Loading...
HomeMy WebLinkAboutC2018-236 - 6/8/2018 - NA TASK ORDER NO. 6 This Task Order pertains to a Master Services Agreement for Geotechnical and Construction Materials Testing by and between City of Corpus Christi, Texas (City) and Tolunay-Wong Engineers, Inc., (Lab)dated January 16, 2018 by Motion No. M2018-005 (Agreement). Lab shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. MSA PROJECT NUMBER/NAME: 17101A Geotechnical and Construction Materials Testing TASK ORDER PROJECT NUMBER/NAME: 17101G Geotechnical and Construction Materials Testing 1. PROJECT DESCRIPTION: E14054 McBride Lift Station and Force Main 2. SCOPE OF SERVICES — Services to observe, test and report on the construction material placement activities for the McBride Lift Station and Force Main project, and as more fully described in Exhibit A. 3. COMPENSATION —The total amount not to exceed for this Task Order only is$11,671.00. This Task Order is approved and Lab may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS TOLUNAY-WONG ENGINEERS, INC. Loy,_ . _ - g' 1)- 12-a 6 .6 - is Jeff Edmonds, '. . Pate Don R. Rokohl, P. E. Date Director of Engineering Services Branch Manager 826 South Padre Island Drive Corpus Christi, TX 78416 (361)884-5050 Office drokohl@tweinc.com Fund Name Accounting Unit Account No. Activity No. Amount WW 20128 RVBD 4249-042 550920 E14054-01-4249-EXP $11,671.00 2018-236 6/08/18 ,,NQ 6 Task Order No.6 Testing Agreement Page 1 of 1 Tolunay-Wong Engineers Inc. INDEXED TASK ORDER FUNDING REQUEST FORM CONTRACT MSA#AND TITLE: 17101A Geotechnical and Construction Materials Testing(TWE) TASK ORDER PROJECT#/TITLE: 17101G Geotechnical and Construction Materials Testing(TWE) REQUESTING DEPARTMENT:Engineering Services FUND NAME/FUND#-ME: ACCOUNT: ACTIVITY: 4249-042 550910 E14054-01-4249-EXP CONSULTANT:TOLUNAY-WONG ENGINEERING,INC. TASK ORDER#:6 SCOPE OF WORK:SEE PROPOSAL TASK ORDER IS FOR PROJECT(S)LISTED BELOW: PROJECT# FEE PROJECT NAME E14054 $11,671 McBride Lift Station and Force Main 511,671 Grand Total PABLO MARTINEZ PM PRINT NAME: SIGNATURE: 6/4/2018 DATE: Exhibit A Page 1 of 6 Tolunay=-Wong Engineers, Inc. 826 South Padre Island Drive * Corpus Christi,Texas 78416* Phone(361)884-5050 May 24,2018 Mr. Cesar G. Moran Engineer I City of Corpus Christi P. O. Box 9277 Corpus Christi,Texas 78469-9277 Email: CesarM@cctexas.com Re: Proposal for Limited Phase II Subsurface Investigation E 14054 McBride Lift Station Site Assessment Corpus Christi, Texas TWE Proposal No. P18-0071 Dear Mr. Moran, Tolunay-Wong Engineers, Inc. (TWE) is pleased to submit this proposal for a limited Phase II Subsurface Investigation for the above referenced project. This proposal presents a general description of the project, our proposed scope of services and the estimated cost for completion of our services associated with the project. Background The project consists of construction of a lift station and 18-in force main line near the intersection of McBride Lane and Interstate Highway 37 in Corpus Christi,Texas. Objective The objective of the subsurface investigation is to discover, document, and report potential impacted soils. The report will include a description of existing soil material, contamination (if present), and groundwater depths, if encountered. Since this effort will be limited in scope, the work will be conducted in general accordance with ASTM E 1903-11, Standard Guide for Environmental Site Assessments: Phase II Environmental Site Assessment Process. This program is designed to evaluate the presence or absence of contaminants at the Site. Scope of Work This Scope of Work is based on obtaining samples of soil to evaluate the potential for impacted surface and subsurface conditions within the Site. The primary focus of this Phase II ESA is to evaluate the existing soils for the presence of petroleum related products. Exhibit A Page 2 of 6 Tolunay-Wong TWE Proposal No.P18-0071 Engineers,Inc. May 24,2018 Page 2 Our scope is to obtain soil samples and groundwater samples, if encountered, for evaluating potentially impacted subsurface media at the Project Location. The primary focus of a Phase II ESA is to evaluate the potential that a"recognized environmental condition" (REC) identified in the Phase I ESA has impacted environmental media (soil and/or water) through releases of regulated substances,such as hydrocarbons. In accordance with the scope of services provided by the City, we will drill two (2) borings to maximum depths of up to 36-ft below ground surface. Two (2) soil samples will be collected to 8-ft below the ground surface in the vicinity of the proposed lift station. The soil samples will be packed into an ice-filled chest and transported to the laboratory under Chain of Custody to be analyzed for BTEX,TPH 1005, and VOCs. The soil borings will be performed using a Geoprobe "Direct Push" soil sampler. Soil samples will be sealed in clear poly tubing for field analysis. Groundwater samples, if encountered, will be obtained from temporary groundwater monitoring well(s) and a groundwater screening sample will be extracted from each well for analysis. Continuous soils will be sampled and field screened using a portable organic vapor analyzer (OVA). One (1) soil sample will be obtained from each boring location based on field screening, visual, olfactory, or other evidence of contamination impact. If no evidence of potential impact is observed, soil samples will be collected from the depth most likely affected by a potential release. If groundwater is encountered, temporary monitoring wells will be constructed utilizing slotted PVC screen and PVC riser to the surface. Wells will be purged, developed, and sampled for BTEX, TPH 1005, and VOCs. If groundwater is not encountered, soil cuttings will be placed back into the holes. After groundwater has been sampled, the monitoring well risers and screens will be removed and the resulting borehole plugged with bentonite. Boring locations will be plugged to the surface with bentonite chips at the completion of field services. The soil boring locations will be identified by TWE and City of Corpus Christi representatives and surveyed using a hand-held global positioning system(GPS) device. This proposal does not include pricing for professional surveying services to provide precise coordinates and elevations of the soil boring location. If necessary, pricing for these services can be provided upon request by the Client. We anticipate underground utilities and/or pipelines could be of concern at the site location. Our field personnel will work with City of Corpus Christi representatives to identify and avoid known underground utilities. We will also notify the Texas 811 One Call System prior to the commencement of our field program for clearance of subsurface utilities within the project site. Our field personnel will have the appropriate safety training and will be equipped with the required personal protective equipment. Reporting Upon completion of gathering and interpretation of the laboratory and other applicable data, TWE will prepare a letter report stating the findings of the limited Phase II Subsurface Investigation. Included in the report will be conclusions and recommendations as to the Exhibit A Page 3 of 6 • • Tolunay-Wong TWE Proposal No.P18-0071 Engineers,Inc. May 24,2018 Page 3 evidence of or the potential for environmental impairment at the time of the investigation. Assumptions/Limitations The above-stated Scope of Work and schedule are contingent upon the following assumptions: • TWE will have necessary access to the Site. • The scope of this proposal is only for a limited Phase II Subsurface Investigation and will only involve the collection of soil and groundwater samples for BTEX, TPH 1005, and VOC analysis. • Normal TAT for laboratory analysis is anticipated. Should a rush TAT (within 2 to 3 days)be required,the laboratory costs would double. Estimated Costs The estimated costs to conduct the Limited Phase II Subsurface Investigation are presented below. Every reasonable effort will be made to stay within this proposed budget. Should unforeseen conditions or situations occur that are beyond the control of TWE,we will not exceed this lump sum amount without prior approval from the Client. Exhibit A Page 4 of 6 • Tolunay-Wong TWE Proposal No.P18-0071 Engineers, Inc. May 24,2018 Page 4 Description I Unit I Quantity I Rate I Extension Field Services 1 Mobilization of Drilling Equipment is 1 $1,500.00 $1,500.00 2 Geoprobe+2 man crew day 2 $2,500.00 $5,000.00 3 Per Diem day 2 $350.00 $700.00 4 Well Materials ft 72 $10.00 $720.00 5 Well Development well 2 $250.00 $500.00 6 Drums ea 4 $65.00 $260.00 7 Well Report ea 2 $25.00 $50.00 8 Standby Rate hr $250.00 SUBTOTAL $8,730.00 Laboratory Services—Normal TAT 9 VOC (soil-Terracores) ea 2 $89.00 $178.00 10 VOC(Groundwater) ea 2 $81.00 $162.00 11 BTEX(Soil&GW) ea 4 $41.00 $164.00 12 TPH(Soil&GW) ea 4 $52.00 $208.00 13 TPH(1006)(Soil or GW) ea 1 $259.00 $259.00 SUBTOTAL $971.00 Reporting 14 Senior Project Manager hr 2 $170.00 $340.00 15 Staff Professional hr 16 $95.00 $1,520.00 9 Administrative Support hr 2 $55.00 $110.00 SUBTOTAL $1,970.00 TOTAL $11,671.00 Schedule Upon authorization, our field program can commence within five (5) working days depending on current schedule, site access, weather contingencies and subsurface utility clearance. We anticipate the field program will take one (1) to two (2) working day(s) to complete with laboratory testing beginning as soil samples are delivered to the laboratory. We anticipate laboratory testing under normal turnaround time (TAT) conditions to be completed within seven (7) to ten (10) working days. Analysis of laboratory results and report preparation will take three(3)days to complete. We anticipate an overall project duration of about three(3)weeks from notice to proceed to completion of our final report. Exhibit A Page 5 of 6 A . Tolunay-Wong TWE Proposal No.P18-0071 Engineers, Inc. May 24,2018 Page 5 Closing Remarks The cost estimate contained herein was developed using the scope of services requested by the City of Corpus Christi and the unit rates presented in the Master Service Agreement(Project No. E17101A) between the City of Corpus Christi and Tolunay-Wong Engineers, Inc. We understand that the City will issue a Project Task Order upon acceptance of this proposal in accordance with the MSA and the Task order will serve as our authorization to proceed with our services for the project. If you have any questions regarding this proposal, please contact us at (361) 884-5050. We appreciate your consideration of TWE for this project and look forward to working with you. Sincerely, TOLUNAY-WONG ENGINEERS,INC. 1� p_.Jed 4 Don R. Rokohl,P.E. Branch Manager Exhibit A Page 6 of 6