HomeMy WebLinkAboutC2018-165 - 3/21/2018 - NA TASK ORDER NO. 2
This Task Order pertains to a Master Services Agreement for Geotechnical and Construction Materials Testing by
and between City of Corpus Christi,Texas(City)and Rock Engineering&Testinq Laboratory.Inc. (Lab)dated
January 16, 2018 by Motion No. M2018-005 (Agreement). Lab shall perform services on the project described
below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been
properly signed by both parties. Upon execution,this Task Order shall supplement the Agreement as it pertains to
the project described below.
MSA PROJECT NUMBER/NAME: 17100A Geotechnical and Construction Materials Testinq
TASK ORDER PROJECT NUMBER/NAME: 171000 Geotechnical and Construction Materials Testinq
1. PROJECT DESCRIPTION: E12095—Staples Street from Brawner Parkway to Kostoryz Road
2. SCOPE OF SERVICES—Construction materials testing services for the Staples Street project more fully
described in Exhibit A.
3. COMPENSATION —The total amount not to exceed for this Task Order only is$79,922.00
This Task Order is approved and Lab may proceed. All other terms and conditions of the Agreement remain in
full force and effect.
CITY OF CORPUS CHRI I ROCK ENGINEERING&TESTING
LABORATORY, INC.
4i / �/� . (/i. u X12 03-13-18
Jeff H. dmonds, P.E. ■ate i . Rock Date
Director of Engineering Services Chief Operating Officer
6817 Leopard Street
Corpus Christi, TX 78409
(361)883-4555 Office
Cu rtis@ rocktesti ng.com
Fund Name Accounting Unit Account No. Activity No. Amount
ST2016 CO Bond 2012 3552-051 550920 E12095-01-3552-EXP $79,922.00
2018-165
3/21/18
Rock Engineering& Testing
INDEXED
TASK ORDER FUNDING REQUEST FORM
CONTRACT MSA#AND TITLE: 17100A Geotechnical and Construction Materials Testing(ROCK)
TASK ORDER PROJECT#/TITLE: 17100C Geotechnical and Construction Materials Testing(ROCK)
REQUESTING DEPARTMENT:
FUND NAME/FUND#-ME: ACCOUNT: ACTIVITY:
355a- c 1 55r)gao !ao4D -ol- 3559 -Exp
TASK ORDER#:2
SCOPE OF WORK:SEE PROPOSAL
TASK ORDER IS FOR PROJECT(S)LISTED BELOW:
PROJECT# FEE PROJECT NAME
El 2095 579,922 Staples St(Brawner Parkway to Kostoryz Rd)
$79,922 Grand Total
Chris Hale
Pt`I PRINT NAME:
/A. -fig
SIGNATURE:
2/27/2018
DATE:
EXHIBIT A
Page 1 of 4
•
> • GEOTECHNICAL ENGINEERING
�oa A ar • CONSTRUCTION MATERIALS
(_ r Oeitit ENGINEERING B TESTING
<eo Y SOILS•ASPHALT •CONCRETE
441-
•Al •i
Thursday, March 01,2018
City of Corpus Christi
1201 Leopard St
Corpus Christi,TX 78401
SUBJECT: ESTIMATED TESTING BUDGET FOR THE PROPOSED
E12095 STAPLES ST-KOSTORYZ TO BRAWNER
Corpus Christi,TX
RETL Proposal Number: P022618A
Dear Mr. Edmonds,
Rock Engineering and Testing Laboratory, Inc. (RETL) (TBPE Firm No. 2101) is pleased to provide an estimate to
perform the required Construction Materials Testing for the above referenced project. The Construction Materials
Testing for the above referenced construction project is based upon quantities as derived from the
information as provided to RETL as of the date of this proposal.
We understand that we have been chosen to provide these services for this publicly funded project
Therefore, by providing cost information we are not in violation of the Texas Professional Services
Procurement Act.
The estimated testing amount for this project is$79,922.00.This estimate will change and is dependent upon
the actual scope of work performed as requested by project representatives. Requested services beyond
what is contained in this estimate will be billed based on the unit rates contained here-in.
Please make note that the actual fees invoiced for this project will be based on the actual testing requested
and performed. The total fee assessed will be dependent on the contractors construction techniques,
number of trips made to the jobsite, elapsed time from technician arrival to commencement of testing
activities,and any stand-by time the technician is required to be on-site but not performing testing activities.
This estimate does not take into account project schedule, weather delays, and cancellations of services
after arrival,etc.which are beyond RETL's control.Also note,that holiday/weekend rates do apply as well as
overtime rates for services requested at an additional rate of$34.00 per hour.
In order to best respond to the project testing needs and schedules, please schedule testing a minimum of
48 hours in advance In order to defer any potential delays.RETL strives to accommodate all testing requests
as they are received and can make accommodations with advanced notice to schedules.
RETL appreciates your consideration of our firm to assist you during the construction phase of your project. If you
agree with this proposal, please sign the attached Laboratory Testing Services Agreement, submit the Distribution
List and provide billing information. Please do not hesitate to contact me at(361)883-4555 extension 415 if you have
any questions regarding the proposal or would like to discuss further.
Sincerely,
/
--
Pablo
Pablo Schmitt
Project Estimator
ROCK ENGINEERING&TESTING LABORATORY,INC.
6817 LEOPARD STREET•CORPUS CHRISTI.TEXAS,78409 EXHIBIT A
OFFICE: (361)883-4555•FAX: (361)8834711 •www.rocktesting.com
Page 2 of 4
o, P022618B
i.0-
.
P0'-'- '0. E12095 STAPLES ST - KOSTORYZ TO BRAWNER - BASE BID 1
0Co
4u CITY OF CORPUS CHRISTI
''0q,. of CORPUS CHRISTI, TX
JEFFERY EDMONDS, PE
01. SOILS
A01 SOILS-SUBGRADE
EXISTING SUBGRADE
FREQ LIFTS/MIN SUBT TOTAL RATE AMOUNT
S190 MATERIALS SAMPLING CHARGE PER MATERIAL SOUR 1 1 1 EA $62.00 $62.00
S510 PROCTOR-STANDARD ASTM D698 PER MATERIAL SOUR 1 1 1 EA $233.00 $233.00
S600-1 NUCLEAR FIELD DENSITY Min 3(ASTM D6938) SEE TESTING SCHED 1 296 296 EA $49.00 $14,504.00
V486 VEHICLE PER TRIP 1 50 50 TR $49.00 $2,450.00
A05 SOILS- UTILITY BACKFILL
TRENCH BACKFILL
FREQ LIFTS/MIN SUBT TOTAL RATE AMOUNT
S190 MATERIALS SAMPLING CHARGE PER MATERIAL SOUR 1 1 EA $62.00 $62.00
S510 PROCTOR-STANDARD ASTM D698 PER MATERIAL SOUR 1 1 1 EA $233.00 $233.00
5600-1 NUCLEAR FIELD DENSITY Min 3(ASTM D6938) PER 200LF TRENCH/L 1 300 300 EA $49.00 $14,700.00
V486 VEHICLE PER TRIP 1 20 20 TR $49.00 $980.00
01.SOILS
SUBTOTAL $33,224.00
02. FLEX BASE
A09 SOILS-FLEX BASE
6"CRUSHED LIMESTONE TYPE A GRADE 1-2
FREQ LIFTS/MIN SUBT TOTAL RATE AMOUNT
S190 MATERIALS SAMPLING CHARGE 1 EVERY 3000CYDS 1 3 3 EA $62.00 $186.00
S502 ATTERBERG LIMITS/PLASTICITY INDEX(W/AGGR)ASTM D4318 1 EVERY 3000CYDS 1 3 3 EA $102.00 $306.00
S504 GRADATION(Sieve Analysis)ASTM C136 1 EVERY 3000CYDS 1 3 3 EA $102.00 $306.00
S522 PROCTOR-MODIFIED ASTM D1557 I EVERY 3000CYDS 1 3 3 EA $274.00 $822.00
S546 WET BALL MILL PER MATERIAL SOUR 1 1 I EA $348.00 $348.00
5548 LA ABRASION(ASTM C1311 1 EVERY 3000CYDS I 3 3 EA $348.00 $1,044.00
S600-1 NUCLEAR FIELD DENSITY Min 3(ASTM D6938) SEE TESTING SCHED I 266 266 EA $49.00 $13,034.00
S606 TRIAXIAL PER MATERIAL SOUR I 1 I EA $804.00 $804.00
S610 CALIFORNIA BEARING RATIO(ASTM D1883) PER MATERIAL SOUR 1 1 1 EA $530.00 $530.00
V486 VEHICLE PER TRIP 1 48 48 TR $49.00 $2,352.00
02. FLEX BASE
SUBTOTAL $19,732.00
03. HMAC
801 ASPHALT
ASPHALT PAVEMENT REPAIR
FREQ LIFTS/MIN SUBT TOTAL RATE AMOUNT
A105 ASPHALT FULL SERIES(ASTM C117,C136,D2041,D6307) PER 500 TONS 1 1 1 EA $687.00 $687.00
A200 ROLLING PATTERN PER HOUR 1 4 4 HR $76.00 $304.00
A202 ASPHALT CORED IN PLACE DENSITY I PER I000LF ST 1 1 1 EA $104.00 $104.00
S191 SAMPLE PREPARATION CHARGE PER 500 TONS 1 1 1 EA $74.00 $74.00
V486 VEHICLE PER TRIP 1 2 2 TR $49.00 $98.00
03. HMAC
SUBTOTAL $1,267.00
Thursday,March 01,2018 EXHIBIT A
Page 3 of 4
P022618B
p� E12095 STAPLES ST - KOSTORYZ TO BRAWNER - BASE BID 1
*�
4.*OC "r
CITY OF CORPUS CHRISTI
CORPUS CHRISTI,TX
JEFFERY EDMONDS, PE
04.CONCRETE
COI CONCRETE
147,3428
COMPRESSION TESTING
FREQ LIFTS/MIN SUBT TOTAL RATE AMOUNT
C301-1 CONCRETE CYLINDERS(Min 4) SEE TESTING SCHED 4 82 328 EA $49.00 $16,072.00
C404 AIR CONTENT OF FRESHLY MIXED CONCRETE SEE TESTING SCHED 1 82 82 EA $17.00 $1,394.00
0501 OBSERVATIONS(Pier,Rebar,Grout Min 1 hour) PER HOUR 1 6 6 HR $94.00 $564.00
S399 CUBES/CYLINDERS PICK UP FEE PER PICK UP 1 56 56 POU $48.00 $2,688.00
V486 VEHICLE PER TRIP 1 100 100 TR $49.00 $4,900.00
04.CONCRETE
SUBTOTAL $25,618.00
MISC
MOI MISCELLANEOUS
ADMINISTRATION FEE.
FREQ LIFTS/MIN SUBT TOTAL RATE AMOUNT
P119 ADMINISTRATION FEE ONE TIME PER PROJ 1 LS $8 .00 $8 .D0
MISC
SUBTOTAL $81.00
ESTIMATED TOTAL $79,922.00
Thursday,March 01,2018 EXHIBIT A
Page 4 of 4