HomeMy WebLinkAboutC2018-193 - 4/24/2018 - NA TASK ORDER NO. 26
This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus
Christi, Texas (City) and LNV, Inc. (Consultant) dated August 16, 2016 (Agreement). Consultant shall perform
services on the project described below as provided in this Task Order and in the Agreement. This Task Order
shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall
supplement the Agreement as it pertains to the project described below.
PROJECT NAME/NUMBER: Water and Wastewater Treatment On-Call Support, E16264
1. PROJECT DESCRIPTION-This project provides the Utility Department with on-call services to assist with
any technical, operational, maintenance, diagnostic and design concerns for the City's O.N.Stevens Water
Treatment Plant and six wastewater treatment plants.
2. SCOPE OF SERVICES -O.N. Stevens Water Treatment Plant Liquid Chlorine Piping Replacement and
more fully described in Exhibit A.
3. COMPENSATION - The total amount not to exceed for Task Order No. 26 only is $74,000.00.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement
remain in full force and effect.
op
CITY OF 0 RP 1 HRIST LNV, INC
'PAO
digi 412) g #0 AOP, A,. V .°gI qiillif
Jeff H. Edmonds, P.E. Date ri: ••-•`:� er, P.E. Date
Director of Engineering Services President
801 Navigation, Suite 300
Corpus Christi, TX 78408
(361) 883-1984 Office
loganb@Invinc.com
Fund Name Accounting Unit Account No. Activity No. Amount
Water Operating 4010-31010-062 530000 E16264-01-4010-EXP $74,000.00
2018-193
4/24/18
LNV Inc.
INDEXED
Professional Services Contract
City of Corpus Christi
Water/Wastewater Treatment On-Call Support
City Project No. E16264
Task Authorization No. 26
ONSWTP Liquid Chlorine Piping Replacement
April 13, 2018
LIMA,
Task Order No.26
Exhibit A
Page 1 of 8
,.,use„
O q
LNV
4
O_ Y �k
G
J •
h
• list
SCOPE OF WORK
Water and Wastewater Treatment On-Call Support
Project No. E16264
Task Authorization No.26—ONSWTP Liquid Chlorine Piping Replacement
BACKGROUND& PURPOSE
The O.N. Stevens Water Treatment Plant (ONSWTP) currently uses an aging chlorine gas system for
disinfection. The facility stores liquefied chlorine gas in 90-ton railcars on-site in an open-air, covered
storage area. Due to capacity limitations,redundancy and safety concerns,and potential future regulatory
challenges associated with the use of chlorine gas,the City recently decided to replace the existing chlorine
gas system with a sodium hypochlorite on-site generation(OSG)system. Implementation of the new OSG
system is expected to take 3-5 years. In the meantime, while the new system is being designed and
constructed, there are some critical liquid piping improvements necessary to the existing gas chlorine
system to ensure safe and reliable operation over the next few years.
The pressurized liquid chlorine is piped from the railcar storage area to the gas measurement building where
it is first converted to gas at the evaporators, and then metered at the chlorinators prior to injection. A
portion of the liquid piping between the railcars and the exterior wall of the gas measurement building was
replaced in the past few years and is still in good condition. However,the piping from the exterior of the
building to the feed side of the three evaporators is in very poor condition and needs to be replaced.
The purpose of this task authorization is to assist the City in the replacement of the liquid chlorine piping
that runs between the outside wall of the gas measurement building and the upstream side of the three
evaporators (the portion in poor condition). This task authorization will provide the City with
recommendations for replacement of the piping along with the development of a bid package for
implementing the recommendations. The bid package will include but may not be limited to simple
drawings (such as PFDs and/or schematic piping diagrams), specifications for piping, fittings, and
appurtenances and front-end documents such as a bid tab,project sequencing,contractor qualifications and
construction constraints. The replacement of this piping includes significant risk to disinfection at
ONSWTP; therefore, this task authorization will provide a detailed maintenance of plant operations and
temporary back-up plans to mitigate potential risk to the chlorine system currently in service.Additionally,
due to the critical nature of the project,this task authorization will also assist the City by providing extensive
construction phase services support for the successful replacement of the piping.
The high risk nature of the project, unknown O&M needs during construction and the
corresponding level of consultant effort required to support the Contractor and Owner are not well
defined at this stage. As a result,the fee for this task authorization is anticipated to be in the range
of$50,000-$74,000, with$74,000 being on the conservative side. The scope of work, anticipated
schedule and man-hour and fee analysis are presented in the following sections.
Task Order No.26
Exhibit A
Page 2 of 8
• ppUi CN
`O 9
LNV0
Ate. 4.
SCOPE OF WORK
BASIC SERVICES:
The Engineer will perform the following:
Task 0001 —Design Phase
1. Conduct a kick-off meeting and up to two (2) status meetings with the City to provide an
update on project progress and coordinate the proposed design and construction activities.
2. Obtain and review all available record drawings and reports pertaining to the chlorine gas
system.
3. Conduct up to two (2) site visits to assess the existing condition of the air pipes, identify
special concerns and gain an overall understanding of the project site and constraints.
4. Evaluate different replacement alternatives and recommend the most suitable course of
action.
5. Host a three(3)hour workshop with City staff to define the construction constraints and
to identify an acceptable level of risk that should be assumed in preparing and the project
budget. This workshop may be used to brainstorm and identify the temporary feed
alternatives and advantages/disadvantages of each.
6. Prepare necessary design calculations, drawings and specifications for the suggested
replacement method.The following are the anticipated drawing and specifications
Drawings
- Cover Sheet
- Symbols and Details
- Site plan
- Demo Plan
- Piping plan
- Piping Details
- P&ID
- Instrumentation Details
Specifications
- Front End Documents
- Liquid Chlorine Piping
- Valves and Appurtenances
- Detailed Maintenance of Operations
7. Identify specialty contractors available and interested in bidding this work. Provide
Contractor qualifications in front end documents to ensure only those qualified for doing
the work are able to bid the work.
8. Assist the City in responding to questions and/or clarifications during the bid process
Task Order No.26
Exhibit A
Page 3 of 8
• PPS�N
•
GO A�
LNVAzar
Task 0002—Bid Phase
1. Participate in the pre-bid conference.
2. Prepare required addenda in the City's format in response to pre-bid questions.
3. Due to the specialized nature of work to be performed, analyze bids and confirm
Contractor's qualifications are per requirements.
4. Prepare bid tabulation and provide a bid recommendation letter to the City.
Task 0003—Construction Phase
1. Review shop drawings and submittals for conformance with contract documents.
2. Make up to seven (7) site visits including a final inspection with the City staff to
observe general progress and quality of construction.
ASSUMPTIONS
• City to provide a Project Manager to assist in the coordination of efforts with utility staff
• City Maintenance staff to be available for design status meetings and construction site
visits to ensure improvements are consistent with the City's preference.
DELIVERABLES
The Engineer will prepare a DRAFT package, necessary specifications, along with construction plans to
direct the installation of the recommended piping improvements,for the City's review and comment.Upon
receipt of comments, the Engineer will incorporate comments into the Final package and provide one(1)
hard copy and one(1)electronic copy to the designated City Task Authorization Manager specified under
this authorization. Additionally,the Engineer will also provide the City with a Bid Recommendation Letter
at the end of the bidding process.
SCHEDULE
The Engineer's services shall be performed in a timely manner consistent with sound professional
practices.
The time limits set forth in the schedule shall include allowances for reasonable and expected review time
by the City and approval by authorities having jurisdiction over this project, and shall not be allowed as
cause for delay or adjustments to the schedule. Delays caused by review times by the City exceeding those
anticipated by the Engineer's schedule are cause for adjustments in the schedule. Any adjustments made
to the agreed upon schedule shall be made in writing and accepted by both parties. The construction
schedule presented is a preliminary estimate and may change depending on the improvement solutions
selected.
The Engineer shall begin work immediately upon receipt of the executed Task Authorization and/or Notice
to Proceed (written or emailed). The work under this task authorization is anticipated to be complete in
accordance with the following schedule.
Task Order No.26
Exhibit A
Page 4 of 8
PPUS co
O A
LNV q r4
O"
JzN
•
+is'9
MONTHS
TASK TASK DESCRIPTION DURATION
1 2 3 4 5 6 7 8
0001 Design Phase MENNEN..
- Site visit and review of existing data 2 Weeks •••••••
- DRAFT Plans and Specifications 3 Weeks+1 Week ■■■■■■
For Ci Review
- FINAL Plans and Specifications 2 Weeks ■ ■■■■■■
0002 Bid Phase 3 months ■■ MEM
0003 Construction Phase ■■■■■■■■
- Product Submittal by Supplier/Manufacturer 2 weeks MENEM
EN
- Piping&Appurtenances Manufacture* 3 Weeks 11111.111111
■
- Installation of Piping on Site 3 weeks ■■■■■■ ■
Note: *Initial estimate.Might vary based on manufacturer's schedule
FEE
The services will be provided on a Time and Materials (T&M) basis as the project is moved towards
completion.The anticipated amount for this task authorization is$74,000.00.This is a conservative estimate
and the actual effort is anticipated to be in the range of$50,000-$74,000.
A detailed man hour breakdown for this task authorization can be found in ATTACHMENT A. If the level
of effort exceeds this estimate,a separate task authorization will be requested.
Task Order No.26
Exhibit A
Page 5 of 8
• fUi C
• PNq
LNVti
TASK AUTHORIZATION MANAGER
The Task Authorization Manager will be the primary contact person during the performance of this work.
All correspondence or inquiries should be addressed to the Task Authorization Manager. This work task
will be coordinated by:
Dan Grimsbo, P.E. A.I.C.P.
Executive Director of Utilities Department
City of Corpus Christi
Office: 361-826-1874
Fax: 361-826-1889
Email: DanG@cctexas.com
APPROVAL
The undersigned has reviewed and approved this Task Authorization and authorizes LNV,Inc.to perform
the work as presented:
Au or zed by:
kc,--/;)"7- l
r /n ( d (Printed Name)
3 .12/ L /,' (Date)
Task Order No.26
Exhibit A
Page 6 of 8
Attachment A
Task Authorization No.26
Ilan_hlnur incl Fee Analvsi
Task Order No. 26
Exhibit A
Page 7 1118
'-t Engineer
Project Engine.
Elis
Sr. CA001015 Tech
CADD Tech
L60 TOTAL
•
$ 115.00
S 90.00
Total W s-
`- ToU1 F
• "
Mrs,
Subtotal
0,9.
SubtpMl
Hrs.
Subtotal
IRa.
Subtotal
0001
9e4011P8...
-
Mes*ps wM CM Sb9 (Up to 3)
$
-
6
5 1.230
$
-
$
-
6
$ 720
f -
f -
12
S 1250.00
-
SM cab [Up to 2) 8 rime et docw„erds
$
-
2
f 410
s
-
2
S
340
6
f 720
S -
0 -
10
S 1.470.00
Ev.su.on of Abmsbaes and Workshop web CM Stag (Up
b3- hours
f
-
3
f 815
$
-
S
B
f 980
f -
S
11
f +.575.00
-
Technical Specifications 8 Project Seousr.ng
$
-
f -
$
-
2
S
340
16
$ 1820
$ -
S -
18
8 2.260.00
-
Project Cost and Schedule
f
-
1
s 206
f
-
2
$
4
f 480
f -
f
•340
7
f 1.025.00
DRAFT Plans (LW to bad site plan dent plan. p,png
.. . details
f
-
3
s 615
f
-
3
$
510
20
$ 2.400
8
$ 690
32
$ 2.880
ea
$ 7 095.00
-
_.
Fein Plana and Speo6otrora
1
s
265
1
$ 205
f
-
2
f
340
4
f 480
$ -
8
f 720
16
$ 2010.00
-
ONOC
s
-
$ -
2
$
400
f
-
f -
f -
S -
2
$ 400.00
0002
Ble Phase
•
Pre Ba Cerement*
3
-
2
$ 4f0
f
-
2
s
340
4
f 480
$ -
S -
8
$ 1230.00
-
Add.M. Preparation n Response b Prie8id Omegans
$
•-
1
s 205
s
-
4
f
4
S 480
f -
S -
•660
9
s 1.365.00
-
Bid 0pen,09
$
•-
2
s 410
s
-
2
$
340
$
f -
s -
4
S 75080
-
feaW.on of Contractor's Owi6ueons
S
-
2
s 410
s
-
6
s
1.020
$ -
s -
S -
a
f 1430.00
-
0,0 Tap, 60 and Bid Reo„n.n.ndamn Lana
1
f
265
1
s 205
s
-
1
f
170
2
s 240
f -
s -
5
3 880.00
-
ONOC
S
s -
1
8
201
f
-
S -
f -
$ -
5
S 20000
0003
Construction Plisse
-
PreCon9t Son Meebg
$
•
2
$ 410
f
-
f
-
2
s 240
f -
$ -
4
$ 650.00
-
Re. 5,bn0bb (Up b 3)
$
•
2
f 410
f
-
3
$
510
3
S 360
s -
f -
a
S 1.280.00
-
Answer RFts(Up b 2)
f
-
2
$ 410
S
-
4
f
660
10
$ 1.200
f -
f -
16
S 2.290.00
-
Sib V Sita l7)
S
6
f 1.230
f
8
S
1.360
f 4
S 1.680
$ -
f -
18
S 4,270.00
-
Final Yrpecbn.95, Coy Staff
S
-
2
f 410
f
-
2
3
340
2
S 240
S -
f -
8
$ 990.00
2
3
030.00
30
S 7,718.00
3
f
000.00
43
0
7,310.00
100
$ 12,000.00
1
$ 090.00
40
$ 3100.00
277
$ 33,120.00
Task Order No. 26
Exhibit A
Page 7 1118
Attachment A
Task Authorization No.26
Man-hour and Fee Analysis
Task
Haten & Sawyer
Description
PrinclpaVVP
QAQC
Pro(eet Engineer
EIT IV
CARD Tech
Hazen & Salryal Tole
$ 265.00
$ 305.00
$ 165.00
0110.00
$ 90.00
Tots) IM.
Total Fee
Ke.
Sub -teal
Ike.
Sub4ole
Hrs.
Sub40tal
Hrs.
Subtotal
lbs.
886.001
0001
Design Phase
•
Meetings with City Sian (Up b 3)
5 -
S
e
$ 0006
$ 000
S -
12
S 1.650.00
-
Site wens (Up to 218 review of document
5 •
S -
4
S 6604
S 440
$ -
8
$ 1.100.00
Evaluation of Alternatives and Nbrkehop with City San
(Up to 3 hours)
1
$ 285
2
0 610
8
S 1.320
12
$ 1.320
S -
23
$ 3.535.00
-
Technical Specifications (Assume 5 specs) 8 Protea
Sequenc,n0
5
2
$ 610
12
$ 1.980
32
$ 3.520
$ -
48
$ 6.11000
-
Protect Cost and Schedule
1
$ 285
1
$ 305
2
S 330
fl
$ 600
S -
10
$ 1.580.00
DRAFT Plana (Hazen to support pipers piping details and
lead P810, Instrumentation)
S •
2
$ 610
8
S 1.320
20
S 2.200
32
$ 2.880
62
$ 7.010.00
-
Final Plans and Specifications
1
S 265
2
$ 810
2
$ 330
8
S 880
8
$ 720
21
S 2.825.00
•
Constructability Review
1
S 285
2
S 810
2
$ 330
2
$ 220
5
7
$ 1.44500
4
$ 1,140.00
11
$ 3,365.00
44
$ 7,260.00
90
$ 9,900.00
40
0 3,600.00
109
$ 26,266.00
0002
Bid Phase
•
Pre Be Conference
$ -
S -
2
.8 3302
$ 220
$ -
4
0 550.00
-
Addenda Reparation in Response to Re•&d Questions
S .
S -
2
0 330
$ -
$ -
2
$ 330.00
•
Bid Opamng
S -
•
S -
2
S 330
$
$ -
2
0 330 00
-
Evaluation of Contractor's Oualihcations
1
S 285
2
S 610
2
$ 330
2
0 220
$ -
7
$ 1.44500
-
814 Tabulabon and Bid Recommenda5on Liter
S •
S -
2
S 930
$
S -
2
$ 330.00
-
OA/OC
$ •
$ -
$ -
S •
S -
0
S
1
8 200.00
2
8 610.00
10
8 1,460.00
4
5 440.00
0
8
17
8 2,966.00
0003
Construction Phase
$ -
•
P.Construceon Meearr
$-
S
2
S 330
2
S 220
S -
4
$ 55000
•
Review Subsides (Up to 3)
d
1
S 285
2
S 610
0
$ 090
0
$ 660
$
15
S 2.545 00
•
Answer RFIS (Up b 3)
S -
S
3
$ 4950
$ 660
$ -
9
S 1.155.00
•
Site Visit (7)
$ •
$ -14
S 2,370
14
S 1.540
S -
28
$ 3.850.00
•
Fina Inapec8on with City Staff
$-
S
3
$ 495
3
$ 330
S -
6
5 825.00
Subtotal
1
$ 286
2
S 610.00
20 -
$ 4,020.00
31
8 3,410.00
0
8 -
82
0 0,923.00
0
$ 1,710.00
15
$ 4,575.00
62
$ 13,530.00
125
$ 13,76000
40
S 3000.00
268
$ 37,186.00
Administrative Fee (10% of Suboonsulant Fee)
S 3,717
Total Fee
S 40,001.50
TOTAL FEE FOR TASK AUTHORIZATION 28 ( LNV • HAZEN FEE) a 574.000.00
Task Order No. 26
Exhibit A
Page 8 of 8