HomeMy WebLinkAboutC2018-133 - 2/21/2018 - NA TASK ORDER 1
This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus
Christi, Texas (City) and Munoz Engineering, LLC (Consultant) dated December 19, 2017 (Motion M2017-196)
(Agreement). Consultant shall perform services on the project described below as provided in this Task Order and
in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon
execution, this Task Order shall supplement the Agreement as it pertains to the project described below.
TASK ORDER NO.: 1
PROJECT NAME: 18064B MSA Street Munoz Engineering - Bond 2018 Feasibility Report
1. PROJECT DESCRIPTION The project includes assessment of the following properties:
18021A HOLLY RD (PAUL JONES AVE TO RODD FIELD RD) -Tier 1
18029A LIPES BLVD (YORKTOWN BLVD TO STAPLES ST) -Tier 2
18030A LONGMEADOW DR (ST ANDREWS DR TO HUNT DR)
18040A SOUTH OSO PKWY (S STAPLES ST TO S OSO PKWY)
18042A SLOUGH RD (RODD FIELD RD TO EAST TO DEAD END) -Tier 1
18044A STRASBOURG DR (RIOM ST TO MARSEILLE DR)
2. SCOPE OF SERVICES The scope of services includes preliminary engineering street feasibility and
cost estimate reports. This task order is more fully described in Exhibit A.
3. COMPENSATION The total amount not to exceed for Task Order No. 1 only is $266,500.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement
remain in full force an• affect.
CITY OF C! : ' -ISTI MUNOZ ENGINEERING, LLC
Jeff H. dmonds, P. E. D-'a �
02/20/2018
Director of Engineering Services Ramiro Muno , Ill, P. E. Date
Principal
1608 S. Brownlee Boulevard
Corpus Christi, TX 78404
(361) 946-4848 Office
(361) 265-0562 Fax
ram@munozengrg.com
FUND NAME I FUND # - ME: ACCOUNT: ACTIVITY:
ST 2012 GO BD 08 3548-051 550950 E17083-01-3548-EXP
2018-133
2/21/18
Munoz Engineering LLC
INDEXED
TASK ORDER FUNDING REQUEST FORM
CONTRACT MSA#AND TITLE:18064A MSA Street Munoz - Bond 2018 Feasibility Report
TASK ORDER PROJECT#/TITLE: 18064B RISA Street Munoz-Bond 2018 Feasibility Report
TASK ORDER IS FOR WHICH PROJECT(S):SEE BELOW
REQUESTING DEPARTMENT: ENGINEERING SERVICES
FUND NAME/FUND #-ME: ACCOUNT: ACTIVITY:
ST 2012 GO BD 08 3548-051 550950 El 7083-01-3548-EXP
CONSULTANT:Munoz Engineering FEE: SEE BELOW
TASK ORDER#: 1
SCOPE OF WORK: PREVIOUSLY DISTRIBUTED
PROJECT# FEE PROJECT NAME
18021A SG0,000 HOLLY RD(PAUL JONES AVE TO RODD FIELD RD)-Tier 1
18029A S58,000 LIPES BLVD (YORKTOWN BLVD TO STAPLES ST) -Tier 2
18030A S48,000 LONGMEADOW DR (ST ANDREWS DR TO HUNT DR)
18040A S13,500 SOUTH OSO PKWY(S STAPLES ST TO S OSO PKWY)
18042A S42,000 SLOUGH RD(RODD FIELD RD TO EAST TO DEAD END) -Tier 1
18044A 545,000 STRASBOURG DR (RIOM ST TO MARSEILLE DR)
S266,500 Grand Total
PM PRINT NAME:
Ala
SIGNATURE:
."--/./113
DATE:
Exhibit A
Page 1 of 13
MUNOZ ENGINEERING
TBPE ARM No. 12240
Practical Engineering Solutions
January 12, 2018
City of Corpus Christi —Engineering Department
1201 Leopard Street
Corpus Christi, Texas 78401
Attn: Chris Hale, Major Projects Engineer
Re: Proposal for Engineering Services
18021A Preliminary Engineering Street Feasibility Report (Bond 2018)—Holly Road
Mr. Hale,
Munoz Engineering, LCC (ME, LLC) is pleased to submit this proposal for engineering
services. ME, LLC proposes to perform said services and all acts attendant thereto with a
reasonable standard of care. Our proposed scope of work is as follows:
Task 18021A Preliminary Engineering Street Feasibility Report—Holly Road
1 Prepare one (1) Preliminary Engineering Street Feasibility Report for Holly Road from
Rodd Field Road to Paul Jones Avenue that includes the following:
A.) Cover Sheet
B.) Executive Summary which includes the following:
1 Project description,
2 Opinion of Probable Cost (OPCC)Summary,
3 Project timetable,
4 Location map
C.) Project Report which includes the following:
1 Project Description
a Bond 2018 language
b Location
c Existing conditions
i Existing utility type and location will be determined by
Subsurface Utility Engineering Level D (QL-D)
d Proposed construction
e Agency/Permit coordination
f Land acquisition
g Other project elements
2 Opinion of Probable Cost
a Summary Table of all costs
b Opinion of Probable Cost Assumptions
c Opinion of Probable Cost form
3 Project Timetable/ Schedule
4 Street Section
a Existing section
b Proposed section
5 Project Site Photographs
6 Strip Map
a Graphically representing the proposed street improvements
b Graphically representing any utility improvements.
2 Attendance at a total of three (3) Meetings with City Staff regarding the Preliminary
Engineering Street Feasibility Report. Additional meetings with City Staff will be at an
hourly rate as per Munoz Engineering 2018 Rate Sheet(Attachment A).
1608 S.BROWNLEE BLVD.*CORPUS CHRISTI,TX 78404'(0)361-946-4848'(F)361-265-0562 Exhibit A
Page 2 of 13
MUNOZ ENGINEERING
TBPE FIRM No. 12240
Practical Engineering Solutions
ME, LLC proposes to perform the scope of work for the following lump sum fee:
Engineering Services $ 60,000.00
We appreciate the opportunity to assist you in this matter and if you have any comments or
questions please contact call me at(361) 946-4848 or e-mail me at ram(a�munozengrq.com
Sincerely,
MUNOZ ENGINEERING
TBPE FIRM No. 12240
N
Ramiro Munoz I I, PE, MLSE
Principal/Project Manager
For payment services, invoice to:
Firm: Attn:
Address: Title:
City: State: Zip Code:
Phone: Fax:
Email Address:
** Payment is due upon receipt of the invoice. Please remit to the above address and reference
your invoice number on payment.
1608 S.BROWNLEE BLVD.*CORPUS CHRISTI,TX 78404*(0)361-946-4848'(F)361-265-0562 Exhibit A
Page 3 of 13
MUNOZ ENGINEERING
TBPE FIRM No. 12240
Practical Engineering Solutions
January 12, 2018
City of Corpus Christi —Engineering Department
1201 Leopard Street
Corpus Christi, Texas 78401
Attn: Chris Hale, Major Projects Engineer
Re: Proposal for Engineering Services
18029A Preliminary Engineering Street Feasibility Report (Bond 2018)—Lipes
Boulevard
Mr. Hale,
Munoz Engineering, LCC (ME, LLC) is pleased to submit this proposal for engineering
services. ME, LLC proposes to perform said services and all acts attendant thereto with a
reasonable standard of care. Our proposed scope of work is as follows:
Task 18029A Preliminary Engineering Street Feasibility Report—Lipes Boulevard
1 Prepare one (1) Preliminary Engineering Street Feasibility Report for Lipes Boulevard
from Yorktown Boulevard to Staples Street that includes the following:
A.) Cover Sheet
B.) Executive Summary which includes the following:
1 Project description,
2 Opinion of Probable Cost (OPCC) Summary,
3 Project timetable,
4 Location map
C.) Project Report which includes the following:
1 Project Description
a Bond 2018 language
b Location
c Existing conditions
i Existing utility type and location will be determined by
Subsurface Utility Engineering Level D (QL-D)
d Proposed construction
e Agency/ Permit coordination
f Land acquisition
g Other project elements
2 Opinion of Probable Cost
a Summary Table of all costs
b Opinion of Probable Cost Assumptions
c Opinion of Probable Cost form
3 Project Timetable/Schedule
4 Street Section
a Existing section
b Proposed section
5 Project Site Photographs
6 Strip Map
a Graphically representing the proposed street and utility
improvements
1608 S.BROWNLEE BLVD.'CORPUS CHRISTI,TX 78404'(0)361-946-4848'(F)361-265-0562 Exhibit A
Page 4 of 13
MUNOZ ENGINEERING
TBPE FIRM No. 12240
Practical Engineering Solutions
2 Attendance at a total of three (3) Meetings with City Staff regarding the Preliminary
Engineering Street Feasibility Report. Additional meetings with City Staff will be at an
hourly rate as per Munoz Engineering 2018 Rate Sheet(Attachment A).
ME, LLC proposes to perform the scope of work for the following lump sum fee:
Engineering Services $ 58,000.00
We appreciate the opportunity to assist you in this matter and if you have any comments or
questions please contact call me at(361) 946-4848 or e-mail me at ram(c�munozengrq.com
Sincerely,
MUNOZ ENGINEERING
TBPE FIRM No. 12240
Ramiro Munoz I I, PE, MLSE
Principal/Project Manager
For payment services, invoice to:
Firm: Attn:
Address: Title:
City: State: Zip Code:
Phone: Fax:
Email Address:
** Payment is due upon receipt of the invoice. Please remit to the above address and reference
your invoice number on payment.
1608 S.BROWNLEE BLVD.•CORPUS CHRISTI,TX 78404 (0)361-946-4848'(F)361-265-0562 Exhibit A
Page 5 of 13
MUNOZ ENGINEERING
TBPE FIRM No. 12240
Practical Engineering Solutions
January 12, 2018
City of Corpus Christi —Engineering Department
1201 Leopard Street
Corpus Christi, Texas 78401
Attn: Chris Hale, Major Projects Engineer
Re: Proposal for Engineering Services
18030A Preliminary Engineering Street Feasibility Report(Bond 2018)— Long
Meadow Drive
Mr. Hale,
Munoz Engineering, LCC (ME, LLC) is pleased to submit this proposal for engineering
services. ME, LLC proposes to perform said services and all acts attendant thereto with a
reasonable standard of care. Our proposed scope of work is as follows:
Task 18030A Preliminary Engineering Street Feasibility Report—Long Meadow Drive
I Prepare one(1) Preliminary Engineering Street Feasibility Report for Long Meadow
Drive from St. Andrews Drive to Hunt Drive that includes the following:
A.) Cover Sheet
B.) Executive Summary which includes the following:
1 Project description,
2 Opinion of Probable Cost(OPCC) Summary,
3 Project timetable,
4 Location map
C.) Project Report which includes the following:
I Project Description
a Bond 2018 language
b Location
c Existing conditions
i Existing utility type and location will be determined by
Subsurface Utility Engineering Level D (QL-D)
d Proposed construction
e Agency/Permit coordination
f Land acquisition
g Other project elements
2 Opinion of Probable Cost
a Summary Table of all costs
b Opinion of Probable Cost Assumptions
c Opinion of Probable Cost form
3 Project Timetable/Schedule
4 Street Section
a Existing section
b Proposed section
5 Project Site Photographs
6 Strip Map
a Graphically representing the proposed street and utility
improvements
1608 S.BROWNLEE BLVD. 'CORPUS CHRISTI,TX 78404 (0)361-946-4848'(F)361-265-0562 Exhibit A
Page 6 of 13
MUNOZ ENGINEERING
TBPE FIRM No. 12240
Practical Engineering Solutions
2 Attendance at a total of three (3) Meetings with City Staff regarding the Preliminary
Engineering Street Feasibility Report. Additional meetings with City Staff will be at an
hourly rate as per Munoz Engineering 2018 Rate Sheet(Attachment A).
ME, LLC proposes to perform the scope of work for the following lump sum fee:
Engineering Services $48,000.00
We appreciate the opportunity to assist you in this matter and if you have any comments or
questions please contact call me at(361) 946-4848 or e-mail me at rammunozengrq.com .
Sincerely,
MUNOZ ENGINEERING
TBPE FIRM No. 12240
� , J
NH
Ramiro Munoz ILSE
Principal/Project Manager
For payment services, invoice to:
Firm: Attn:
Address: Title:
City: State: Zip Code:
Phone: Fax:
Email Address:
** Payment is due upon receipt of the invoice. Please remit to the above address and reference
your invoice number on payment.
1608 S.BROWNLEE BLVD.*CORPUS CHRISTI,TX 78404'(0)361-946-4848*(F)361-265-0562 Exhibit A
Page 7 of 13
•
MUNOZ ENGINEERING
TBPE FIRM No. 12240
Practical Engineering Solutions
January 12, 2018
City of Corpus Christi —Engineering Department
1201 Leopard Street
Corpus Christi, Texas 78401
Attn: Chris Hale, Major Projects Engineer
Re: Proposal for Engineering Services
18040A Preliminary Engineering Street Feasibility Report (Bond 2018)—South Oso
Parkway
Mr. Hale,
Munoz Engineering, LCC (ME, LLC) is pleased to submit this proposal for engineering
services. ME, LLC proposes to perform said services and all acts attendant thereto with a
reasonable standard of care. Our proposed scope of work is as follows:
Task 18040A Preliminary Engineering Street Feasibility Report—South Oso Parkway
1 Prepare one (1) Preliminary Engineering Street Feasibility Report for South Oso
Parkway from South Staples Street to the existing South Oso Parkway that includes
the following:
A.) Cover Sheet
B.) Executive Summary which includes the following:
1 Project description,
2 Opinion of Probable Cost(OPCC) Summary,
3 Project timetable,
4 Location map
C.) Project Report which includes the following:
1 Project Description
a Bond 2018 language
b Location
c Existing conditions
i Existing utility type and location will be determined by
Subsurface Utility Engineering Level D (QL-D)
d Proposed construction
e Agency/ Permit coordination
f Land acquisition
g Other project elements
2 Opinion of Probable Cost
a Summary Table of all costs
b Opinion of Probable Cost Assumptions
c Opinion of Probable Cost form
3 Project Timetable/Schedule
4 Street Section
a Existing section
b Proposed section
5 Project Site Photographs
6 Strip Map
a Graphically representing the proposed street and utility
improvements
1608 S.BROWNLEE BLVD.*CORPUS CHRISTI,TX 78404*(0)361-946-4848 (F)361-265-0562 Exhibit A
Page 8 of 13
MUNOZ ENGINEERING
TBPE FIRM No. 12240
Practical Engineering Solutions
2 Attendance at a total of three (3) Meetings with City Staff regarding the Preliminary
Engineering Street Feasibility Report. Additional meetings with City Staff will be at an
hourly rate as per Munoz Engineering 2018 Rate Sheet (Attachment A).
ME, LLC proposes to perform the scope of work for the following lump sum fee:
Engineering Services $ 13,500.00
We appreciate the opportunity to assist you in this matter and if you have any comments or
questions please contact call me at(361) 946-4848 or e-mail me at ram(cr�munozengrq.com
Sincerely,
MUNOZ ENGINEERING
TBPE FIRM No. 12240
Ramiro Munoz I I, PE, MLSE
Principal/Project Manager
For payment services, invoice to:
Firm: Attn:
Address: Title:
City: State: Zip Code:
Phone: Fax:
Email Address:
** Payment is due upon receipt of the invoice. Please remit to the above address and reference
your invoice number on payment.
1608 S.BROWNLEE BLVD.•CORPUS CHRISTI,TX 78404'(0)361-946-4848'(F)361-265-0562 Exhibit A
Page 9 of 13
MUNOZ ENGINEERING
TBPE FIRM No. 12240
Practical Engineering Solutions
January 12, 2018
City of Corpus Christi— Engineering Department
1201 Leopard Street
Corpus Christi, Texas 78401
Attn: Chris Hale, Major Projects Engineer
Re: Proposal for Engineering Services
18042A Preliminary Engineering Street Feasibility Report (Bond 2018)—Slough
Road
Mr. Hale,
Munoz Engineering, LCC (ME, LLC) is pleased to submit this proposal for engineering
services. ME, LLC proposes to perform said services and all acts attendant thereto with a
reasonable standard of care. Our proposed scope of work is as follows:
Task 18042A Preliminary Engineering Street Feasibility Report—Slough Road
I Prepare one(1) Preliminary Engineering Street Feasibility Report for Slough Road
from Rodd Field Road to the East to the dead end that includes the following:
A.) Cover Sheet
B.) Executive Summary which includes the following:
1 Project description,
2 Opinion of Probable Cost(OPCC) Summary,
3 Project timetable,
4 Location map
C.) Project Report which includes the following:
1 Project Description
a Bond 2018 language
b Location
c Existing conditions
i Existing utility type and location will be determined by
Subsurface Utility Engineering Level D (QL-D)
d Proposed construction
e Agency/Permit coordination
f Land acquisition
g Other project elements
2 Opinion of Probable Cost
a Summary Table of all costs
b Opinion of Probable Cost Assumptions
c Opinion of Probable Cost form
3 Project Timetable/Schedule
4 Street Section
a Existing section
b Proposed section
5 Project Site Photographs
6 Strip Map
a Graphically representing the proposed street and any utility
improvements.
1608 S.BROWNLEE BLVD.'CORPUS CHRISTI,TX 78404*(0)361-946-4848'(F)361-265-0562 Exhibit A
Page 10 of 13
MUNOZ ENGINEERING
TBPE FIRM No. 12240
Practical Engineering Solutions
2 Attendance at a total of three (3) Meetings with City Staff regarding the Preliminary
Engineering Street Feasibility Report. Additional meetings with City Staff will be at an
hourly rate as per Munoz Engineering 2018 Rate Sheet (Attachment A).
ME, LLC proposes to perform the scope of work for the following lump sum fee:
Engineering Services $42,000.00
We appreciate the opportunity to assist you in this matter and if you have any comments or
questions please contact call me at(361) 946-4848 or e-mail me at ram a(�munozengrq.com .
Sincerely,
MUNOZ ENGINEERING
TBPE FIRM No. 12240
In` r` -,If
Ramiro Munoz I I, PE, MLSE
Principal/Project Manager
For payment services, invoice to:
Firm: Attn:
Address: Title:
City: State: Zip Code:
Phone: Fax:
Email Address:
** Payment is due upon receipt of the invoice. Please remit to the above address and reference
your invoice number on payment.
1608 S.BROWNLEE BLVD.*CORPUS CHRISTI,TX 78404*(0)361-946-4848'(F)361-265-0562 Exhibit A
Page 11 of 13
MUNOZ ENGINEERING
TBPE FIRM No. 12240
Practical Engineering Solutions
January 12, 2018
City of Corpus Christi —Engineering Department
1201 Leopard Street
Corpus Christi, Texas 78401
Attn: Chris Hale, Major Projects Engineer
Re: Proposal for Engineering Services
18044A Preliminary Engineering Street Feasibility Report (Bond 2018)—Strasbourg
Drive
Mr. Hale,
Munoz Engineering, LCC (ME, LLC) is pleased to submit this proposal for engineering
services. ME, LLC proposes to perform said services and all acts attendant thereto with a
reasonable standard of care. Our proposed scope of work is as follows:
Task 18044A Preliminary Engineering Street Feasibility Report—Strasbourg Drive
1 Prepare one(1) Preliminary Engineering Street Feasibility Report for Strasbourg
Drive from Marseille Drive to Riom Street that includes the following:
A.) Cover Sheet
B.) Executive Summary which includes the following:
1 Project description,
2 Opinion of Probable Cost (OPCC) Summary,
3 Project timetable,
4 Location map
C.) Project Report which includes the following:
1 Project Description
a Bond 2018 language
b Location
c Existing conditions
i Existing utility type and location will be determined by
Subsurface Utility Engineering Level D (QL-D)
d Proposed construction
e Agency/ Permit coordination
f Land acquisition
g Other project elements
2 Opinion of Probable Cost
a Summary Table of all costs
b Opinion of Probable Cost Assumptions
c Opinion of Probable Cost form
3 Project Timetable/Schedule
4 Street Section
a Existing section
b Proposed section
5 Project Site Photographs
6 Strip Map
a Graphically representing the proposed street and utility
improvements
1608 S.BROWNLEE BLVD.*CORPUS CHRISTI,TX 78404 (0)361-946-4848'(F)361-265-0562 Exhibit A
Page 12 of 13
•
MUNOZ ENGINEERING
TBPE FIRM No. 12240
Practical Engineering Solutions
2 Attendance at a total of three (3) Meetings with City Staff regarding the Preliminary
Engineering Street Feasibility Report. Additional meetings with City Staff will be at an
hourly rate as per Munoz Engineering 2018 Rate Sheet (Attachment A).
ME, LLC proposes to perform the scope of work for the following lump sum fee:
Engineering Services $45,000.00
We appreciate the opportunity to assist you in this matter and if you have any comments or
questions please contact call me at(361) 946-4848 or e-mail me at ram(c�munozengrq.com
Sincerely,
MUNOZ ENGINEERING
TBPE FIRM No. 12240
Ramiro Munoz I I, PE, MLSE
Principal/Project Manager
For payment services, invoice to:
Firm: Attn:
Address: Title:
City: State: Zip Code:
Phone: Fax:
Email Address:
** Payment is due upon receipt of the invoice. Please remit to the above address and reference
your invoice number on payment.
1608 S.BROWNLEE BLVD.'CORPUS CHRISTI,TX 78404'(0)361-946-4848'(F)361-265-0562 Exhibit A
Page 13 of 13