HomeMy WebLinkAboutC2018-186 - 4/12/2018 - NA TASK ORDER NO. 4
This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus
Christi,Texas(City)and Maldonado-Burkett Intelligent Transportation Systems,LLP(Consultant)dated February 9,
2016(Agreement). Consultant shall perform services on the project described below as provided in this Task Order
and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon
execution, this Task Order shall supplement the Agreement as it pertains to the project described below.
TASK ORDER NO. 4
PROJECT NAME: Spur 3 Corridor (Ennis Joslin Road) Traffic Improvements
from SH 358 (SPID) to Ocean Drive
1. PROJECT DESCRIPTION — This project includes implementation of traffic signalization and roadway
improvements for Spur 3 Corridor(Ennis Joslin Road)from SH 358(SPID)to Ocean Drive from the Traffic
Impact Analysis (TIA) Study that was approved by TXDOT, Staff, and recommended to the Transportation
Advisory Council (TAC).
2. SCOPE OF SERVICES — Professional services to revise traffic signal plans on Ennis Joslin Road with
Islander Way to remove the right-turn-lane and re-design the signal to be with the existing right-of-way.
3. COMPENSATION —The total amount not to exceed for Task Order No. 4 only is $4,765.49.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement
remain in full force and effect.
CITY OF CORPUS 'I MALDONADO-BURKETT INTELLIGENT
TRANSPORTATION SYSTEMS, LLP
/ / ? _41) q(Z 7iS PL 04/11/18
J. H. Ed •onds, P.E., (D.te amonaldonado, Jr., P. E. (Date)
Director of Engineering Services Managing Partner
3833 S. Staples Street, Suite N214
Corpus Christi, TX 78411
(361) 236-4611 Office
ramon@mbitsgroup.com Email
Task Order No. 4
Fund Name Accounting Unit Account No. Activity No. Amount
Street 2015 GO Bond Fund 3551-051 550950 E15113-01-3551-EXP $4,765.49
2018-186
4/12/18
Maldonado-Burkett Intelligent
INDEXED
•
MALDONADO-BURKETT
INTELLIGENT TRANSPORTATION SYSTEMS,LLP
January 18, 2018
Mr.Jeff Edmonds, P.E.
Director
Engineering Services
1201 Leopard Street
Corpus Christi, TX 78401
Re:Traffic Signal and Lighting Improvements Project#E15113—Master Services Agreement—Task Order No.4
Dear Mr. Edmonds:
This is an ongoing Master Services Agreement for traffic signal improvements (City wide).
As requested, MBITS will revise the traffic signal plans to remove the right-turn-lane and redesign the signal to be
within the existing right-of-way.
Master Services Agreement amount: $547,275.87
Amendment No. 1: $27,586.08
Task Order No.3:$3,342.25
Task Order No. 4: $4,765.49
Total: $582,969.69
Task Order No.4
Revise traffic signal plans on Ennis Joslin Road with Islander Way to remove the right-turn-lane and redesign the
signal to be within the existing right-of-way for a total lump sum fee of$4,765.49.
Contents for Master Services Agreement
Technical specifications and front-end documents will be required.
If you have any additional questions please let us know.
Best regards,
P. .
Ramon H. Maldonado Jr., P.E.
Managing Partner
CC: Jerry Shoemaker, P.E.
Chris Hale, P.E.
Raymond Chong, P.E, PTOE
3833 SOUTH STAPLES ST SUITE N214 CORPUS CHRISTI,TX 78411 • Office: 361-236-4611 • www.mbitsgroup.com
TASK ORDER NO.4
EXHIBIT"A"
Page 1 of 3
TRAFFIC SIGNAL AND LIGHTING IMPROVEMENTS (CITY WIDE) BOND 2014 - Task Order No. 4
Com an
Discipline
WBS Range
Estimated by
Rev
Date
Page 1
1
Maldonado -Burkett
Traffic Signal Design Ramon Maldonado 1 01/18/17
Task
Task Description
Drawing
Sheets Design
Fee
1
Ennis Joslin Corridor Revisions
TASK
ORDER
-------
NO.
4
$4.765.49
Additional Services
-------�-
-
Survey Topo and Utilities - TBD
-------
Bid Phase - To be included with Ennis Joslin Project
-------
Construction Administration Phase - Pro ect Wide - TBD
-------
-
Construction Observation Services - Pro-ect Wide - TBD
-------
-
Start-up Services - Pro ect Wide - TBD
---_---
Subsurface Utili Investi.ation - Pro'ect Wide - TBD
-------
TOTAL
LUMP
Total 54.765.49
SUM DESIGN FEE SUMMARY = $4,765.49
1
ASSUMPTIONS
Plans to be submitted as one package.
2
Additional Services to be determined.
3
EXCLUSIONS to be Provide by Client
1
2
3
4
5
Page 1
1
Page 2
1
TRAFFIC SIGNAL AND LIGHTING IMPROVEMENTS (CITY WIDE) BOND 2014 - Task Order No. 4
Company
Discipline
WBS Range
Estimated by
Rev
Date
Maldonado -Burkett
Traffic
Signal Design
Ramon Maldonado
1
01/18/17
WBSDescription
Task
Drawing
Sheets
Project
Manager
Design
Engineer
Hours by Classification
Senior
EIT Engineering
Tech
Engineering
Tech
Junior
Engineering
Tech
Admin
3.00
6.00
0.00 12.00
14.00
0.00
0.00
Ennis Joslin Corridor Design
Revise Summary of Materials Sheet
1.00
2.00
4.00
Revise Traffic Signal Plans to remain within existing ROW
1.00
4.00
6.00
Revise Standard Sheets to Latest Standards
1.00
2.00
Revise Plan Set to Remove Right Turn Lane
1.00
2.00
Revise OPCC
2.00
2.00
QA/QC
2.00
1.00
1.00
Coordination and Meetings
1.00
1.00
1.00
Subtotal
-
3.00
6.00
0.00
12.00
14.00
0.00
0.00
Direct Labor Rates (2014)
$ 202.03
$ 130.89
$ 110.53
$ 145.43
$ 116.35
$ 58.17
$ 45.32
Weighted Average Labor Escalation Rate (2014 thru 2016)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Subtotal Direct Labor Costs
$ 606.09
S 785.34
S -
S 1.745.16
S 1.628.90
$ -
S -
Exclusions
Total Hours
Total Direct Labor Costs
35
S4.765.49
Page 2
1
•
EXHIBIT B
TASK ORDER SUMMARY
Master Services Agreement
Spur 3 Corridor(Ennis Joslin Road)Traffic Improvements
from SH 358(SPID)to Ocean Drive
Project No. E15165 (formerly Project No. E15113)
TASK NOT TO
DESCRIPTION AMOUNT EXCEED
AMOUNT
Master Services Agreement(Feb. 9, 2016) $547,275.87
Amendment No. 1 to Master Services Agreement 27,586.08
Amendment No. 2 to Master Services Agreement 8,107.74
Maximum Contract Amount $582,969.69
TASK ORDERS:
Task Order No. 1 341,802.25
Master Services Agreement
Location 1 Ennis Joslin Road Simulation Study $15,128.84
Location 2 Ennis Joslin Road with Islander Way Signal 98,746.16
Location 3 Ennis Joslin Road with Nile Drive Signal 23,401.64
Location 4 Ennis Joslin Road with McArdle Road 23,401.64
Location 5 Ennis Joslin Road with Alameda Street Signal 23,401.64
Location 6 Ennis Joslin Road Signal Interconnect 21,504.72
Location 7 Ennis Joslin Road Corridor Signal Coordination 38,426.61
Location 8 Ocean Drive with Doddridge Street Signal 23,401.64
Location 9 Ocean Drive with Island Blvd. Signal 23,401.64
---- - --- Location 10 Ocean Drive with Sand Dollar Blvd. 23,401.64
Amendment No. 1 to Master Services Agreement
Location Ennis Joslin Road with Ocean Drive 25,871.53
Location McArdle Road with Nile Drive 1,714.55
Task Order No. 2 233,059.70
Master Services Agreement
Location 11 Flour Bluff Drive with Purdue Road New Signal
22,444.94
Design
Location 12 Home Road with Columbia Drive Signal Upgrade 23,401.64
Design with Pedestrian Poles
Location 13 Ayers Street with Roosevelt Drive Signal Upgrade 23,401.64
Design with Pedestrian Poles
Location 14 Staples Street with Brownlee Boulevard Signal 23,401.64
Upgrade Design with Pedestrian Poles
---- ---- Location 15 Nueces Bay Boulevard with Buddy Lawrence 23,401.64
Drive Signal Upgrade Design with Pedestrian Poles
Location 16 Leopard Street with Battlin Buc Boulevard Signal 23,401.64
Upgrade Design with Pedestrian Poles
Location 17 Leopard Street with Palm Drive Signal Upgrade 23,401.64
Design with Pedestrian Poles
Location 18 Leopard Street with Lantana Street Signal 23,401.64
Upgrade Design with Pedestrian Poles
Location 19 McKinzie Road with Haven Drive Signal Upgrade 23,401.64
Design with Pedestrian Poles
Location 20 Santa Fe Street with Texan Trail Signal Upgrade 23401 64
Design with Pedestrian Poles
TASK ORDER NO.4
EXHIBIT"B"
Page 1 of 2
•
Task Order No. 3
Amendment No. 2 to Master Services Agreement 3,342.25
HSIP 2017 Candidate Projects 3,342.25
Task Order No.4
Amendment No. 2 to Master Services Agreement 4,765.49
Ennis Joslin Road with Islander Way-traffic signal plans 4,765.49
revisions
Amount Remaining on Master Services Agreement $0.00
TASK ORDER NO.4
EXHIBIT"B"
Page 2 of 2