HomeMy WebLinkAboutC2018-176 - 3/29/2018 - NA TASK ORDER NO. 22
This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus
Christi, Texas (City) and LNV. Inc. (Consultant) dated August 16, 2016 (Agreement). Consultant shall perform
services on the project described below as provided in this Task Order and in the Agreement. This Task Order
shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall
supplement the Agreement as it pertains to the project described below.
PROJECT NAME/NUMBER: Water and Wastewater Treatment On-Call Support, El 6264
1. PROJECT DESCRIPTION—This project provides the Utility Department with on-call services to assist with
any technical,operational, maintenance,diagnostic and design concerns for the City's O.N.Stevens Water
Treatment Plant and six wastewater treatment plants.
2. SCOPE OF SERVICES—Laguna Madre Wastewater Treatment Plant Digester Air Piping Replacement and
more fully described in Exhibit A.
3. COMPENSATION —The total amount not to exceed for Task Order No. 22 only is $20,135.00.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement
remain in full force and effect.
CITY OF
O . RI• LNV, INC.
`, =� �g V,
-Y'„,.
'G ! moi . -a'm
Jeff H. Edmonds, P.E. Date Dan -. .- .ecker, P.E. Date
Director of Engineering Services President
801 Navigation, Suite 300
Corpus Christi, TX 78408
(361) 883-1984 Office
loganb@Invinc.com
Fund Name , Accounting Unit Account No. Activity No. Amount
Wastewater Operating 4200-33000-042 530000 E16264-01-4200-EXP $20,135.00
2018-176
3/29/18
LNV Inc.
INDEXED
City Project No. E16264
Professional Services Contract
City of Corpus Christi
Water/Wastewater Treatment On-Call Support
Task Authorization No. 22 — Laguna Madre WWTP Digester
Air Piping Replacement
March 21 , 2018
Task Order No. 22
Exhibit A
Page 1 of 6
LNV s,h
SCOPE OF WORK
Project No. E16264
Water and Wastewater Treatment On-Call Support
Task Authorization No. 22- Laguna Madre WWTP Digester Air Piping Replacement
PURPOSE
The Laguna Madre WWTP (LMWWTP) was originally constructed in 1971 to serve the Flour Bluff area
of the City and has the capacity to process an average daily flow of 3.0 million gallons per day(MGD).
At present, multiple leaks have been observed on the two (2) 8 inch air header pipes for Digesters 2, 3,4
and 5. The air pipes are made of ductile iron (DI Class 250) and were originally installed in 1987. The
pipes and accompanying supports and air drops have corroded severely in multiple locations causing
leaks and preventing adequate supply of air from the blower house to the digesters.
The purpose of this task authorization is to assist the City in the replacement of the digester air header
pipes, supports, air drops and diffusers. The replacement of the digester air pipe and associated
appurtenances will be performed as a change order to the Oso Water Reclamation Plant Infrastructure
Rehabilitation and Improvements Project(E12206).
This task authorization will provide the City with recommendations for replacement of the digester air
pipes, including the preparation of plans, specifications and change order documents for City review.
Additionally, this task authorization will also assist the City by providing construction phase services
support for the successful replacement of the digester air pipes.
SCOPE OF WORK
BASIC SERVICES:
Task 0001 —Design Phase
The Engineer will perform the following:
I. Conduct a kick-off meeting and up to two (2) status meetings with the City to provide an
update on project progress and coordinate the proposed design and construction activities.
2. Obtain and review all available data pertaining to the project including reports and record
drawings.
3. Conduct up to two (2) site visits to assess the existing condition of the air pipes, identify
special concerns and gain an overall understanding of the project site and constraints.
4. Evaluate different replacement alternatives and recommend the most suited course of
action.
5. Prepare necessary design calculations, plans and specifications for the suggested
replacement method.
Task Order No. 22
Exhibit A
Page 2 of 6
. o
t ,
LNV •• ;��
+e»
•
6. Prepare a change order under Project E12206- Oso Water Reclamation Plant
Infrastructure Rehabilitation and Improvements, including details on anticipated cost
and schedule.
Task 0002—Construction Phase
The Engineer will perform the following:
1. Review shop drawings and submittals for conformance with contract documents.
2. Make up to three (3) site visits including a final inspection with the City staff to
observe general progress and quality of construction.
DELIVERABLES
The Engineer will prepare a DRAFT package, which will contain change order documents, necessary
specifications, along with construction plans to direct the installation of the recommended air piping, for
the City's review and comment. Upon receipt of comments, the Engineer will incorporate comments into
the Final package and provide one (1) hard copy and one (1) electronic copy to the designated City Task
Authorization Manager specified under this authorization.
SCHEDULE
The Engineer's services shall be performed in a timely manner consistent with sound professional
practices.
The time limits set forth in the schedule shall include allowances for reasonable and expected review time
by the City and approval by authorities having jurisdiction over this project, and shall not be allowed as
cause for delay or adjustments to the schedule. Delays caused by review times by the City exceeding
those anticipated by the Engineer's schedule are cause for adjustments in the schedule. Any adjustments
made to the agreed upon schedule shall be made in writing and accepted by both parties.
The Engineer shall begin work immediately upon receipt of the executed Task Authorization and/or
Notice to Proceed (written or emailed). The work under this task authorization is anticipated to be
complete in accordance with the following schedule.
Task Order No. 22
Exhibit A
Page 3 of 6
TASK TASK DESCRIPTION
1 2
3
4
WEEKS
5 6 7
8
9
10 11 12 13
0001
Design Phase
-.--..-.-...
-
Site visit and review of existing dataCITY
-�..------.
-
DRAFT Change Order, Plans and Specification
REVIEW..----.--
-
FINAL Change Order, Plans and Specifications
---
-.--..---
0002
Construction Phase
-------------
-
Product submittal by supplier/ manufacturer*
----
-
Air piping & appurtenances manufacture *
--..-
-
Installation of air piping on site
.--..--
Note: `Initial estimate. Might vary based on manufacturer's schedule
Task Order No. 22
Exhibit A
Page 4 of 6
FEE
The services will be provided on a Time and Materials (T&M) basis as the project is moved towards
completion. The anticipated amount for this task authorization is $20,135.00, as shown in
ATTACHMENT A. If the level of effort exceeds this estimate, a separate task authorization will be
requested.
TASK AUTHORIZATION MANAGER
The Task Authorization Manager will be the primary contact person during the performance of this work.
All correspondence or inquiries should be addressed to the Task Authorization Manager. This work task
will be coordinated by:
Dan Grimsbo, P.E. A.I.C.P.
Executive Director of Utilities Department
City of Corpus Christi
Office: 361-826-1874
Fax: 361-826-1889
Email: DanG@cctexas.com
APPROVAL
The undersigned has reviewed and approved this Task Authorization and authorizes LNV, Inc.to perform
the work as presented:
Authorized by:
iVc- )//7
7)4A/ ó/2/1/15/ () (Printed Name)
/v7/ ,/ (Date)
Task Order No. 22
Exhibit A
Page 5 of 6
Attachment A
Task Authorization No.22
Man-hour and Fee Analysis
Task
LNV Inc.
Description
PrIncipaINP
Protect Mgr.
Project Engineer
EIT 11
Sr. CAODIGIS Tech
CAOD Tech
LNV TOTAL
$ 265.00
$ 205.00
$ 170.00
5120.00
$ 115.00
5 90.00
Total Hp.
Total Fee
Hrs. Subtotal
Hrs.
Sub -total
Hrs. Subtotal
Hrs
Sub•totg1, . ,;may,-,
..-;
Sub -40131
Hrs. Subtotal
0001
Design Phase
•
Meetings with City Staff (Up to 2)
$ •
4
$ 820
5
4
S 480
$ -
2
S 180
10
$ 1.480.00
•
Site visits (2) 8 review of documents
5 •
4
$ 820
S
4
$ 480
5 -
$ -
8
$ 1,300.00
•
Plans
S •
2
$ 410
3
5 510
40
$ 4.800
2
$ 230
48
$ 4,320
95
$ 10.270.00
-
Technical Specifications
$
$ -
1
$ 170
4
5 480
$ •
5 -
5
$ 650.00
-
Change Order
5 -
5 -
1
$ 170
2
$ 240
$ •
$
3
5 410.00
OA/OC
2
S 530
5 -
2
5 340
5 -
5 -
$ -
4
$ 870.00
-
Structural Department Design Services
S -
2
$ 410
6
$ 1.020
$ -
$ -
$ -
8
$ 1.430.00
2
$ 530.00
12
5 2,460.00
13
$ 2,210.00
54 I $ 6,480.00
2
$ 230.00
50
$ 4.500.00
133
$ 16,410.00
0002
Construction Phase
4
•
Submittals (up l0 2)
$
1
5 205
$ •
S 480
$ -
$
5
$ 685.00
•
Sile Visits (up to 3)
5
$ -
6
$ 1.020
6
S 720
S -
$ -
12
$ 1,740.00
-
Final Inspection
5 •
4
$ 820
$
4
$ 480
$ -
$ -
8
$ 1,300.00
2
$ 530.00
17
S 3,485.00
19
$ 3,230.00
68
$ 8,160.00
2
$ 230.00
50
$ 4,500.00
158
$ 20,135.00
Task Order No. 22
Exhibit A
Page 6 of 6