LNV Solutions Today with a
Vision for Tomorrow
engineers architects I surveyors
This Task Order pertains to a Master Services Agreement for Professional Services by and between
City of Corpus Christi, Texas (City) and LNV, Inc. dated December 191'1, 2018 (Consultant). Consultant
shall perform services on the project described below as provided in the Task Order and in the
Agreement. This Task Order shall not be binding until it has been properly signed by both parties.
Upon execution, this Task Order shall supplement the Agreement as it pertains to the project
described below.
Task Order No.: 1, City Project#18032D
LNV, Inc. Project No.: 180019.140.2
PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports
(Bond 2018)
TASK ORDER: Mechanical, Electrical, and Fire Alarm Upgrades —Water Garden
1. PROJECT DESCRIPTION
Visual field assessment of the existing facility for renovations and possible relocation of
existing equipment from below ground to above ground.
2. SCOPE OF SERVICES
Field assessments, report of findings with photos, recommended actions, and cost estimates
for these recommendations. We will conduct a feasibility study to determine if existing space
can be "water proofed" to protect existing mechanical & electrical systems, or if relocating
equipment is the best option.
3. COMPENSATION
The fee for these services will not exceed those identified and will be full and total
compensation for all services outlined above, and all expenses incurred in performing these
services. $9,500.00 lump sum fee will be billed monthly based on the percentage of task
completion.
4. SCHEDULE
Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or
before March 2, 2018.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the
Agreement remain in full force and effect.
CITY OF CORPUS CHRISTI LNV, INC.
Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date
Director of Engineering Services President
801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408
P:361-883-1984 I EXHIBIT AWWw.LNVINC.COM Page 8 of 16
•
LNV Solutions Today with a
Vision for Tomorrow
engineers architects surveyors
This Task Order pertains to a Master Services Agreement for Professional Services by and between
City of Corpus Christi, Texas (City) and LNV, Inc. dated December 191, 2018 (Consultant). Consultant
shall perform services on the project described below as provided in the Task Order and in the
Agreement. This Task Order shall not be binding until it has been properly signed by both parties.
Upon execution, this Task Order shall supplement the Agreement as it pertains to the project
described below.
Task Order No.: 1, City Project#18032G
LNV, Inc. Project No.: 180019.020.2
PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports
(Bond 2018)
TASK ORDER: Mechanical, Electrical, and Fire Alarm Upgrades —Senior & Recreational
Centers
1. PROJECT DESCRIPTION
Visual field assessments of the existing Mechanical, and Electrical systems for the facilities
noted above.
2. SCOPE OF SERVICES
Field assessments, report of findings at each facility with photos, recommended actions, and
cost estimates for these recommendations. Assess condition of existing HVAC system, and
primary electrical service at the panel. Verification of existing Fire Alarm systems for these
facilities, and recommended upgrades if required.
3. COMPENSATION
The fee for these services will not exceed those identified and will be full and total
compensation for all services outlined above, and all expenses incurred in performing these
services. $9,500.00 lump sum fee will be billed monthly based on the percentage of task
completion.
4. SCHEDULE
Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or
before March 2, 2018.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the
Agreement remain in full force and effect.
CITY OF CORPUS CHRISTI LNV, INC.
Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date
Director of Engineering Services President
801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408
P:361-883-1984 I EXHIsvir AWWW.LNVINC.COM Page 9 of 16
•
LNV Solutions Today with a
Vision for Tomorrow
engineers I architects I surveyors
This Task Order pertains to a Master Services Agreement for Professional Services by and between
City of Corpus Christi, Texas (City) and LNV, Inc. dated December 19`h, 2018 (Consultant). Consultant
shall perform services on the project described below as provided in the Task Order and in the
Agreement. This Task Order shall not be binding until it has been properly signed by both parties.
Upon execution, this Task Order shall supplement the Agreement as it pertains to the project
described below.
Task Order No.: 1, City Project#18037B
LNV, Inc. Project No.: 180019.050.2
PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports
(Bond 2018)
TASK ORDER: Parking Renovations and Upgrades — City Hall
1. PROJECT DESCRIPTION
Visual field assessment of current condition of the existing parking lots and compliance with
ADA standards.
2. SCOPE OF SERVICES
Field assessments, report of findings with photos, recommended actions, and cost estimates
for these recommendations. Assessments will include current condition evaluation, existing
ADA parking and access to the building.
3. COMPENSATION
The fee for these services will not exceed those identified and will be full and total
compensation for all services outlined above, and all expenses incurred in performing these
services. $8,000.00 lump sum fee will be billed monthly based on the percentage of task
completion.
4. SCHEDULE
Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or
before March 2, 2018.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the
Agreement remain in full force and effect.
CITY OF CORPUS CHRISTI LNV, INC.
Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date
Director of Engineering Services President
801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408
P:361-883-1984 I EXHIE W AWWW.LNVINC.COM Page 10 of 16
•
LNV Solutions Today with a
Vision for Tomorrow
engineers architects I surveyors
This Task Order pertains to a Master Services Agreement for Professional Services by and between
City of Corpus Christi, Texas (City) and LNV, Inc. dated December 1921, 2018 (Consultant). Consultant
shall perform services on the project described below as provided in the Task Order and in the
Agreement. This Task Order shall not be binding until it has been properly signed by both parties.
Upon execution, this Task Order shall supplement the Agreement as it pertains to the project
described below.
Task Order No.: 1, City Project#18037C
LNV, Inc. Project No.: 180019.070.2
PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports
(Bond 2018)
TASK ORDER: Parking Renovations and Upgrades —CC Fire Department Warehouse
1. PROJECT DESCRIPTION
Visual field assessment of current condition of the existing parking lots and compliance with
ADA standards.
2. SCOPE OF SERVICES
Field assessments, report of findings with photos, recommended actions, and cost estimates
for these recommendations. Assessments will include current condition evaluation, existing
ADA parking and access to the building.
3. COMPENSATION
The fee for these services will not exceed those identified and will be full and total
compensation for all services outlined above, and all expenses incurred in performing these
services. $8,000.00 lump sum fee will be billed monthly based on the percentage of task
completion.
4. SCHEDULE
Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or
before March 2, 2018.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the
Agreement remain in full force and effect.
CITY OF CORPUS CHRISTI LNV, INC.
Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date
Director of Engineering Services President
801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408
P:361-883-1984 I EX1418W AWWW.LNVINC.COM Page 11 of 16
LNV Solutions Today with a
Vision for Tomorrow
engineers I architects I surveyors
This Task Order pertains to a Master Services Agreement for Professional Services by and between
City of Corpus Christi, Texas (City) and LNV, Inc. dated December 191. 2018 (Consultant). Consultant
shall perform services on the project described below as provided in the Task Order and in the
Agreement. This Task Order shall not be binding until it has been properly signed by both parties.
Upon execution, this Task Order shall supplement the Agreement as it pertains to the project
described below.
Task Order No.: 1, City Project#18037D
LNV, Inc. Project No.: 180019.120.2
PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports
(Bond 2018)
TASK ORDER: Parking Renovations and Upgrades — Fire Stations #4, 6, 7, 8, & 11
1. PROJECT DESCRIPTION
Visual field assessment of current condition of the existing parking lots and compliance with
ADA standards.
2. SCOPE OF SERVICES
Field assessments, report of findings at each facility with photos, recommended actions, and
cost estimates for these recommendations. Assessments will include current condition
evaluation, existing ADA parking and access to the building.
3. COMPENSATION
The fee for these services will not exceed those identified and will be full and total
compensation for all services outlined above, and all expenses incurred in performing these
services. $9,000.00 lump sum fee will be billed monthly based on the percentage of task
completion.
4. SCHEDULE
Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or
before March 2, 2018.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the
Agreement remain in full force and effect.
CITY OF CORPUS CHRISTI LNV, INC.
Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date
Director of Engineering Services President
801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408
P:361-8834984 I EXHIBIT AWWW.LNVINC.COM Page 12 of 16
LNV Solutions Today with a
Vision for Tomorrow
engineers I architects surveyors
This Task Order pertains to a Master Services Agreement for Professional Services by and between
City of Corpus Christi, Texas (City) and LNV, Inc. dated December 191, 2018 (Consultant). Consultant
shall perform services on the project described below as provided in the Task Order and in the
Agreement. This Task Order shall not be binding until it has been properly signed by both parties.
Upon execution, this Task Order shall supplement the Agreement as it pertains to the project
described below.
Task Order No.: 1, City Project #18039B
LNV, Inc. Project No.: 180019.090.2
PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports
(Bond 2018)
TASK ORDER: Roof Replacement and Upgrades — Fire Station #1
1. PROJECT DESCRIPTION
Visual field assessment of the existing roof and the interior of the fire station.
2. SCOPE OF SERVICES
Field assessments, report of findings with photos. recommended actions, and cost estimates
for these recommendations. This assessment will focus on the existing roof with regards to
potential leaks and the assessment of the interior of the fire station to assess damages due to
leaks and determine required upgrades.
3. COMPENSATION
The fee for these services will not exceed those identified and will be full and total
compensation for all services outlined above, and all expenses incurred in performing these
services. $8,000.00 lump sum fee will be billed monthly based on the percentage of task
completion.
4. SCHEDULE
Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or
before March 2, 2018.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the
Agreement remain in full force and effect.
CITY OF CORPUS CHRISTI LNV, INC.
Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date
Director of Engineering Services President
801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408
P:361-883-1984 I EXHIBIT AWWW.LNVINC.COM Page 13 of 16
•
LNV Solutions Today with a
Vision for Tomorrow
engineers I architects surveyors
This Task Order pertains to a Master Services Agreement for Professional Services by and between
City of Corpus Christi, Texas (City) and LNV, Inc. dated December 19! , 2018 (Consultant). Consultant
shall perform services on the project described below as provided in the Task Order and in the
Agreement. This Task Order shall not be binding until it has been properly signed by both parties.
Upon execution, this Task Order shall supplement the Agreement as it pertains to the project
described below.
Task Order No.: 1, City Project#18039G
LNV, Inc. Project No.: 180019.110.2
PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports
(Bond 2018)
TASK ORDER: Roof Replacement and Upgrades — Fire Station #16
1. PROJECT DESCRIPTION
Visual field assessment of the existing roof and the interior of the fire station.
2. SCOPE OF SERVICES
Field assessments, report of findings with photos, recommended actions, and cost estimates
for these recommendations. This assessment will focus on the existing roof with regards to
potential leaks and the assessment of the interior of the fire station to assess damages due to
leaks and determine required upgrades.
3. COMPENSATION
The fee for these services will not exceed those identified and will be full and total
compensation for all services outlined above, and all expenses incurred in performing these
services. $7.500.00 lump sum fee will be billed monthly based on the percentage of task
completion.
4. SCHEDULE
Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or
before March 2, 2018.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the
Agreement remain in full force and effect.
CITY OF CORPUS CHRISTI LNV, INC.
Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date
Director of Engineering Services President
801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408
P:361-883-1984 I EXHIBIFF AWWW.LNVINC.COM Page 14 of 16
LNV Solutions Today with a
Vision for Tomorrow
engineers I architects surveyors
This Task Order pertains to a Master Services Agreement for Professional Services by and between
City of Corpus Christi, Texas (City) and LNV, Inc. dated December 191, 2018 (Consultant). Consultant
shall perform services on the project described below as provided in the Task Order and in the
Agreement. This Task Order shall not be binding until it has been properly signed by both parties.
Upon execution, this Task Order shall supplement the Agreement as it pertains to the project
described below.
Task Order No.: 1, City Project#18039H
LNV, Inc. Project No.: 180019.150.2
PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports
(Bond 2018)
TASK ORDER: Roof Replacement and Upgrades — EMS Central
1. PROJECT DESCRIPTION
Visual field assessment of the existing roof and the interior of the fire station.
2. SCOPE OF SERVICES
Field assessments. report of findings at each facility with photos. recommended actions, and
cost estimates for these recommendations. This assessment will focus on the existing roof
with regards to potential leaks and the assessment of the interior of the fire station to assess
damages due to leaks and determine required upgrades.
3. COMPENSATION
The fee for these services will not exceed those identified and will be full and total
compensation for all services outlined above, and all expenses incurred in performing these
services. $7,500.00 lump sum fee will be billed monthly based on the percentage of task
completion.
4. SCHEDULE
Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or
before March 2, 2018.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the
Agreement remain in full force and effect.
CITY OF CORPUS CHRISTI LNV, INC.
Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date
Director of Engineering Services President
801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408
P:361-883-1984 I EXHIBVI AWwW.LNVINC.COM Page 15 of 16
I
I
LNV Solutions Today with a
Vision for Tomorrow
engineers I architects I surveyors
This Task Order pertains to a Master Services Agreement for Professional Services by and between
City of Corpus Christi, Texas (City) and LNV, Inc. dated December 19th, 2018 (Consultant). Consultant
shall perform services on the project described below as provided in the Task Order and in the
Agreement. This Task Order shall not be binding until it has been properly signed by both parties.
Upon execution, this Task Order shall supplement the Agreement as it pertains to the project
described below.
Task Order No.: 1, City Project#18039K
LNV, Inc. Project No.: 180019.030.2
PROJECT NAME: Preliminary Engineering Facility Feasibility and Cost Estimate Reports
(Bond 2018)
TASK ORDER: Roof Replacement and Upgrades —Oso Park and Recreation Center
1. PROJECT DESCRIPTION
Visual field assessment of the existing roof at the facility noted above, along with
recommended upgrades to the interior of the recreation center.
2. SCOPE OF SERVICES
Field assessment, report of findings with photos, recommended actions, and cost estimates for
these recommendations. This assessment will focus on the existing roof with regards to
potential leaks and the assessment of the interior of the recreation center to assess damages
due to leaks and determine required upgrades.
3. COMPENSATION
The fee for these services will not exceed those identified and will be full and total
compensation for all services outlined above, and all expenses incurred in performing these
services. $6,500.00 lump sum fee will be billed monthly based on the percentage of task
completion.
4. SCHEDULE
Final report submission/ presentation of findings to City of Corpus Christi — Delivered on or
before March 2, 2018.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the
Agreement remain in full force and effect.
CITY OF CORPUS CHRISTI LNV, INC.
Jeff H. Edmonds, P.E. Date Dan S. Leyendecker, P.E. Date
Director of Engineering Services President
801 NAVIGATION BLVD. I SUITE 200 I CORPUS CHRISTI,TEXAS 78408
P:361-883-1984 I EXHIBIFF AWWW.LNVINC.COM Page 16 of 16