HomeMy WebLinkAboutC2018-462 - 9/14/2018 - NA TASK ORDER NO. 8
This Task Order pertains to a Master Services Agreement for Geotechnical and Construction Materials Testing by
and between City of Corpus Christi,Texas(City)and Rock Engineering&Testing Laboratory,Inc.,(Lab)dated
January 16, 2018 by Motion No. M2018-005 (Agreement). Lab shall perform services on the project described
below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been
properly signed by both parties. Upon execution,this Task Order shall supplement the Agreement as it pertains to
the project described below.
MSA PROJECT NUMBER/NAME: 17100A Geotechnical and Construction Materials Testing
TASK ORDER PROJECT NUMBER/NAME: 171001 Geotechnical and Construction Materials Testing
1. PROJECT DESCRIPTION: 18135A SPMP FY 2019—Overlays
2. SCOPE OF SERVICES—GeoTech and/or Construction Material Services to observe,test and report for the
SPMP FY 2019—Overlays project, and as more fully described in Exhibit A.
3. COMPENSATION —The total amount not to exceed for this Task Order only is $50,000.00.
This Task Order is approved, and Lab may proceed. All other terms and conditions of the Agreement remain in
full force and effect.
CITY OF CORPU .:4 - .TI ROCK ENGINEERING&TESTING
4111r,
LABORATORY, INC.
9A:/, 09,4,8-ff H. Edmonds, P.E. urtis . Rock Date
Director of Engineering Services Chief Operating Officer
6817 Leopard Street
Corpus Christi, TX 78409
(361) 883-4555 Office
curtis@rocktesting.com
Fund Name Accounting Unit Account No. Activity No. Amount
Streets 1041-12415-051 530000 18135-A-1041-EXP $50,000.00
2018-462
9/14/18
k Order No.8
Rock Engineering & Testing t st g Agreement
P TANNED
TASK ORDER FUNDING REQUEST FORM
CONTRACT MSA#AND TITLE: 17100A Geotechnical and Construction Materials Testing(ROCK)
TASK ORDER PROJECT#/TITLE: 17100I Geotechnical and Construction Materials Testing(ROCK)
REQUESTING DEPARTMENT:ENGINEERING DEPARTMENT
FUND NAME/FUND#-ME: _ACCOUNT: ACTIVITY:
1041-12415-051 530000 18135-A-1041-EXP
CONSULTANT:Rock Engineering
TASK ORDER#:8
SCOPE OF WORK:SEE PROPOSAL
TASK ORDER IS FOR PROJECT(S)LISTED BELOW:
PROJECT# FEE PROJECT NAME
18135A $50,000 Street Preventative Maintenance Program(SPMP)FY 2019-Overlays
$50,000 Grand Total
MARISA ALANIZ
PM PRINT NAME:
SIGNATL F.:
9/12/2018
DATE:
Task Order No.8
Testing Agreement
Page 2 of 2
t-c`
V- ). • GEOTECHNICAL ENGINEERING
,,,a' i- •• CONSTRUCTION MATERIALS
", • O. .o ENGINEERING &TESTING
va PSE • SOILS • ASPHALT• CONCRETE
O94T 04 \aGoPPOP
City of Corpus Christi
1201 Leopard St
Corpus Christi, TX 78401
SUBJECT: ESTIMATED TESTING BUDGET FOR THE PROPOSED
18135A STREET PREVENTATIVE MAINTENANCE PROGRAM(SPMP)FY 2019—
OVERLAYS-TASK ORDER 8
Corpus Christi, TX
RETL Proposal Number: P082818A
Dear Mr. Edmonds,
Rock Engineering and Testing Laboratory, Inc. (RETL) (TBPE Firm No. 2101) is pleased to provide an estimate to
perform the required Task Order 8 for the above referenced project. The Task Order 8 is based upon information
provided to RETL as of the date of this proposal.
We understand that we have been chosen to provide these services for this publicly funded project.
Therefore, by providing cost information we are not in violation of the Texas Professional Services
Procurement Act.
The estimated testing amount for this project is $50,000.00. This estimate will change and is dependent upon
the actual scope of work performed as requested by project representatives. Requested services beyond
what is contained in this estimate will be billed based on the unit rates contained here-in.
Please make note that the actual fees invoiced for this project will be based on the actual testing requested
and performed. The total fee assessed will be dependent on the contractor's construction techniques,
number of trips made to the jobsite, elapsed time from technician arrival to commencement of testing
activities, and any stand-by time the technician is required to be on-site but not performing testing activities.
This estimate does not take into account project schedule, weather delays, and cancellations of services
after arrival, etc.which are beyond RETL's control. Also note, that holiday/weekend rates do apply as well as
overtime rates for services requested at an additional rate of$34.00 per hour.
In order to best respond to the project testing needs and schedules, please schedule testing a minimum of
48 hours in advance in order to defer any potential delays. RETL strives to accommodate all testing requests
as they are received and can make accommodations with advanced notice to schedules.
RETL appreciates your consideration of our firm to assist you during the construction phase of your project. If you
agree with this proposal, please sign the attached Laboratory Testing Services Agreement, submit the Distribution
List and provide billing information. Please do not hesitate to contact me at(361)883-4555 extension 415 if you have
any questions regarding the proposal or would like to discuss further.
Sincerely,
Pablo Schmitt
Project Estimator
ROCK ENGINEERING&TESTING LABORATORY,INC.
6817 LEOPARD STREET•CORPUS CHRISTI,TEXAS,78409 Exhibit A
OFFICE: (361)883-4555•FAX: (361)883-4711 •www.rocktesting.corn Page 1 of 3
P082818A
18135A STREET PREVENTATIVE MAINTENANCE PROGRAM(SPMP) FY 2019-
a��� OC �n OVERLAYS - TASK ORDER 8
°Oarf °`¢ CITY OF CORPUS CHRISTI
of CORPUS CHRISTI,TX
JEFFREY EDMONDS, P.E.
01.INVESTIGATIVE ANALYSIS
A01 SOILS-SUBGRADE/GENERAL FILL
ATTERBERG LIMITS AND MOISTURE
FREQ LIFTS/MIN QTY TOTAL RATE AMOUNT
S310 ATTERBERG LIMITS/PLASTICITY INDEX ASTM D4318 EA 1 104 104 EA $65.00 $6,760.00
S532-1 MOISTURE CONTENT EA 1 104 104 EA $16.00 $1,664.00
A09 SOILS-FLEX BASE
COMPOSITE ATTERBERG LIMITS
FREQ LIFTS/MIN QTY TOTAL RATE AMOUNT
S502 ATTERBERG LIMITS/PLASTICITY INDEX(W/AGGR)ASTM D4318 EA 1 51 51 EA $102.00 $5,202.00
MO1 MISCELLANEOUS
MISCELLANEOUS
FREQ LIFTS/MIN QTY TOTAL RATE AMOUNT
P119 ADMINISTRATION FEE PER PROJECT 1 1 1 LS $74.00 $74.00
P01 PERSONNEL
CORE THROUGH ASPHALT,BASE AND HAND AUGER 1 FT INTO SUBGRADE
FREQ LIFTS/MIN QTY TOTAL RATE AMOUNT
P396 ENGINEERING TECHNICIAN HR 1 192 192 HR $66.00 $12,672.00
V100 TRAFFIC CONTROL DAY 1 12 12 DAY $1,920.00 $23,040.00
V486 VEHICLE PER TRIP 1 12 12 TR $49.00 $588.00
01.INVESTIGATIVE ANALYSIS
SUBTOTAL $50,000.00
ESTIMATED TOTAL $50,000.00
All Laboratory Testing Rates include Technician Time and Reporting
The vehicle fee includes the technician travel time and all vehicle charges.
The Nuclear Density fee includes the technician time,equipment,and reporting.
A minimum of 3 densities will be billed each time this service is requested.
The fee for one set of concrete test cylinders includes the technician time,equipment,making,curing,testing and reporting.
Certified Weld Inspections(CWI)will be billed at 4 hours minimum
Wednesday,August 29,2018 Exhibit A
Page 2 of 3
•
P082818A
$a• °e 18135A STREET PREVENTATIVE MAINTENANCE PROGRAM(SPMP) FY 2019—
•A,OC4k" OVERLAYS - TASK ORDER 8
0
o CITY OF CORPUS CHRISTI
•a, CORPUS CHRISTI, TX
JEFFREY EDMONDS, P.E.
Wednesday,August 29,2018 Exhibit A
Page 3 of 3