HomeMy WebLinkAboutC2018-166 - 3/21/2018 - NA TASK ORDER NO. 1
This Task Order pertains to a Master Services Agreement for Geotechnical and Construction Materials Testing by
and between City of Corpus Christi,Texas(City)and Rock Engineering&Testinq Laboratory.Inc.,(Lab)dated
January 16, 2018 by Motion No. M2018-005 (Agreement). Lab shall perform services on the project described
below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been
properly signed by both parties. Upon execution,this Task Order shall supplement the Agreement as it pertains to
the project described below.
MSA PROJECT NUMBER/NAME: 17100A Geotechnical and Construction Materials Testinq
TASK ORDER PROJECT NUMBER/NAME: 171006 Geotechnical and Construction Materials Testinq
1. PROJECT DESCRIPTION: 3426 - Barge Dock Improvements
2. SCOPE OF SERVICES—Construction materials testing services for the Barge Dock Improvements project
more fully described in Exhibit A.
3. COMPENSATION—The total amount not to exceed for this Task Order only is $7,571.00
This Task Order is approved and Lab may proceed. All other terms and conditions of the Agreement remain in
full force and effect.
dop
CITY OF CORPUS • ROCK ENGINEERING&TESTING
LABORATORY, INC.
4. at SA (\ r�c�2 03-13-18
Jeff . Edmonds, P.E. Cu/BcA.,Rock \ Date
Director of Engineering Services Chief Operating Officer
6817 Leopard Street
Corpus Christi, TX 78409
(361) 883-4555 Office
curtis@rocktesting.com
Fund Name Accounting Unit Account No. Activity No. Amount
Seawall/Type A Funds 3271-777 550920 E03426-01-3271-EXP $7,571.00
2018-166
3/21/18
Rock Engineering& Testing
INDEXED
TASK ORDER FUNDING REQUEST FORM
CONTRACT MSA#AND TITLE: 17100A Geotechnical and Construction Materials Testing (ROCK)
TASK ORDER PROJECT#/TITLE: 17100B Geotechnical and Construction Materials Testing (ROCK)
REQUESTING DEPARTMENT: Type A Board
FUND NAME /FUND # -ME ACCOUNT: ACTIVITY:
3271-777 550920 E03426-01-3271-EXP
TASK ORDER#: 1
SCOPE OF WORK SEE PROPOSAL
TASK ORDER IS FOR PROJECT(S) LISTED BELOW:
PROJECT# FEE PROJECT NAME
3426 $7,571 Barge Dock Improvements
$7,571 Grand Total
Sarah West
PM PRINT NAME:
SIGNATURE:
2/21/2018
DATE:
EXHIBIT A
Page 1 of 4
•
• GEOTECHNICAL ENGINEERING
CONSTRUCTION MATERIALS
o r r ENGINEERING 8 TESTING
9. Y• • SOILS•ASPHALT•CONCRETE
Wednesday,February 21,2018
City of Corpus Christi
1201 Leopard St
Corpus Christi,Tx 78401
SUBJECT: ESTIMATED TESTING BUDGET FOR THE PROPOSED
83426 BARGE DOCK IMPROVEMENTS
Corpus Christi,TX
RETL Proposal Number.P101817A
Dear Mr.Edmonds,
Rack Engineering and Testing Laboratory, Inc. (RETE) (TBPE Firm No.2101)is pleased to provide an estimate to
perform the required Construction Materials Testing for the above referenced project.The Construction Materials
Testing for the above referenced construction project is based upon quantities as derived from the
information as provided to RETL as of the date of this proposal.
We understand that we have been chosen to provide these services for this publicly funded project
Therefore, by providing cost information we are not in violation of the Texas Professional Services
Procurement Act.
... ...........The estimated testing amount for this project is$7,571.00.This estimate will change and Is dependent upon
the actual scope of work performed as requested by project representatives. Requested services beyond
what is contained in this estimate will be billed based on the unit rates contained here-In.
Please make note that the actual fees invoiced for this project will be based on the actual testing requested
and performed. The total fee assessed will be dependent on the contractor's contraction techniques,
number of trips made to the jobsite, elapsed time from technician arrival to commencement of testing
activities,and any stand-by time the technician is required to be on-site but not performing testing activities.
This estimate does not take into account project schedule, weather delays, and cancellations of services
after arrival,etc.which are beyond RETL's control.Also note,that holiday/weekend rates do apply as wall as
overtime rates for services requested at an additional rate of$33.00 per hour.
hi order to best respond to the project testing needs and schedules,please schedule testing a minimum of
48 hours In advance in order to defer any potential delays.RETL strives to accommodate all testing requests
as they are received and can make accommodations with advanced notice to schedules.
RETL appreciates your consideration of our firm to assist you during to construction phase of your project. If you
agree with this proposal, please sign the attached Laboratory Testing Services Agreement, submit the Distribution
List and provide billing information.Please do not hesitate to contact meat(361)883-4555 extension 415 if you have
any questions regarding the proposal or would like to discuss further.
Sincerely,
Pablo Schmitt
Project Estimator
ROCK ENGINEERING&TESTING LABORATORY,INC.
6817 LEOPARD STREET•CORPUS CHRISTI,TEXAS,78409 EXHIBIT A
OFFICE: (361)883-9555•FAX: (361)8a34711•v,ew.rodaesting.com
Page 2 of 4
�o, ' P101817A
0e�a y, #3426 Barge Dock Improvements
City of Corpus Christi
�o
OC
°per Corpus Christi, TX
°D} °p � Jeffrey Edmonds, P.E.
01. LABORATORY
08. PERSONNEL
LIFTS/MIN SUBTOT TOTAL RATE AMOUNT
ADMIN FEE
LS-Lump Sum
P'19 ADMINISTRATION FEE L3 I 1 1 $79.C: $79.03
01. LABORATORY
SUBTOTAL $79.00
02. SOILS
01.A SOILS-SUBGRADE
LIFTS/MIN SUBTOT TOTAL RATE AMOUNT
RAW SUBGRADE
SEE PLANS FOR TESTING FREQUENCIES
CITY Frequencies
5190 MATERIALS SAMPLING CHARGE EA I 2 2 $60.00 $120.00
5510 PROCTOR-STANDARD ASTM D698 EA 1 2 2 $226.00 $452.00
S600-1 NUCLEAR FIELD DENSITY Min 3(ASTM D6938) EA 1 7 7 $47.00 $329.00
V486 VEHICLE TR I 3 3 $48.00 $144.00
02. SOILS
SUBTOTAL $1,045.00
03.ASPHALT
02.ASPHALT
LIFTS/MIN SUBTOT TOTAL RATE AMOUNT
HMAC
SEE PLANS FOR TESTING FREQUENCIES
CITY Frequencies
A105 ASPHALT FULL SERIES(ASTM C117,C136,D2041,D6307) EA 1 2 2 $667.00 $1,334.00
A202 ASPHALT CORED IN PLACE DENSITY EA 1 2 2 $104.00 $208.00
5191 SAMPLE PREPARATION CHARGE EA 1 2 2 $72.00 $144.00
S200 ROLLING PATTERN HR I 2 2 $74.00 $148.00
V486 VEHICLE TR I 2 2 $48.00 $96.00
03.ASPHALT
SUBTOTAL $1,930.00
Tuesday.February 20,2018 EXHIBIT A
Page 3 of 4
ate, P101817A
a`P c9 #3426 Barge Dock Improvements
``oOC City of Corpus Christi
, • Corpus Christi, TX
Jeffrey Edmonds, P.E.
04. CONCRETE
03.CONCRETE
LIFTS/MIN SUBTOT TOTAL RATE AMOUNT
147,3@28
SEE PLANS FOR TESTING FREQUENCIES
CITY Frequencies
C301-1 CONCRETE CYLINDERS(Min 4) EA 4 11 44 $47.00 $2,068.00
C404 AIR CONTENT OF FRESHLY MIXED CONCRETE EA 1 I I 11 $16.00 $176.00
5399 CUBES/CYLINDERS PICK UP FEE POU I 11 I 1 $46.00 $506.00
V486 VEHICLE TR 1 21 21 $48.00 $1,008.00
04.CONCRETE
SUBTOTAL $3,758.00
05.ALT 1
10.LAB/FIELD
LIFTS/MIN SUBTOT TOTAL RATE AMOUNT
SEE PLANS FOR TESTING FREQUENCIES
CITY Frequencies
C301-I CONCRETE CYLINDERS(Min 4) EA 4 I 4 $47.00 $188.00
SI90 MATERIALS SAMPLING CHARGE EA 1 I I $60.00 $60.00
S399 CUBES/CYLINDERS PICK UP FEE POU 1 I I $46.00 $46.00
S510 PROCTOR-STANDARD ASTM D698 EA 1 I I $226.00 $226.00
S600-1 NUCLEAR FIELD DENSITY Min 3(ASTM D6938) EA I I I $47.00 $47.00
V486 VEHICLE TR 1 4 4 $48.00 $192.00
05.ALT 1
SUBTOTAL $759.00
06.TESTING NOT INCLUDED
TESTING NOT INCLUDED IN THIS PROPOSAL
LIFTS/MIN SUBTOT TOTAL RATE AMOUNT
FLOW FILL TESTING
06.TESTING NOT INCLUDED
SUBTOTAL
ESTIMATED TOTAL $7,571.00
Tuesday.February 20,2018 EXHIBIT A
Page 4 of 4