HomeMy WebLinkAboutC2018-230 - 6/8/2018 - NA CITY OF CORPUS CHRISTI
CONTRACT FOR PROFESSIONAL SERVICES
AMENDMENT NO. 4
The City of Corpus Christi, Texas, a Texas home-rule municipal corporation ("City")and LNV, Inc. "Consultant"),
agree to the following amendments to the Contract for Professional Services for Broadway Wastewater Treatment
Plant Effluent Line Rehabilitation (Project No. E10003):
Original Contract March 15, 2010 Administrative Approval $43,816.00
Amendment No. 1 November 8, 2011 Motion No. M2011-249 $245,158.00
Amendment No. 2 October 1, 2015 Administrative Approval $37,449.00
Amendment No. 3 January 18, 2018 Administrative Approval $0.00
Amendment No. 4 April 24, 2018 Administrative Approval $0.00
Exhibit A, Scope of Services shall be amended as set forth in the attached Amendment No.4, Exhibit A.
Exhibit A, Fees shall be amended based on the modified scope of services in the attached Amendment No. 5,
Exhibit A for a fee not to exceed $0.00, for a total restated fee not to exceed $326,423.00.
All other terms and conditions of the March 15, 2010 Contract for Professional Services between the City and
Consultant,and of any amendments to that contract,which are not specifically addressed herein shall remain in full
•
force and effect.
CITY OFC• ' • I LNV, IN411r
or
I
Jeff H. dmonds, P.E. Cp1ate Dan S. =01:Ir er, P.E. Date
Director of Engineering Services Presiden
801 Navigation, Suite 300
Corpus Christi, TX 78408
(361) 883-1984 Office
(361) 883-1986 Fax
loganb@Invinc.com
danl@Invinc.com
APPROVED AS TO LEGAL FORM
' 2018.06.04
10:07:15 -05'00'
Assistant City Attorney Date
ATTEST
eb•cca 'uerta sate
City Secretary
2618-230
6/08/18
E10003-BROADWAY WWTP EFFLUENT LINE REHABILITATIONWMENDMENT NO 5 ZERO AMENDMENTVAMENDMENT NO
LNV Inc. REV 101 15
INDEXED
•
LNV
engineers architects surveyors
May 10,2018
Mr. J.H. Edmonds,P.E.
Director of Capital Programs
City of Corpus Christi
Engineering Services
P.O. Box 9277
Corpus Christi,TX 78469-9277
Re: AMENDMENT NO.5 TO PROFESSIONAL SERVICES CONTRACT
BROADWAY WWTP EFFLUENT LINE REHABILITATION
(CITY PROJECT NO. E10003)
Dear Mr. Edmonds:
With regard to the services associated with Project E10003- Broadway WWTP Effluent Line
Rehabilitation,we are proposing the following $0.00 amendment to provide technical support for
the project as requested by the City.
PROJECT BACKGROUND
The Broadway Effluent Line Rehabilitation Project (E10003) original contract was executed in
2009. The purpose of the project was initially to rehabilitate approximately 1,450 feet of the
existing 42-inch effluent line from the New Broadway Wastewater treatment Plant (NBWWTP)
to the concrete lined Salt Flats Ditch, constructing a new outfall structure and connecting to the
New Broadway WWTP. In 2011, a new Amendment was executed that included rehabilitation of
approximately 1,300 linear feet of existing 42-inch concrete flex joint effluent line and the
installation of approximately 2,600 linear feet of new 42-inch line parallel to the Salt Flats
Drainage Ditch from the New Broadway Wastewater Treatment Plant(NBWWTP) to the Port of
Corpus Christi ship channel. However, due to issues arising in obtaining the necessary discharge
permits from TCEQ concerning the line rehabilitation and outfall structure relocation,the project
was put on-hold by the City.
In July 2015 and 2016, the City and LNV explored a number of options for the rehabilitation of
the 42-inch effluent line. LNV was contacted to provide engineering services to redesign the
NBWWTP Effluent Line Rehabilitation project, which included slip lining approximately 1,300
linear feet of the existing 42 inch effluent line and the installation of approximately 2,600 linear
feet of a new 42 inch line from the New Broadway WWTP to the Port of Corpus Christi Ship
Channel. LNV submitted the design for this project to the City on September 16, 2016 but the
construction of the project was put on-hold until further notice.
Page 1 of 4 EXHIBIT A
. . .
LNV
engineers architects surveyors
Following this, in September 2017, LNV was contacted by the City to assess damage to the 42-
inch effluent line located approximately 300 feet north of the permitted outfall structure at Corpus
Christi Ship Channel. Based on the assessment, LNV assisted the City with the design for the
rehabilitation of the 42-inch reinforced concrete effluent line from New Broadway Wastewater
Treatment Plant (NBWWTP). As per original design, 1,350 LF of the 42-inch effluent line from
NBWWTP was to be rehabilitated by slip lining the existing pipe from Junction Box B to the
outtake at Salt Flats Ditch. As per the City's directive, it was decided that the effluent line would
be rehabilitated by CIPP lining instead of slip lining and construction on the project began in March
2018 and was completed in April 2018.
PURPOSE
At present, due to LNV's long-standing association with the project and familiarity with project
components and constraints, the City has requested additional technical support for analysis of
data from between 2009-2015 along with the submission of a report to United States Army Corps
of Engineers (USACE) reporting the completion of construction. In addition, LNV is to also
provide technical and supplemental support to the City as requested.
SCOPE OF SERVICES:
ADDITIONAL SERVICES:
ITEM 8—Technical and Supplemental Support
This task will be comprised of the following:
• Provide the City with record drawings and base maps from 2009-2012 showing the
location of the effluent line.
• Provide the City with relevant construction plans, as-builts, easement information,
correspondence, etc. from LNV's association with the Port of Corpus Christi Authority
(POCCA)during the earlier design phase of the project.
• Prepare a report for the USACE detailing the work performed during Amendment 3 and 4
of this project and stating that all efforts have been completed as per requirements.
• Provide CCTV data for work done on 42-inch Broadway WWTP effluent line in the past
and assist in evaluation of videos.
• Provide the City with additional technical and supplemental support as requested.
Page 2 of 4 EXHIBIT A
•
LNV
engineers I architects I surveyors
SCHEDULE
Activity Completion Date
Contract Execution-Notice to Proceed (NTP) TBD
Additional Services:
ITEM 8- Technical & Supplemental Support As per City's Request
SUMMARY OF A/E CONTRACT FEES
All work under Amendment 5 is to be performed on a Time and Material (T&M) basis. The
anticipated amount for this Amendment is $15,000. This will be a zero dollar contact and funds
will be reallocated from the Amendment 1 Construction Phase to the Technical and Supplemental
Support Phase for Amendment 5. If the level of effort requested by the City exceeds this amount,
a separate amendment will be requested.
ORIGINAL AMD.NO.1 AMD.NO.2 AMD.NO.3 AMD.NO.4 AMD.NO.5 TOTAL
CONTRACT
BASIC SERVICES
1. Preliminary Phase $ - $ - $ - $ -
2. Design Phase $ 43,816.00 $ 94,670.00 $ 27,658.00 $ 38,185.00 $204,329.00
3. Bid Phase $ - $ 9,844.00 $ 7,416.00 $ 17,260.00
4. Construction Phase $ - $ 35,552.00 $ - $ 18,420.00 $ 3,300.00 $(15,000.00) $ 42,272.00
Subtotal Basic Services(Authorized) $ 43,816.00 $140,066.00 $ 35,074.00 $ 56,605.00 $ 3,300.00 $(15,000.00) $263,861.00
ADDITIONAL SERVICES(ALLOWANCE)
1. Permit Preparation(TBD) $ - $ - $ - $ 8,800.00 $ 8,800.00
2. ROW Acquisition Survey $ - $ 19,768.00 $ 2,375.00 $ 22,143.00
3. Topographic Survey $ - $ 6,056.00 $ - $ 6,056.00
4. Environmental Issues(TBD) $ - $ - $ - $ -
5. Construction Observation Services(85 weeks) $ - $ 67,200.00 $ - $(65,405.00) $ 1,795.00
6. Start-Up Services $ - $ 8,352.00 $ - $ (3,300.00) $ 5,052.00
7. Warranty Phase $ - $ 3,716.00 $ - $ 3,716.00
8.Technical&Supplemental Support $ 15,000.00 $ 15,000.00
Subtotal Additional Services $ - $105,092.00 $ 2,375.00 $(56,605.00) $ (3,300.00) $ 15,000.00 $ 62,562.00
TOTAL AUTHORIZED FEE $ 43,816.00 $245,158.00 $ 37,449.00 $ - $ - $ - $326,423.00
Council
03-15-10 Approval on
Admin 11-08-11 Approved on Approved on Approved on Pending
10-01-15 01-23-18 04-26-18 Approval
Approval By Motion 4.
M2011-249
Page 3 of 4 EXHIBIT A
engineers I architects I surveyors
Please feel free to contact me if you have any questions or concerns.