HomeMy WebLinkAboutC2018-191 - 4/20/2018 - NA •
TASK ORDER NO. 5
This Task Order pertains to a Master Services Agreement for Geotechnical and Construction Materials Testing by
and between City of Corpus Christi,Texas(City)and Rock Engineering&Testing Laboratory,Inc. (Lab)dated
January 16. 2018 by Motion No. M2018-005 (Agreement). Lab shall perform services on the project described
below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been
properly signed by both parties. Upon execution,this Task Order shall supplement the Agreement as it pertains to
the project described below.
MSA PROJECT NUMBER/NAME: 17100A Geotechnical and Construction Materials Testing
TASK ORDER PROJECT NUMBER/NAME: 17100F Geotechnical and Construction Materials Testing
1. PROJECT DESCRIPTION: E12206—Oso Water Reclamation Plant Nutrient Removal and Re-route to 24
MGD Phase 2
2. SCOPE OF SERVICES—Construction materials testing services as more fully described in Exhibit A.
3. COMPENSATION —The total amount not to exceed for this Task Order only is$109,927.00
This Task Order is approved and Lab may proceed. All other terms and conditions of the Agreement remain in
full force and effect.
CITY OF CORPUS C STI ROCK ENGINEERING&TESTING
LABORATORY, INC.
C J L r� /g ark
04-11-18
eff H. Edmonds, P.E. ate (\Cu is ckDate
Director of Engineering Services CI112fOperating Officer
6817 Leopard Street
Corpus Christi, TX 78409
(361)883-4555 Office
curtis@rocktesting.com
Fund Name Accounting Unit Account No. Activity No. Amount
Wastewater 2015 4254-042 550920 E12206-01-4254-EXP $109,927.00
2018-191
4/20/18
Rock Engineering& Testing
INDEXED
TASK ORDER FUNDING REQUEST FORM
CONTRACT MSA#AND TITLE: 17100A Geotechnical and Construction Materials Testing(ROCK)
TASK ORDER PROJECT#/TITLE: 17100F Geotechnical and Construction Materials Testing(ROCK)
REQUESTING DEPARTMENT:UTILITIES
FUND NAME/FUND# -ME: ACCOUNT: ACTIVITY:
425-1-042 5509.20 El 2206-01-4254-EXP
TASK ORDER#: 5
SCOPE OF WORK:SEE PROPOSAL
TASK ORDER IS FOR PROJECT(S)LISTED BELOW:
PROJECT# FEE PROJECT NAME
E12206 S 109,927 Oso Water Reclamation Plant Nutrient Removal and Re-route to 24 MGD Phase 2
S 109,927 Grand Total
PABLU MARTINEZ
PM PRINT NAME:
SIGNATURE:
4/6/2018
DATE:
Exhibit A
Page 1 of 20
�a`t'G rF • GEOTECHNICAL ENGINEERING
G`•,4 sri • CONSTRUCTION MATERIALS
<10e 0C P*o ENGINEERING&TESTING
v •t� SOILS•ASPHALT• CONCRETE
gQroAY ``'Go' 0
March 13,2018
City of Corpus Christi
1201 Leopard St
Corpus Christi,TX 78401
SUBJECT: ESTIMATED TESTING BUDGET FOR THE PROPOSED
E12206 Oso Water Reclamation Plant Nutrient Removal and Re-route to 24 MGD Phase 2
Corpus Christi,TX
RETL Proposal Number:P102116A Revision 2
Dear Mr.Edmonds,
Rock Engineering and Testing Laboratory, Inc. (RETL) (TBPE Firm No. 2101) is pleased to provide a revised
estimate to perform the required Construction Materials Testing for the above referenced project. The Construction
Materials Testing for the above referenced construction project is based upon quantities as derived from the
information as provided to RETL as of the date of this proposal.
We understand that we have been chosen to provide these services for this publicly funded project.
Therefore, by providing cost information we are not in violation of the Texas Professional Services
Procurement Act.
The REVISED estimated testing amount for this project is $109,927.00. This estimate will change and is
dependent upon the actual scope of work performed as requested by project representatives. Requested
services beyond what is contained in this estimate will be billed based on the unit rates contained here-in.
Please make note that the actual fees invoiced for this project will be based on the actual testing requested and
performed. The total fee assessed will be dependent on the contractor's construction techniques, number of trips
made to the jobsite, elapsed time from technician arrival to commencement of testing activities, and any stand-by
time the technician is required to be on-site but not performing testing activities.
This estimate does not take into account project schedule,weather delays, and cancellations of services after arrival,
etc. which are beyond RETL's control. Also note, that holiday/weekend rates do apply as well as overtime rates for
services requested at an additional rate of$34.00 per hour.
In order to best respond to the project testing needs and schedules, please schedule testing a minimum of 48 hours
in advance in order to defer any potential delays. RETL strives to accommodate all testing requests as they are
received and can make accommodations with advanced notice to schedules.
RETL appreciates your consideration of our firm to assist you during the construction phase of your project. If you
agree with this proposal, please sign the attached Laboratory Testing Services Agreement, submit the Distribution
List and provide billing information. Please do not hesitate to contact me at(361)883-4555 extension 415 if you have
any questions regarding the proposal or would like to discuss further.
Sincerely,
Pablo Schmitt
Project Estimator
ROCK ENGINEERING&TESTING LABORATORY,INC. Exhibit A
6817 LEOPARD STREET•CORPUS CHRISTI,TEXAS,78409 Page 2 of 20
OFFICE: (361)883-4555•FAX: (361)883-4711 •www.rocktesting.com
•
•
P102116A
`1' �RE12206 Oso Water Reclamation Plant Infrastructure
o.+ ?i
a1 , OC to Rehabilitation(100%)
o44, City of Corpus Christi
°q, Corpus Christi,TX
Jefrrey Edmonds, P.E.
01.LABORATORY LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
Al.SUBGRADE
Fat Clay under J Box,Interceptor,Meter box and Lift Station
98%ASTM D698 at or above OMC
EA-1 each material type
5190 MATERIALS SAMPLING CHARGE 1 1 I ea $62.00 $62.00
5510 PROCTOR-STANDARD ASTM D698 1 1 I ea $233.00 $233.00
V486 VEHICLE 1 1 I trip $49.00 $49.00
Lime Stabilized Subgrade under Pavement
98%ASTM D698 at or above OMC
EA-1 each material type
5190 MATERIALS SAMPLING CHARGE I I 1 ea $62.00 $62.00
S5I0 PROCTOR-STANDARD ASTM D698 1 2 2 ea $233.00 $466.00
S552 FIELD GRADATION 1 5 5 ea $84.00 $420.00
V486 VEHICLE I I 1 trip $49.00 $49.00
A2.SELECT FILL
Select FIll
95%ASTM D698 at or above OMC
EA-1 each material type
5190 MATERIALS SAMPLING CHARGE I 2 2 eo $62.00 $124.00
S3I0 ATTERBERG LIMITS/PLASTICITY INDEX ASTM D4318 I 2 2 ea $65.00 $130.00
S510 PROCTOR-STANDARD ASTM D698 I 2 2 ea $233.00 $466.00
S599 FINER THAN#200 MESH(Decantation) I 2 2 ea $70.00 $140.00
V486 VEHICLE I 2 2 trip $49.00 $98.00
A3.FLEX BASE
8"Crushed Limestone Type A Gr 1
98%ASTM D1557±1.5%OMC
EA-1 each material type
SI90 MATERIALS SAMPLING CHARGE 1 1 I ea $62.00 $62.00
5502 ATTERBERG LIMITS/PLASTICITY INDEX(with Aggregate)AST 1 1 I ea $102.00 $102.00
S504 GRADATION(Sieve Analysis) I I I ea $102.00 $102.00
S522 PROCTOR-MODIFIED ASTM D1557 I I 1 ea $274.00 $274.00
S546 WET BALL MILL I I I ea $348.00 $348.00
V486 VEHICLE I I 1 trip $49.00 $49.00
A5.BACKFILL
Trench Backfill
95%ASTM D698 at or above OMC
EA-1 each material type
5190 MATERIALS SAMPLING CHARGE 1 2 2 ea $62.00 $124.00
S510 PROCTOR-STANDARD ASTM D698 1 2 2 ea $233.00 $466.00
V486 VEHICLE 1 2 2 trip $49.00 $98.00
Tuesday.March 13,2018 Exhibit A
Page 3 of 20
P102116A
spa ' rR.
E12206 Oso Water Reclamation Plant Infrastructure
e, • OC 1- Rehabilitation (100%)
'°0 4`` City of Corpus Christi
°A, Corpus Christi,TX
Jefrrey Edmonds, P.E.
G. PERSONNEL
Administration Fee
LS-Lump Sum
P 119 ADMINISTRATION FEE(I time per project) 53 ::r $'11 Cn
01. LABORATORY SUBTOTAL $4,005.00
Tuesday,March 13.2018 Exhibit A
Page 4 of 20
•
•
•
0, P102116A
•P� 'R E12206 Oso Water Reclamation Plant Infrastructure
Q, Rehabilitation (100%)
( °A,Oc•°o City of Corpus Christi
Corpus Christi, TX
Jefrrey Edmonds, P.E.
02.CONCRETE PAVEMENT LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
Al.SUBGRADE
SF 72387
Lime Stabilized Subgrade
98%ASTM D698 at or above OMC
SF-1 per 3000 SF of each lift
5600-I NUCLEAR FIELD DENSITY MIN 3(ASTM D6938) 1 25 25 ea $49.00 $1.225.00
V486 VEHICLE I 8 8 trip $49.00 $392.00
A3.FLEX BASE
SF 72387
8'Crushed Limestone Type A Gr 1
98%ASTM D1557±1.5%OMC
SF-1 per 3000 SF of each lift
5600-I NUCLEAR FIELD DENSITY MIN 3(ASTM D6938) 2 25 50 ea $49.00 $2.450.00
V486 VEHICLE I 16 16 trip $49.00 $784.00
Cl. CONCRETE
SY 8043
1(47.1@14,3@28
3000 PSI
P-1 set per days pour
C301-I CONCRETE CYLINDERS(Min 4) 5 14 70 ea $49.00 $3.430.00
C302-I BEAM FLEXURAL TEST ASTM C293(Set of 4) I 14 14 set $252.00 $3.528.00
C404 AIR CONTENT I 14 14 ea $17.00 $238.00
S399 CONCRETE CYLINDERS PICK UP FEE 1 7 7 pour $48.00 $336.00
V486 VEHICLE 1 21 21 trip $49.00 $1,029.00
E.OBSERVATIONS
SY 8043
Rebar Inspection
HR-per hour
0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etcl I 12 12 hr $94.00 $1,128.00
V486 VEHICLE 12 12 trip $49.00 $588.00
02.CONCRETE PAVEMENT SUBTOTAL $15,128.00
Tuesday,March 13,2018 Exhibit A
Page 5 of 20
•
4 P102116A
���m$ 'Rs,�y E12206 Oso Water Reclamation Plant Infrastructure
4 ' OC If
Rehabilitation (100%)
°q4 �PCity of Corpus Christi
°Ar . °~ Corpus Christi, TX
Jefrrey Edmonds, P.E.
03.ASPHALT PAVEMENT LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
B.ASPHALT
SY 90
Asphalt Full Series
T-1 per 500 tons
A105 ASPHALT FULL SERIES I I 1 ea $687.00 $687.00
SI91 SAMPLE PREPARATION CHARGE I 1 hr $74.00 $74.00
5200 ROLLING PATTERN 2 2 hr $76.00 $152.00
V486 VEHICLE • I 1 trip $49.00 $49.00
Cored In Place Desnity
T-1 per 500 tons
A202 ASPHALT CORING/THICKNESS/DENSITY I 3 3 ea $104.00 $312.00
V486 VEHICLE I 1 I trip $49.00 $49.00
03.ASPHALT PAVEMENT SUBTOTAL $1,323.00
04. FORCE MAIN LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
A5. BACKFILL
LF 689
Trench Backfill
95%ASTM 0698 at or above OMC
LF-1 per 200 LF of each lane/liff
5600-I NUCLEAR FIELD DENSITY MIN 3 IASTM D6938) I 25 25 ea $49.00 $1,225.00
V486 VEHICLE I 15 15 trip $49.00 $735.00
04. FORCE MAIN SUBTOTAL $1,960.00
Tuesday.March 13,2018 Exhibit A
Page 6 of 20
P102116A
•0'.
a '44, E12206 Oso Water Reclamation Plant Infrastructure
4. �C '�o Rehabilitation (100%)
`°q, City of Corpus Christi
°pr Corpus Christi, TX
Jefrrey Edmonds, P.E.
05.INFLUENT JUNCTION BOX LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
AI.SUBGRADE
SF 441
Compacted In situ
95%ASTM 0698 at or above OMC
5600-I NUCLEAR FIELD DENSITY MIN 3(ASTM D6938) I I I 11 ea $49.00 $539.00
V486 VEHICLE I 5 5 trip $49.00 $245.00
C 1. CONCRETE
CY 102
I 7,1 @14,3@28
4000 PSI
P-1 set per days pour
C301-I CONCRETE CYLINDERS(Min 41 5 4 20 ea $49.00 $980.00
S399 CONCRETE CYLINDERS PICK UP FEE 1 4 4 pour $48.00 $192.00
V486 VEHICLE I 8 8 trip $49.00 $392.00
E. OBSERVATIONS
SF 441
Rebar Inspection
HR-per hour
0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etc) 4 4 hr $94.00 $376.00
V486 VEHICLE 4 4 trip $49.00 $196.00
05. INFLUENT JUNCTION BOX SUBTOTAL $2,920.00
Tuesday,March 13,2018 Exhibit A
Page 7 of 20
P102116A
.0* E12206 Oso Water Reclamation Plant Infrastructure
OC v4e Rehabilitation (100%)
4 X44 City of Corpus Christi
Corpus Christi, TX
Jefrrey Edmonds, P.E.
06.INTERCEPTOR LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
A 1. SUBGRADE
SF 432
Compacted In Situ
95%ASTM D698 at or above OMC
5600-1 NUCLEAR FIELD DENSITY MIN 3(ASTM 069381 i 10 10 ea $49.00 $490.00
V486 VEHICLE i 4 4 trip $49.00 $196.00
C 1. CONCRETE
CY 69
1@7,1414,3@28
4000 PSI
P-1 set per days pour
C301-1 CONCRETE CYLINDERS(Min 4) 5 3 15 ea $49.00 $735.00
5399 CONCRETE CYLINDERS PICK UP FEE 1 3 3 pour $48.00 $144.00
V486 VEHICLE I 6 6 trip $49.00 $294.00
E.OBSERVATIONS
SF 432
Rebar Inspection
HR-per hour
0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etc) 1 3 hr $94.00 $282.00
V486 VEHICLE I 3 trip $49.00 $147.00
06.INTERCEPTOR SUBTOTAL $2,288.00
luesday,March 13,2018 Exhibit A
Page 8 of 20
•
P102116A
`O.`p�a rf 1
'4 E12206 Oso Water Reclamation Plant Infrastructure
Rehabilitation (100%)
•oq�t City of Corpus Christi
Corpus Christi,TX
Jefrrey Edmonds, P.E.
07.METER VAULT 1,2&3 LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
AI. SUBGRADE
SF 885
Compacted In Situ
95%ASTM D698 at or above OMC
5600-I NUCLEAR FIELD DENSITY MIN 3)ASTM D6938) I 36 36 ea $49.00 $1,764.00
V486 VEHICLE 1 6 6 trip $49.00 $294.00
Cl. CONCRETE
SF 162
147,1g14,3'428
4000 PSI
P-1 set per days pour
C301-I CONCRETE CYLINDERS(Min 4) 5 12 60 ea $49.00 $2,940.00
S399 CONCRETE CYLINDERS PICK UP FEE I 12 12 pour $48.00 $576.00
V486 VEHICLE I 24 24 trip $49.00 $1,176.00
E. OBSERVATIONS
SF 885
Rebar Inspection
HR-per hour
0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etc) I I I 12 hr $94.00 $1,128.00
V486 VEHICLE I I I 12 trip $49.00 $588.00
07.METER VAULT 1,2&3 SUBTOTAL $8,466.00
Tuesday.March 13,2018 Exhibit A
Page 9 of 20
ao r P102116A
of f9, E12206 Oso Water Reclamation Plant Infrastructure
Rehabilitation (100%)
`,°q,O City of Corpus Christi
°Ar Corpus Christi,TX
Jefrrey Edmonds, P.E.
08.LIFT STATION 1 LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
Al.SUBGRADE
SF 1681
Compacted In Situ
95%ASTM D698 at or above OMC
5600-I NUCLEAR FIELD DENSITY MIN 3(ASTM D6938) 1 36 36 ea $49.00 $1,764.00
V486 VEHICLE I I l l I trip $49.00 $539.00
Cl.CONCRETE
CY 186
1@7,1@14,3@28
3000 PSI
CY-1set every 50CY
C301-I CONCRETE CYLINDERS(Min 4) 5 4 20 ea $49.00 $980.00
S399 CONCRETE CYLINDERS PICK UP FEE I 2 2 pour $48.00 $96.00
V486 VEHICLE I 4 4 trip $49.00 $196.00
CY 450
1@7,1@14,3@28
4000 PSI
CY-1 set every 50 CY
C301-I CONCRETE CYLINDERS(Min 4) 5 9 45 ea $49.00 $2,205.00
S399 CONCRETE CYLINDERS PICK UP FEE 1 5 5 pour $48.00 $240.00
V486 VEHICLE 1 6 6 trip $49.00 $294.00
E.OBSERVATIONS
CY 450
Rebar Inspection
HR-per hour
0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etcl I 5 5 hr $94.00 $470.00
V486 VEHICLE I 5 5 trip $49.00 $245.00
08.LIFT STATION 1 SUBTOTAL $7,029.00
Tuesday,March 13,2018 Exhibit A
Page 10 of 20
•
P102116A
;444 '0. E12206 Oso Water Reclamation Plant Infrastructure
Rehabilitation (100%)
'°A,O� City of Corpus Christi
°.k Corpus Christi, TX
Jefrrey Edmonds, P.E.
09A.HEADWORKS(Piers) LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
Cl. CONCRETE
CY 794
107,1@14,3428
P-1 set per days pour
C301-I CONCRETE CYLINDERS(Min 4) 5 28 140 ea $49.00 $6,860.00
E. OBSERVATIONS
CY 497
Drilled Pier Observation(108 Piers)
HR-per hour
0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etc) 8 28 224 hr $94.00 $21,056.00
V486 VEHICLE 1 28 28 trip $49.00 $1,372.00
09A. HEADWORKS(Piers) SUBTOTAL $29,288.00
• 09B. HEADWORKS(Foundation Cap) • LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
C 1. CONCRETE
CY 650
1:07,1@l4,3428
4000 PSI
CY-1 set every 50 CY
C301-I CONCRETE CYLINDERS(Min 4) 5 13 65 ea $49.00 $3,185.00
S399 CONCRETE CYLINDERS PICK UP FEE 1 3 3 pour $48.00 $144.00
V486 VEHICLE I 5 5 trip $49.00 $245.00
E.OBSERVATIONS
CY 650
Rebar Inspection
HR-per hour
0501 OBSERVATIONS(Pier,Rebar,Structural Steel.etcl I 4 4 hr $94.00 $376.00
V486 VEHICLE 4 4 trip $49.00 $196.00
09B.HEADWORKS(Foundation Cap) SUBTOTAL $4,146.00
Tuesday,March 13,2018 Exhibit A
Page 11 of 20
•
•
o, P102116A
����`s.O �r ,'h E12206 Oso Water Reclamation Plant Infrastructure
0
Rehabilitation (100%)
9;a
City P fot of Corpus Christi
Corpus Christi, TX
Jefrrey Edmonds, P.E.
09C.HEADWORKS(Columns) LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
C 1. CONCRETE
CY 30
1@7,1@14,3@28
4000 PSI
P-1 set per days pour
C301-I CONCRETE CYLINDERS(Min 4) 5 2 10 ea $49.00 $490.00
5399 CONCRETE CYLINDERS PICK UP FEE I 2 2 pour $48.00 $96.00
V486 VEHICLE I 4 4 trip $49.00 $196.00
E.OBSERVATIONS
CY 30
Rebar Inspection
HR-per hour
0501 OBSERVATIONS(Pier,Rebar.Structural Steel.etc) i ' 2 hr $94.00 $188.00
V486 VEHICLE . 2 trip $49.00 $98.00
09C.HEADWORKS(Columns) SUBTOTAL $1,068.00
09D.HEADWORKS(MID LEVEL PLAN) LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
C 1. CONCRETE
CY 68
1@7,103.1 4,3@28
4000 PSI
CY-1 set every 50 CY
C301-I CONCRETE CYLINDERS(Min 41 5 2 10 ea $49.00 $490.00
5399 CONCRETE CYLINDERS PICK UP FEE I 1 I pour $48.00 $48.00
V486 VEHICLE 1 2 2 trip $49.00 $98.00
E.OBSERVATIONS
CY 68
Rebar Inspection
HR-per hour
0501 OBSERVATIONS(Pier,Rebar,Structural Steel.etcl I 2 2 lu $94.00 $188.00
V486 VEHICLE I 1 I trip $49.00 $49.00
09D.HEADWORKS(MID LEVEL PLAN) SUBTOTAL $873.00
Tuesday,March 13.2018 Exhibit A
Page 12 of 20
•
•
. , P102116A
•°� rf E12206 Oso Water Reclamation Plant Infrastructure
•+ '� Rehabilitation (100%)
0
</oA4 Op. �•� City of Corpus Christi
Corpus Christi, TX
Jefrrey Edmonds, P.E.
09E. HEADWORKS(UPPER LEVEL PLAN) LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
Cl.CONCRETE
CY 83
107,1@14,3@28
4000 PSI
CY-1 set every 50 CY
C301-I CONCRETE CYLINDERS(Min 4) 5 3 15 ea $49.00 $735.00
S399 CONCRETE CYLINDERS PICK UP FEE 1 3 3 pour $48.00 $144.00
V486 VEHICLE I 6 6 trip $49.00 $294.00
E.OBSERVATIONS
CY 83
Rebar Inspection
HR-per hour
0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etc) 1 1 hr $94.00 $94.00
V486 VEHICLE 1 I trip $49.00 $49.00
09E. HEADWORKS(UPPER LEVEL PLAN) SUBTOTAL $1,316.00
09F.HEADWORKS(SECTIONS) LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
Cl.CONCRETE
CY 700
1 @ 7,1 @ 14,3@28
4000 PSI
CY-1 set every 50 CY
C301-I CONCRETE CYLINDERS(Min 4) 5 14 70 ea $49.00 $3,430.00
5399 CONCRETE CYLINDERS PICK UP FEE I 7 7 pour $48.00 $336.00
V486 VEHICLE 1 16 16 trip $49.00 $784.00
E.OBSERVATIONS
CY 700
Rebar Inspection
HR-per hour
0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etc) I 16 16 hi $94.00 $1.504.00
V486 VEHICLE I 8 8 trip $49.00 $392.00
09F. HEADWORKS(SECTIONS) SUBTOTAL $6,446.00
Tuesday,March 13,2018 Exhibit A
Page 13 of 20
•
04 P102116A
044`.0r�g?� E12206 Oso Water Reclamation Plant Infrastructure
o.+°' "° Rehabilitation (100%)
1.0.0,O� `� City of Corpus Christi
'• Corpus Christi, TX
Jefrrey Edmonds, P.E.
10.BIOFILTER LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
Al.SUBGRADE
SF 4100
Compacted In Situ
95%ASTM D698
MIN-Min of 3
5600-I NUCLEAR FIELD DENSITY MIN 3 IASTM D69381 I 3 3 ea $49.00 $147.00
V486 VEHICLE I 1 I trip $49.00 $49.00
Cl. CONCRETE
CY 70
1@7,1@14,3@28
4000 PSI
CY-1 set every 50 CY
C301-I CONCRETE CYLINDERS(Min 41 5 2 10 eo $49.00 $490.00
S399 CONCRETE CYLINDERS PICK UP FEE 1 2 2 pour $48.00 $96.00
V486 VEHICLE 1 4 4 trip $49.00 $196.00
E. OBSERVATIONS
CY 70
Rebar Inspection
HR-per hour
0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etc) I 2 2 hr $94.00 $188.00
V486 VEHICLE I 2 2 trip $49.00 $98.00
10. BIOFILTER SUBTOTAL $1,264.00
Tuesday.March 13.2018 Exhibit A
Page 14 of 20
•
P102116A
o'E` t ''3. E12206 Oso Water Reclamation Plant Infrastructure
Rehabilitation(100%)
{` °q4 O City of Corpus Christi
°Ar Corpus Christi,TX
Jefrrey Edmonds, P.E.
11A. ECR No 5(Piers) LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
CI.CONCRETE
CY 10
1@7,1@14,3@28
4000 PSI
P-1 set per days pour
C301-I CONCRETE CYLINDERS(Min 4) 5 2 10 ea $49.00 $490.00
S399 CONCRETE CYLINDERS PICK UP FEE I 1 I pour $48.00 $48.00
E.OBSERVATIONS
CY 10
Drilled Pier Observation
HR-per hour
0501 OBSERVATIONS(Pier,Rebar.Structural Steel,etc) 2 8 16 hr $94.00 $1,504.00
V486 VEHICLE I 2 2 trip $49.00 $98.00
11A.ECR No 5(Piers) SUBTOTAL $2,140.00
11B.ECR No 5(Caps) LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
C I.CONCRETE
CY 4
1@7,1@l4,34428
4000 PSI
CY-1 set every 50 CY
C301-1 CONCRETE CYLINDERS(Min 4) 5 1 5 ea $49.00 $245.00
S399 CONCRETE CYLINDERS PICK UP FEE I 1 1 pour $48.00 $48.00
V486 VEHICLE I 2 2 trip $49.00 $98.00
E.OBSERVATIONS
CY 4
Rebar Inspection
HR-per hour
0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etc) I I I hr $94.00 $94.00
V486 VEHICLE I 1 I trip $49.00 $49.00
11B.ECR No 5(Caps) SUBTOTAL $534.00
Tuesday,March 13,2018 Exhibit A
Page 15 of 20
, 4 P102116A
oft'ea, ,R ,'y E12206 Oso Water Reclamation Plant Infrastructure
c rOC ° Rehabilitation (100%)
l'o4,4 ``� City of Corpus Christi
O �" Corpus Christi, TX
Jefrrey Edmonds, P.E.
12.ODOR CONTROL LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
A 1.SUBGRADE
SF 4830
Compacted In Situ
95%ASTM D698
MIN-Min of3
S600-1 NUCLEAR FIELD DENSITY MIN 3(ASTM D6938) I 3 3 ea $49.00 $147.00
V486 VEHICLE I I I trip $49.00 $49.00
A2.SELECT FILL
SF 4830
3.5'Slect Fill
95%ASTM D698
SF-1 per 3000 SF of each lift
5600-I NUCLEAR FIELD DENSITY MIN 3(ASTM D6938) 7 3 21 ea $49.00 $1,029.00
V486 VEHICLE I 7 7 trip $49.00 $343.00
C 1. CONCRETE
CY 118
1@7.1@14,3@28
4000 PSI
P-1 set per days pour
C301-1 CONCRETE CYLINDERS(Min 4) 5 4 20 ea $49.00 $980.00
S399 CONCRETE CYLINDERS PICK UP FEE I 2 2 pour $48.00 $96.00
V486 VEHICLE I 4 4 trip $49.00 $196.00
E.OBSERVATIONS
CY 118
Rebar Inspection
HR-per hour
0501 OBSERVATIONS(Pier.Rebar,Structural Steel,etc) I 3 hi $94.00 $282.00
V486 VEHICLE I 7 2 trip $49.00 $98.00
12.ODOR CONTROL SUBTOTAL $3,220.00
fuesdoy.March 13.2018 Exhibit A
Page 16 of 20
P102116A
O`aff°aa T�9>M E12206 Oso Water Reclamation Plant Infrastructure
.+ r ° Rehabilitation (100%)
°�,O� �o City of Corpus Christi
ofr Corpus Christi,TX
Jefrrey Edmonds, P.E.
13.ODOR CONTROL EQUIPMENT LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
Al.SUBGRADE
SF 720
Compacted In Situ
95%ASTM D698 at or above OMC
MIN-Min of 3
5600-1 NUCLEAR FIELD DENSITY MIN 3(ASTM D6938) 1 3 3 ea $49.00 $147.00
V486 VEHICLE 1 1 1 trip $49.00 $49.00
A2.SELECT FILL
SF 720
7 Select Fill
95%ASTM D698 at or above OMC
SF-1 per 3000 SF of each lift
S600-1 NUCLEAR FIELD DENSITY MIN 3(ASTM D6938) I 7 7 ea $49.00 $343.00
V486 VEHICLE I 7 7 trip $49.00 $343.00
C 1. CONCRETE
SF 29
147,1@14,3428
4000 PSI
P-1 set per days pour
C301-1 CONCRETE CYLINDERS(Min 4) 5 2 10 ea $49.00 $490.00
5399 CONCRETE CYLINDERS PICK UP FEE I 1 I pour $48.00 $48.00
V486 VEHICLE I 3 3 trip $49.00 $147.00
E.OBSERVATIONS
SF 29
Rebar Inspection
HR-per hour
0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etc) I I I hr $94.00 $94.00
V486 VEHICLE I 2 2 trip $49.00 $98.00
13.ODOR CONTROL EQUIPMENT SUBTOTAL $1,759.00
Tuesday.March 13,2018 Exhibit A
Page 17 of 20
•
•
P102116A
rCe4".0. rRBrti E12206 Oso Water Reclamation Plant Infrastructure
a 1 ° Rehabilitation (100%)
f 04,4 �°qv' City of Corpus Christi
°A. Corpus Christi, TX
Jefrrey Edmonds, P.E.
14.STRUCTURAL STEEL INSPECTION LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
E.OBSERVATIONS
Bolting and Welding Inspection,including Cable Troy Bridge
HR-per hour
0116 CERTIFIED WELDING OBSERVATION(Min 4 hours) 4 I 1 48 hr $173.00 $8,304.00
V486 VEHICLE I I 1 12 trip $49.00 $588.00
14.STRUCTURAL STEEL INSPECTION SUBTOTAL $8,892.00
15.MAINTENANCE PAD LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
Cl. CONCRETE
107,1(014,3@28
P-1 set per days pour
C301-1 CONCRETE CYLINDERS(Min 4) 5 2 10 ea $49.00 $490.00
5399 CONCRETE CYLINDERS PICK UP FEE I 2 2 pour $48.00 $96.00
V486 VEHICLE I 4 4 trip $49.00 $196.00
E.OBSERVATIONS
Rebar Inspection
HR-per hour
0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etc) I 1 2 hi $94.00 $188.00
V486 VEHICLE I 2 7 tn1 $49.00 $98.00
15.MAINTENANCE PAD SUBTOTAL $1,068.00
Tuesday,March 13,2018 Exhibit A
Page 18 of 20
•
P102116A
E*°' rRs? E12206 Oso Water Reclamation Plant Infrastructure
a+° ""? Rehabilitation (100%)
�•oA,O� �o City of Corpus Christi
''c Corpus Christi, TX
Jefrrey Edmonds, P.E.
16.CABLE TRAY PEDESTALS LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
CI.CONCRETE
CY 26
Pier Caps
1@7,1@14,3@28
P-1 set per days pour
C301-I CONCRETE CYLINDERS(Min 4) 5 1 Sea $49.00 $245.00
$399 CONCRETE CYLINDERS PICK UP FEE I 1 I pour $48.00 $48.00
V486 VEHICLE I 2 2 trip $49.00 $98.00
CY 52
Piers
1@7,1@14,3@28
P-1 set per days pour
C301-I CONCRETE CYLINDERS(Min 4) 5 3 15 ea $49.00 $735.00
S399 CONCRETE CYLINDERS PICK UP FEE 1 3 3 pour $48.00 $144.00
E. OBSERVATIONS
Drilled Pier Observation
3 days(27 Piers)
HR-per hour
0501 OBSERVATIONS(Pier,Rebar,Structural Steel,etc) 3 8 24 hr $94.00 $2,256.00
V486 VEHICLE I 3 3 trip $49.00 $147.00
CY 26
Rebar Inspection Pier Caps
HR-per hour
0501 OBSERVATIONS(Pier,Rebor,Structural Steel,etc) I hr $94.00 $94.00
V486 VEHICLE I 1 trip $49.00 $49.00
16.CABLE TRAY PEDESTALS SUBTOTAL $3,816.00
Tuesday,March 13.2018 Exhibit A
Page 19 of 20
•
e°f P102116A
Ea s, E12206 Oso Water Reclamation Plant Infrastructure
Rehabilitation (100%)
.�oA,O� �o City of Corpus Christi
or,
Corpus Christi, TX
Jefrrey Edmonds, P.E.
17.TRANSFORMER FOUNDATION PAD LIFTS/MIN/ SUBQTY QTY RATE AMOUNT
INCHES
Al.SUBGRADE
SF 253
Compacted Subgrade
MIN-Min of 3
S600-1 NUCLEAR FIELD DENSITY MIN 3(ASTM D6938I I 3 3 eo $49.00 $147.00
V486 VEHICLE i 1 Itrip $49.00 $49.00
Cl. CONCRETE
CY 19
1@7.1@@14.3:428
P-1 set per days pour
C301-1 CONCRETE CYLINDERS(Min 41 2 10 ea $49.00 $490.00
S399 CONCRETE CYLINDERS PICK UP FEE I 2 2 pour $48.00 $96.00
V486 VEHICLE 4 4 trip $49.00 $196.00
17.TRANSFORMER FOUNDATION PAD SUBTOTAL $978.00
GRAND TOTAL $109,927.00
Tuesday.March 13.2018 Exhibit A
Page 20 of 20