Loading...
HomeMy WebLinkAboutC2018-223 - 5/29/2018 - NA • TASK ORDER NO. 5 This Task Order pertains to a Master Services Agreement for Geotechnical and Construction Materials Testing by and between City of Corpus Christi,Texas(City)and Professional Service Industries,Inc.,(Lab)dated January 16, 2018 by Motion No. M2018-005 (Agreement). Lab shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. MSA PROJECT NUMBER/NAME: 17099A Geotechnical and Construction Materials Testing TASK ORDER PROJECT NUMBER/NAME: 17099F Geotechnical and Construction Materials Testing 1. PROJECT DESCRIPTION: E17060 JC Elliot Landfill Site Improvements 2. SCOPE OF SERVICES — Services to observe, test and report on the construction material placement activities for the JC Elliot Landfill Site Improvements project, and as more fully described in Exhibit A. 3. COMPENSATION —The total amount not to exceed for this Task Order only is $11,610.00. This Task Order is approved and Lab may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORP: 'ISTI PR IOC SERVICE INDUSTRIES, INC. I _ ,�i�ii�'�./ � 5-23-2018 • Je . Edmonds, P.E. Date Henry i alindo, P.E. Date Director of Engineering Services Branch Manager 810 South Padre Island Drive Corpus Christi, TX 78416 (361) 854-4801 Office henry.galindo@psiusa.com Fund Name Accounting Unit Account No. Activity No. Amount Landfill 2015C0 3367-033 550920 El 7060-01-3367-EXP $11,610.00 2018-223 5/29/18 ,r No.5 Task Order No.5 Testing Agreement Page 1 of 1 Professional Service Industries INDEXED TASK ORDER FUNDING REQUEST FORM CONTRACT MSA#AND TITLE: 17099A Geotechnical and Construction Materials Testing(PSI) TASK ORDER PROJECT#/TITLE: 17099F Geotechnical and Construction Materials Testing(PSI) REQUESTING DEPARTMENT:SOLID WASTE FUND NAME/FUND#-ME: ACCOUNT: ACTIVITY: 3367-033 550970 El 7060-01-3367-EXP CONSULTANT:Professional Services Industries(PSI) TASK ORDER#: 5 SCOPE OF WORK:SEE PROPOSAL TASK ORDER IS FOR PROJECT(S)LISTED BELOW: PROJECT# FEE PROJECT NAME E17060 S 11,610 JC Elliott Site Improvements 511,610 Grand Total LUIS VARGAS PM PRINT NAME: S G AT-URE: 4/26/2018 DATE: K:\Engineering\MSA TESTING TASK ORDERS\PSI\Task Order No.5 Exhibit A Page 1 of 4 • ntertek iPli Total Quaity.ksured. April 25,2018 City of Corpus Christi Engineering Services 1201 Leopard Street Corpus Christi,Texas 78401 Attn: Mr. Luis Vargas, EIT Email: LuisVae.cctexas.com Phone: (361)826-3528 Re: Construction Materials Testing and Observation Proposal Project No. E17060 JC Elliot Landfill Site Improvements 2018/2019 MSA Geotechnical and Materials Testing Corpus Christi,Texas PSI Proposal No.: 0325-242933 Dear Mr.Vargas: Professional Service Industries, Inc. (PSI) is pleased to have been selected based on qualifications to perform Construction Materials Testing and Observation Services on Project No. E17060 JC Elliot Landfill Site Improvements. We are submitting this proposal, with fees, as the second step of negotiation process. Construction HiveTM is the primary report distribution platform used by PSI to provide a better experience to our clients. You will have 24-hour access to your reports on this website from any internet enabled device with a web browser. Construction Hive"' has powerful report viewing, retrieval and searching capabilities that allow you to find the information you are looking for faster and with greater ease. This proposal includes our services to observe, test and report on the construction material placement activities. Please note that our services will be performed on an intermittent, call-out, as requested basis. This proposal does not include full time or continuous on-site observation services. Scheduling will be the responsibility of our client's designated representative. We will commence work upon receipt of a fully executed copy of this proposal in its entirety including PSI General Conditions. Work will be performed pursuant to the PSI General Conditions. When returning the proposal, please be sure to fill out the attached Project Data Sheet for timely distribution of reports. We look forward to providing our services during construction of the above referenced project. Please do not hesitate to contact our office with any questions or concerns. • Felix Ovalle Henry Galindo, P.E. Project Manager Branch Manager Construction Services K:\Engineering\MSA TESTING TASK ORDERS\PSI\Task Order No.5 Exhibit A Page 2 of 4 . . . . . . • . inCif C' i';" Total Quality.Assured. ESTIMATED FEES PSI Proposal No. 242933 E17060 JC Elliot Landfill Site Improvements E17060-JC Elliot Landfill Site Improv. City of Corpus Christi Corpus Christi Luis Vargas,EIT Estimated Construction Materials Testing Services Project: E17060 JC Elliot Landfill Site Improvements, Corpus Christi,TX Unit Unit Item Total Quantity Price Earthwork Testing and Observation Building Pad Preparation Engineering Technician(In-place Density Testing) Per Hour 40 $40.00 $1,600.00 Laboratory Moisture Density Relationship(Standard) Each 2 $150.00 $300.00 Atterberg Limit Determination Each 2 $65.00 $130.00 Percent Passing No.200 Sieve Each 2 $50.00 $100.00 Sieve Analysis Each 2 $65.00 $130.00 Sample Preparation for Laboratory Testing Each 2 $50.00 $100.00 Daily Equipment Charge Per Trip 10 $65.00 $650.00 Sample Pickup Charge Per Trip 2 $150.00 $300.00 Transportation Charge Per Trip 10 $30.00 $300.00 Per Management Services for Supervision and Report Review Report 4 $25.00 $100.00 Subtotal $3,710.00 Paving Preparation Engineering Technician(In-place Density Testing) Per Hour 8 $40.00 $320.00 Laboratory Moisture Density Relationship(Modified) Each 1 $175.00 $175.00 Atterberg Limit Determination Each 1 $65.00 $65.00 Sieve Analysis Each 1 $65.00 $65.00 Percent Passing No.200 Sieve Each 1 $50.00 $50.00 Sample Preparation for Laboratory Testing Each 1 $50.00 $50.00 Transportation Charge Per Trip 2 $30.00 $60.00 Sample Pickup Charge(Trip,Technician,and Report Review) Per Trip 1 $150.00 $150.00 Daily Equipment Charge Per Trip 2 $65.00 $455.00 Per Management Services for Supervision and Report Review Report 6 $25.00 $150.00 Subtotal $1,540.00 Utility Trench Backfill Engineering Technician(In-place Density Testing) Per Hour 24 $40.00 $960.00 Moisture Density Gauge Min.3(D6938) Per Day 6 $65.00 $390.00 Transportation Charge Per Trip 6 $30.00 $180.00 Per Management Services for Supervision and Report Review Report 6 $25.00 $150.00 Subtotal $1,680.00 K:\Engineering\MSA TESTING TASK ORDERS\PSI\Task Order No.5 Exhibit A Page 3 of 4 Earthwork Testing and Observation Estimate $6,930.00 Concrete Testing and Observation Structural Concrete Engineering Technician(Concrete Sampling and Testing) Per Hour 12 $40.00 $480.00 Concrete Cylinders(Cured and/or Tested in Compression)(4x8) Each 12 $15.00 $180.00 Transportation Charge Per Trip 3 $30.00 $90.00 Sample Pickup Charge(Trip,Technician,and Report Review) Per Trip 2 $150.00 $300.00 Per Management Services for Supervision and Report Review Report 3 $25.00 $75.00 Subtotal $1,125.00 Miscellaneous Concrete(Sidewalk,C&G,and Manholes) Engineering Technician(Concrete Sampling and Testing) Per Hour 16 $40.00 $640.00 Concrete Cylinders(Cured and/or Tested in Compression)(4 x 8) Each 24 $15.00 $360.00 Daily Equipment Charge Per Trip 8 $65.00 $520.00 Transportation Charge Per Trip 8 $30.00 $240.00 Sample Pickup Charge(Trip,Technician,and Report Review) Per Trip 3 $150.00 $450.00 Per Management Services for Supervision and Report Review Report 6 $25.00 $150.00 Subtotal $2,360.00 Concrete Testing and Observation Estimate $3,485.00 Asphalt Testing and Observation Asphalt Testing and Observation(Paving/Parking) Engineering Technician(In-place Density Testing) Per Hour 8 $40.00 $320.00 Daily Equipment Charge Per Trip 2 $65.00 $130.00 Transportation Charge Per Trip 2 $30.00 $60.00 Extraction Sieve Analysis Each 1 $185.00 $185.00 Lab Density and Stability Each 1 $40.00 $40.00 Theoretical Density(Rice Method) Each 1 $80.00 $80.00 Thickness-Air voids(Core) Each 2 $25.00 $50.00 Theoretical Density(In-place density)(Core) Each 2 $50.00 $100.00 Coring Machine and Generator Per Day 1 $150.00 $130.00 Per Management Services for Supervision and Report Review Report 4 $25.00 $100.00 Subtotal $1,195.00 Asphalt Testing and Observation Estimate $1,195.00 Construction Materials Testing and Observation Estimated Total $11,610.00 Remarks; Estimate Only Does Not Account for Material Overruns. K:\Engineering\MSA TESTING TASK ORDERS\PSI\Task Order No.5 Exhibit A Page 4 of 4