Loading...
HomeMy WebLinkAboutC2018-257 - 6/15/2018 - NA CITY OF CORPUS CHRISTI CONTRACT FOR PROFESSIONAL SERVICES AMENDMENT NO. 5 The City of Corpus Christi, Texas, a Texas home-rule municipal corporation ("City")and LNV, Inca agree to the following amendment to the Contract for Professional Services for Elevated Water Storage Tanks City-Wide jProject No. 8651): Original Contract February 10, 2009 Motion No. 2009-032 $ 705,242.00 Amendment No. 1 November 20, 2011 Administrative Approval $0.00 Amendment No. 2 August 21, 2012 Administrative Approval $0.00 Amendment No. 3 May 29, 2014 Administrative Approval $-3,738.00 Amendment No. 4 May 16, 2018 Administrative Approval $43,870.00 In the Original Contract, Exhibit A, Scope of Services shall be amended as set forth in the attached Amendment No.5, Exhibit A. In the Original Contract, Exhibit A, Section No. 3 Fees, C. Summary of Fees, shall be amended based on the modified scope of services in the attached Amendment No. 5, Exhibit A for a fee not to exceed $49,680.00, for a total restated fee not to exceed $795,054.00. All other terms and conditions of the February 10, 2009 Contract for Professional Services between the City and Consultant,and of any amendments to that contract,which are not specifically addressed herein shall remain in full force and effect. CITY OF CORPUS CHRIST LNV, IN" "Ade Samuel "Keith"Selman D e •an er, P.E. Date Interim City Manager President 801 Navigation, Suite 300 RECOMMENDED Corpus Christi, TX 78408 (361)883-1984 Office r 2 i dant@Invinc.com Mark Van Vleck to • to Ci anager LAO Atai =rie H. tray, P.E D.te Executi - Di - • . 'f Pub c W i0IP Jeff Edmonds, P.E. • to Director of Engineering Services APPROVED AS TO LEGAL FORM 9/� / 2018.06.04 10:46:42 (� -05'00' Assistant City Attorney Date 2018-257 LNVLNV Inc. Amendment No s Contract for Professional Sermon INDEXED 4id n . 1,740A 6 becca Huerta Date City Secretary Accounting Unit: 4080-041 Account: 550950 Activity: 180203-01-4080-EXP Account Category: 50950 Fund Name: Water CIP Amount: $49,680.00 Amendment No.5 Contract for Professional Services . • • LNV Solutions Today with a engineers architects contractors Vision for Tomorrow February 22, 2018 Mr. Jeff Edmonds, P.E. Director of Capital Programs City of Corpus Christi P.O. Box 9277 Corpus Christi, Texas 78469-9277 RE: AMENDMENT NO. 5 TO PROFESSIONAL SERVICES CONTRACT Elevated Water Storage Tanks - Citywide (ACR Implementation Phase 2) City Project#8651 Mr. Edmonds: In response to the City's request, we are proposing Amendment No. 5 to account for additional services as a result of water analyzer and fiber optics conduit changes during construction of the Elevated Water Storage Tanks - Citywide (ACR Implementation Phase 2) project. Additional effort is also anticipated for the start-up services phase to provide assistance to the City in bringing the Holly EST and Rand Morgan EST on-line in an efficient manner, without effecting water distribution system operations significantly. PROJECT BACKGROUND As per the user requirements for project #8651 - Elevated Water Storage Tanks- Citywide (ACR Implementation Phase 2), LNV and the City staff agreed to incorporate reagentless analyzers (Hach "CLT10" and Rosemount "Total Ammonia") at both Holly and Rand Morgan ESTs for measuring pH, temperature, total chlorine, monochloramine, and free ammonia. These water analyzers were agreed to by all parties and approved by the City during the design phase of the project. During construction, LNV received a request from the City requiring a change in analyzers. The City requested that instead of the originally proposed reagentless analyzers, reagent analyzers be installed at Holly and Rand Morgan ESTs. It was noted that these reagent analyzers would also require sewer connections in order to safely discharge the reagents. The sewer connections were not a part of the original design at both the sites since reagentless analyzers were initially intended to be used. In addition to these analyzer changes, the City requested that LNV revise the site plans for both Holly EST and Rand Morgan EST to include extension of proposed fiber optic conduits from each tank to existing fiber optic lines so that CB&I could install while mobilized at the site and City MIS Page 1 of 6 801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 78408 OFFICE 361.883.1984 I FAX 361.883.1986 I WWW.LNVINC.COM EXHIBIT A • would not have to contract out the work. During the design phase, upon agreement with the City, only stub outs had been provided at both tanks. At the City's request, the plans have to be modified to include extended conduits and tie-ins. This amendment also proposes additional work to be performed under the start-up services phase. The two (2) new ESTs being constructed under this project (Holly EST and Rand Morgan EST) are to replace the four (4) existing ESTs within Pressure Zone 1 of the City's distribution system and raise the system hydraulic grade line (HGL) by approximately 46 feet (or 20 psi). As a result of the proposed HGL being higher than the existing HGL, it has been deemed necessary to establish a plan in advance that will assist the City in filling new ESTs during the tank disinfection period. The plan is to also include directions to assist City staff in bringing the two (2) new ESTs online and enabling the smooth transition from the existing to the new ESTs. The amendment further provides scope for the Engineer to extend additional technical support to the City during start-up to assist with any unanticipated problems or concerns. PURPOSE OF AMENDMENT NO. 5 The purpose of the work to be performed under this Amendment No.5 is to assist the City with the design revisions and coordination necessary to accommodate the City's request concerning change in analyzer and extension of fiber optic cables at both Holly and Rand Morgan EST, during construction. Additionally, the amendment is to assist the City in transitioning from the existing ESTs to the new ESTs without effecting water distribution system operations significantly. SCOPE OF WORK BASIC SERVICES (N/A) ADDITIONAL SERVICES: TASK 6-D: Start-Up Services for EST-ACR, Phase 2 (#8651) This task is to include the following action items: 1. Assess options and provide City recommended plan for filling new Rand Morgan and Holly ESTs. This is to include the following items: • Review of record drawings to identify existing system component locations. • Performing site visits (up to 3) to field verify location of existing system components and coordinating with City on components operational status. • Fire flow testing coordination/pressure monitoring and analysis of recorded data. • Coordination with manufacturers for pump sizing/cost proposal. • Conducting one (1) meeting with City on recommended plan for filling new ESTs. Page 2 of 8 801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 78408 OFFICE 361883.1984 I FAX 361.883.1986 I WWWINVINC.COM EXHIBIT A 2. Assess options and provide City recommendation for transitioning from existing to new ESTs. This will include the following items: • Coordination with City on operational status of existing EST isolation valves. • Preparation of a Start-up Plan. • QA/QC review of Start-up Plan. • Presentation of Start-up Plan to the City to discuss recommended course of action and assimilate feedback. 3. Provide additional technical support to the City during the start-up phase as required. TASK 17- Design Revisions due to Water Analyzers and Fiber Optic Conduit Changes This task is to include the following action items: I. Holly EST 1. Evaluation of the replacement and installation of the following Water Quality analyzers: • Replacement of two (2) Hach CLT 10 Water Quality Analyzers with two (2) Hach CL-17 Water Quality Analyzers configured for total chlorine. • Replacement of two (2) Rosemount Water Quality Analyzers with one (1) Hach 5500 SC configured with dual channel to tie-in the two (2) sample points. • Replacement of two (2) Water Quality Analyzer controllers specified in the plans with one (1) Hach SC1000 controller. -----2. Evaluation of all possible sewer connections in the area. This is to be done in lieu of a stormwater connection in order to comply with the City's stormwater discharge permit and in order to ensure safe discharge of reagents from reagent based Water Quality Analyzers. 3. Increase of drain size from 2 inch drain line to a 4 inch drain line and rerouting to tie into existing sewer line. 4. Revision of site plan (Plan Sheet C5) to include new sewer connection. 5. Revision of site plan (Plan Sheet C5) and additional details to include 3 inch fiber optics conduit extension to tie into existing fiber optic conduit per City MIS recommendation. II. Rand Morgan EST 1. Coordination with City staff to determine most suited Water Quality Analyzer for the site. 2. Evaluation of the following sewer connection options for using a reagent based water quality analyzer on site: • Connection to nearest manhole — 1 mile South of EST site along Rand Morgan road • Connection to manhole present across from site at Stripes gas station. • Connection to manhole North East of EST site at Whataburger. • Connection to sewer line from Land & Sea restaurant East of EST site. 3. Coordination with City to determine what water quality parameters would need to be monitored at the site. 4. Attendance in meetings and coordination with manufacturers and ONSWTP staff to determine most suited water quality analyzer for the site. Page3 of 6 801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 78408 OFFICE 361883.1990 I FAX 361.883.1986 I WWW.LNVINC.COM EXHIBIT A • • 5. Based on evaluation and discussion with City, coordination for the replacement of water quality analyzers with selected new analyzers. Revision of original design and addition of specifications for new water quality analyzer. 6. Revision of site plan (Plan Sheet C2) for Rand Morgan EST and inclusion of additional details to include extension of 3"fiber optics conduit as recommended by City MIS. SCHEDULE Activity Completion Date Additional Services TASK 6-D: Start-Up Services for EST-ACR, Phase 2 TBD (8651) TASK 17- Design Revisions due to Water Analyzer and TBD Fiber Optics Conduit Changes FEES All services under this Amendment No. 5 will be provided on a Time and Materials (T&M) basis as the proiect is moved towards completion. The anticipated amount for this amendment is $49,680.00 as shown in Table 1. No work is to be performed in excess of this amount. If additional work is required, the Engineer will obtain authorization from the City prior to performing additional work. The Summary of NE contract fee for Project 8651- Elevated Water Storage Tanks- Citywide (ACR Implementation Phase 2) is shown in Table 1 below. Page 4 of 6 801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 78408 OFFICE 361883.1984 I Fax 361.883.1986 I www.INVINCCOM EXHIBIT A Table 1 ORIGINAL AMD.NO.1 AMD.NO.2 AMD.NO.3 AMD.NO.4 AMD.NO.5 TOTAL CONTRACT BASIC SERVICES 1. Preliminary Phase(City Project#8651) $ 55,000.00 S - $ S 26,575.00 $ 81,575.00 2.1 Design Phase(City Project#8651) $ 160,000.00 $ - $ $ (72,000.00) $ 88,000.00 2.2 Design Phase(EST-ACR,Phase 2XCity Project#8651) $ - $ • $ 72,200.00 $ 72,200.00 3.1 BidPhase(CityProject#8651) $ 5,000.00 $ - $ - $ (5,000.00) $ - 3.2 Bid Phase(EST-ACR,Phase 2)(Oty Project#8651) $ - $ - $ 5,000.00 $ 5,000.00 4.Construction Phase 4.1 Tank 1(City Project#8651) $ 39,000.00 $ - $ • $ (39,000.00) $ - 4.2 Tank 2(City Project#8651) $ 39,000.00 $ - $ - $ (39,000.00) $ • 4.3 Tank 3(City Project#8651) $ 39,000.00 $ - $ - $ (39,000.00) $ - 4.4(EST-ACR,Phase 2)(0ty Project#8651) $ - 5 - $ 78,000.00 $ 78,000.00 Subtotal Basic Services(Authorized) $ 337,000.00 $ - $ - $ (12,225.00 $ 324,775.00 ADDITIONAL SERVICES(ALLOWANCE) 1.1 Permit Preparation(as applicable)(City Project#8651) $ 29,998.00 $ - $ - $ (1,499.90) $ 28,498.10 1.2 Permit Preparation(EST-ACR,Phase 2)(City Project#865:)$ _ $ - $ - $ 9,999.90 $ 9,999.90 2.1 ROW Acquisition Survey(City Project#8651) $ 18,038.00 $ - $ - $ (13,528.50) $ 4,509.50 2.2 ROW Acquisition Survey(EST-ACR,Phase 2XOty Project# 8651) $ 5 $ - $ 13,528.50 $ 13,528.50 3.1 Topographic Survey(City Project#8651) $ 21,024.00 $ - $ - $ (2,102.40) $ 18,921.60 3.2 Topographic Survey(EST-ACR,Phase 2XCIty Project#8651) $ $ $ $ 7,002.40 $ 7,002.40 4.1 Environmental Issues(City Project#8651) $ 23,996.00 $ - $ $ (1,439.76) $ 22,556.24 4.2 Environmental Issues(EST-ACR,Phase 2XOty Project It 8651) $ - $ - $ - $ 8,039.76 $ 8,039.76 5. Construction Observation Services(85 weeks) A. Tank 1(City Project#8651) $ 47,000.00 $ • $ (12,676.00) $ (34,324.00) $ - B.Tank 2(City Project#8651) $ 47,000.00 $ (43,740.00) $ (3,260.00) $ $ - C.Tank 3(City Project#8651) $ 47,000.00 $ (47,000.00) $ - $ $ - D. (EST-ACR,Phase 2)(Oty Project#8651 $ • $ - $ - $ - $ - 6.Start-Up Services A. Tank 1(City Project#8651) $ 5,978.00 $ - $ - $ (5,978.00) $ - B.Tank2(CityProject#8651) $ 5,806.00 $ - $ - $ (5,806.00) $ - C.Tank 3(City Project#8651) $ 5,806.00 $ - $ $ (5,806.00) 5 - D. (EST-ACR,Phase 2N0ty Project#8651) $ • $ - $ $ 11,784.00 $ 32,240.00 $ 44,024.00 7.Warranty Phase $ - A. Tank 1(City Project#8651) $ 3,147.00 S - $ - $ (3,147.00) $ - B.Tank 2(City Project#8651) $ 2,972.00 $ - $ - $ (2,972.00) $ - C.Tank 3(City Project#8651) $ 2,904.00 $ - $ $ (2,904.00) $ - D. (EST-ACR,Phase 2Xoty Project#8651) $ $ - $ $ 6,119.00 5 6,119.00 E. Provide SCADA Documentation S - A. Tank 1(City Project#8651) $ 2,521.00 $ - $ - $ - $ 2,521.00 8.Tank 2(City Project#8651) $ 2,521.00 $ - $ $ - 5 2,521.00 C.Tank 3(City Project#8651) $ 2,521.00 $ - $ - $ (2,521.00) $ - D. (EST-ACR,Phase 2)(0ty Project#8651) $ - $ - 5 - $ - $ - 9.Siting Evaluation&Recommendation(City Project#8651) $ 59,970.00 $ - $ $ - 5 59,970.00 10. Pressure and Water Age Evaluation(City Project#8651) $ 40,040.00 $ - $ - $ - $ 40,040.00 11.2025 Scenarios&Surge Analysis-ACR for Elev.Stor.(City Project #8651) $ - $ 90,740.00 $ - $ - $ 90,740.00 12.42"Waterline in Holly Road(City Project#8651) $ - $ $ 15,936.00 $ - $ 15,936.00 13.Project Manual(EST-ACR,Phase 2)(Oty Project#8651) $ - $ - $ $ 12,000.00 $ 12,000.00 14.O&M Manuals and Training(EST-ACR,Phase 2XOty Project# 8651) $ • $ • $ - $ 5,042.00 $ 5,042.00 15.Process Automation System Development(EST-ACR,Phase 2) (City Project*8651) $ - $ - $ - S 17,000.00 $ 17,000.00 16.CB&I Change Order Claims $ 43,870.00 5 43,870.00 17.Design Revisions due to Water Analyzer and Fiber Optics Conduit Changes $ 17,440.00 $ 17,440.00 Subtotal Additional Services $ 368,242.00 $ - $ - $ 8,487.00 $ 43,870 00 $ 49,680.00 5 470,279.00 TOTAL AUTHORIZED FEE 5 705,242.00 5 - $ - 5 (3,738.00) $ 43,870.00 $ 49,680.00 5 795,054.00 02/10/09 Council 11/29/11 09/06/12 06/03/12 Approval M2009-032 Page 5 of 6 801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 78408 OFFICE 361.883.1984 ( FAX 361.883.1986 ( WWW.LNVINC.COM EXHIBIT A If you have any questions or if you would like to discuss in more detail, please feel free to call me at 361-883-1984. Sincerely, Øw7 /. /22j,a L Burton, P.E. PrincipalNice President LNV, Inc. TBPE Firm No. F-366 Page 6 of 6 801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 78408 OFFICE 361.883.1984 I FAX 361.883 1986 I WWW.LNVINC.COM EXHIBIT A