Loading...
HomeMy WebLinkAboutC2018-452 - 9/11/2018 - NA TASK ORDER 3 This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and Freese and Nichols, Inc. (Consultant) dated December 19, 2017 (Motion M2017-196) (Agreement). Consultant shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. MSA PROJECT NUMBER/NAME: 18061A Preliminary Engineering Street Feasibility and Cost Estimate Reports (Bond 2018) TASK ORDER PROJECT NUMBER/NAME: 18061D Preliminary Engineering Street Feasibility and Cost Estimate Reports (Bond 2018) 1. PROJECT DESCRIPTION: 18033B North Beach Coastal Protection 2. SCOPE OF SERVICES The scope of services includes preliminary engineering street feasibility and cost estimate reports. This task order is more fully described in Exhibit A. 3. COMPENSATION The total amount not to exceed for Task Order No. 3 only is $11,076. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full fo and e t. Co - 'US RI I FREESE AND NICHOLS, INC. dr A./1 . • / 9/9/2018 eff H. Edmonds, P. E. sate ..on Gu man, Date Director of Engineering Services Principal 800 N. Shoreline Blvd., Suite 1600N Corpus Christi, TX 78401 (361) 561-6500 Office (361) 561-6501 Fax rg@freese.com Fund Name Accounting Unit Account No. Activity No. Amount_ ST 2012 GO BD 08 3548-051 550950 E17083-01-3548-EXP $11,076 2018-452 9/11/18 Freese and Nichols Inc. SCANNED FREESEInnovative approaches zNICHOLS Practical results r, a Outstanding service 800 N.Shoreline Blvd.,Suite 1600N • Corpus Christi,Texas 78401 • 361-561-6500 • fax 361-561-6501 www.freese.com TASK ORDER NO.: 3 PROJECT NAME: 18061A Preliminary Engineering Street Feasibility and Cost Estimate Reports (Bond 2018) TASK ORDER PROJECT NUMBER/NAME: 18061C Preliminary Engineering Street Feasibility and Cost Estimate Reports (Bond 2018) 1. PROJECT DESCRIPTION — 18033B N. Beach Coastal Protection 2. SCOPE OF SERVICES —The scope of services includes preliminary engineering street feasibility and cost estimate reports. This task order is more fully described in Exhibit A. 3. COMPENSATION Lump sum amount of $11,076.00 This Task Order is approved, and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. FREESE AND NICHOLS, INC. CITY OF CORPUS CHRISTI Ron Guzman, P. E. Date Jeff H. Edmonds, P. E. Date Principal Director of Engineering Services 800 N. Shoreline Blvd., Suite 1600N Corpus Christi, TX 78401 (361) 561-6500 Office (361) 561-6501 Fax rg@freese.com TASK ORDER NO. 3 Exhibit "A" Page 1 of 3 • FR E E S E Innovative approaches °N ICHOLS Practical results r, Q Outstanding service 800 N.Shoreline Blvd.,Suite 1600N • Corpus Christi,Texas 78401 • 361-561-6500 • fax 361-561-6501 www.freese.com Exhibit A August 21, 2018 Mr.Jeff Edmonds, P.E. Director of Engineering Services City of Corpus Christi P. 0. Box 9277 Corpus Christi,Texas 78469-9277 Re: North Beach Coastal Erosion Protection (City Project No. 18033B) Dear Mr. Edmonds, At the request of City of Corpus Christi (City)staff, Freese and Nichols, Inc. (FNI) is pleased to submit a Small AE proposal for professional services to determine the technical practicality based on a conceptual configuration of the City's proposed North Beach Coastal Erosion Protection project plan. We understand the City proposes to develop and enhance portions of the North Beach to include various erosion protection elements,the creation of a residential boat channel and inlets,and nearshore islands/breakwaters.The scope of the proposed professional services is as follows: 1. FNI will conduct basic numerical modeling for conceptual evaluation of the water elevations,wind,waves, and currents to determine potential siting of the proposed uplands development dredged channel,such as: basic geometry,depth of water, intertidal flushing capacity,and potential flushing influence from waves and currents. 2. FNI will assemble and submit a draft Technical Memo for the Conceptual Plan Evaluation to include: • Results of the technical practicality assessment • Alternatives for conceptual channel dimensions • Water quality guidance • Identification of post-construction maintenance considerations • Local FNI personnel will meet with City Staff in a submittal meeting 3. FNI will assemble and submit a final Technical Memo based on City review comments. • Incorporate City Comments into the Technical Memo (for inclusion in the final Conceptual Plan Evaluation Report,or) as a stand-alone Technical Memorandum The City staff will: a) Provide all relevant data or guidance required to support updated design details b) Review and comment on the draft Conceptual Plan Evaluation Report TASK ORDER NO. 3 Exhibit "A" Page 2 of 3 Schedule Date Activity Fee Submit Draft Technical Memo(for inclusion in Draft Preliminary Conceptual Plan Evaluation Report)for City Review $10,423.00 Within 3 weeks of Notice to Proceed and Comment Within 2 weeks of receipt of City $653.00 comments on draft submittal Submit final Technical Memo Total Effort $11,076.00 Freese and Nichols, Inc. respectfully requests a lump sum contract in the amount of$11,076.00 to perform these services. Please feel free to contact me at 361.561.6500 should you have any questions regarding this matter. Respectfully, 12 (...,,,.. Ron Guzman, P.E. Principal/Vice President Enclosures TASK ORDER NO. 3 Exhibit "A" Page 3 of 3 EXHIBIT B TASK ORDER SUMMARY Master Services Agreement Preliminary Engineering Street Feasibility and Cost Estimate Reports (Bond 2018) Project No. 18061A TASK NOT TO DESCRIPTIONAMOUNT EXCEED AMOUNT Master Services Agreement(Dec. 19, 2017) $300,000.00 Amendment No. 1 to Master Services Agreement(Jul. 25, 2018) 25,000.00 Maximum Contract Amount $325,000.00 TASK ORDERS: 324,973.00 Task Order No. 1 289,153.00 18004A Airline Road from SPID to McArdle Road 36,250.00 18005A Alameda Street from Chamberlain to Louisiana 39,217.00 18007A Beach Avenue from Dead End at Gulf Breeze to E 33,174.00 Causeway 18011A Castanon from Trojan to Delgado 33,147.00 18012A Downtown Management District Improvements 38,804.00 18033A North Beach Access Management Initiative 38,417.00 18041A S. Staples Street from Kostoryz to Baldwin 26,224.00 18046A Swantner Drive from Texan Trail to Indiana Avenue 43,920.00 Task Order No. 2 24,744.00 18033B North Beach Coastal Protection 24,744.00 Task Order No. 3 11,076.00 18033B North Beach Coastal Protection 11,076.00 Amount Remaining on Master Services Agreement $27.00 TASK ORDER NO. 3 Exhibit "B" Page 1 of 1