HomeMy WebLinkAboutC2018-214 - 5/17/2018 - NA CITY OF CORPUS CHRISTI
CONTRACT FOR PROFESSIONAL SERVICES
AMENDMENT NO. 1
The City of Corpus Christi, Texas, a Texas home-rule municipal corporation ("City") and Hanson
Professional Services, Inc., ("Consultant"), agree to the following amendments to the Contract for
Professional Services for Paul Jones Sports Facility Minor Site Improvements (E162541:
Original Contract April 21, 2016 Administrative Approval $29,800.00 I
In the Original Contract, Exhibit A, Scope of Services shall be amended as set forth in the attached
Amendment No.1, Exhibit A.
In the Original Contract, Fees shall be amended based on the modified scope of services in the attached
Amendment No. 1, Exhibit A for a fee not to exceed $2,377.25, for a total restated fee not to exceed
$32,177.25.
All other terms and conditions of the April 21, 2016 Contract for Professional Services between the City
and Consultant, and of any amendments to that contract, which are not specifically addressed herein
shall remain in full force and effect.
CITY OFC PUS CHRISTI HANS NI;0" -SIONAL SERVICES, INC.
idLO as- o 3 - r g
Jeff H. dmi6nds, P.E. Date Wilfredo River., P.E. Date
Director of Engineering Service 4501 Gollihar Road
Corpus Christi, TX 78411
(361) 814-9900 Office
wrivera@hanson-inc.com
APPROVED AS TO LEGAL FORM
2018.05.08
09:32:29 -05'00'
Assistant City Attorney Date
Accounting Unit: 3290-141
Account: 550950
Activity: E 16254-01-3290-EXP
Account Category: 50950
Fund Name: Park & Rec 08 TN
Amount: $2,377.25
Amendment No.1
2018-214 Contract for Professional Services
5/17/18 Page t of t
Hanson Professional Services Inc.
INDEXED
•
•
HANSON�� Professional Services Inc.
4501 Goldner
Road
eninertel rurr,y1Aleis,au, Corpus Christ,,Tx.78401
(361.014.9900
www.hanson.tnc.com
March 26, 2018
Mr. J.H. Edmonds, P.E.
Director of Engineering Services
P.O. Box 9277
Corpus Christi, Texas 78469-9277
Re: Amendment 1 — Paul Jones Sports Facility Minor Site Improvements
City Project No. E16254
NEI/Hanson Project No.16L0254
Dear Mr. Edmonds:
Please accept this letter as our formal request for our Contract Amendment No. 1 on the above
referenced project. The original agreement, processed as a small Architect/Engineer(NE) agreement,
was issued on April 14, 2016. The work anticipated under this contract amendment consists of
additional drainage study analysis resulting from the recently completed Ennis Joslin Ditch and Road
Extension. A portion of the Immediate Drainage Improvements and Bidding/Construction
Administration scope has also been reduced.
Project Description:
The original contract scope was to prepare a small drainage analysis that establishes various options
for drainage the Paul Jones Sports Complex towards the proposed Ennis Joslin Extension being
completed by the City's Consultant. The drainage analysis was to be used by the City's Consultant for
establishing drainage easements and upsizing Ennis Joslin drainage components based on a 25-year
and 100-year Storm Event.
Flow data was provided to the City's Consultant for the Ennis Joslin Extension. The final design did not
include the Paul Jones Sports Complex flow data, allowance for additional pond discharge or the 25-
year and 100-year water surface for the proposed improvements. The ditch improvements designed by
the City's Consultant have been constructed. In order to properly evaluate the effect of the pond
discharge on the Ennis Joslin Extension additional, drainage system analysis will be required. The 25-
year and 100-year water surface of the recently constructed Ennis Joslin Extension Improvements will
need to be determined. The allowable discharge from the Paul Jones Sports Complex will then need to
be assessed.
The original contract scope included addressing immediate drainage improvements which has been
requested to be removed from the project scope. The Bidding/Construction Phase has been asked to
be removed.
Exhibit A
11111111111111111111
Mr. J.H. Edmonds
March 26, 2018
Scope of Services:
Drainage Study (Additional Analysis)
1. Review of planned improvements to the upstream drainage system at the Ennis Joslin Road
Extension and Ennis Joslin Ditch Extension (Off-Site Improvements).
2. Evaluate the current as-built condition of the Off-Site Improvements.
3. Review the Engineering Letter Report provided by the City for the Off-Site Improvements.
Determine the allowable discharge used in the Off-Site Improvement Design.
4. Determine the water surface elevation of the 5-year 25-year and 100-year storm event for the
Off-Site Improvements.
5. Evaluate the allowable discharge to determine the effect on the proposed Ennis Joslin water
surface elevation.
Immediate Drainage Improvements (Reduction in Scope)
Field work and preliminary design review has already been completed.
1. The final design and recommendations for all items detailed in the Immediate Drainage
Improvements has been removed.
2. The Bidding/Construction Administration for Immediate Drainage Improvements will be removed
•
from the scope.
•
Long Term Drainage Improvements (Reduction in Scope)
The 60% bid documents have already been completed.
1. The City will either change order the work into the Ennis Joslin project or complete the work
under an IDIQ contract. The bid phase and construction administration phase will be removed
from the scope.
Project Summary of Fees:
Item Task Original Fee Amended Fee Revised Fee
A. Drainage Study $5,630.00 $10,106.00 $15,736.00
Construction Plans for Immediate Drainage
B. Improvements $3,370.00 ($866.25) $2,503.75
Bidding/Construction Administration for
C. Immediate Drainage Improvements $4,575.00 ($4,575.00) $0.00
D. Long Term Drainage Improvements $16,225.00 ($2,287.50) $13,937.50
Total $29,800.00 $2,377.25 $32,177.25
Mr. J.H. Edmonds
March 26, 2018
Schedule:
EXHIBIT A
PROJECT SCHEDULE(Revision 4)
Paul loon Sporty Facility Mnor Site Improvements(Prosed Number E16154)
•
Weekly Progro"Derttn sS S, Woeld•LProgre Is Cunstrudlon
ea
' Ellg
X- . o o vi r- 0.1 0 0 o i3 E R R n g R o h R rG g g N
ri R g ei ri n
fi !i fi k 8 8 1{� z oC d nj pi 4 g d .'i e.. xi 2 u
Task-Paul tones Spoils fadllty lmprevemenlo
1.1 Maitre the Drainage Study
1.11ong Term Drainage Improvements Design Pham
A.30%Design Phase
City Review of Drainage Report and 30%Ptana
_
6.90%Design Plisse
City Revof Plans
C.Signed end Sealed eld
Documents IMMIE
. I I I I . i 1 f
1.3 Construction I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
The Amendment would result in an overall increase to the project fee of$2,377.25 totaling $32,177.25.
Once again we thank you for the opportunity to assist you with this project and we look forward to
working with you, City Staff and the City Council. Should you have any questions or require any
additional information, please do not hesitate to call.
Sincerely,
HANSON PROF NAL SERVICES, INC.
WAJA ,
Wilfredo Rivera Jr., P.E.
Assistant Vice-President/Senior Project Manager
I:/ 16L0254/Agreements/Amendment No. 1 Request (032618)
Basic Services:
Preliminary Phase
Design Phase
Bid Phase
Construction Phase
Subtotal Basic Services
Additional Services:
Permitting
Warranty Phase
Inspection
Platting Survey
0 & M Manuals
SCADA
Subtotal Additional Services
Summary of Fees:
Basic Services Fees
Additional Services Fees
Total of Fees
COMPLETE PROJECT NAME
Project No. XXXX
Invoice No. 12345
Invoice Date 01/01/2017
Contract Amd No. 1 Amd No. 2
Total
Contract
$1,000.00
$0.00
50.00
$1,000.00
$2,000.00
$1,000.00
$0.00
$3,000.00
$500.00
$0.00
$250.00
$750.00
$2,500.00
$0.00
$1,000.00
$3,500.00
$6,000.00
$1,000.00
$1,250.00
$8,250.00
$0.00
$2,000.00
50.00
$0.00
$2,000.00
$0.00
$1,120.00
$0.00
$1,120.00
$0.00
50.00
$1,627.00
$1,627.00
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
$2,000.00
51,120.00
51,627.00
$4,747.00
$6,000.00
$1,000.00
51,250.00
$8,250.00
52,000.00
$1,120.00
51,627.00
$4,747.00
58,000.00
$2,120.00
52,877.00
$12,997.00
Current
Invoice
Previous
Invoice
Total
Invoice
50.00
$1,000.00
$1,000.00
$1,000.00
$500.00
$1,500.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,000.00
$1,500.00
$2,500.00
0.0%
$500.00
$0.00
$500.00
$0.00
$0.00
50.00
$0.00
$0.00
$0.00
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
$500.00
$0.00
$500.00
$1,000.00
$1,500.00
$2,500.00
$500.00
$0.00
$500.00
$1,500.00
$1,500.00
$3,000.00
Notes:
If needed, update this sample form based on the contract requirements.
If applicable. refer to the contract for information on what to include with time and materials (T&M).
Sample form for:
Payment Request
AE Contract
Revised 02/01/17
Remaining
Balance
Percent
Complete
$0.00
100.0%
$1,500.00
50.0%
$750.00
0.0%
$3,500.00
0.0%
55,750.00
30.3%
51,500.00
25.0%
51,120.00
0.0%
$1,627.00
0.0%
TBD
TBD
TBD
TBD
TBD
TBD
$4,247.00
10.5%
$5,750.00
30.3%
54,247.00
10.5%
$9,997.00
23.1%
EXHIBIT B
Page 1 of 1
•
EXHIBIT C
Insurance Requirements
Pre-Design, Design and General Consulting Contracts
1.1 Consultant must not commence work under this agreement until all required insurance has been
obtained and such insurance has been approved by the City. Consultant must not allow any
subcontractor to commence work until all similar insurance required of any subcontractor has been
obtained.
1.2 Consultant must furnish to the Director of Engineering Services with the signed agreement a copy
of Certificates of Insurance (COI) with applicable policy endorsements showing the following minimum
coverage by an insurance company(s)acceptable to the City's Risk Manager.A waiver of subrogation
is required on all applicable policies. Endorsements must be provided with COI. Project name
and or number must be listed in Description Box of COI.
TYPE OF INSURANCE MINIMUM INSURANCE COVERAGE
30-written day notice of cancellation, Bodily Injury and Property Damage
- required on all certificates or by Per occurrence - aggregate
applicable policy endorsements
PROFESSIONAL LIABILITY $1,000,000 Per Claim
(Errors and Omissions)
If claims made policy, retro date must be
prior to inception of agreement, have
extended reporting period provisions and
identify any limitations regarding who is
insured.
1.3 In the event of accidents of any kind related to this agreement, Consultant must furnish the City
with copies of all reports of any accidents within 10 days of the accident.
1.4 Consultant shall obtain and maintain in full force and effect for the duration of this Contract, and
any extension hereof, at Consultants sole expense, insurance coverage written on an occurrence basis,
by companies authorized and admitted to do business in the State of Texas and with an A.M. Best's
rating of no less than A- VII. Consultant is required to provide City with renewal Certificates.
1.5 In the event of a change in insurance coverage, Consultant shall be required to submit a copy of
the replacement certificate of insurance to City at the address provided below within 10 business days of
said change. Consultant shall pay any costs resulting from said changes. All notices under this Article
shall be given to City at the following address:
Exhibit C
Page 1 of 2
City of Corpus Christi
Attn: Engineering Services
P.O. Box 9277
Corpus Christi, TX 78469-9277
1.6 Consultant agrees that with respect to the above required insurance,all insurance policies
are to contain or be endorsed to contain the following required provisions:
1.6.1 If the policy is cancelled, other than for nonpayment of premium, notice of such
cancellation will be provided at least 30 days in advance of the cancellation effective date
to the certificate holder.
1.6.2 If the policy is cancelled for nonpayment of premium, notice of such cancellation will be
provided within 10 days of the cancellation effective date to the certificate holder.
1.7 Within five(5)calendar days of a suspension,cancellation or non-renewal of coverage, Consultant
shall notify City of such lapse in coverage and provide a replacement Certificate of Insurance and
applicable endorsements to City. City shall have the option to suspend Consultant's performance should
there be a lapse in coverage at any time during this contract. Failure to provide and to maintain the
required insurance shall constitute a material breach of this contract.
1.8 In-addition to any other remedies the City may have upon Consultant's failure to provide and
maintain any insurance or policy endorsements to the extent and within the time herein required,the City
shall have the right to withhold any payment(s) if any, which become due to Consultant hereunder until
Consultant demonstrates compliance with the requirements hereof.
1.9 Nothing herein contained shall be construed as limiting in anyway the extent to which Consultant
may be held responsible for payments of damages to persons or property resulting from Consultant's or
its subcontractor's performance of the work covered under this agreement.
1.10 Itis agreed that Consultant's insurance shall be deemed primary and non-contributory with respect
to any insurance or self-insurance carried by the City of Corpus Christi for liability arising out of
operations under this agreement.
1.11 It is understood and agreed that the insurance required is in addition to and separate from any
other obligation contained in this agreement.
Exhibit C
Page 2 oft