Loading...
HomeMy WebLinkAboutC2018-469 - 9/21/2018 - NA ' TASK ORDER NO. 10 This Task Order pertains to a Master Services Agreement for Geotechnical and Construction Materials Testing by and between City of Corpus Christi,Texas(City)and Professional Service Industries,Inc.,(Lab)dated January 16, 2018 by Motion No. M2018-005 (Agreement). Lab shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. MSA PROJECT NUMBER/NAME: 17099A Geotechnical and Construction Materials Testing TASK ORDER PROJECT NUMBER/NAME: 17099K Geotechnical and Construction Materials Testing 1. PROJECT DESCRIPTION: E16258 Schanen Ditch Hike and Bike Trail-Saratoga to Killarmet(TXDOT) 2. SCOPE OF SERVICES—GeoTech and/or Construction Material Services to observe,test and report for the Schanen Ditch Hike and Bike Trail-Saratoga to Killarmet(TXDOT) project, and as more fully described in Exhibit A. 3. COMPENSATION —The total amount not to exceed for this Task Order only is $17,880.00. This Task Order is approved, and Lab may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUSC :'TI PROFE SIO SERVICE INDUSTRIES, INC. 4 -[t!...._ 4 — / /O ` 9-20-2018 Jeff H. Ea onds, P.E. 1-te Henry ' alindo, P.E. Date Director of Engineering Services Branch Manager 810 South Padre Island Drive Corpus Christi, TX 78416 (361) 854-4801 Office henry.galindo@psiusa.com Fund Name Accounting Unit Account No. Activity No. Amount PK&RC2013GOBD12 3293-141 550920 E16258-01-3293-EXP $17,880.00 2018-469 9/21/18 Task Order No. 10 Professional Service Industries Testing Agreement Pal ll rANNFl TASK ORDER FUNDING REQUEST FORM CONTRACT MSA#AND TITLE: 17099A Geotechnical and Construction Materials Testing(PSI) TASK ORDER PROJECT#/TITLE: 17099K Geotechnical and Construction Materials Testing(PSI) REQUESTING DEPARTMENT: ENGINEERING SERVICES FUND NAME/FUND#-ME: ACCOUNT: ACTIVITY: 3283-1.11 550920 E16258-01-32g3-EXP CONSULTANT: Professional Services Industries(PSI) TASK ORDER#: 10 SCOPE OF WORK:SEE PROPOSAL TASK ORDER IS FOR PROJECT(S) LISTED BELOW: PROJECT# FEE PROJECT NAME E16258 517,880 Schanen Ditch Hike and Bike Trail- Saratoga Rd to Killarmet SI 7,880 Grand Total MARISA ALANIZ PM PRINT NAME: SIGNATI 9/19/2018 DATE: Task Order No.10 Testing Agreement Page 2 of 2 intertek August 10,2018 City of Corpus Christi Engineering Services 1201 Leopard Street Corpus Christi,Texas 78401 Attn: Ms. Marisa Alaniz E.I.T./Engineer II Email: MarisaAl@cctexas.com Phone: (361)826-3526 Re: Construction Materials Testing and Observation Proposal Schanen Hike and Bike Trail Project No. E16258 2018/2019 MSA Geotechnical and Materials Testing Corpus Christi,Texas PSI Proposal No.:0325-252349 Dear Ms.Alaniz: Professional Service Industries, Inc. (PSI) is pleased to have been selected based on qualifications to perform Construction Material Testing and Observations Services for the Schanen Hike and Bike Trail Located between Saratoga Blvd. and Killarmet Dr. Construction Hive TM is the primary report distribution platform used by PSI to provide a better experience to our clients. You will have 24-hour access to your reports on this website from any internet enabled device with a web browser. Construction HiveTM has powerful report viewing, retrieval and searching capabilities that allow you to find the information you are looking for faster and with greater ease. This proposal includes our services to observe, test and report on the construction material placement activities. Please note that our services will be performed on an intermittent, call-out, as requested basis. This proposal does not include full time or continuous on-site observation services. Scheduling will be the responsibility of our client's designated representative. PSI will proceed with the work upon issuance by the City of Corpus Christi of a Task Order to proceed with this project. We look forward to providing our services during construction of the above referenced project. Please do not hesitate to contact our office with any questions or concerns. Respectfully submitted, Professional Service Industries,Inc. . 11/41 - �, ,lam Felix Ovalle Henry Galindo, P.E. Project Manager Branch Manager Construction Services Intertek PSI•810 S.Padre Island Drive•Corpus Christi,TX 78416•Phone(361)854-4801 •Fax(361)854-6049 Exhibit A Page 1 of 2 uitertek ESTIMATED FEES PSI Proposal No. 252349 E16258 Schanen Hike and Bike Trail,Corpus Christi,Texas E16258 Schanen Hike and Bike Trail City of Corpus Christi Marisa Alaniz,E.I.T./Engineer I1 Estimated Construction Materials Testing Services Project: E16258 Schanen Hike and Bike Trail (Saratoga Blvd. to Killarmet Dr.), Corpus Christi, TX Unit Unit Item Total Quantity Price Earthwork Testing and Observation Paving Preparation(Trail and Sidewalks) Engineering Technician(In-place Density Testing) Per Hour 100 $40.00 $4,000.00 Laboratory Moisture Density Relationship(Standard) Each 3 $150.00 $450.00 Laboratory Moisture Density Relationship(Modified) Each 2 $175.00 $350.00 Atterberg Limit Determination Each 5 $60.00 $300.00 Sieve Analysis Each 5 $65.00 $325.00 Field Gradations Each 6 $50.00 $300.00 Sample Preparation for Laboratory Testing Each 5 $50.00 $250.00 Transportation Charge Per Trip 25 $30.00 $750.00 Sample Pickup Charge(Trip,Technician,and Report Review) Per Trip 5 $150.00 $750.00 Daily Equipment Charge Per Trip 25 $60.00 $455.00 Report Review Per Hour 30 $30.00 $900.00 Subtotal $8,830.00 Earthwork Testing and Observation Estimate $8,830.00 Miscellaneous Concrete(Sidewalk,Trail,and Curb) Engineering Technician(Concrete Sampling and Testing) Per Hour 80 $40.00 $3,200.00 Concrete Cylinders(Cured and/or Tested in Compression)(4 x 8) Each 50 $15.00 $750.00 Daily Equipment Charge Per Trip 20 $50.00 $1,000.00 Transportation Charge Per Trip 20 $30.00 $600.00 Sample Pickup Charge(Trip,Technician,and Report Review) Per Trip 18 $150.00 $2,700.00 Report Review Per Hour 40 $20.00 $800.00 Subtotal $9,050.00 Concrete Testing and Observation Estimate $9,050.00 Construction Materials Testing and Observation Estimated Total $17,880.00 Remarks: Estimate Only.Does Not Account for Material Overruns. • Exhibit A Page 2 of 2