Loading...
HomeMy WebLinkAboutC2018-207 - 5/11/2018 - NA TASK ORDER NO. 1 This Task Order pertains to a Master Services Agreement for Geotechnical and Construction Materials Testing by and between City of Corpus Christi, Texas (City) and Tolunav-Wong Engineers, Inc., (Lab)dated January 16, 2018 by Motion No. M2018-005 (Agreement). Lab shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. MSA PROJECT NUMBER/NAME: 17101A Geotechnical and Construction Materials Testing TASK ORDER PROJECT NUMBER/NAME: 17101B Geotechnical and Construction Materials Testing 1. PROJECT DESCRIPTION: E17118 Cefe Valenzuela Landfill Disposal Cell Construction Sector 3C 2. SCOPE OF SERVICES—Geotechnical and construction materials testing services for the Cefe Valenzuela Landfill Disposal Cell Construction Sector 3C project more fully described in Exhibit A. 3. COMPENSATION—The total amount not to exceed for this Task Order only is$15,350.00 This Task Order is approved, and Lab may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS CHRISTI TOLUNAY-WONG ENGINEERS,INC. / r2-- - - 18 Je 'I:dmo . ., P. . Da Don R. Rokohl, P. E. Date Director of Engineering Services Branch Manager 826 South Padre Island Drive Corpus Christi, TX 78416 (361)884-5050 Office drokohl@tweinc.com Fund Name Accounting Unit Account No. Activity No. Amount Landfill 2015CO 3367-033 550920 E17118-01-3367-EXP $15,350.00 2018-207 5/11/18 VAY WONG\TWE Task Order No.1 Task Order No.1 Testing Agreement Page 1 of 1 Tolunay-Wong Engineers Inc. INDEXED TASK ORDER FUNDING REQUEST FORM CONTRACT MSA# AND TITLE: 17101A Geotechnical and Construction Materials Testing(TWE) TASK ORDER PROJECT#/TITLE: 17101B Geotechnical and Construction Materials Testing(TWE) REQUESTING DEPARTMENT:SOLID WASTE FUND NAME/FUND#-ME: ACCOUNT: ACTIVITY: 3367-033 550920 El 7118-01-3367-EXP CONSULTANT:TOLUNAY-WONG ENGINEERING, INC. TASK ORDER#: 1 SCOPE OF WORK:SEE PROPOSAL TASK ORDER IS FOR PROJECT(S)LISTED BELOW: PROJECT# FEE PROJECT NAME El 7118 S 15,350 CEFE VALENZUELA LANDFILL DISPOSAL CELL CONSTRUCTION SECTOR 3C S 15,350 Grand Total Luis Vargas PM PRINT NAME: SI ATI IRE: DAT : Exhibit A Page 1 of 5 • • TOLUNAY-WONG 826 South Padre Island Drive ENGINEERS Corpus Christi,Texas 78416 Phone:(361)884-5050 March 2,2018 City of Corpus Christi P.O. Box 9277 Corpus Christi,Texas 78469-9277 Via e-Mail: LuisVa@cctexas.com Phone: (361)826-3500 Attn: Mr.Luis Vargas Re: Construction Materials Testing Services For: E17118 Cefe Valenzuela Landfill Sector 3C Development Corpus Christi,Texas TWE Proposal No.P18-0034 Mr.Vargas: Tolunay-Wong Engineers (TWE) appreciates the opportunity to submit our proposal to provide construction materials testing and inspection services for the above referenced project. The proposed scope of services was based on the testing schedule and the project plans downloaded from the CivCast website. The cost estimate contained herein was developed using the scope of services from the drawings and specification and the unit rates presented in the Master Service Agreement (Project No. 17101A) between the City of Corpus Christi and Tolunay-Wong Engineers, Inc. We understand that the City will issue a Project Task Order upon acceptance of this proposal in accordance with the MSA and the Task order will serve as our authorization to proceed with our services for the project. Tolunay-Wong Engineers has established a reputation for excellence in the materials engineering field through a business philosophy based on quality professional services responsive to the needs of our clients. We thank you for the opportunity to serve you with this philosophy and your consideration for this project. Please do not hesitate to contact us,if you have any questions regarding the proposal or if additional information is needed. Respectfully submitted, Tolunay-Wong Engineers,Inc. 14 (2, ?c t-k Don R.Rokohl,P.E. Branch Manager drokohl@tweinc.com DRR/drr Exhibit A Page 2 of 5 Geotechnical Engineering*Environmental Field and Consulting Services•Construction Materials Testing*Deep Foundations Testing TOLUNAY-WONG March 2,2018 Proposal No.P18-0034 Page 2 of 4 INTRODUCTION TWE understands the importance of this project to you and the special needs associated with construction of a project of this type. Of particular importance is for the overall project team to be comprised of experienced professionals working together toward a common objective. This objective is to obtain a quality project, meeting the intent of the project specifications,as well as completion on schedule and within budget. From our Corpus Christi facility located at 826 South Padre Island Drive, we will provide experienced engineering technicians to perform the on-site testing and inspection services. Additionally, we meet the requirements of ASTM E-329 "Standard Practice for Inspection and Testing Agencies for Concrete, Steel and Bituminous Materials Used in Construction" regarding qualifications of the testing laboratory. Additionally, our Corpus Christi laboratory is accredited in construction materials testing by the American Association for Laboratory Accreditation(A2LA). WORK PLAN TWE's approach to providing materials testing services is to assign qualified engineering technicians, directed by Senior Professional Engineers, experienced in their respective disciplines. Our assigned Project Manager will provide communication, service direction, and overall project coordination. It is presumed that the contractor will be encouraged to provide their own formalized quality control program separate and apart from our acceptance inspection/testing program stated herein. We anticipate providing the majority of the required testing services for this particular project on a "part- time"basis. The anticipated services required on this project are as follows: A. In-Place Soil Compaction(nuclear method) B. Cast In-Place Portland Cement Concrete Inspection/Testing All reports of materials tests and inspection services provided will be issued to appropriate members of the project team. In the event individual reports indicate potential problems or items of non-conformance to the project specifications,you will be contacted as soon as possible. SCOPE OF SERVICES The specific materials monitoring services and laboratory tests anticipated for this project are as follows: A. In-Place Soil Compaction(Nuclear Method) • The technician will obtain samples of soil, borrow material and/or base materials and deliver them to our laboratory facility for testing. Laboratory testing will include Moisture/Density Relationships,Atterberg Limit determinations and sieve analysis. Additional laboratory testing to be performed on crushed limestone base (Type A/Grade 1) material provided will include L.A.Abrasion and laboratory-soaked California Bearing Ratio(CBR). • The technician will perform in-place compaction testing (nuclear method) at the frequency required by the project specifications to determine the moisture content and degree of compaction. B. Cast In-Place Portland Cement Concrete Monitoring/Testing • The technician will sample the concrete in order to perform standard field tests and prepare test cylinders in accordance with project specifications. The frequency of sampling will also be as directed by the project specifications. Standard field tests include slump, air content and temperature for normal weight concrete and will also include unit weight on all samples of lightweight concrete. • TWE will cure the test specimens and perform compressive strength tests at the age designated by project specifications. Exhibit A Geotechnical Engineering•Environmental Field and Consulting Services•Construction Materials Testing.Deep Foundations Testing Page 3 of 5 • March 2,2018 TOLUNAY-WONG Proposal No.P18-0034 Page 3 of 4 • The technician will visually estimate the slump of each load of concrete delivered and perform actual slump tests and other standard field tests when test specimens are prepared, or as necessary to evaluate concrete consistency. • The on-site technician will monitor the concrete temperature, ambient temperature, mixing time, and placement procedures. The technician will also sample concrete at the frequency specified in the project specifications. • The technician will record detailed information regarding the location of the placement, date of the placement,concrete mixture strength requirement and all other pertinent information. COST ESTIMATE&GENERAL NOTES In this section of the proposal you will find our cost estimate. Additional services or tests requested and not specifically addressed in this proposal will be invoiced per the Master Service Agreement(Project No. 17101A) between the City of Corpus Christi and Tolunay-Wong Engineers,Inc. Based on the testing schedule, the project bid documents (plans/Specifications) provided to us at this time,and the anticipated construction schedule,we have established what we believe is the most realistic cost estimate for this project. Please remember that the units stated are only an estimate. Due to factors beyond our control such as weather, unforeseen conditions, contractor expertise,contractor scheduling, etc.,the cost of our services may vary from the estimated amount. We estimate the cost of the construction materials testing for our proposed Scope of Services (Base Bid) will be$15,350.00 as detailed in the following section,although all services will be invoiced on a time and materials basis. A minimum 4-hour labor equivalent charge is applicable for all field testing and inspection services. Overtime rates for field personnel are applicable for all hours worked in excess of 8 hours per day, weekends, and holidays and are assessed at 1.5 times the standard rates. All field hours will be charged portal to portal from our Corpus Christi laboratory.All sample pick-ups will be charged travel time from portal to portal and will include associated vehicle charges.Administrative costs, Engineering consultation and evaluation in connection with field and laboratory testing services will be charged at a rate of approximately one hour for each 20 hours of field work performed. Our prices include copies of our reports distributed through e-mail in accordance with your instructions. Additional copies mailed at$0.50 per page. Direct expenses incurred in connection with the project will be invoiced at cost plus 15%for handling. Travel and lodging expenses for out of town assignments will be invoiced at cost plus 15%or $125.00 per day, whichever is greater. Our terms are net 30 days upon receipt of invoice. Invoices will be submitted on a monthly basis. COST ESTIMATE SUMMARY Description Unit Quantity Rate I Extension Earthwork Testing 1 Construction Materials Technician, HR. ea. 60 $60.00 $3,600.00 2 Vehicle Charge ea. 15 $75.00 $1,125.00 3 Nuclear Density Gauge, Day ea. 15 $50.00 $750.00 4 Sample Pick-up ea. 2 $175.00 $350.00 Geotechnical Engineering•Environmental field and Consulting Services•Construction Materials Testing*Deep Foundations Testing Exhibit A Page 4 of 5 TOLUNAY-WONG March 2,2018 Proposal No.P18-0034 Page 4 of 4 Concrete Testing 5 Construction Materials Technician, HR. ea. 56 $60.00 $3,360.00 6 Vehicle Charge ea. 14 $75.00 $1,050.00 7 Sample Pick-up ea. 2 $175.00 $350.00 Laboratory Testing 8 Standard Compaction Effort-ASTM D 698 ea. 2 $160.00 $320.00 (Proctor) _ 9 Modified Compaction Effort-ASTM D 1557 ea. 1 $180.00 $180.00 10 Atterberg Limits-ASTM D 4318 ea. 3 $65.00 $195.00 11 Percent Finer Minus No. 200-ASTM D 1140 ea. 3 $50.00 $150.00 12 Sieve Analysis, Through No. 200 Sieve (ASTM D ea. 1 $60.00 $60.00 422) 13 TxDOT Triaxial Series per specimen (Tex-117E) ea. 3 $110.00 $330.00 14 California Bearing Ratio-Single Point (ASTM D ea. 1 $350.00 $350.00 1883) 15 LA Abrasion Loss of Limestone Base ea. 1 $550.00 $550.00 16 Wet Ball Mill Test ea. 1 $300.00 $300.00 17 Compressive Strength of Concrete Cylinders ea. 70 $20.00 $1,400.00 Project Management 18 Project Manager, Hr. ea. 6 $105.00 $630.00 19 Administrative Support, Hr. ea. 6 $50.00 $300.00 Total Cost Estimate $15,350.00 ASSUMPTIONS: The cost estimate is based on the following assumptions and our experience on similar projects: 1. The project bid documents and testing schedule provided by the Client and downloaded from the CivCast website. 2. Soil sample pick-up charges will not be assessed if retrieval of soil sample(s)occurs during performance of other scheduled testing at the site. 3. Concrete sample pick-up charges will not be assessed if retrieval of concrete test specimens occurs during performance of other scheduled testing at the site. 4. Concrete compressive strength samples taken will consist of five (5) 4"x8" cylinders to be tested as follows:one(1)at 7 day's compressive strength,three(3)at 28 day's compressive strength,and one(1)to be held as a reserve. Exhibit A Geotechnical Engineering*Environmental Field and Consulting Services*Construction Materials Testing*Deep Foundations Testing Page 5 of 5 From: Lunda Herndon To: Gina Hohmann Cc: Melinda Cantu-Martin Subject: RE:Funds Verification:E17118 Cefe Valenzuela Landfill Disposal Cell Construction Sector 3C Date: Thursday,May 10,2018 3:29:18 PM Attachments: imaoe001.ioq The funding source activity needs to be changed to E17118-01-3367-EXP Fund are available! From:Gina Hohmann Sent:Thursday, May 10, 2018 12:08 PM To: Lynda Herndon <LyndaS@cctexas.com> Cc: Melinda Cantu-Martin<MelindaCM@cctexas.com> Subject: Funds Verification: E17118 Cefe Valenzuela Landfill Disposal Cell Construction Sector 3C Lynda, Please verify the following: Fund Name Accounting Account Activity No. Amount Unit No. Landfill 2015C0 3367-033 550920 E17101-01- $15,350.00 3367-EXP Kind Regards, G►,nc�M. liahmann. Contracts/Funds Administrator (361) 826-8466 City of Corpus Christi I Engineering Services Department imgres 8