Loading...
HomeMy WebLinkAboutC2018-470 - 9/21/2018 - NA CITY OF CORPUS CHRISTI AMENDMENT NO. 1 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas, a Texas home-rule municipal corporation("City")and LNV,Inc.("Consultant"), agree to the following amendments to the Contract for Professional Services for Holly Road from Paul Jones to Rodd Field Road BOND 2018 (Project No. 18021A): Original Contract June 12, 2018 Resolution No. 031445 $792,940.00 In the Original Contract, Exhibit "A", Section I. Scope of Services shall be amended as set forth in the attached Amendment No. 1, Exhibit"A". In the Original Contract,Section III. Fees shall be amended based on the modified scope of services in the attached Amendment No. 1, Exhibit "A" for a fee not to exceed $36,600.00, for a total restated fee not to exceed $829,540.00. All other terms and conditions of the June 12, 2018 Contract for Professional Services between the City and Consultant,and of any amendments to that contract,which are not specifically addressed herein shall remain in full force and effect. CITY OF CORPUS CH STI LNV I4 N ,.. ////�/� 21 r8 ��� �-�. ,' V, 09/10/18 Mark Van Vlec c� -��-�-" D e D- •- er, P.E. Date Assistant City M.na!er President at , e ill ' ,/ s Corpus801NChvigaristiion, TSuitX 78408300 C. (361)883-1984 Office V.7 e H. Gr- , P. =. sate danl@Invinc.com Ex: utive 9' : o o P is Works pf 0C}' yl /g" eff H. Edmonds, P. E. Date Director of Engineering Services APPROVED AS TO LEGAL FORM 0 2018.09.10 14:07:53 -05'00' Assistant City Attorney Date raeoe,.....4„12.44r." gic-_7/1 8 City Secretary Date Accounting Unit 3551-051 e,...ru i„+ nogn 2018-470 9/21/18 LNV Inc. SCANNED • LNV Solutions Today with a engineers architects contractors Vision for Tomorrow August 23, 2018 Mr. Jeff Edmonds, P.E. Director of Engineering Services City of Corpus Christi P.O. Box 9277 Corpus Christi, Texas 78469-9277 RE: AMENDMENT NO. 1 TO PROFESSIONAL SERVICES CONTRACT Holly Road— Rodd Field to Ennis Joslin (Bond 2018) City Project 18021A Mr. Edmonds: The City has requested that LNV make the following changes and revisions to the scope of improvements on the Holly Road (18021A) Project: 1. Reduce the Project Limits to only include improvements from Rodd Field Road to Ennis Joslin Road with no Additive Alternate for Ennis Joslin Road to Paul Jones Avenue; 2. Add the replacement of the existing 30" water transmission main from Rodd Field Road to Ennis Joslin Road; and 3. Revise the design road profile such that no roadside ditches are required, and drainage is accomplished through underground storm sewer only. In response to this, we are proposing Amendment No. 1 in the amount of $36,600 to provide additionally-required engineering services to accomplish the changes. PROJECT BACKGROUND On June 20, 2018, LNV received a formal Notice to Proceed (NTP) on the Holly Road—Rodd Field to Ennis Joslin (Bond 2018) Project (18021A), which will provide for the reconstruction of Holly Road from Rodd Field Road to Ennis Joslin Road with an Additive Alternate for the continued reconstruction from Ennis Joslin Road to Paul Jones Avenue. On July 24, 2018, LNV submitted the DRAFT Engineering Letter Report on schedule. The Original Contract amount for the Basic and Additional Services associated with this project was $792,940. Page 1 of 4 801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 78408 AMEND. NO. 1 OFFICE 361.883.1984 I FAX 361.883.1986 I WWW.LNVINC.COM EXHIBIT "A" Page 1 of 5 Holly Road Project LNV, Inc. August 23,2018 (18021A) Contract Amendment No. 1 PURPOSE OF AMENDMENT NO. 1 The purpose of Amendment No. 1 is to provide additionally-required engineering services necessary to perform the Project revisions and added scope of improvements. The work covered by Amendment No. 1 includes completion of the Preliminary Phase, as described below, and additional design efforts for the replacement of the existing 30" water transmission main and lowering of the road profile. The lowered road profile will require the design of retaining walls, ditch fill, and extended driveway and intersecting street connections. SCOPE OF WORK BASIC SERVICES: 1. Preliminary Phase: The DRAFT Engineering Letter Report (ELR) submitted on July 24, 2018 will be revised to reflect the revisions to the Project Scope of Improvements and to address City comments received on the DRAFT ELR. A Response-to-Comments letter will be prepared and submitted with the FINAL ELR per the amended schedule below. This work will be performed with no increase to the Preliminary Phase fee. 2. Design Phase: Additional design efforts covered by this Amendment include: design of retaining walls, design of extended driveway and intersecting road connections, design of utility adjustments for conflicts with existing utilities, and design of a new 30"water transmission main, including: water modeling to determine allowable downtime, night-time connections to the existing main, pre-connection water system requirements, sequence of water construction, and removal or abandonment of the existing 30" main. 3. Bid Phase: No change. 4. Construction Administration Phase: No change. ADDITIONAL SERVICES: Changes to the Additional Services related to this Amendment include: Item 5. Design Water System Improvements: Authorization of this Original Contract task for the design of water distribution improvements. This task does not include design efforts related to replacement of the existing 30"water transmission main. Item 9. Stormwater Pollution Prevention Plan: Removal of this task item and reallocating its fee to the Design Phase. Item 10. Traffic Signal Design — Rodd Field Road: Removal of this task item and reallocating its fee to the Design Phase. Page 2 of 4 801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 78408 AMEND. NO. 1 OFFICE 361.883.1984 I FAX 361.883.1986 I WWW.LNVINC.COM EXHIBIT"A" Page 2 of 5 Holly Road Project LNV, Inc. August 23,2018 (18021A) Contract Amendment No. 1 SCHEDULE Pending receipt of approval and Notice to Proceed with this amendment, LNV will perform the remaining work on the Project per the revised schedule below. Revisions to the Original Contract Schedule are shown in RED. Date Activity (8-31-18) Submit Response to ELR Comments & Final ELR 6 Weeks after Final ELR Submittal 60% Design Submittal (10-12-18) 2 Weeks City Review 2 Weeks after Receipt of City 100% Design Submittal Comments (11-09-18) 2 Weeks City Review 2 Weeks after Receipt of City Final Submittal Comments (12-07-18) (1-8-19) Advertise for Bids (1-15-19) Pre-Bid Conference (1-23-19) Receive Bids (2-20-19) Contract Award (3-6-19) Begin Construction Approximately 28 Months (July Complete Construction 2021) FEES A. Fees for Basic Services. The City will pay the NE a fixed fee for providing for all "Basic Services" authorized as per the table shown in ATTACHMENT 1. The fees for Basic Services will not exceed those identified and will be full and total compensation for all services outlined herein and in Original Contract Sections I.A.1-4, and for all expenses incurred in performing these services. The fee for this project is subject to the availability of funds. The Engineer may be directed to suspend work pending receipt and appropriation of funds. For services provided, NE will submit monthly statements for services rendered. The statement will be based upon NE's estimate (and with City's concurrence) of the proportion of the total services actually completed at the time of billing. City will make prompt monthly payments in response to A/E's monthly statements. B. Fees for Authorized Additional Services. For services authorized by the Executive Director of Public Works under Original Contract Section I.B. "Additional Services", as modified herein, the City will pay the NE a not-to-exceed fee as per the table shown in ATTACHMENT 1. Page 3 of 4 801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 78408 AMEND. NO. 1 OFFICE 361.883.1984 I FAX 361.883.1986 I WWW.LNVINC.COM EXHIBIT "A" Page 3 of 5 • • Holly Road Project LNV Inc August 23, 2018 (18021A) Contract Amendment No 1 C. Summary of fees. Refer to ATTACHMENT 1 If you have any questions, or if you would like to discuss in more detail, please feel free to call me at 361-883-1984. Sincerely, Dan S. Le •ecker, P.E. President/CEO LNV, Inc. TBPE Firm No. F-366 Cc:LNV File Attachment DSJ/dsl Page 4 of 4 801 NAVIGATION SUITE 300 I CORPUS CHRISTI,TEXAS 78408 OFFICE 361 883.1984 FAX 361 8831986 WWW LNVINC COM AMEND. NO. 1 EXHIBIT "A" Page 4 of 5 ATTACHMENT 1 - SUMMARY FEE TABLE Project: Holly Road (18021A) TASK ORIGINAL CONTRACT AMENDMENT 1 TOTAL BASIC SERVICES 1. Preliminary Phase _ $105,000 $0 $105,000 2. Design Phase $448,000 $71,100 $519,100 3. Bid Phase $15,000 $0 $15,000 4. Construction Administration Phase $49,900 $0 $49,900 Subtotal Basic Services $617,900 $71,100 $689,000 ADDITIONAL SERVICES(ALLOWANCE) 1. Permit: TDLR * $1,940 $0 $1,940 2. ROW Survey* $3,800 $0 $3,800 3. Topographic Survey* $19,700 $0 $19,700 4. Hazardous Materials $3,300 $0 $3,300 5. Design Water System Improvements * $60,000 $0 $60,000 6. Design Wastewater System Upgrades TBD $0 7. Public Involvement(2 Meetings) * $13,000 $0 $13,000 8. Detailed Traffic Control Plans $12,000 $0 $12,000 9. Stormwater Pollution Prevention Plan $5,500 ($5,500) $0 10. Traffic Signal Design -Rodd Field Road $29,000 ($29,000) $0 11. Street Light Design * $22,100 $0 $22,100 12. Warranty Phase $4,700 $0 $4,700 Subtotal Additional Services $175,040 ($34,500) $140,540 TOTAL FEE $792,940 $36,600 $829,540 (` Additional Services authorized with the Original Council Approved on Contract or this Amendment.) 6/12/2018 by Res. No. 031445 AMENDMENT 1 ATTACHMENT 1 AMEND. NO. 1 EXHIBIT "A" Page 5 of 5