Loading...
HomeMy WebLinkAboutC2018-196 - 4/27/2018 - NA • • CITY OF CORPUS CHRISTI CONTRACT FOR PROFESSIONAL SERVICES AMENDMENT NO. 1 The City of Corpus Christi, Texas,a Texas Forme-rule municipal corporation("City)and DWamaAtthkapts,.lit ("Consultant"),spree to the following amendments to the Contract for Protectionist Bsrvicsa for E170B2 Modernize Selene Elevators: Original Contract October 10, 2017 Adminietraave Approval I 846600.00 In the Original Contract,Exhibit A,Scope of Services shall be amended as set forth In the attached Amendment No.1,ExhibitA In the Original Contract, Fees shall be amended based on the modified scope of services In the attached Amendment No. 1, Exhibit A for a fee not to exceed maga a,fora total restated fee not to exceed 115A0004. Ati otter terms and conditions of the October 10,2017 Contract for Professional Services between the City and Consultant,and of any amendments to that contract,which are not epec8lcafyaddressed herein shall remain in full force and effect. cmvopc P42/ i ,� DYKEMA ARCHI , H Elm .78 t�-'r Jeff ands,P.E. Date n R.Dyke r.,A.I A. Date Director of Engineering Services 01 Ocean Drive Corpus Christi,TX 78404 (361)882.8171 Office jdykemaadykema-architects.com APPROVED AS TO LEGAL FORM 2018.04.24 VU 10:12:44-05'00' Assistant City Attorney Date Accounting Unit: 1030-13608-734 Account:620130 Activity:E17062-01-1030-EXP Account Category.20130 Fund Name:Hotel Occuo Amount 89.150.00 2018-196 „mE„ZESUN*a€,..m..a,d.IE. w„ 9.,,E.,o.B„SE,I.,,e.,.ENI I 4/27/18 "E"'o"" Dykema Architects Inc. INDEXED . . • ! IDT:TT:T ARHITECTS , INC . o January 29,2018 Mr. Kevin McCord City of Corpus Christi 1201 Leopard St. Corpus Christi,TX 78401 RE: E17062 Modernize Selena Elevators Amd 1 Proposal Estimated construction budget$450,000.00 Dear Mr. McCord, We appreciate the opportunity to offer to provide the Architectural Services for the above referenced project. The project will consist of a survey to determine what equipment can be retained and what needs to be replaced to meet current technology and code requirements. Alternates will be presented with budget implications. Design, bidding and construction services will be provided for the modernization of both an existing freight elevator and an existing passenger elevator. Scope of work to include: Freight Elevator • Modernization of existing 5 landing Dover Elevator—300 fpm(Type 66700) • Replacement of existing motor and freight elevator equipment to modernize and bring into current code. • New monitoring system for remote diagnostics of equipment • Smart Rise controller suggested • New locking hardware at door to mechanical room(need to verify existing door is acceptable) • New rollers, and slide guides for freight elevator doors. • Add alternate to replace all freight elevator doors. (Alternate#1) Passenger Elevator • Modernization of existing in-ground hydraulic Dover Elevator, 3 Landings. • Needs new packing(seal around pistons) • Provide new sump pit and pump. • Suggested to replace with wet unit,currently a dry unit • Verify if equipment room layout is adequate and determine if separation of equipment is required. Amendment No. 1 Exhibit A Page 1 of 2 • Person Hahn will act as architect's elevator consultant on the project. In consideration for the above scope of work, we amend the original contract in the amount of $9,150.00 for a new total fee of $49,650.00. Our consultants will be included in this amount. Thank you for the opportunity to work with you on this project. Sincerely, 34- John R Dykema Jr. A. I. A. Amendment No.1 Exhibit A Page 2 of 2 Basic Services: Preliminary Phase Design Phase Bid Phase Construction Phase Subtotal Basic Services Additional Services: Permitting Warranty Phase Inspection Platting Survey 0 8 M Manuals SCADA Subtotal Additional Services Summary of Fees: Basic Services Fees Additional Services Fees Total of Fees Contract COMPLETE PROJECT NAME Project No. XXXX Invoice No. 12345 Invoice Date 01/01/2017 Amd No. 1 Amd No. 2 Total Contract $1,000.00 $o.00 $o.00 $1,000.00 $2,000.00 $1,000.00 $0.00 $3,000.00 $500.00 $0.00 $250.00 $750.00 $2,500.00 $0.00 $1,000.00 $3,500.00 $6,000.00 $1,000.00 $1,250.00 $8,250.00 $0.00 $2,000.00 $0.00 $0.00 $2,000.00 $0.00 $1,120.00 $0.00 $1,120.00 $0.00 $0.00 $1,627.00 $1,627.00 TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD $2,000.00 $1,120.00 $1,627.00 $4,747.00 $6,000.00 $1,000.00 $1,250.00 $8,250.00 $2,000.00 $1,120.00 $1,627.00 $4,747.00 $8,000.00 $2,120.00 $2,877.00 $12,997.00 Current Invoice Previous Invoice Total Invoice $0.00 $1,000.00 $1,000.00 $1,000.00 $500.00 $1500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,000.00 $1,500.00 $2,500.00 0.0% $500.00 $0.00 $500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TBD TBD TBD TBD TBD TBD TBD TBD TBD $500.00 $0.00 $500.00 $1,000.00 $1,500.00 $2,500.00 $500.00 $0.00 $500.00 $1,500.00 $1,500.00 $3,000.00 Notes. If needed, update this sample form based on the contract requirements. If applicable, refer to the contract for information on what to include with time and materials (T&M). Sample form for. Payment Request AE Contract Revised 02/01/17 Remaining Balance Percent Complete $0.00 100.0% $1,500.00 50.0% $750.00 0.0% $3,500.00 0.0% $5,750.00 30.3% $1,500.00 25.0% $1,120.00 0.0% $1,627.00 0.0% TBD TBD TBD TBD TBD TBD $4,247.00 10.5% $5,750.00 30.3% $4,247.00 10.5% $9,997.00 23.1% EXHIBIT B Page 1 of 1 EXHIBIT C Insurance Requirements Pre-Design, Design and General Consulting Contracts 1.1 Consultant must not commence work under this agreement until all required insurance has been obtained and such insurance has been approved by the City. Consultant must not allow any subcontractor to commence work until all similar insurance required of any subcontractor has been obtained. 1.2 Consultant must furnish to the Director of Engineering Services with the signed agreement a copy of Certificates of Insurance (COI) with applicable policy endorsements showing the following minimum coverage by an insurance company(s) acceptable to the City's Risk Manager. A waiver of subrogation is required on all applicable policies. Endorsements must be provided with COI. Project name and or number must be listed in Description Box of COI. TYPE OF INSURANCE MINIMUM INSURANCE COVERAGE -- -- - -30-written day notice of cancellation, Bodily Injury and Property Damage required on all certificates or by Per occurrence - aggregate applicable policy endorsements PROFESSIONAL LIABILITY $1,000,000 Per Claim (Errors and Omissions) If claims made policy, retro date must be prior to inception of agreement, have extended reporting period provisions and identify any limitations regarding who is insured. 1.3 In the event of accidents of any kind related to this agreement, Consultant must furnish the City with copies of all reports of any accidents within 10 days of the accident. 1.4 Consultant shall obtain and maintain in full force and effect for the duration of this Contract, and any extension hereof, at Consultant's sole expense, insurance coverage written on an occurrence basis, by companies authorized and admitted to do business in the State of Texas and with an A.M. Best's rating of no less than A- VII. Consultant is required to provide City with renewal Certificates. 4 Rev 07/16 1.5 Consultant shall be required to submit a copy of the replacement certificate of insurance to City at the address provided below within 10 days of the requested change. Consultant shall pay any costs incurred resulting from said changes. All notices under this Article shall be given to City at the following address: City of Corpus Christi Attn: Engineering Services P.O. Box 9277 Corpus Christi, TX 78469-9277 1.6 Consultant agrees that with respect to the above required insurance, all insurance policies are to contain or be endorsed to contain the following required provisions: 1.6.1 Provide thirty (30) calendar days advance written notice directly to City of any suspension, cancellation or non-renewal of coverage, and not less than ten (10) calendar days advance written notice for nonpayment of premium. 1.7 Within five (5) calendar days of a suspension, cancellation or non-renewal of coverage, Consultant shall provide a replacement Certificate of Insurance and applicable endorsements to City. City shall have the option to suspend Consultant's performance should there be a lapse in coverage at any time during this contract. Failure to provide and to maintain the required insurance shall constitute a material breach of this contract. 1.8 In addition to any other remedies the City may have upon Consultant's failure to provide and maintain any insurance or policy endorsements to the extent and within the time herein required, the City shall have the right to order Consultant to remove the exhibit hereunder, and/or withhold any payment(s) if any, which become due to Consultant hereunder until Consultant demonstrates compliance with the requirements hereof. 1.9 Nothing herein contained shall be construed as limiting in any way the extent to which Consultant may be held responsible for payments of damages to persons or property resulting from Consultant's or its subcontractor's performance of the work covered under this agreement. 1.10-- --It is agreed that Consultant's insurance shall be deemed primary and non- contributory with respect to any insurance or self-insurance carried by the City of Corpus Christi for liability arising out of operations under this agreement. 1.11 It is understood and agreed that the insurance required is in addition to and separate from any other obligation contained in this agreement. 5 Rev 07/16 Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services Table of Contents Page Article 1—Definitions and Terminology 2 Article 2—Preliminary Matters 8 Article 3—Contract Documents: Intent,Requirements, Reuse 8 Article 4—Commencement and Progress of the Work 9 Article 5—Availability of Lands;Subsurface, Physical and Hazardous Environmental Conditions 9 Article 6—Bonds and Insurance 10 Article 7—Contractor's Responsibilities 10 Article 8—Other Work at the Site 10 Article 9—Owner's and OPT's Responsibilities 10 Article 10—OAR's and Designer's Status During Construction 11. Article 11—Amending the Contract Documents; Changes in the Work 13 Article 12—Change Management 13 Article 13—Claims 14 Article 14—Prevailing Wage Rate Requirements 16 Article 15—Cost of the Work;Allowances; Unit Price Work 16 Article 16—Tests and Inspections;Correction, Removal,or Acceptance of Defective Work 16 Article 17—Payments to Contractor;Set-Offs;Completion;Correction Period 16 Article 18—Suspension of Work and Termination 16 Article 19—Project Management 16 Article 20—Project Coordination 16 Article 21—Quality Management 17 Article 22—Final Resolution of Disputes 17 Article 23—Minority/MBE/DBE Participation Policy 17 Article 24—Document Management 17 Article 25—Shop Drawings 17 Article 26—Record Data 20 Article 27—Construction Progress Schedule 21 Article 28—Video and Photographic documentation 21 Article 29—Execution and Closeout 21 Article 30—Miscellaneous 22 Excerpt from Form 00 72 00 General Conditions-1 Rev 18-2 • • ARTICLE 1—DEFINITIONS AND TERMINOLOGY 1.1 Defined Terms A. Terms with initial capital letters, including the term's singular and plural forms, have the meanings indicated in this paragraph wherever used in the Bidding Requirements or Contract Documents. In addition to the terms specifically defined, terms with initial capital letters in the Contract Documents may include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda - Documents issued prior to the receipt of Bids which clarify or modify the Bidding Requirements or the proposed Contract Documents. 2. Agreement - The document executed between Owner and Contractor covering the Work. 3. Alternative Dispute Resolution -The process by which a disputed Claim may he settled as an alternative to litigation, if Owner and Contractor cannot reach an agreement between themselves. 4. Application for Payment - The forms used by Contractor to request payments from Owner and the supporting documentation required by the Contract Documents. 5. Award Date—The date the City Council of the City of Corpus Christi(City)authorizes the City Manager or designee to execute the Contract on behalf of the City. 6. Bid-The documents submitted by a Bidder to establish the proposed Contract Price and Contract Times and provide other information and certifications as required by the Bidding Requirements. 7. Bidding Documents - The Bidding Requirements, the proposed Contract Documents, and Addenda. 8. Bidder-An individual or entity that submits a Bid to Owner. 9. Bidding Requirements-The Invitation for Bids, Instructions to Bidders,Bid Security, Bid Form and attachments,and required certifications. 10. Bid Security-The financial security in the form of a bid bond provided by Bidder at the time the Bid is submitted and held by Owner until the Agreement is executed and the evidence of insurance and Bonds required by the Contract Documents are provided. A cashier's check, certified check, money order or bank draft from any State or National Bank will also be acceptable. 11. Bonds - Performance Bond, Payment Bond, Maintenance Bond, and other Surety instruments executed by Surety. When in singular form,refers to individual instrument. 12. Change Order- A document issued on or after the Effective Date of the Contract and signed by Owner and Contractor which modifies the Work, Contract Price, Contract Times,or terms and conditions of the Contract. 13. Change Proposal - A document submitted by Contractor in accordance with the requirements of the Contract Documents: a. Requesting an adjustment in Contract Price or ContractTimes; Excerpt from Form 00 72 00 General Conditions-2 Rev 18-2 • b. Contesting an initial decision concerning the requirements of the Contract Documents or the acceptability of Work under the Contract Documents; c. Challenging a set-off against payment due;or d. Seeking a Modification with respect to the terms of the Contract. 14. City Engineer-The Corpus Christi City Engineer and/or his designated representative as identified at the preconstruction conference or in the Notice toProceed. 15. Claim -A demand or assertion by Owner or Contractor submitted in accordance with the requirements of the Contract Documents. A demand for money or services by an entity other than the Owner or Contractor is not a Claim. 16. Constituent of Concern - Asbestos, petroleum, radioactive materials, polychlorinated biphenyls (PCBs), hazardous wastes, and substances, products, wastes, or other materials that are or become listed, regulated,or addressed pursuantto: a. The Comprehensive Environmental Response,Compensation and Liability Act, 42 U.S.C. §49601 et seq. ("CERCLA"); b. The Hazardous Materials Transportation Act,49 U.S.C. §45101 et seq.; c. The Resource Conservation and Recovery Act,42 U.S.C. §56901 et seq. ("RCRA"); d. The Toxic Substances Control Act, 15 U.S.C. 442601 et seq.; e. The Clean Water Act,33 U.S.C. 451251 et seq.; f. The Clean Air Act,42 U.S.C. 557401 et seq.;or g. Any other Laws or Regulations regulating, relating to, or imposing liability or standards of conduct concerning hazardous,toxic,or dangerous waste,substance, or material. 17. Contract-The entire integrated set of documents concerning the Work and describing the relationship between the Owner and Contractor. 18. Contract Amendment-A document issued on or after the Effective Date of the Contract and signed by Owner and Contractor which: a. Authorizes new phases of the Work and establishes the Contract Price, Contract Times,or terms and conditions of the Contract for the new phase of Work;or b. Modifies the terms and conditions of the Contract, but does not make changes in the Work. 19. Contract Documents - Those items designated as Contract Documents in the Agreement. 20. Contract Price - The monetary amount stated in the Agreement and as adjusted by Modifications,and increases or decreases in unit price quantities,if any,that Owner has agreed to pay Contractor for completion of the Work in accordance with the Contract Documents. 21. Contract Times-The number of days or the dates by which Contractor must: a. Achieve specified Milestones; Excerpt from Form 00 72 00 General Conditions-3 Rev 18-2 • h. Achieve Substantial Completion;and c. Complete the Work. 22. Contractor-The individual or entity with which Owner has contracted for performance of the Work. 23. Contractor's Team - Contractor and Subcontractors, Suppliers, individuals, or entities directly or indirectly employed or retained by them to perform part of the Work or anyone for whose acts they may be liable. 24. Cost of the Work-The sum of costs incurred for the proper performance of the Work as allowed by Article 15. 25. Defective - When applied to Work, refers to Work that is unsatisfactory, faulty, or deficient in that it: a. Does not conform to the Contract Documents; b. Does not meet the requirements of applicable inspections,reference standards, tests,or approvals referred to in the Contract Documents;or c. Has been damaged or stolen prior to OAR's recommendation of final payment unless responsibility for the protection of the Work has been assumed by Owner at Substantial Completion in accordance with Paragraphs 17.12 or17.13. 26. Designer - The individuals or entity named as Designer in the Agreement and the subconsultants, individuals, or entities directly or indirectly employed or retained by Designer to provide design or other technical services to the Owner. Designer has responsibility for engineering or architectural design and technical issues related to the Contract Documents. Designers are Licensed Professional Engineers, Registered Architects or Registered Landscape Architects qualified to practice their profession in the State of Texas. 27. Drawings - The part of the Contract that graphically shows the scope, extent, and character of the Work. Shop Drawings and other Contractor documents are not Drawings. 28. Effective Date of the Contract-The date indicated in the Agreement on which the City Manager or designee has signed the Contract. 29. Field Order-A document issued by OAR or Designer requiring changes in the Work that do not change the Contract Price or the ContractTimes. 30. Hazardous Environmental Condition - The presence of Constituents of Concern at the Site in quantities or circumstances that may present a danger to persons or property exposed to Constituents of Concern. The presence of Constituents of Concern at the Site necessary for the execution of the Work or to be incorporated in the Work is not a Hazardous Environmental Condition provided these Constituents of Concern are controlled and contained pursuant to industry practices,Laws and Regulations,and the requirements of the Contract. 31. Indemnified Costs-All costs,losses,damages,and legal or other dispute resolution costs resulting from claims or demands against Owner's Indemnitees. These costs include fees for engineers,architects,attorneys,and other professionals. Excerpt from Form 00 72 00 General Conditions-4 Rev 18-2 • 32. Laws and Regulations;Laws or Regulations-Applicable laws,statutes,rules,regulations, ordinances,codes,and orders of governmental bodies,agencies,authorities,and courts having jurisdiction over the Project. 33. Liens -Charges, security interests, or encumbrances upon Contract related funds, real property,or personal property. 34. Milestone-A principal event in the performance of the Work that Contractor is required by Contract to complete by a specified date or within a specified period of time. 35. Modification - Change made to the Contract Documents by one of the fallowing methods: a. Contract Amendment; b. Change Order; c. Field Order;or d. Work Change Directive. 36. Notice of Award-The notice of Owner's intent to enter into a contract with the Selected Bidder. 37. Notice to Proceed -A notice to Contractor of the Contract Times and the date Work is to begin. 38. Owner-The City of Corpus Christi (City), a Texas home-rule municipal corporation and political subdivision organized under the laws of the State of Texas, acting by and through its duly authorized City Manager and his designee, the City Engineer (the Director of Engineering Services), and the City's officers, employees, agents, or representatives,authorized to administer design and construction of the Project. 39. Owner's Authorized Representative or OAR -The individual or entity named as OAR in the Agreement and the consultants, subconsultants, individuals, or entities directly or indirectly employed or retained by them to provide construction management services to the Owner. The OAR may be an employee of the Owner. 40. Owner's Indemnitees-Each member of the OPT and their officers,directors, members, partners,employees,agents,consultants,and subcontractors. 41. Owner's Project Team or OPT - The Owner, Owner's Authorized Representative, Resident Project Representative, Designer, and the consultants, subconsultants, individuals, or entities directly or indirectly employed or retained by them to provide services to the Owner. 42. Partial Occupancy or Use-Use by Owner of a substantially completed part of the Work for the purpose for which it is intended (or a related purpose) prior to Substantial Completion of all the Work. 43. Progress Schedule-A schedule prepared and maintained by Contractor, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Times. The Progress Schedule must be a Critical Path Method )CPM)Schedule. 44. Project - The total undertaking to be accomplished for Owner under the Contract Documents. Excerpt from Form 00 72 00 General Conditions-5 Rev 18-2 • 45. Resident Project Representative or RPR-The authorized representative of OPT assigned to assist OAR at the Site. As used herein, the term Resident Project Representative includes assistants and field staff of the OAR. 46. Samples - Physical examples of materials, equipment, or workmanship representing some portion of the Work that are used to establish the standards for that portion of the Work. 47. Schedule of Documents-A schedule of required documents, prepared,and maintained by Contractor. 48. Schedule of Values - A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for Contractor's Applications for Payment. 49. Selected Bidder-The Bidder to which Owner intends to award the Contract. 50. Shop Drawings - All drawings, diagrams, illustrations, schedules, and other data or information that are specifically prepared or assembled and submitted by Contractor to illustrate some portion of the Work. Shop Drawings, whether approved or not,are not Drawings and are not Contract Documents. 51. Site-Lands or areas indicated in the Contract Documents as being furnished by Owner upon which the Work is to be performed. The Site includes rights-of-way, easements, and other lands furnished by Owner which are designated for use by the Contractor. 52. Specifications-The part of the Contract that describes the requirements for materials, equipment, systems, standards,and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable to the Work. 53. Subcontractor-An individual or entity having a direct contract with Contractor or with other Subcontractors or Suppliers for the performance of a part of the Work. 54. Substantial Completion -The point where the Work or a specified part of the Work is sufficiently complete to be used for its intended purpose in accordance with the Contract Documents. 55. Supplementary Conditions-The part of the Contract that amends or supplements the General Conditions. 56. Supplier - A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with Subcontractors or other Suppliers to furnish materials or equipment to be incorporated in the Work. 57. Technical Data-Those items expressly identified as Technical Data in the Supplementary Conditions with respect to either: a. Subsurface conditions at the Site; b. Physical conditions relating to existing surface or subsurface structures at Site, except Underground Facilities;or c. Hazardous Environmental Conditions at the Site. 58. Underground Facilities - All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, other similar facilities or appurtenances, and encasements containing these facilities which are used to convey electricity, gases, Excerpt from Form 00 72 00 General Conditions-6 Rev 18-2 steam, liquid petroleum products, telephone or other communications, fiber optic transmissions, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 59. Unit Price Work-Work to be paid for on the basis of unit prices. 60. Work - The construction of the Project or its component parts as required by the Contract Documents. 61. Work Change Directive -A directive issued to Contractor on or after the Effective Date of the Contract ordering an addition, deletion, or revision in the Work. The Work Change Directive serves as a memorandum of understanding regarding the directive until a Change Order can be issued. 1.2 Terminology A. The words and terms discussed in this Paragraph 1.02 are not defined, but when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. It is understood that the cost for performing Work is included in the Contract Price and no additional compensation is to be paid by Owner unless specifically stated otherwise in the Contract Documents. Expressions including or similar to "at no additional cost to Owner," "at Contractor's expense,"or similar words mean that the Contractor is to perform or provide specified operation of Work without an increase in the Contract Price. C. The terms"day"or"calendar day"mean a calendar day of 24 hours measured from midnight to the next midnight. D. The meaning and intent of certain terms or adjectives are described asfollows: 1. The terms"as allowed, "as approved," "as ordered, "as directed," or similar terms in the Contract Documents indicate an exercise of professional judgment by the OPT. 2. Adjectives including or similar to "reasonable," "suitable,' "acceptable," "proper," "satisfactory," or similar adjectives are used to describe a determination of OPT regarding the Work. 3. Any exercise of professional judgment by the OPT will be made solely to evaluate the Work for general compliance with the Contract Documents unless there is a specific statement in the Contract Documents indicating otherwise. 4. The use of these or similar terms or adjectives does not assign a duty or give OPT authority to supervise or direct the performance of the Work, or assign a duty or give authority to the OPT to undertake responsibilities contrary to the provisions of Articles 9 or 10 or other provisions of the Contract Documents. E. The use of the words "furnish," "install," "perform," and "provide" have the following meanings when used in connection with services, materials,orequipment: 1. Furnish means to supply and deliver the specified services, materials, or equipment to the Site or other specified location ready for use or installation. 2. Install means to complete construction or assembly of the specified services, materials, or equipment so they are ready for their intended use. Excerpt from Form 00 72 00 General Conditions-7 Rev 18-2 3. Perform or provide means to furnish and install specified services, materials, or equipment,complete and ready for their intended use. 4. Perform or provide the specified services,materials,or equipment complete and ready for intended use if the Contract Documents require specific services, materials, or equipment, but do not expressly use the words "furnish,' "install," "perform," or "provide" F. Contract Documents are written in modified brief style: 1. Requirements apply to all Work of the same kind,class,and type even though the word "all"is not stated. 2. Simple imperative sentence structure is used which places a verb as the first word in the sentence. It is understood that the words "furnish," "install, "perform,"'provide;'or similar words include the meaning of the phrase "The Contractor shall.." before these words. 3. Unless specifically stated that action is to be taken by the OPT or others,it is understood that the action described is a requirement of the Contractor. G. Words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with this recognized meaning unless stated otherwise in the Contract Documents. H. Written documents are required where reference is made to notices, reports, approvals, consents, documents, statements, instructions, opinions or other types of communications required by the Contract Documents. Approval and consent documents must be received by Contractor prior to the action or decision for which approval or consent is given.These may be made in printed or electronic format through the OPT's project management information system or other electronic media as required by the Contract Documents or approved by the OAR. I. Giving notice as required by the Contract Documents may be by printed or electronic media using a method that requires acknowledgment of the receipt of that notice. ARTICLE 2—PRELIMINARY MATTERS ARTICLE 3—CONTRACT DOCUMENTS: INTENT,REQUIREMENTS,REUSE 3.1 Intent B. Provide equipment that is functionally complete as described in the Contract Documents. The Drawings and Specifications do not indicate or describe all of the Work required to complete the installation of products purchased by the Owner or Contractor. Additional details required for the correct installation of selected products are to be provided by the Contractor and coordinated with the Designer through the OAR. 3.2 Reference Standards Comply with applicable construction industry standards,whether referenced or not. 1. Standards referenced in the Contract Documents govern over standards not referenced but recognized as applicable in the construction industry. Excerpt from Form 00 72 00 General Conditions-8 Rev 18-2 • 2. Comply with the requirements of the Contract Documents if they produce a higher quality of Work than the applicable construction industry standards. 3. Designer determines whether a code or standard is applicable,which of several are applicable,or if the Contract Documents produce a higher quality of Work. 3.3 Reporting and Resolving Discrepancies 3.4 Interpretation of the Contract Documents Submit questions regarding the design of the Project described in the Contract Documents to the OAR immediately after those questions arise. OAR is to request an interpretation of the Contract Documents from the Designer. Designer is to respond to these questions by providing an interpretation of the Contract Documents. OAR will coordinate the response of the OPT to Contractor. C. OPT may initiate a Modification to the Contract Documents through the OAR if a response to the question indicates that a change in the Contract Documents is required. Contractor may appeal Designer's or OAR's interpretation by submitting a Change Proposal. ARTICLE 4—COMMENCEMENT AND PROGRESS OF THE WORK ARTICLE 5—AVAILABILITY OF LANDS;SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS 5.1 Availability of Lands 5.2 Use of Site and Other Areas 5.3 Subsurface and Physical Conditions 5.4 Differing Subsurface or Physical Conditions OAR is to notify the OPT after receiving notice of a differing subsurface or physical condition from the Contractor. Designer is to: 1. Promptly review the subsurface or physical condition; 2. Determine the necessity of OPT's obtaining additional exploration or tests with respect the subsurface or physical condition; 3. Determine if the subsurface or physical condition falls within one or more of the differing Site condition categories in Paragraph 5.04.A; 4. Prepare recommendations to OPT regarding the Contractor's resumption of Work in connection with the subsurface or physical condition in question; 5. Determine the need for changes in the Drawings or Specifications;and 6. Advise OPT of Designer's findings,conclusions,and recommendations. C. OAR is to issue a statement to Contractor regarding the subsurface or physical condition in question and recommend action as appropriate after review of Designer's findings, conclusions,and recommendations. Excerpt from form 00 72 00 General Conditions-9 Rev 18-2 5.5 Underground Facilities The Designer is to take the following action after receiving notice from the OAR: 1. Promptly review the Underground Facility and conclude whether the Underground Facility was not shown or indicated in the Contract Documents, or was not shown or indicated with reasonable accuracy; 2. Prepare recommendations to OPT regarding the Contractor's resumption of Work in connection with this Underground Facility; 3. Determine the extent to which a change is required in the Drawings or Specifications to document the consequences of the existence or location of the Underground Facility; and 4. Advise OAR of Designer's findings, conclusions, and recommendations and provide revised Drawings and Specifications if required. D. OAR is to issue a statement to Contractor regarding the Underground Facility in question and recommend action as appropriate after review of Designer's findings, conclusions, and recommendations. ARTICLE 6—BONDS AND INSURANCE ARTICLE 7—CONTRACTOR'S RESPONSIBILITIES ARTICLE S—OTHER WORK AT THE SITE ARTICLE 9—OWNER'S AND OPT'S RESPONSIBILITIES 9.1 Communications to Contractor A. OPT issues communications to Contractor through OAR except as otherwise provided in the Contract Documents. 9.2 Replacement of Owner's Project Team Members A. Owner may replace members of the OPT at its discretion. 9.3 Furnish Data A. OPT is to furnish the data required of OPT under the Contract Documents. 9.4 Pay When Due 9.5 Lands and Easements; Reports and Tests A. Owner's duties with respect to providing lands and easements are described in Paragraph 5.01. OPT will make copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at the Site available to Contractor in accordance with Paragraph 5.03. Excerpt from Form 00 72 00 General Conditions-10 Rev 18-2 9.6 Insurance 9.7 Modifications 9.8 Inspections,Tests,and Approvals A. OPT's responsibility with respect to certain inspections,tests,and approvals are described in Paragraph 16.02. 9.9 Limitations on OPT's Responsibilities A. The OPT does not supervise,direct,or have control or authority over,and is not responsible for Contractor's means, methods,techniques,sequences, or procedures of construction, or related safety precautions and programs, or for failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. OPT is not responsible for Contractor's failure to perform the Work in accordance withthe Contract Documents. 9.10 Undisclosed Hazardous Environmental Condition A. OPT's responsibility for undisclosed Hazardous Environmental Conditions is described in Paragraph 5.06. 9.11 Compliance with Safety Program A. Contractor is to inform the OPT of its safety programs and OPT is to comply with the specific applicable requirements of this program. ARTICLE 10—OAR'S AND DESIGNER'S STATUS DURING CONSTRUCTION 10.1 Owner's Representative A. OAR is Owner's representative. The duties and responsibilities and the limitations of authority of OAR as Owner's representative are described in the Contract Documents. 10.2 Visits to Site A. Designer is to make periodic visits to the Site to observe the progress and quality of the Work. Designer is to determine, in general, if the Work is proceeding in accordance with the Contract Documents based on observations made during these visits. Designer is not required to make exhaustive or continuous inspections to check the quality or quantity of the Work. Designer is to inform the OPT of issues or concerns and OAR is to work with Contractor to address these issues or concerns. Designer's visits and observations are subject to the limitations on Designer's authority and responsibility described in Paragraphs 9.09 and 10.07. B. OAR is to observe the Work to check the quality and quantity of Work, implement Owner's quality assurance program, and administer the Contract as Owner's representative as described in the Contract Documents. OAR's visits and observations are subject to the limitations on OAR's authority and responsibility described in Paragraphs 9.09 and 10.07. Excerpt from Form 00 72 00 General Conditions-11 Rev 18-2 • • 10.3 Resident Project Representatives A. Resident Project Representatives assist OAR in observing the progress and quality of the Work at the Site. The limitations on Resident Project Representatives' authority and responsibility are described in Paragraphs 9.09 and 10.07. 10.4 Rejecting Defective Work A. OPT has the authority to reject Work in accordance with Article 16. OAR is to issue a Defective Work Notice to Contractor and document when Defective Work has been corrected or accepted in accordance with Article 16. 10.5 Shop Drawings, Modifications and Payments A. Designer's authority related to Shop Drawings and Samples are described in the Contract Documents. B. Designer's authority related to design calculations and design drawings submitted in response to a delegation of professional design services are described in Paragraph 7.15. C. OAR and Designer's authority related to Modifications is described in Article 11. D. OAR's authority related to Applications for Payment is described in Articles 15 and 17. 10.6 Decisions on Requirements of Contract Documents and Acceptability of Work A. OAR is to render decisions regarding non-technical or contractual / administrative requirements of the Contract Documents and will coordinate the response of the OPT to Contractor. B. Designer is to render decisions regarding the conformance of the Work to the requirements of the Contract Documents. Designer will render a decision to either correct the Defective Work,or accept the Work under the provisions of Paragraph 16.04,if Work does not conform to the Contract Documents. OAR will coordinate the response of the OPT to Contractor. C. OAR will issue a Request for a Change Proposal if a Modification is required. OAR will provide documentation for changes related to the non-technical or contractual / administrative requirements of the Contract Documents. Designer will provide documentation if design related changes are required. D. Contractor may appeal Designer's decision by submitting a Change Proposal if Contractor does not agree with the Designer's decision. 10.7 Limitations on OAR's and Designer's Authority and Responsibilities A. OPT is not responsible for the acts or omissions of Contractor's Team. No actions or failure to act, or decisions made in good faith to exercise or not exercise the authority or responsibility available under the Contract Documents creates a duty in contract, tort, or otherwise of the OPT to the Contractor or members of the Contractor's Team. Excerpt from Form 00 72 00 General Conditions-12 Rev 18-2 • ARTICLE 11—AMENDING THE CONTRACT DOCUMENTS;CHANGES IN THE WORK ARTICLE 12—CHANGE MANAGEMENT 12.1 Requests for Change Proposal A. Designer will initiate Modifications by issuing a Request for a Change Proposal(RCP). 1. Designer will prepare a description of proposed Modifications. 2. Designer will issue the Request for a Change Proposal form to Contractor. A number will be assigned to the Request for a Change Proposal when issued. 3. Return a Change Proposal in accordance with Paragraph 12.02 to the Designer for evaluation by the OPT. 12.2 Change Proposals A. Submit a Change Proposal(CP)to the Designer for Contractor initiated changes in the Contract Documents or in response to a Request for Change Proposal. 1. Use the Change Proposal form provided. 2. Assign a number to the Change Proposal when issued. 3. Include with the Change Proposal: a. A complete description of the proposed Modification if Contractor initiated or proposed changes to the OPT's description of the proposed Modification. b. The reason the Modification is requested, if not in response to a Request for a Change Proposal. c. A detailed breakdown of the cost of the change if the Modification requires a change in Contract Price. The itemized breakdown is to include: 1) list of materials and equipment to be installed; 2) Man hours for labor by classification; 3) Equipment used in construction; 4) Consumable supplies,fuels,and materials; 5) Royalties and patent fees; 6) Bonds and insurance; 7) Overhead and profit; 8) Field office costs; 9) Home office cost;and 10) Other items of cost. d. Provide the level of detail outlined in the paragraph above for each Subcontractor or Supplier actually performing the Work if Work is to be provided by a Subcontractor or Supplier. Indicate appropriate Contractor mark-ups for Work Excerpt from Form 00 72 00 General Conditions-13 Rev 18-2 • provided through Subcontractors and Suppliers. Provide the level of detail outline in the paragraph above for self-performed Work. e. Submit Change Proposals that comply with Article 15 for Cost of Work. f. Provide a revised schedule.Show the effect of the change on the Project Schedule and the Contract Times. B. Submit a Change Proposal to the Designer to request a Field Order. C. A Change Proposal is required for all substitutions or deviations from the Contract Documents. D. Request changes to products in accordance with Article 25. 12.3 Designer Will Evaluate Request for Modification A. Designer will issue a Modification per Article 11 if the Change Proposal is acceptable to the Owner. Designer will issue a Change Order or Contract Amendment for any changes in Contract Price or Contract Times. 1. Change Orders and Contract Amendments will be sent to the Contractor for execution with a copy to the Owner recommending approval. A Work Change Directive may be issued if Work needs to progress before the Change Order or Contract Amendment can be authorized by the Owner. 2. Work Change Directives, Change Orders, and Contract Amendments can only be approved by the Owner. a. Work performed on the Change Proposal prior to receiving a Work Change Directive or approval of the Change Order or Contract Amendment is performed at the Contractor's risk. b. No payment will be made for Work on Change Orders or Contract Amendments until approved by the Owner. B. The Contractor may be informed that the Request for a Change Proposal is not approved and construction is to proceed in accordance with the Contract Documents. ARTICLE 13—CLAIMS 13.1 Claims 13.2 Claims Process A. Claims must be initiated by written notice.Notice must conspicuously state that it is a notice of a Claim in the subject line or first sentence.Notice must also list the date of first occurrence of the claimed event. B. Claims by Contractor must be in writing and delivered to the Owner, Designer and the OAR within 7 days: 1. After the start of the event giving rise to the Claim;or 2. After a final decision on a Change Proposal has been made. Excerpt from Form 00 72 00 General Conditions-14 Rev 18-2 C. Claims by Contractor that are not received within the time period provided by section 13.02(B) are waived. Owner may choose to deny such Claims without a formal review. Any Claims by Contractor that are not brought within 90 days following the termination of the Contract are waived and shall be automatically deemed denied. D. Claims by Owner must be submitted by written notice to Contractor. E. The responsibility to substantiate a Claim rests with the entity making the Claim. Claims must contain sufficient detail to allow the other party to fully review theClaim. 1. Claims seeking an adjustment of Contract Price must include the Contractor's job cost report. Provide additional documentation as requested by OAR. 2. Claims seeking an adjustment of Contract Time must include native schedule files in Primavera or MS Project digital format. Provide additional documentation as requested by OAR. F. Contractor must certify that the Claim is made in good faith, that the supporting data is accurate and complete,and that to the best of Contractor's knowledge and belief,the relief requested accurately reflects the full compensation towhich Contractor is entitled. G. Claims by Contractor against Owner and Claims by Owner against Contractor,including those alleging an error or omission by Designer but excluding those arising under Section 7.12,shall be referred initially to Designer for consideration and recommendation toOwner. H. Designer may review a Claim by Contractor within 30 days of receipt of the Claim and take one or more of the following actions: 1. Request additional supporting data from the party who made the Claim; 2. Issue a recommendation; 3. Suggest a compromise;or 4. Advise the parties that Designer is not able to make a recommendation due to insufficient information or a conflict of interest. I. If the Designer does not take any action,the claim shall be deemed denied. J. The Contractor and the Owner shall seek to resolve the Claim through the exchange of information and direct negotiations. If no agreement is reached within 90 days, the Claim shall be deemed denied. The Owner and Contractor may extend the time for resolving the Claim by mutual agreement. Notify OAR of any actions taken on a Claim. K. Owner and Contractor may mutually agree to mediate the underlying dispute at any time after a recommendation is issued by the Designer. Excerpt from Form 00 72 00 General Conditions-15 Rev 18-2 ARTICLE 14—PREVAILING WAGE RATE REQUIREMENTS ARTICLE 15—COST OF THE WORK;ALLOWANCES;UNIT PRICE WORK ARTICLE 16—TESTS AND INSPECTIONS;CORRECTION,REMOVAL,OR ACCEPTANCE OF DEFECTIVE WORK ARTICLE 17—PAYMENTS TO CONTRACTOR;SET-OFFS;COMPLETION;CORRECTION PERIOD ARTICLE 18—SUSPENSION OF WORK AND TERMINATION ARTICLE 19— PROJECT MANAGEMENT ARTICLE 20—PROJECT COORDINATION 20.1 Work Included 20.2 Document Submittal 20.3 Communication During Project A. The OAR is to be the first point of contact for all parties on matters concerning this Project. B. The Designer will coordinate correspondence concerning: 1. Documents, including Applications for Payment. 2. Clarification and interpretation of the Contract Documents. 3. Contract Modifications. 4. Observation of Work and testing. 5. Claims. 20.4 Requests for Information A. Submit Request for Information (RFI) to the Designer to obtain additional information or clarification of the Contract Documents. 1. Submit a separate RFI for each item on the form provided. 2. Attach adequate information to permit a written response without further clarification. Designer will return requests that do not have adequate information to the Contractor for additional information. Contractor is responsible for all delays resulting from multiple document submittals due to inadequate information. 3. A response will be made when adequate information is provided. Response will be made on the RFI form or in attached information. B. Response to an RFI is given to provide additional information, interpretation, or clarification of the requirements of the Contract Documents, and does not modify the Contract Documents. C. Designer will initiate a Request for a Change Proposal(RCP)per Article 12 if the RFI indicates that a Contract Modification is required. Excerpt from Form 00 72 00 General Conditions-16 Rev 18-2 • ARTICLE 21—QUALITY MANAGEMENT ARTICLE 22—FINAL RESOLUTION OF DISPUTES ARTICLE 23—MINORITY/MBE/DBE PARTICIPATION POLICY ARTICLE 24—DOCUMENT MANAGEMENT ARTICLE 25—SHOP DRAWINGS 25.1 Work Included A. Shop Drawings are required for those products that cannot adequately be described in the Contract Documents to allow fabrication, erection, or installation of the product without additional detailed information from the Supplier. B. Submit Shop Drawings as required by the Contract Documents and as reasonably requested by the OPT to: 1. Record the products incorporated into the Project for the Owner; 2. Provide detailed information for the products proposed for the Project regarding their fabrication, installation,commissioning,and testing;and 3. Allow the Designer to advise the Owner if products proposed for the Project by the Contractor conform, in general,to the design concepts of the Contract Documents. 25.2 Quality Assurance 25.3 Contractor's Responsibilities 25.4 Shop Drawing Requirements A. Provide adequate information in Shop Drawings and Samples so Designer can: 1. Assist the Owner in selecting colors,textures,or other aestheticfeatures. 2. Compare the proposed features of the product with the specified features and advise Owner that the product does,in general,conform to the Contract Documents. 3. Compare the performance features of the proposed product with those specified and advise the Owner that the product does,in general,conform to the performance criteria specified in the Contract Documents. 4. Review required certifications, guarantees, warranties, and service agreements for compliance with the Contract Documents. Excerpt from Form 00 72 00 General Conditions-17 Rev 18-2 • 25.5 Special Certifications and Reports 25.6 Warranties and Guarantees 25.7 Shop Drawing Submittal Procedures 25.8 Sample and Mockup Submittal Procedures 25.9 Requests for Deviation 25.10 Designer Responsibilities A. Shop Drawings will be received by the Designer. Designer will log the documents and review per this Article for general conformance with the Contract Documents. 1. Designer's review and approval will be only to determine if the products described in the Shop Drawing or Sample will, after installation or incorporation into the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. Designer's review and approval will not extend to means, methods, techniques, sequences,or procedures of construction or to safety precautions or programs incident thereto. 3. Designer's review and approval of a separate item as such will not indicate approval of the assembly in which the item functions. B. Comments will be made on items called to the attention of the Designer for review and comment. Any marks made by the Designer do not constitute a blanket review of the document submittal or relieve the Contractor from responsibility for errors or deviations from the Contract requirements. 1. Designer will respond to Contractor's markups by either making markups directly in the Shop Drawings file using the color green or by attaching a Document Review Comments form with review comments. 2. Shop Drawings that are reviewed will be returned with one or more of the following status designations: a. Approved: Shop Drawing is found to be acceptable as submitted. b. Approved as Noted:Shop Drawing is Approved so long as corrections or notations made by Designer are incorporated into the Show Drawing. c. Not Approved: Shop Drawing or products described are not acceptable. 3. Shop Drawing will also be designated for one of the following actions: a. Final distribution: Shop Drawing is acceptable without further action and has been filed as a record document. b. Shop Drawing not required:A Shop Drawing was not required by the Contract Documents. Resubmit the document per Article 26. Excerpt from Form 00 72 00 General Conditions-18 Rev 18-2 • c. Cancelled: This action indicates that for some reason, the Shop Drawing is to be removed from consideration and all efforts regarding the processing of that document are to cease. d. Revise and resubmit:Shop Drawing has deviations from the Contract Documents, significant errors, or is inadequate and must be revised and resubmitted for subsequent review. e. Resubmit with corrections made: Shop Drawing is "Approved as Noted," but has significant markups. Make correction and notations to provide a revised document with markup incorporated into the original document so that no markups are required. f. Returned without review due to excessive deficiencies: Document does not meet the requirement of the Specifications for presentation or content to the point where continuing to review the document would be counterproductive to the review process or clearly does not meet the requirements of the Contract Documents. Revise the Shop Drawing to comply with the requirements of this Section and resubmit. g. Actions a through c will close out the Shop Drawing review process and no further action is required as a Shop Drawing. Actions d through f require follow up action to close out the review process. 4. Drawings with a significant or substantial number of markings by the Contractor may be marked "Approved as Noted" and "Resubmit with corrections made" These drawings are to be revised to provide a clean record of the Shop Drawing. Proceed with ordering products as the documents are revised. 5. Dimensions or other data that does not appear to conform to the Contract Documents will be marked as "At Variance With" (AVW) the Contract Documents or other information provided. The Contractor is to make revisions as appropriate to comply with the Contract Documents. C. Bring deviations to the Shop Drawings to the attention of the Designer for approval by using the Shop Drawing Deviation Request form. Use a single line for each requested deviation so the Status and Action for each deviation can be determined for that requested deviation. If approval or rejection of a requested deviation will impact other requested deviations, then all related deviations should be included in that requested deviation line so the status and action can be determined on the requested deviation as a whole. D. Requested deviations will be reviewed as possible Modification to the Contract Documents. 1. A Requested deviation will be rejected as"Not Approved" if the requested deviation is unacceptable. Contractor is to revise and resubmit the Shop Drawing with corrections for approval. 2. A Field Order will be issued by the Designer for deviations approved by the Designer if the requested deviation is acceptable and if the requested deviation will not result in a change in Contract Price or Contract Times. Requested deviations from the Contract Documents may only be approved by Field Order. 3. A requested deviation will be rejected if the requested deviation is acceptable but the requested deviation will or should result in a change in Contract Price or Contract Times. Excerpt from Form 00 72 00 General Conditions-19 Rev 18-2 • • Submit any requested deviation that requires a change in Contract Price or Contract Times as a Change Proposal for approval prior to resubmitting the Shop Drawing. E. Contractor is to resubmit the Shop Drawing until it is acceptable and marked Approved or Approved as Noted and is assigned an action per Paragraph 25.10.8 that indicates that the Shop Drawing process is closed. F. Information that is submitted as a Shop Drawings that should be submitted as Record Data or other type of document, or is not required may be returned without review, or may be deleted. No further action is required and the Shop Drawing process for this document will be closed. ARTICLE 26—RECORD DATA 26.1 Work Included 26.2 Quality Assurance 26.3 Contractor's Responsibilities 26.4 Record Data Requirements 26.5 Special Certifications and Reports 26.6 Warranties and Guarantees 26.7 Record Data Submittal Procedures 26.8 Designer's Responsibilities A. Record Data will be received by the Designer, logged,and provided to Owner as the Project record. 1. Record Data may he reviewed to see that the information provided is adequate for the purpose intended. Record Data not meeting the requirements of Paragraph 26.02 may be rejected as unacceptable. 2. Record Data is not reviewed for compliance with the Contract Documents. Comments may be returned if deviations from the Contract Documents are noted during the cursory review performed to see that the information is adequate. 3. Contractor's responsibility for full compliance with the Contract Documents is not relieved by the review of Record Data.Contract modifications can only be approved by a Modification. B. Designer may take the following action in processing Record Data: 1. File Record Data as received if the cursory review indicates that the document meets the requirements of Paragraph 26.02. Document will be given the status of "Filed as Received"and no further action is required on that Record Data. 2. Reject the Record Data for one of the following reasons: a. The document submittal requirements of the Contract Documents indicate that the document submitted as Record Data should have been submitted as a Shop Excerpt from Form 00 72 00 General Conditions-20 Rev 18-2 Drawing.The Record Data will be marked"Rejected"and "Submit Shop Drawing." No further action is required on this document as Record Data and the Record Data process will be closed. Resubmit the document as a Shop Drawing per Article 25. b. The cursory review indicates that the document does not meet the requirements of Paragraph 26.02. The Record Data will be marked "Rejected" and "Revise and Resubmit" Contractor is to resubmit the Record Data until it is acceptable and marked "Filed as Received. When Record Data is filed, no further action is required and the Record Data process will be closed. c. The Record Data is not required by the Contract Documents nor is the Record Data applicable to the Project. The Record Data will be marked "Rejected"and"Cancel -Not Required" No further action is required and the Record Data process will be closed. C. Contractor is to resubmit the Record Data until it is acceptable and marked "Filed as Received." ARTICLE 27—CONSTRUCTION PROGRESS SCHEDULE ARTICLE 28—VIDEO AND PHOTOGRAPHIC DOCUMENTATION ARTICLE 29—EXECUTION AND CLOSEOUT 29.1 Substantial Completion A. Notify the Designer that the Work or a designated portion of the Work is substantially complete per the General Conditions. Include a list of the items remaining to be completed or corrected before the Project will be considered to be complete. B. OPT will visit the Site to observe the Work within a reasonable time after notification is received to determine the status of the Project. C. Designer will notify the Contractor that the Work is either substantially complete or that additional Work must be performed before the Project will be considered substantially complete. 1. Designer will notify the Contractor of items that must be completed before the Project will be considered substantially complete. 2. Correct the noted deficiencies in the Work. 3. Notify the Designer when the items of Work in the Designer's notice have been completed. 4. OPT will revisit the Site and repeat the process. 5. Designer will issue a Certificate of Substantial Completion to the Contractor when the OPT considers the Project to be substantially complete. The Certificate will include a tentative list of items to be corrected before Final Payment will be recommended. 6. Review the list and notify the Designer of any objections to items on the list within 10 days after receiving the Certificate of Substantial Completion. Excerpt from Form 00 72 00 General Conditions-21 Rev 18-2 • 29.2 Final Inspections A. Notify the Designer when: 1. Work has been completed in compliance with the Contract Documents; 2. Equipment and systems have been tested per Contract Documents and are fully operational; 3. Final Operations and Maintenance Manuals have been provided to the Owner and all operator training has been completed; 4. Specified spare parts and special tools have been provided;and 5. Work is complete and ready for final inspection. B. OPT will visit the Site to determine if the Project is complete and ready for Final Payment within a reasonable time after the notice is received. C. Designer will notify the Contractor that the Project is complete or will notify the Contractor that Work is Defective. D. Take immediate steps to correct Defective Work. Notify the Designer when Defective Work has corrected. OPT will visit the Site to determine if the Project is complete and the Work is acceptable. Designer will notify the Contractor that the Project is complete or will notify the Contractor that Work is Defective. E. Submit the Request for Final Payment with the closeout documents described in Paragraph 29.06 if notified that the Project is complete and the Work is acceptable. ARTICLE 30—MISCELLANEOUS END OF SECTION Excerpt from Form 00 72 00 General Conditions-22 Rev 18-2