Loading...
HomeMy WebLinkAboutC2018-170 - 3/23/2018 - NA CITY OF CORPUS CHRISTI AMENDMENT NO. 6 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas. hereinafter called "CITY," and Freese and Nichols, Inc. hereinafter called `ENGINEER." agree to the following amendment to the Contract for Professional Services for South Staples Street from Brawner Parkway to Kostoryz Road (Bond 2012) (Project No. E12095) as authorized and administratively amended by: Original Contract January 29, 2013 Motion No. M2013-017 $731,030.00 Amendment No. 1 July 11, 2014 Administrative Approval $49,537.00 Amendment No. 2 January 23, 2015 Administrative Approval $39,154.00 Amendment No. 3 April 25, 2016 Administrative Approval $37,454.00 Amendment No. 4 October 13, 2016 Administrative Approval $49,883.00 Amendment No. 5 November 28, 2017 Administrative Approval $42,769.00 EXHIBIT A, SECTION 1. SCOPE OF SERVICES, PART A. BASIC SERVICES shall be modified as shown below. 4. Construction Administration Phase: "ENGINEER" will provide construction administration phase services and more fully described in Exhibit "A". EXHIBIT A, SECTION 3. FEES, PART B. SUMMARY OF FEES shall be modified by the attached Summary of Fees as shown in the attached Exhibit "B" for an additional fee not to exceed $49,951 for a total restated fee not to exceed $999,778. All other terms and conditions of the January 29, 2013 contract between the "CITY" and "ENGINEER" and of any amendments to that contract which are not specifically addressed herein shall remain in full force and effect. CITY OF CORPUSCHRISTI 3! FREESE AND NICHOLS, INC. 0� 1, a qi45% 12 (j).9-0,-, 3/7/2018 Margie C. Rose, Date Ron Guzman, P.E. Date City Manager Vice President/Principal 800 N. Shoreline Blvd., Suite 1600N „/ Corpus Christi, Texas 78401 ''����''yy'' ��/ 3 Z %8 (361) 561-6500 Office Mark Van Vleck, Dat (361) 561-6501 Fax Assistant Cit Ma .g:r rg@freese.com ) °/( 7 Vale ie H. Gray P " Date Exe utive • - • of ' • C Works Jeff H. Edmonds, P.E. late Director of Engineering Services AMEND. NO. 6 2018-170 Page 1 of 2 3/23/18 2095 SOUTH STAPLES FROM BRAWNER TO KOSTORYZ BOND ISSUE 2012\CONSULTANT CONTRACT FREESE ,5 FREESE NICHOLS DOCX Freese and Nichols Inc. I INDEXED APPROVED AS TO LEGAL FORM 2018.03.08 10:28:24-06'00' Legal Department Date ATTEST 1\3e_ L. F:GkeAr-lok Rebecca Huerta, City Secretary South Staples Street from Brawner Parkway to Kostoryz Rd (Project No. E12095) Freese and Nichols Amendment No. 6, $49,951 Not to Exceed $999,778 Fund Name Accounting Account Activity No. Account Amount Unit No. Category ST 2013 GO Bond 2012 3549-051 550950 E12095-01-3549-EXP 50950 $49,951.09 Total $49,951.00 AMEND. NO. 6 Page 2 of 2 K\ENGINEERING DATAEXCHANGE\VELMAP\STREET1E12095 SOUTH STAPLES FROM BRAWNER TD KOSTDRYZ BOND ISSUE 20121CONSULTANT CONTRACT FREESE NICHOLSIAMENDMENT NO.6\AMENDMENT NO 6 E12095 FREESE NICHOLS DDCX F R E E S EInnovative approaches Practical results faiNICHOLS `E Outstanding service i, 800 N.Shoreline Blvd.,Suite 1600N • Corpus Christi,Texas 78401 • 361-561-6500 • fax 361-561-6501 www.freese.com November 7, 2017 Mr.Jeff Edmonds, P.E. Director of Engineering Services City of Corpus Christi P. 0. Box 9277 Corpus Christi,Texas 78469-9277 Re: South Staples Street from Brawner Parkway to Kostoryz Road (Bond 2012) City Project No. E12095-Amendment#6 Dear Mr. Edmonds, At the request of your staff, Freese and Nichols, Inc. is pleased to submit our contract amendment#6 for South Staples Street from Brawner Parkway to Kostoryz Road. This amendment includes construction administration phase services effort as follows: 1. Add Construction Administration Phase Services. Amendment#4 previously deleted the Construction Administration Phase Services. a. As part of the project redesign, Amendment#4 deleted the amount for construction administration phase services. This amendment proposes to add construction administration phase services back into the contract. Construction administration phase services will include the following: i. Participate in pre-construction meeting conference and provide a recommended agenda for critical construction activities and elements impacted the project. ii. Review, Contractor submittals and operating and maintenance manuals for conformance to contract documents. iii. Review and interpret field and laboratory tests. iv. Provide interpretations and clarifications of the contract documents for the contractor and authorize required changes,which do not affect the contractor's price and are not contrary to the general interest of the City under the contract. v. Make regular visits to the site of the Project to confer with the City project inspector and contractor to observe the general progress and quality of work, and to determine, in general, if the work is being done in accordance with the contract documents.This will not be confused with the project representative observation or continuous monitoring of the progress of construction. vi. Prepare change orders as authorized by the City; provide interpretations and clarifications of the plans and specifications for the contractor and authorize minor changes which do not affect the contractor's price and are not contrary to the general interest of the City under the contract. AMEND. NO. 6 EXHIBIT "A" Page 1 of 2 vii. Attend final inspection with City staff and provide the City with a Certificate of Completion for the project upon successful completion of the project. viii. Review Contractor-provided construction"red-line" drawings. Prepare Project record drawings and provide a reproducible set and electronic file(AutoCAD r.14 or later)within two(2)months of final acceptance of the project.All drawings shall be CARD drawn using dwg format in AutoCAD,and graphics data will be in dxf format with each layer being provided in a separate file. Attribute data will be provided in ASCII format in tabular form. All electronic data will be compatible with the City GIS system. The City staff will: a) Prepare applications/estimates for payments to contractor. b) Conduct the final acceptance inspection with the Engineer. Freese and Nichols,Inc. respectfully requests a contract amendment in the amount of$49,951.00 to address the aforementioned items. Please feel free to contact me at 361.561.6500 should you have any questions regarding this matter. Respectfully, Ron Guz an,P Principal/Vice President Enclosures AMEND. NO. 6 EXHIBIT"A" Page 2 of 2 Basic Services Fees 1 Preliminary Phase Design Phase Bid Phase 2 3 4 Construction Administration Phase Subtotal Basic Services Fees Additional Services Fees (Allowance) 1 Permitting ROW Acquisition Survey Topographic Survey Environmental Issues Public Meetings Additional Public Outreach Subsurface Utility Investigation 2 3 4 5A 5B 6 7 onstruction Observation Services Warranty Phase Signalization Improvements Traffic Control Subtotal Additional Services Fees Auth 8 9 10 Total Authorized Fee South Staples Street from Brawner Parkway to Kostoryz Road (Bond 2012) Project No. E12095 SUMMARY OF FEES Original Contract Street Wastewater Storm Water Water Gas MIS Total 532,813.10 $3,611.71 $16,734.62 54,267.85 $325.17 $313.56 $58,066.00 142,612.59 15,69723 72,732.17 18,548.97 1,413.26 1,36278 252,367.00 6,986.33 768.98 3,563.02 908.68 69.23 66.76 12,363.00 35,140.74 3,867.91 17,921.72 4,570.60 348.24 335.80 62,185.00 217,552.76 23,945.82 110,951.52 28,296.10 2,155.89 2,078.90 384981.00 14,131.46 1,555.44 7,207.02 1,838.01 140.04 135.04 25,007.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39,366.56 4,333.04 20,076.88 5,120.23 390.11 376.18 69,663.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14, 056.86 1,547.23 7,168.98 1,828.31 139.30 134.33 24, 875.00 20,871.97 2,297.36 10,644.67 2,714.72 206.84 199.45 36,935.00 39,205.51 4,315.31 19,994.74 5,099.28 388.52 374.64 69,378.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,107.48 342.04 1,584.81 404.18 30.79 29.69 5,499.00 33,239.75 3,658.67 16,952.21 4,323.34 329.40 317.63 58,821.00 31,572.70 3,475.18 16,102.02 4,106.52 312.88 301.70 55,871.00 195,552.29 21,524.25 99,731.32 25,434.60 1,937.87 1,868.66 346,049.00 $413,105.05 $45,470.07 $210,682.85 $53,730.71 $4,093.77 $3,947.56 $731,030.00 01/29/13 Motion No. M2013 017 South Staples Street from Brawner Parkway to Kostoryz Road (Bond 2012) Project No. E12095 SUMMARY OF FEES Bas c Services Fees 1 Preliminary Phase Design Phase Bid Phase 2 3 4 Construction Administration Phase Subtotal Basic Services Fees Add tional Services Fees (Allowance) 1 Permitting ROW Acquisition Survey Topographic Survey Environmental Issues Public Meetings Additional Public Outreach Subsurface Utility Investigation Construction Observation Services 2 3 4 5A 5B 6 7 Warranty Phase Signalization Improvements Traffic Control Subtotal Additional Services Fees Authc 8 9 10 Total Authorized Fee Amendment No 1 Amd. No. 2 Amd. No. 3 Amd. No. 4 Street Storm Water Total Street Street Street $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 0.00 0.00 39,154.00 37,454.00 140,783.00 0.00 0.00 0.00 0.00 0.00 (12,363.00) 0.00 0.00 0.00 0.00 0.00 (62,185.00) 0.00 0.00 0.00 39,154.00 37,454.00 66,235.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 (1,465.00) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 (9,388.00) 0.00 0.00 0.00 0.00 0.00 0.00 7,432.00 42,105.00 49,537.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 (5,499.00) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,432.00 42,105.00 49,537.00 0.00 0.00 (16,352.00) $7,432.00 $42,105.00 $49,537.00 $39,154.00 $37,454.00 $49,883.00 07/11/14 Admin. Approval 01/23/15 Ad. Approval 04/25/16 Ad. Approval 10/13/16 Ad. Approval Basic Services Fees Preliminary Phase Design Phase Bid Phase 1 2 3 4 Construction Administration Phase Subtotal Basic Services Fees Additional Services Fees (Allowance) 1 Permitting ROW Acquisition Survey Topographic Survey Environmental Issues Public Meetings Additional Public Outreach Subsurface Utility Investigation Construction Observation Services 2 3 4 5A 5B 6 7 Warranty Phase Signalization Improvements Traffic Control Subtotal Additional Services Fees Authc 8 9 10 Total Authorized Fee South Staples Street from Brawner Parkway to Kostoryz Road (Bond 2012) Project No. E12095 SUMMARY OF FEES Amd. No. 5 Amd. No. 6 Street Wastewater Storm Water Water Gas Total Street $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 7,107.00 0.00 0.00 16,007.00 23,114.00 0.00 7,053.09 768.98 3,563.02 908.68 69.23 12,363.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49,951.00 7,053.09 7,875.98 3,563.02 908.68 16,076.23 35,477.00 49,951.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,292.00 0.00 0.00 0.00 0.00 7,292.00 0.00 7,292.00 0.00 0.00 0.00 0.00 7,292.00 0.00 $14,345.09 $7,875.98 $3,563.02 $908.68 $16,076.23 $42,769.00 $49,951.00 11/28/17 Administrative Approval Ad. Approval South Staples Street from Brawner Parkway to Kostoryz Road (Bond 2012) Project No. E12095 SUMMARY OF FEES Total Street Wastewater Storm Water Water Gas MIS Total Basic Services Fees 1 Preliminary Phase $32,813.10 $3,611.71 $16,734.62 54,267.85 5325.17 $313.56 558,066.00 2 Design Phase 360,003.59 22,804.23 72,732.17 18,548.97 17,420.26 1,362.78 492,872.00 3 Bid Phase 1,676.42 1,537.96 7,126.04 1,817.36 138.46 66.76 12,363.00 4 Construction Administration Phase 22,906.74 3,867.91 17,921.72 4,570.60 348.24 335.80 49,951.00 Subtotal Basic Services Fees 417,399.85 31,821.80 114,514.54 29,204.78 18,232.12 2,078.90 613,252.00 Additional Services Fees (Allowance) 1 Permitting 14,131.46 1,555.44 7,207.02 1,838.01 140.04 135.04 25,007-00 2 ROW Acquisition Survey 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3 Topographic Survey 37,901.56 4,333.04 20,076.88 5,120.23 390.11 376.18 68,198.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5A Public Meetings 4,668.86 1,547.23 7,168.98 1,828.31 139.30 134.33 15,487.00 5B Additional Public Outreach 20,871.97 2,297.36 10,644.67 2,714.72 206.84 199.45 36,935.00 6 Subsurface Utility Investigation 46,637.51 4,315.31 62,099.74 5,099.28 388.52 374.64 118,915.00 7 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 Warranty Phase (2,391.52) 342.04 1,584.81 404.18 30.79 29.69 0.00 9 Signalization Improvements 33,239.75 3,658.67 16,952.21 4,323.34 329.40 317.63 58,821.00 10 Traffic Control 38,864.70 3,475.18 16,102.02 4,106.52 312.88 301.70 63,163.00 Subtotal Additional Services Fees Autho 193,924.29 21,524.25 141,836.32 25,434.60 1,937.87 1,868.66 386,526.00 Total Authorized Fee 5611,324.14 $53,346.05 5256,350.87 $54,639.39 $20,170.00 $3,947.56 $999,778.00