Loading...
HomeMy WebLinkAboutC2018-231 - 6/8/2018 - NA TASK ORDER NO. 30 This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and LNV, Inc. (Consultant) dated August 16, 2016 (Agreement). Consultant shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. PROJECT NAME/NUMBER: Water and Wastewater Treatment On-Call Support, El 6264 1. PROJECT DESCRIPTION—This project provides the Utility Department with on-call services to assist with any technical, operational, maintenance, diagnostic and design concerns for the City's O.N.Stevens Water Treatment Plant and six wastewater treatment plants. 2. SCOPE OF SERVICES — Harbor Bridge Crossing Waterline Modeling Technical Support more fully described in Exhibit A. 3. COMPENSATION —The total amount not to exceed for Task Order No. 30 only is $6,740.00. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPU - ' -ISTI LNV, INC. OP 1 Jeff . Edmonds, P.E. Date Dan S. Leyen.,.r er, P.E. Date Director of Engineering Services President 801 Navigation, Suite 300 Corpus Christi, TX 78408 (361) 883-1984 Office loganb@Invinc.com Fund Name Accounting Unit Account No. Activity No. Amount I Water Operating Fund 4010-31010-062 530000 E16264-01-4010-EXP $6,740.00 I 2018-231 6/08/18 LNV Inc. INDEXED City Project No. E16264 Professional Services Contract City of Corpus Christi Water/Wastewater Treatment On-Call Support Task Authorization No. 30—Harbor Bridge Crossing Waterline Modeling Technical Support May 31 , 2018 LNV Task Order No. 30 Exhibit A Page 1 of 4 V i LNV0 t, • . 4• SCOPE OF WORK Project No. E16264 Water and Wastewater Treatment On-Call Support Task Authorization No. 30—harbor Bridge Crossing Waterline Modeling Technical Support PURPOSE The new US 181 Harbor Bridge Project is currently under construction under the directive of Texas Department of Transportation(TxDOT).The project involves demolition of existing bridge,reconstruction of parts of Crosstown Expressway and I-37 along with construction of a new bridge and connecting roadway. As a part of the restructuring required for this project and to avoid any potential conflicts,the United States Army Corp of Engineers (USACE) has requested the City of Corpus Christi to remove two (2) 16 inch waterlines located at the Harbor Bridge crossing. These lines currently feed water to the North Beach area.The City of Corpus Christi wants to evaluate the effects of pipe removal on the distribution system along with possible feasible alternatives to meet water demands in North Beach area. In order to evaluate this scenario,the City's utility department wishes to use the City of Corpus Christi Hydraulic Water Model to run various scenarios and perform the evaluation using in house staff. The purpose of this Task Authorization is to provide technical assistance to the City staff in running the model, troubleshooting any problems and evaluating the results. SCOPE OF WORK ADDITIONAL SERVICES: Task 0009 — General Engineering The Engineer will perform the following: • Attend meetings with City staff to discuss the scenario to be evaluated and troubleshoot problems. • Provide technical support as requested by the City. DELIVERABLES Not applicable SCHEDULE The schedule for this task authorization will be based on the needs of the City. Task Order No. 30 Exhibit A Page 2 of 4 • G �Jf LNV4,t AW.H' FEE The services under this task authorization will be provided on a Time and Materials (T&M) basis. The anticipated amount for this task authorization is$6,740,as shown in ATTACHMENT A.The Engineer shall not incur cost in excess of this Not-to-exceed amount without prior written authorization from the City. TASK AUTHORIZATION MANAGER The Task Authorization Manager will be the primary contact person during the performance of this work. All correspondence or inquiries should be addressed to the Task Authorization Manager. This work task will be coordinated by: .for Dan Grimsbo, P.E. A.I.C.P. Executive Director of Utilities Department City of Corpus Christi Office: 361-826-1874 Fax: 361-826-1889 Email: DanG(gcctexas.com APPROVAL The undersigned has reviewed and approved this Task Authorization and recommends LNV, Inc.to perform the work as presented: Recommended by: Oo ri+,I RAIN Yet (Printed Name) Q 5/3 t 1 g (Date) Task Order No.30 Exhibit A Page 3 of 4 Attachment A Task Authorization No.30 Man-hour and Fee Analysis Total = $ 6,740.00 LNV Inc. Project Manager Project Engineer EIT II TOTALS $ 205.00 $ 170.00 $ 120.00 Task Description Hrs. Sub -total Hrs. Sub -total Hrs. Sub -total Total Hrs. Total Fee 0009 General Engineering 4 $ 820 32 $ 5,440 4 $ 480 40 $ 6,740.00 4 $ 820 32 $ 5,440 4 $ 480 40 $ 6,740.00 Total = $ 6,740.00