HomeMy WebLinkAboutC2018-191 - 4/20/2018 - NA • TASK ORDER NO. 5 This Task Order pertains to a Master Services Agreement for Geotechnical and Construction Materials Testing by and between City of Corpus Christi,Texas(City)and Rock Engineering&Testing Laboratory,Inc. (Lab)dated January 16. 2018 by Motion No. M2018-005 (Agreement). Lab shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution,this Task Order shall supplement the Agreement as it pertains to the project described below. MSA PROJECT NUMBER/NAME: 17100A Geotechnical and Construction Materials Testing TASK ORDER PROJECT NUMBER/NAME: 17100F Geotechnical and Construction Materials Testing 1. PROJECT DESCRIPTION: E12206—Oso Water Reclamation Plant Nutrient Removal and Re-route to 24 MGD Phase 2 2. SCOPE OF SERVICES—Construction materials testing services as more fully described in Exhibit A. 3. COMPENSATION —The total amount not to exceed for this Task Order only is$109,927.00 This Task Order is approved and Lab may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS C STI ROCK ENGINEERING&TESTING LABORATORY, INC. C J L r� /g ark 04-11-18 eff H. Edmonds, P.E. ate (\Cu is ckDate Director of Engineering Services CI112fOperating Officer 6817 Leopard Street Corpus Christi, TX 78409 (361)883-4555 Office curtis@rocktesting.com Fund Name Accounting Unit Account No. Activity No. Amount Wastewater 2015 4254-042 550920 E12206-01-4254-EXP $109,927.00 2018-191 4/20/18 Rock Engineering& Testing INDEXED TASK ORDER FUNDING REQUEST FORM CONTRACT MSA#AND TITLE: 17100A Geotechnical and Construction Materials Testing(ROCK) TASK ORDER PROJECT#/TITLE: 17100F Geotechnical and Construction Materials Testing(ROCK) REQUESTING DEPARTMENT:UTILITIES FUND NAME/FUND# -ME: ACCOUNT: ACTIVITY: 425-1-042 5509.20 El 2206-01-4254-EXP TASK ORDER#: 5 SCOPE OF WORK:SEE PROPOSAL TASK ORDER IS FOR PROJECT(S)LISTED BELOW: PROJECT# FEE PROJECT NAME E12206 S 109,927 Oso Water Reclamation Plant Nutrient Removal and Re-route to 24 MGD Phase 2 S 109,927 Grand Total PABLU MARTINEZ PM PRINT NAME: SIGNATURE: 4/6/2018 DATE: Exhibit A Page 1 of 20 �a`t'G rF • GEOTECHNICAL ENGINEERING G`•,4 sri • CONSTRUCTION MATERIALS <10e 0C P*o ENGINEERING&TESTING v •t� SOILS•ASPHALT• CONCRETE gQroAY ``'Go' 0 March 13,2018 City of Corpus Christi 1201 Leopard St Corpus Christi,TX 78401 SUBJECT: ESTIMATED TESTING BUDGET FOR THE PROPOSED E12206 Oso Water Reclamation Plant Nutrient Removal and Re-route to 24 MGD Phase 2 Corpus Christi,TX RETL Proposal Number:P102116A Revision 2 Dear Mr.Edmonds, Rock Engineering and Testing Laboratory, Inc. (RETL) (TBPE Firm No. 2101) is pleased to provide a revised estimate to perform the required Construction Materials Testing for the above referenced project. The Construction Materials Testing for the above referenced construction project is based upon quantities as derived from the information as provided to RETL as of the date of this proposal. We understand that we have been chosen to provide these services for this publicly funded project. Therefore, by providing cost information we are not in violation of the Texas Professional Services Procurement Act. The REVISED estimated testing amount for this project is $109,927.00. This estimate will change and is dependent upon the actual scope of work performed as requested by project representatives. Requested services beyond what is contained in this estimate will be billed based on the unit rates contained here-in. Please make note that the actual fees invoiced for this project will be based on the actual testing requested and performed. The total fee assessed will be dependent on the contractor's construction techniques, number of trips made to the jobsite, elapsed time from technician arrival to commencement of testing activities, and any stand-by time the technician is required to be on-site but not performing testing activities. This estimate does not take into account project schedule,weather delays, and cancellations of services after arrival, etc. which are beyond RETL's control. Also note, that holiday/weekend rates do apply as well as overtime rates for services requested at an additional rate of$34.00 per hour. In order to best respond to the project testing needs and schedules, please schedule testing a minimum of 48 hours in advance in order to defer any potential delays. RETL strives to accommodate all testing requests as they are received and can make accommodations with advanced notice to schedules. RETL appreciates your consideration of our firm to assist you during the construction phase of your project. If you agree with this proposal, please sign the attached Laboratory Testing Services Agreement, submit the Distribution List and provide billing information. Please do not hesitate to contact me at(361)883-4555 extension 415 if you have any questions regarding the proposal or would like to discuss further. Sincerely, Pablo Schmitt Project Estimator ROCK ENGINEERING&TESTING LABORATORY,INC. Exhibit A 6817 LEOPARD STREET•CORPUS CHRISTI,TEXAS,78409 Page 2 of 20 OFFICE: (361)883-4555•FAX: (361)883-4711 •www.rocktesting.com • • P102116A `1' �RE12206 Oso Water Reclamation Plant Infrastructure o.+ ?i a1 , OC to Rehabilitation(100%) o44, City of Corpus Christi °q, Corpus Christi,TX Jefrrey Edmonds, P.E. 01.LABORATORY LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES Al.SUBGRADE Fat Clay under J Box,Interceptor,Meter box and Lift Station 98%ASTM D698 at or above OMC EA-1 each material type 5190 MATERIALS SAMPLING CHARGE 1 1 I ea $62.00 $62.00 5510 PROCTOR-STANDARD ASTM D698 1 1 I ea $233.00 $233.00 V486 VEHICLE 1 1 I trip $49.00 $49.00 Lime Stabilized Subgrade under Pavement 98%ASTM D698 at or above OMC EA-1 each material type 5190 MATERIALS SAMPLING CHARGE I I 1 ea $62.00 $62.00 S5I0 PROCTOR-STANDARD ASTM D698 1 2 2 ea $233.00 $466.00 S552 FIELD GRADATION 1 5 5 ea $84.00 $420.00 V486 VEHICLE I I 1 trip $49.00 $49.00 A2.SELECT FILL Select FIll 95%ASTM D698 at or above OMC EA-1 each material type 5190 MATERIALS SAMPLING CHARGE I 2 2 eo $62.00 $124.00 S3I0 ATTERBERG LIMITS/PLASTICITY INDEX ASTM D4318 I 2 2 ea $65.00 $130.00 S510 PROCTOR-STANDARD ASTM D698 I 2 2 ea $233.00 $466.00 S599 FINER THAN#200 MESH(Decantation) I 2 2 ea $70.00 $140.00 V486 VEHICLE I 2 2 trip $49.00 $98.00 A3.FLEX BASE 8"Crushed Limestone Type A Gr 1 98%ASTM D1557±1.5%OMC EA-1 each material type SI90 MATERIALS SAMPLING CHARGE 1 1 I ea $62.00 $62.00 5502 ATTERBERG LIMITS/PLASTICITY INDEX(with Aggregate)AST 1 1 I ea $102.00 $102.00 S504 GRADATION(Sieve Analysis) I I I ea $102.00 $102.00 S522 PROCTOR-MODIFIED ASTM D1557 I I 1 ea $274.00 $274.00 S546 WET BALL MILL I I I ea $348.00 $348.00 V486 VEHICLE I I 1 trip $49.00 $49.00 A5.BACKFILL Trench Backfill 95%ASTM D698 at or above OMC EA-1 each material type 5190 MATERIALS SAMPLING CHARGE 1 2 2 ea $62.00 $124.00 S510 PROCTOR-STANDARD ASTM D698 1 2 2 ea $233.00 $466.00 V486 VEHICLE 1 2 2 trip $49.00 $98.00 Tuesday.March 13,2018 Exhibit A Page 3 of 20 P102116A spa ' rR. E12206 Oso Water Reclamation Plant Infrastructure e, • OC 1- Rehabilitation (100%) '°0 4`` City of Corpus Christi °A, Corpus Christi,TX Jefrrey Edmonds, P.E. G. PERSONNEL Administration Fee LS-Lump Sum P 119 ADMINISTRATION FEE(I time per project) 53 ::r $'11 Cn 01. LABORATORY SUBTOTAL $4,005.00 Tuesday,March 13.2018 Exhibit A Page 4 of 20 • • • 0, P102116A •P� 'R E12206 Oso Water Reclamation Plant Infrastructure Q, Rehabilitation (100%) ( °A,Oc•°o City of Corpus Christi Corpus Christi, TX Jefrrey Edmonds, P.E. 02.CONCRETE PAVEMENT LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES Al.SUBGRADE SF 72387 Lime Stabilized Subgrade 98%ASTM D698 at or above OMC SF-1 per 3000 SF of each lift 5600-I NUCLEAR FIELD DENSITY MIN 3(ASTM D6938) 1 25 25 ea $49.00 $1.225.00 V486 VEHICLE I 8 8 trip $49.00 $392.00 A3.FLEX BASE SF 72387 8'Crushed Limestone Type A Gr 1 98%ASTM D1557±1.5%OMC SF-1 per 3000 SF of each lift 5600-I NUCLEAR FIELD DENSITY MIN 3(ASTM D6938) 2 25 50 ea $49.00 $2.450.00 V486 VEHICLE I 16 16 trip $49.00 $784.00 Cl. CONCRETE SY 8043 1(47.1@14,3@28 3000 PSI P-1 set per days pour C301-I CONCRETE CYLINDERS(Min 4) 5 14 70 ea $49.00 $3.430.00 C302-I BEAM FLEXURAL TEST ASTM C293(Set of 4) I 14 14 set $252.00 $3.528.00 C404 AIR CONTENT I 14 14 ea $17.00 $238.00 S399 CONCRETE CYLINDERS PICK UP FEE 1 7 7 pour $48.00 $336.00 V486 VEHICLE 1 21 21 trip $49.00 $1,029.00 E.OBSERVATIONS SY 8043 Rebar Inspection HR-per hour 0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etcl I 12 12 hr $94.00 $1,128.00 V486 VEHICLE 12 12 trip $49.00 $588.00 02.CONCRETE PAVEMENT SUBTOTAL $15,128.00 Tuesday,March 13,2018 Exhibit A Page 5 of 20 • 4 P102116A ���m$ 'Rs,�y E12206 Oso Water Reclamation Plant Infrastructure 4 ' OC If Rehabilitation (100%) °q4 �PCity of Corpus Christi °Ar . °~ Corpus Christi, TX Jefrrey Edmonds, P.E. 03.ASPHALT PAVEMENT LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES B.ASPHALT SY 90 Asphalt Full Series T-1 per 500 tons A105 ASPHALT FULL SERIES I I 1 ea $687.00 $687.00 SI91 SAMPLE PREPARATION CHARGE I 1 hr $74.00 $74.00 5200 ROLLING PATTERN 2 2 hr $76.00 $152.00 V486 VEHICLE • I 1 trip $49.00 $49.00 Cored In Place Desnity T-1 per 500 tons A202 ASPHALT CORING/THICKNESS/DENSITY I 3 3 ea $104.00 $312.00 V486 VEHICLE I 1 I trip $49.00 $49.00 03.ASPHALT PAVEMENT SUBTOTAL $1,323.00 04. FORCE MAIN LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES A5. BACKFILL LF 689 Trench Backfill 95%ASTM 0698 at or above OMC LF-1 per 200 LF of each lane/liff 5600-I NUCLEAR FIELD DENSITY MIN 3 IASTM D6938) I 25 25 ea $49.00 $1,225.00 V486 VEHICLE I 15 15 trip $49.00 $735.00 04. FORCE MAIN SUBTOTAL $1,960.00 Tuesday.March 13,2018 Exhibit A Page 6 of 20 P102116A •0'. a '44, E12206 Oso Water Reclamation Plant Infrastructure 4. �C '�o Rehabilitation (100%) `°q, City of Corpus Christi °pr Corpus Christi, TX Jefrrey Edmonds, P.E. 05.INFLUENT JUNCTION BOX LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES AI.SUBGRADE SF 441 Compacted In situ 95%ASTM 0698 at or above OMC 5600-I NUCLEAR FIELD DENSITY MIN 3(ASTM D6938) I I I 11 ea $49.00 $539.00 V486 VEHICLE I 5 5 trip $49.00 $245.00 C 1. CONCRETE CY 102 I 7,1 @14,3@28 4000 PSI P-1 set per days pour C301-I CONCRETE CYLINDERS(Min 41 5 4 20 ea $49.00 $980.00 S399 CONCRETE CYLINDERS PICK UP FEE 1 4 4 pour $48.00 $192.00 V486 VEHICLE I 8 8 trip $49.00 $392.00 E. OBSERVATIONS SF 441 Rebar Inspection HR-per hour 0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etc) 4 4 hr $94.00 $376.00 V486 VEHICLE 4 4 trip $49.00 $196.00 05. INFLUENT JUNCTION BOX SUBTOTAL $2,920.00 Tuesday,March 13,2018 Exhibit A Page 7 of 20 P102116A .0* E12206 Oso Water Reclamation Plant Infrastructure OC v4e Rehabilitation (100%) 4 X44 City of Corpus Christi Corpus Christi, TX Jefrrey Edmonds, P.E. 06.INTERCEPTOR LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES A 1. SUBGRADE SF 432 Compacted In Situ 95%ASTM D698 at or above OMC 5600-1 NUCLEAR FIELD DENSITY MIN 3(ASTM 069381 i 10 10 ea $49.00 $490.00 V486 VEHICLE i 4 4 trip $49.00 $196.00 C 1. CONCRETE CY 69 1@7,1414,3@28 4000 PSI P-1 set per days pour C301-1 CONCRETE CYLINDERS(Min 4) 5 3 15 ea $49.00 $735.00 5399 CONCRETE CYLINDERS PICK UP FEE 1 3 3 pour $48.00 $144.00 V486 VEHICLE I 6 6 trip $49.00 $294.00 E.OBSERVATIONS SF 432 Rebar Inspection HR-per hour 0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etc) 1 3 hr $94.00 $282.00 V486 VEHICLE I 3 trip $49.00 $147.00 06.INTERCEPTOR SUBTOTAL $2,288.00 luesday,March 13,2018 Exhibit A Page 8 of 20 • P102116A `O.`p�a rf 1 '4 E12206 Oso Water Reclamation Plant Infrastructure Rehabilitation (100%) •oq�t City of Corpus Christi Corpus Christi,TX Jefrrey Edmonds, P.E. 07.METER VAULT 1,2&3 LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES AI. SUBGRADE SF 885 Compacted In Situ 95%ASTM D698 at or above OMC 5600-I NUCLEAR FIELD DENSITY MIN 3)ASTM D6938) I 36 36 ea $49.00 $1,764.00 V486 VEHICLE 1 6 6 trip $49.00 $294.00 Cl. CONCRETE SF 162 147,1g14,3'428 4000 PSI P-1 set per days pour C301-I CONCRETE CYLINDERS(Min 4) 5 12 60 ea $49.00 $2,940.00 S399 CONCRETE CYLINDERS PICK UP FEE I 12 12 pour $48.00 $576.00 V486 VEHICLE I 24 24 trip $49.00 $1,176.00 E. OBSERVATIONS SF 885 Rebar Inspection HR-per hour 0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etc) I I I 12 hr $94.00 $1,128.00 V486 VEHICLE I I I 12 trip $49.00 $588.00 07.METER VAULT 1,2&3 SUBTOTAL $8,466.00 Tuesday.March 13,2018 Exhibit A Page 9 of 20 ao r P102116A of f9, E12206 Oso Water Reclamation Plant Infrastructure Rehabilitation (100%) `,°q,O City of Corpus Christi °Ar Corpus Christi,TX Jefrrey Edmonds, P.E. 08.LIFT STATION 1 LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES Al.SUBGRADE SF 1681 Compacted In Situ 95%ASTM D698 at or above OMC 5600-I NUCLEAR FIELD DENSITY MIN 3(ASTM D6938) 1 36 36 ea $49.00 $1,764.00 V486 VEHICLE I I l l I trip $49.00 $539.00 Cl.CONCRETE CY 186 1@7,1@14,3@28 3000 PSI CY-1set every 50CY C301-I CONCRETE CYLINDERS(Min 4) 5 4 20 ea $49.00 $980.00 S399 CONCRETE CYLINDERS PICK UP FEE I 2 2 pour $48.00 $96.00 V486 VEHICLE I 4 4 trip $49.00 $196.00 CY 450 1@7,1@14,3@28 4000 PSI CY-1 set every 50 CY C301-I CONCRETE CYLINDERS(Min 4) 5 9 45 ea $49.00 $2,205.00 S399 CONCRETE CYLINDERS PICK UP FEE 1 5 5 pour $48.00 $240.00 V486 VEHICLE 1 6 6 trip $49.00 $294.00 E.OBSERVATIONS CY 450 Rebar Inspection HR-per hour 0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etcl I 5 5 hr $94.00 $470.00 V486 VEHICLE I 5 5 trip $49.00 $245.00 08.LIFT STATION 1 SUBTOTAL $7,029.00 Tuesday,March 13,2018 Exhibit A Page 10 of 20 • P102116A ;444 '0. E12206 Oso Water Reclamation Plant Infrastructure Rehabilitation (100%) '°A,O� City of Corpus Christi °.k Corpus Christi, TX Jefrrey Edmonds, P.E. 09A.HEADWORKS(Piers) LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES Cl. CONCRETE CY 794 107,1@14,3428 P-1 set per days pour C301-I CONCRETE CYLINDERS(Min 4) 5 28 140 ea $49.00 $6,860.00 E. OBSERVATIONS CY 497 Drilled Pier Observation(108 Piers) HR-per hour 0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etc) 8 28 224 hr $94.00 $21,056.00 V486 VEHICLE 1 28 28 trip $49.00 $1,372.00 09A. HEADWORKS(Piers) SUBTOTAL $29,288.00 • 09B. HEADWORKS(Foundation Cap) • LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES C 1. CONCRETE CY 650 1:07,1@l4,3428 4000 PSI CY-1 set every 50 CY C301-I CONCRETE CYLINDERS(Min 4) 5 13 65 ea $49.00 $3,185.00 S399 CONCRETE CYLINDERS PICK UP FEE 1 3 3 pour $48.00 $144.00 V486 VEHICLE I 5 5 trip $49.00 $245.00 E.OBSERVATIONS CY 650 Rebar Inspection HR-per hour 0501 OBSERVATIONS(Pier,Rebar,Structural Steel.etcl I 4 4 hr $94.00 $376.00 V486 VEHICLE 4 4 trip $49.00 $196.00 09B.HEADWORKS(Foundation Cap) SUBTOTAL $4,146.00 Tuesday,March 13,2018 Exhibit A Page 11 of 20 • • o, P102116A ����`s.O �r ,'h E12206 Oso Water Reclamation Plant Infrastructure 0 Rehabilitation (100%) 9;a City P fot of Corpus Christi Corpus Christi, TX Jefrrey Edmonds, P.E. 09C.HEADWORKS(Columns) LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES C 1. CONCRETE CY 30 1@7,1@14,3@28 4000 PSI P-1 set per days pour C301-I CONCRETE CYLINDERS(Min 4) 5 2 10 ea $49.00 $490.00 5399 CONCRETE CYLINDERS PICK UP FEE I 2 2 pour $48.00 $96.00 V486 VEHICLE I 4 4 trip $49.00 $196.00 E.OBSERVATIONS CY 30 Rebar Inspection HR-per hour 0501 OBSERVATIONS(Pier,Rebar.Structural Steel.etc) i ' 2 hr $94.00 $188.00 V486 VEHICLE . 2 trip $49.00 $98.00 09C.HEADWORKS(Columns) SUBTOTAL $1,068.00 09D.HEADWORKS(MID LEVEL PLAN) LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES C 1. CONCRETE CY 68 1@7,103.1 4,3@28 4000 PSI CY-1 set every 50 CY C301-I CONCRETE CYLINDERS(Min 41 5 2 10 ea $49.00 $490.00 5399 CONCRETE CYLINDERS PICK UP FEE I 1 I pour $48.00 $48.00 V486 VEHICLE 1 2 2 trip $49.00 $98.00 E.OBSERVATIONS CY 68 Rebar Inspection HR-per hour 0501 OBSERVATIONS(Pier,Rebar,Structural Steel.etcl I 2 2 lu $94.00 $188.00 V486 VEHICLE I 1 I trip $49.00 $49.00 09D.HEADWORKS(MID LEVEL PLAN) SUBTOTAL $873.00 Tuesday,March 13.2018 Exhibit A Page 12 of 20 • • . , P102116A •°� rf E12206 Oso Water Reclamation Plant Infrastructure •+ '� Rehabilitation (100%) 0 </oA4 Op. �•� City of Corpus Christi Corpus Christi, TX Jefrrey Edmonds, P.E. 09E. HEADWORKS(UPPER LEVEL PLAN) LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES Cl.CONCRETE CY 83 107,1@14,3@28 4000 PSI CY-1 set every 50 CY C301-I CONCRETE CYLINDERS(Min 4) 5 3 15 ea $49.00 $735.00 S399 CONCRETE CYLINDERS PICK UP FEE 1 3 3 pour $48.00 $144.00 V486 VEHICLE I 6 6 trip $49.00 $294.00 E.OBSERVATIONS CY 83 Rebar Inspection HR-per hour 0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etc) 1 1 hr $94.00 $94.00 V486 VEHICLE 1 I trip $49.00 $49.00 09E. HEADWORKS(UPPER LEVEL PLAN) SUBTOTAL $1,316.00 09F.HEADWORKS(SECTIONS) LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES Cl.CONCRETE CY 700 1 @ 7,1 @ 14,3@28 4000 PSI CY-1 set every 50 CY C301-I CONCRETE CYLINDERS(Min 4) 5 14 70 ea $49.00 $3,430.00 5399 CONCRETE CYLINDERS PICK UP FEE I 7 7 pour $48.00 $336.00 V486 VEHICLE 1 16 16 trip $49.00 $784.00 E.OBSERVATIONS CY 700 Rebar Inspection HR-per hour 0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etc) I 16 16 hi $94.00 $1.504.00 V486 VEHICLE I 8 8 trip $49.00 $392.00 09F. HEADWORKS(SECTIONS) SUBTOTAL $6,446.00 Tuesday,March 13,2018 Exhibit A Page 13 of 20 • 04 P102116A 044`.0r�g?� E12206 Oso Water Reclamation Plant Infrastructure o.+°' "° Rehabilitation (100%) 1.0.0,O� `� City of Corpus Christi '• Corpus Christi, TX Jefrrey Edmonds, P.E. 10.BIOFILTER LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES Al.SUBGRADE SF 4100 Compacted In Situ 95%ASTM D698 MIN-Min of 3 5600-I NUCLEAR FIELD DENSITY MIN 3 IASTM D69381 I 3 3 ea $49.00 $147.00 V486 VEHICLE I 1 I trip $49.00 $49.00 Cl. CONCRETE CY 70 1@7,1@14,3@28 4000 PSI CY-1 set every 50 CY C301-I CONCRETE CYLINDERS(Min 41 5 2 10 eo $49.00 $490.00 S399 CONCRETE CYLINDERS PICK UP FEE 1 2 2 pour $48.00 $96.00 V486 VEHICLE 1 4 4 trip $49.00 $196.00 E. OBSERVATIONS CY 70 Rebar Inspection HR-per hour 0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etc) I 2 2 hr $94.00 $188.00 V486 VEHICLE I 2 2 trip $49.00 $98.00 10. BIOFILTER SUBTOTAL $1,264.00 Tuesday.March 13.2018 Exhibit A Page 14 of 20 • P102116A o'E` t ''3. E12206 Oso Water Reclamation Plant Infrastructure Rehabilitation(100%) {` °q4 O City of Corpus Christi °Ar Corpus Christi,TX Jefrrey Edmonds, P.E. 11A. ECR No 5(Piers) LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES CI.CONCRETE CY 10 1@7,1@14,3@28 4000 PSI P-1 set per days pour C301-I CONCRETE CYLINDERS(Min 4) 5 2 10 ea $49.00 $490.00 S399 CONCRETE CYLINDERS PICK UP FEE I 1 I pour $48.00 $48.00 E.OBSERVATIONS CY 10 Drilled Pier Observation HR-per hour 0501 OBSERVATIONS(Pier,Rebar.Structural Steel,etc) 2 8 16 hr $94.00 $1,504.00 V486 VEHICLE I 2 2 trip $49.00 $98.00 11A.ECR No 5(Piers) SUBTOTAL $2,140.00 11B.ECR No 5(Caps) LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES C I.CONCRETE CY 4 1@7,1@l4,34428 4000 PSI CY-1 set every 50 CY C301-1 CONCRETE CYLINDERS(Min 4) 5 1 5 ea $49.00 $245.00 S399 CONCRETE CYLINDERS PICK UP FEE I 1 1 pour $48.00 $48.00 V486 VEHICLE I 2 2 trip $49.00 $98.00 E.OBSERVATIONS CY 4 Rebar Inspection HR-per hour 0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etc) I I I hr $94.00 $94.00 V486 VEHICLE I 1 I trip $49.00 $49.00 11B.ECR No 5(Caps) SUBTOTAL $534.00 Tuesday,March 13,2018 Exhibit A Page 15 of 20 , 4 P102116A oft'ea, ,R ,'y E12206 Oso Water Reclamation Plant Infrastructure c rOC ° Rehabilitation (100%) l'o4,4 ``� City of Corpus Christi O �" Corpus Christi, TX Jefrrey Edmonds, P.E. 12.ODOR CONTROL LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES A 1.SUBGRADE SF 4830 Compacted In Situ 95%ASTM D698 MIN-Min of3 S600-1 NUCLEAR FIELD DENSITY MIN 3(ASTM D6938) I 3 3 ea $49.00 $147.00 V486 VEHICLE I I I trip $49.00 $49.00 A2.SELECT FILL SF 4830 3.5'Slect Fill 95%ASTM D698 SF-1 per 3000 SF of each lift 5600-I NUCLEAR FIELD DENSITY MIN 3(ASTM D6938) 7 3 21 ea $49.00 $1,029.00 V486 VEHICLE I 7 7 trip $49.00 $343.00 C 1. CONCRETE CY 118 1@7.1@14,3@28 4000 PSI P-1 set per days pour C301-1 CONCRETE CYLINDERS(Min 4) 5 4 20 ea $49.00 $980.00 S399 CONCRETE CYLINDERS PICK UP FEE I 2 2 pour $48.00 $96.00 V486 VEHICLE I 4 4 trip $49.00 $196.00 E.OBSERVATIONS CY 118 Rebar Inspection HR-per hour 0501 OBSERVATIONS(Pier.Rebar,Structural Steel,etc) I 3 hi $94.00 $282.00 V486 VEHICLE I 7 2 trip $49.00 $98.00 12.ODOR CONTROL SUBTOTAL $3,220.00 fuesdoy.March 13.2018 Exhibit A Page 16 of 20 P102116A O`aff°aa T�9>M E12206 Oso Water Reclamation Plant Infrastructure .+ r ° Rehabilitation (100%) °�,O� �o City of Corpus Christi ofr Corpus Christi,TX Jefrrey Edmonds, P.E. 13.ODOR CONTROL EQUIPMENT LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES Al.SUBGRADE SF 720 Compacted In Situ 95%ASTM D698 at or above OMC MIN-Min of 3 5600-1 NUCLEAR FIELD DENSITY MIN 3(ASTM D6938) 1 3 3 ea $49.00 $147.00 V486 VEHICLE 1 1 1 trip $49.00 $49.00 A2.SELECT FILL SF 720 7 Select Fill 95%ASTM D698 at or above OMC SF-1 per 3000 SF of each lift S600-1 NUCLEAR FIELD DENSITY MIN 3(ASTM D6938) I 7 7 ea $49.00 $343.00 V486 VEHICLE I 7 7 trip $49.00 $343.00 C 1. CONCRETE SF 29 147,1@14,3428 4000 PSI P-1 set per days pour C301-1 CONCRETE CYLINDERS(Min 4) 5 2 10 ea $49.00 $490.00 5399 CONCRETE CYLINDERS PICK UP FEE I 1 I pour $48.00 $48.00 V486 VEHICLE I 3 3 trip $49.00 $147.00 E.OBSERVATIONS SF 29 Rebar Inspection HR-per hour 0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etc) I I I hr $94.00 $94.00 V486 VEHICLE I 2 2 trip $49.00 $98.00 13.ODOR CONTROL EQUIPMENT SUBTOTAL $1,759.00 Tuesday.March 13,2018 Exhibit A Page 17 of 20 • • P102116A rCe4".0. rRBrti E12206 Oso Water Reclamation Plant Infrastructure a 1 ° Rehabilitation (100%) f 04,4 �°qv' City of Corpus Christi °A. Corpus Christi, TX Jefrrey Edmonds, P.E. 14.STRUCTURAL STEEL INSPECTION LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES E.OBSERVATIONS Bolting and Welding Inspection,including Cable Troy Bridge HR-per hour 0116 CERTIFIED WELDING OBSERVATION(Min 4 hours) 4 I 1 48 hr $173.00 $8,304.00 V486 VEHICLE I I 1 12 trip $49.00 $588.00 14.STRUCTURAL STEEL INSPECTION SUBTOTAL $8,892.00 15.MAINTENANCE PAD LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES Cl. CONCRETE 107,1(014,3@28 P-1 set per days pour C301-1 CONCRETE CYLINDERS(Min 4) 5 2 10 ea $49.00 $490.00 5399 CONCRETE CYLINDERS PICK UP FEE I 2 2 pour $48.00 $96.00 V486 VEHICLE I 4 4 trip $49.00 $196.00 E.OBSERVATIONS Rebar Inspection HR-per hour 0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etc) I 1 2 hi $94.00 $188.00 V486 VEHICLE I 2 7 tn1 $49.00 $98.00 15.MAINTENANCE PAD SUBTOTAL $1,068.00 Tuesday,March 13,2018 Exhibit A Page 18 of 20 • P102116A E*°' rRs? E12206 Oso Water Reclamation Plant Infrastructure a+° ""? Rehabilitation (100%) �•oA,O� �o City of Corpus Christi ''c Corpus Christi, TX Jefrrey Edmonds, P.E. 16.CABLE TRAY PEDESTALS LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES CI.CONCRETE CY 26 Pier Caps 1@7,1@14,3@28 P-1 set per days pour C301-I CONCRETE CYLINDERS(Min 4) 5 1 Sea $49.00 $245.00 $399 CONCRETE CYLINDERS PICK UP FEE I 1 I pour $48.00 $48.00 V486 VEHICLE I 2 2 trip $49.00 $98.00 CY 52 Piers 1@7,1@14,3@28 P-1 set per days pour C301-I CONCRETE CYLINDERS(Min 4) 5 3 15 ea $49.00 $735.00 S399 CONCRETE CYLINDERS PICK UP FEE 1 3 3 pour $48.00 $144.00 E. OBSERVATIONS Drilled Pier Observation 3 days(27 Piers) HR-per hour 0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etc) 3 8 24 hr $94.00 $2,256.00 V486 VEHICLE I 3 3 trip $49.00 $147.00 CY 26 Rebar Inspection Pier Caps HR-per hour 0501 OBSERVATIONS(Pier,Rebor,Structural Steel,etc) I hr $94.00 $94.00 V486 VEHICLE I 1 trip $49.00 $49.00 16.CABLE TRAY PEDESTALS SUBTOTAL $3,816.00 Tuesday,March 13.2018 Exhibit A Page 19 of 20 • e°f P102116A Ea s, E12206 Oso Water Reclamation Plant Infrastructure Rehabilitation (100%) .�oA,O� �o City of Corpus Christi or, Corpus Christi, TX Jefrrey Edmonds, P.E. 17.TRANSFORMER FOUNDATION PAD LIFTS/MIN/ SUBQTY QTY RATE AMOUNT INCHES Al.SUBGRADE SF 253 Compacted Subgrade MIN-Min of 3 S600-1 NUCLEAR FIELD DENSITY MIN 3(ASTM D6938I I 3 3 eo $49.00 $147.00 V486 VEHICLE i 1 Itrip $49.00 $49.00 Cl. CONCRETE CY 19 1@7.1@@14.3:428 P-1 set per days pour C301-1 CONCRETE CYLINDERS(Min 41 2 10 ea $49.00 $490.00 S399 CONCRETE CYLINDERS PICK UP FEE I 2 2 pour $48.00 $96.00 V486 VEHICLE 4 4 trip $49.00 $196.00 17.TRANSFORMER FOUNDATION PAD SUBTOTAL $978.00 GRAND TOTAL $109,927.00 Tuesday.March 13.2018 Exhibit A Page 20 of 20