HomeMy WebLinkAboutC2018-157 - 3/12/2018 - NA TASK ORDER NO. 1
This Task Order pertains to a Master Services Agreement for Geotechnical and Construction Materials Testing by
and between City of Corpus Christi, Texas(City)and Professional Service Industries, Inc.,(Lab)dated January
16, 2018 by Motion No. M2018-005 (Agreement). Lab shall perform services on the project described below as
provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly
signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the
project described below.
MSA PROJECT NUMBER/NAME: 17099A Geotechnical and Construction Materials Testing
TASK ORDER PROJECT NUMBER/NAME: 17099B Geotechnical and Construction Materials Testing
1. PROJECT DESCRIPTION: E16427 O.N.Stevens Water Treatment Plant Maintenance Building Relocation
2. SCOPE OF SERVICES—Earthwork,concrete and asphalt testing and observation for the relocation of the
O.N. Stevens Water Treatment Plant maintenance building, according to the testing schedule provided by
the Engineer in the sealed submittal and as more fully described in Exhibit A.
3. COMPENSATION —The total amount not to exceed for this Task Order only is $9,400.00.
This Task Order is approved and Lab may proceed. All other terms and conditions of the Agreement remain in
full force and effect.
CITY F ORPUS CHRISTI PR SSIONAL SERVICE INDUSTRIES, INC.
4 I(Y 1 / .41101"413/9/2018
I
e . onds, P.E. Date Henry alindo, P.E. Date
Director of Engineering Services Branch Manager
810 South Padre Island Drive
Corpus Christi, TX 78416
(361) 854-4801 Office
henry.galindo@psiusa.com
Fund Name Accounting Unit Account No. Activity No. Amount
Water 2015 CIP 4096-062 550920 E16427-01-4096-EXP $9,400.00
2018-157
3/12/18
Professional Service Industries
INDEXED
TASK ORDER FUNDING REQUEST FORM
CONTRACT MSA#AND TITLE: 17099A Geotechnical and Construction Materials Testing
TASK ORDER PROJECT#/TITLE: 17099B Geotechnical and Construction Materials Testing
TASK ORDER IS FOR WHICH PROJECT(S):E16427 ONSWTP Mainenance Building Relocation
REQUESTING DEPARTMENT:Utilities
FUND NAME/FUND#-ME: ACCOUNT: ACTIVITY:
4096-Water 2015 CIP 550920 E16427-01-4096-EXP
CONSULTANT:Professional Services Industries(PSI) FEE: S9,400.00
TASK ORDER#: 1
SCOPE OF WORK:Earthwork,concrete and asphalt testing and observation for the relocation
of the ONSWTP Maintenance Building,according to the testing schedule provided by the Engineer
in the sealed submittal.
e
o`=a v k N /
PM PRINT NAME:
SIGNATURE
"� �'b
DATE: /f
Exhibit A
Page 1 of 4
•
R i Inforntatlon
tar—72:11 To Build On
engineering•Consulting•Testing
March 8,2018
City of Corpus Christi
Engineering Services
1201 Leopard Street
Corpus Christi,Texas 78401
Attn: Mr.Alex Barabanov
Email: alexba@cctexas.com
Phone: (361) 826-1873
Re: Construction Materials Testing and Observation Proposal
O.N.Stevens Water Treatment Plant Maintenance Bldg.
Project No. E16427,Task Order#1
2018/2019 MSA for Geotechnical and Construction Material Testing
Corpus Christi,Texas
PSI Proposal No.:0325-229171
Dear Mr. Barabanov:
Professional Service Industries, Inc. (PSI) is pleased to have been selected based on qualifications to
perform Construction Material Testing and Observations Services on Project No. E16427 O.N. Water
Treatment Plant Maintenance Bldg. We are submitting this proposal, with fees, as the second step of
negotiation process.
Construction HiveTM is the primary report distribution platform used by PSI to provide a better experience
to our clients. You will have 24-hour access to your reports on this website from any internet enabled
device with a web browser. Construction HiveTM has powerful report viewing, retrieval and searching
capabilities that allow you to find the information you are looking for faster and with greater ease.
This proposal includes our services to observe, test and report on the construction material placement
activities. Please note that our services will be performed on an intermittent, call-out, as requested basis.
This proposal does not include full time or continuous on-site observation services. Scheduling will be the
responsibility of our client's designated representative.
We look forward to providing our services during construction of the above referenced project. Please do
not hesitate to contact our office with any questions or concerns.
Respectfully submitted,
Professional Service Industries,Inc.
A.;
Henry Galindo, P.E. Felix Ovalle
Branch Manager Project Manager
Construction Services
Exhibit A
Page 2 of 4
Intertek PSI-810 S.Padre Island Drive•Corpus Christi,TX 78416•Phone(361)854-4801 •Fax(361)854.6049
i ' I1�0I7?IQt101i
� .To Build C1117.1 .•
gins dng•consulting•T.sth�g
ESTIMATED FEES
PSI Proposal No. 229171
E16427 O.N. Stevens Water Treatment(Task Order#1)
E16427 O.N.Stevens Water Treatment Plant
City of Corpus Christi
Engineering Services Department
Alex Barabanov
Estimated Construction Materials Testing Services
Project: E16427 O.N. Stevens Water Treatment Plant Main. Bldg. Corpus Christi,TX
Unit Unit Item Total
Quantity Price_
Earthwork Testing and Observation
Building Pad Preparation
Engineering Technician(In-place Density Testing) Per Hour 20 $40 00 $800.00
Laboratory Moisture Density Relationship(Standard) Each 1 S150.00 $150.00
Atterberg Limit Determination Each 1 $65 00 S65.00
Percent Passing No.200 Sieve Each 1 S50.00 $50.00
Sieve Analysis Each 1 $65.00 $65.00
Sample Preparation for Laboratory Testing Each 1 $50.00 550.00
Daily Equipment Charge Per Trip 10 S65 00 $650.00
Sample Pickup Charge Per Trip 1 S150.00 $150.00
Transportation Charge Per Trip 10 S50.00 $500.00
Proiect Set-up Fee Each 1 $80.00 $80 00
Management Services for Supervision and Report Review Per Hour 3 $30 00 $90.00
Sub-
Tota! $2,650.00
Paving Preparation
Engineering Technician(In-place Density Testing) Per Hour 16 $40 00 $640 00
Laboratory Moisture Density Relationship(Standard) Each 1 $150.00 $150.00
Laboratory Moisture Density Relationship(Modified) Each 1 5175.00 $175.00
Atterberg Limit Determination Each 2 S65.00 $130.00
Sieve Analysis Each 2 $65.00 $130.00
Percent Passing No.200 Sieve Each 2 $50.00 $100.00
Sample Preparation for Laboratory Testing Each 2 $50.00 $100.00
LA Abrasion Each 1 $400.00 $400.00
CBR(Standard) Each 1 $350 00 $350.00
Wet Ball Mill Test Each 1 $325.00 $325.00
Triaxial Test Each 1 $700.00 $700.00
Transportation Charge Per Trip 4 $50.00 $200.00
Sample Pickup Charge(Trip,Technician,and Report Review) Per Trip 2 $140.00 $280 00
I'1�itl
M�� Exhibit A PSI Proposal 229171
Page 3 of 4 March 8,2018
Project Set-up Fee Sump 1 $80.00 $80 00
Management Services for Supervision and Report Review Per Hour 2 S30.00 $60.00
Sub-
Total 53,820.00
Utility Trench Backfill
Engineering Technician(In-place Density Testing) Per Hour 4 540.00 S160.00
Moisture Density Gauge Min.3(06938) Per Day 4 $65.00 $260.00
Transportation Charge Per Trip 4 $40.00 $160.00
Management Services for Supervision and Report Review Per Hour 2 $30.00 $60.00
Sub-
Total S640.00
Earthwork Testing and Observation Estimate 57,110.00
Concrete Testing and Observation
Structural Concrete(Foundation)
Engineering Technician(Concrete Sampling and Testing) Per Hour 12 540.00 S480.00
Concrete Cylinders(Cured and/or Tested in Compression)(6x12) Each 20 $15.00 S300.00
Transportation Charge Per Trip 3 $50.00 $150.00
Sample Pickup Charge(Trip,Technician,and Report Review) Per Trip 3 $150.00 $450.00
Management Services for Supervision and Report Review Per Hour 3 $40.00 S120.00
Sub-
Total 51,500.00
Concrete Testing and Observation Estimate $1,500.00
Asphalt Testing and Observation ____
Asphalt Testing and Observation
Engineering Technician(In-place Density Testing) Per Hour 4 540.00 $160.00
Daily Equipment Charge Per Trip 1 S65.00 $65.00
Transportation Charge Per Trip 1 S50.00 $50.00
Extraction Sieve Analysis Each 1 $185.00 $185 00
Lab Density and Stability Each 1 $40.00 $40 00
Theoretical Density(Rice Method) Each 1 $80.00 $80 00
Thickness Air voids Each 1 $100.00 $100.00
Theoretical Density(In-place density) Each 1 S50.00 $50.00
Management Services for Supervision and Report Review Per Hour 2 S30.00 $60.00
Sub-
Total $790.00
Asphalt Testing and Observation Estimate $790.00
Construction Materials Testing and Observation Estimated Total $9,400.00
Remarks: Estimate Only.Does Not Account for Material Overruns.
Fly
Exhibit A PSI Proposal229171
Page 4 of 4 March 8,2018