Loading...
HomeMy WebLinkAboutC2018-483 - 7/13/2018 - NA TASK ORDER NO. 5 This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas(City)and LNV. Inc. (Consultant)dated September 13, 2016(Agreement). Consultant shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. PROJECT NAME: Water System Process Control & Reliability, E13031 1. PROJECT DESCRIPTION — This project provides services for O.N. Stevens Water Treatment Plant Analysis and Optimization, Water Distribution System Analysis and Optimization, Information System Assessment, and SCADA Assessment. 2. SCOPE OF SERVICES — Sand Dollar Pump Station Operational Assessment as more fully described in Exhibit A. 3. COMPENSATION —The total amount not to exceed for Task Order No. 5 only is $18,543.50. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF C• --Pit RIS LNV, INC. /OF 40e die P P 773/6# / AD., __..,..„/// / eff H. Edmonds, P.E. Date /Dan '. • -r cker, P.E. Date Director of Engineering Services Presid 801 Navigation, Suite 300 Corpus Christi, TX 78408 (361) 883-1984 Office loganb@Invinc.com danl@Invinc.com Fund Name Accounting Unit Account No. Activity No. Amount Water 2013 RVBD 4096-041 550950 E13031-01-4096-EXP $18,543,50 C2018-483 7/13/18 LNV Inc. SCANNED City Project No. E13031 Professional Services Contract City of Corpus Christi Water System Process Control & Reliability Task Authorization No. 5 — Sand Dollar Pump Station Operational Assessment July 5, 2018 LINN EXHIBIT A Pana 9 of R LNV „ovusc„4,,,, 0 :Jy SCOPE OF WORK Project No. E13031 Water System Process Control & Reliability Task Authorization No. 5—Sand Dollar Pump Station Operational Assessment PURPOSE The Sand Dollar Pump Station (PS) is located at 14201 Sand Dollar Ave., Corpus Christi, Texas and has a rated capacity of 17.4 MGD. The Sand Dollar PS consists of three (3) 300 horsepower split case centrifugal pumps operated with variable frequency drives (VFD) to supply the North Padre Island distribution system. At present, only Pumps #2 and #3 are in operation due to Pump #1 currently being repaired due to recent failure. Both Pumps #2 and #3 have been limited at this time to not allow full capacity due to the pumps tripping and drawing excessive amperage. As a result, the Sand Dollar pump station has put the City into an emergency condition as the current pumping capacity available is well below the pump stations rated capacity. The purpose of this task authorization is to provide assistance to the City by performing an assessment of the Sand Dollar pump station to determine the causes of the recent pumping issues that have occurred and enable the City to find a solution to the problem. Under this task authorization, a technical memorandum will be issued to the City detailing the reasons for the issues occurring and recommendation for remedial measures needed in order to resolve the issues. Based on the findings of the assessment, the City will make decisions regarding the future course of action and a separate task authorization may be issued for the implementation of selected remedial measures. SCOPE OF WORK ADDITIONAL SERVICES: Task 0001 —Sand Dollar Pump Station Operational Assessment The Engineer will perform the following: i. Conduct up to two (2) meetings with City Staff and Water System Operators to gather input on the existing condition of the pump station, typical operations, operational difficulties and pumping issues that have occurred. ii. Conduct one (1) site visit to gather field data for existing pump station to include pumps, motors, VFDs,and appurtenances. Pump testing will also be required during the site visit to determine the current output performance for each pump. iii. Review existing data provided by City staff to include SCADA recorded data (to include Coral Vines EST levels). recent water consumption data for North Padre 1 EXHIBIT A C1/�1"1e .1sa 9' �N • ' O A LNV0 • b7 Island distribution system, and AMR data for Nueces County Water District #4 (if available in 5-minute increments for a period of 2-weeks). iv. Assess current status/operation of pumps. motors, motor and pump bearing isolation/groundings, grounding and bonding, and VFDs all in comparison to North Padre Island system hydraulics. Coordinate with manufacturers as necessary. v. Prepare a technical memorandum that will provide the following information: • Suitability of existing pump station design for the current operations of the North Padre Island distribution system • Reasons for issues/failures occurring • Remedial measures • Associated costs DELIVERABLES The Engineer will prepare a DRAFT Memorandum summarizing findings for City review and comment. Upon receipt of comments, the Engineer will incorporate the necessary changes and submit one (I) electronic copy of the FINAL Memorandum. SCHEDULE The Engineer's services shall be performed in a timely manner consistent with sound professional practices. The Engineer will complete the work according to the following schedule: Activity Completion Date Contract Execution - Notice to Proceed (NTP) TBD Task 0001 —Sand Dollar Pump Station Operational Assessment • KO Meeting with City Staff 1 week after NTP • Sand Dollar Pump Station Site Visit 2 weeks after KO Meeting • DRAFT Memorandum 4 weeks after Site Visit • Meeting with City Staff to discuss I week after DRAFT Memorandum Findings • FINAL Memorandum 2 weeks after City Meeting The time limits set forth in the schedule shall include allowances for reasonable and expected review time by the City and approval by authorities having jurisdiction over this project. and shall not be allowed as cause for delay or adjustments to the schedule. Delays caused by review times by the City exceeding those anticipated by the Engineer's schedule are cause for adjustments in the schedule. Any adjustments made to the agreed upon schedule shall be made in writing and accepted by both parties. EXHIBIT A PPUS Ch • LNV _ • The Engineer shall begin work immediately upon receipt of the executed Task Authorization and/or Notice to Proceed (written or emailed). FEE The services for all tasks listed under this task authorization will be provided on a Time and Materials (T&M) basis. The anticipated amount for this task authorization is $18,543.50. as shown in ATTACHMENT A. The Engineer will not incur cost in excess of this not-to-exceed amount without prior written authorization from the City. 3 EXHIBIT A Pant 4 of R PpUs�N O 9 • L s/ LNV TASK AUTHORIZATION MANAGER The Task Authorization Manager will be the primary contact person during the performance of this work. All correspondence or inquiries should be addressed to the Task Authorization Manager. This work task will be coordinated by: Dan Grimsbo, P.E. A.I.C.P. Executive Director of Utilities Department City of Corpus Christi Office: 361-826-1874 Fax: 361-826-1889 Email: DanGiu?cctexas.com APPROVAL The undersigned has reviewed and approved this Task Authorization and recommends LNV, Inc. to perform the work as presented: Recommended by: Z/rri.Si V (Printed Name) ,e(s-d (Date) 4 EXHIBIT A ATTACHMENT A LNV Inc. Principal Project Manager Project Engineer EIT TOTALS $ 265.00 $ 205.00 $ 170.00 $ 120.00 Total Hrs. Total Fee Task Description Hrs. Sub-total Hrs. Sub-total Hrs. Sub-total Hrs. Sub-total 0001 SAND DOLLAR PUMP STATION OPERATIONAL ASSESSMENT - Kick-off meeting with City Staff S - 1 5 205.00 1 S 170.00 1 S 120.00 3 $ 495.00 Site visit to gather field data for - existing pumps and perform $ - 4 5 820.00 4 $ 680.00 2 $ 240.00 10 5 1,740.00 pump testing - Review existing SCADA,water $ - 2 $ 410.00 4 $ 680.00 8 $ 960.00 14 5 2,050.00 consumption,and AMR data Assess current status/operation - of pumps in comparison to North 5 - 4 $ 820.00 6 $ 1,020.00 8 S 960.00 18 5 2,800.00 Padre Island system hydraulics - DRAFT Memorandum 5 - 1 5 205.00 4 $ 680.00 6 $ 720.00 11 $ 1,605.00 - Workshop with City Staff S - 1 $ 205.00 1 $ 170.00 1 $ 120.00 3 S 495.00 - FINAL Memorandum 1 5 265.00 1 5 205.00 2 S 340.00 4 $ 480.00 8 $ 1,290.00 Sub-totals 1 $ 265.00 14 $ 2,870.00 22 $ 3,740.00 30 $ 3,600.00 67 $10,475.00 Admin Fee TOTALS Bath Engineering Sr.Engineer Engineer Jr.Designer Expenses Fee (10%of subconsult $ 175.00 $ 165.00 $ 95.00 ant fee) Total Hrs. Total Fee Task Description Hrs. Sub-total Hrs. Sub-total Hrs. Sub-total Sub-total Sub-total Sub-total 0001 SAND DOLLAR PUMP STATION OPERATIONAL ASSESSMENT - Kick-off meeting with City Staff 1 S 175.00 1 $ 165.00 1 5 95.00 $ 435.00 $ 43.50 3 S 478.50 Site visit to gather field data for - existing pumps and perform 4 5 700.00 1 S 165.00 $ - S 865.00 $ 86.50 5 S 951.50 pump testing - Review existing SCADA,VFDs. 4 $ 700.00 3 $ 495.00 $ - $ 1.195.00 S 119.50 7 5 1,314.50 and motor data Assess current status/operation 0 of VFDs and motors to include m - motor and pump bearing 5 S 875.00 4 $ 660.00 $ - S 1.535.00 5 153.50 9 S 1,688.50 1 X isolation/grounding,and grounding and bondings 11 W - DRAFT Memorandum 6 $ 1,050.00 2 $ 330.00 2 $ 190.00 5 1,570.00 $ 157.00 10 $ 1.727.00 mm h - Workshop with City Staff 1 5 175.00 1 S 165.00 1 $ 95.00 S 435.00 5 43.50 3 5 478.50 r) x). - FINAL Memorandum 5 5 875.00 2 5 330.00 1 $ 95.00 $ 1,300.00 $ 130.00 8 $ 1,430.00 Sub-totals 26 $ 4,550.00 14 $ 2,310.00 5 $ 475.00 0 $ 7,335.00 $ 733.50 45 $ 8,068.50 CITY OF CORPUS CHRISTI, TEXAS SUMMARY OF APPROPRIATIONS AND EXPENDITURES AS OF July 31, 2018 Run: 07/12/2018 at 5:00 AM 4096 -Water 2015 CIP Expenditures (Includes Expenditures (Current Project Description Budget Beginning Balance) Year Only) Encumbrance Unencumbered 170062 Park Road 22 Bridge 15,805.74 15,805.74 15,805.74 0.00 0.00 180193 ONS Facilities Feed Optimization 329,999.31 29,206.29 24,805.69 300,788.07 4.a5 180198 Programmed Water Line Lifecycle f 2,050,000.00 2,047,823.17 0.00 2,176.83 0.00 180203 Elevated Water Storage Tanks-City 483.33 483.33 483.33 0.00 0.00 180415 ONS Raw Water Influent Improvem 328,334.70 167,560.70 0.00 160,774.00 0.00 18066 Cost Recovery-Reimbursements 2,165,835.30 0.00 0.00 0.00 2,165,835.30 500030 Reserve Appropriation 443,286.54 0.00 0.00 0.00 443,286.54 55050 55050 4096 Bond Issuance Costs 232,603.15 232,603.15 0.00 0.00 0.00 E10187 ONS WTP Relocate AEP Trans Lin 1,180,759.32 1,180,759.32 0.00 0.00 0.00 E11012 City Wide Alt Capacity Requiremen 750,000.00 750,000.00 0.00 0.00 0.00 E11066 ONS High Service Bldg#3 13,201,756.91 12,269,881.27 6,336,503.61 931,875.64 0.00 E11068 Nueces River Raw Water Pump St 1,097,514.90 602,438.90 30,096.80 495,076.00 0.00 E12004 Staples St Pumping Plant New Pun 196,237.69 195,516.69 68,431.26 721.00 0.00 E12102 Twigg, Shoreline to Broadway 47.58 47.58 47.58 0.00 0.00 E12211 ONS Alum Facilities Replacement 97,818.76 65,147.26 16,228.50 32,671.50 0.00 E13031 System Wide Process Control RellE 34,043.50 15,500.00 0.00 0.00 18,543.50 E13037 Mary Rhodes Ph 1 Segment 1 Unit 0.00 0.00 (35,329.31) 0.00 0.00 E13038 ONS Polymer& Liquid Amonium 40,386.06 40,386.06 0.00 0.00 0.00 E13049 Water Meter&Automater Meter Re 242,163.66 242,163.66 0.00 0.00 0.00 E13050 CC Reservoir Oper Sys Infra Imps 25,500.00 25,500.00 0.00 0.00 0.00 E13051 ONS Site Infrastructure Imp 595,205.06 127,474.07 10,137.93 325,558.92 142,172.07 E13052 ONSWTP Interim Sludge Managerr 433,469.45 433,469.45 0.00 0.00 0.00 E13094 Staples, Alameda to Morgan 13,439.80 0.00 0.00 0.00 13,439.80 E14063 Greenwood Effluent Line to Up Riv( 2,218.84 2,218.84 0.00 0.00 0.00 E14064 Naval Air Station Water Distribution 2,420.04 2,420.04 0.00 0.00 0.00 E15093 Water Transmission Infrastructure ( 129,870.58 129,870.58 0.00 0.00 0.00 E15148 Water Supply Project 150.15 150.15 150.15 0.00 0.00 E16246 ONSWTP Emergency Sludge Rem, 1,516,700.17 1,444,257.67 3,590.66 72,442.50 0.00 E16247 Construction Inspection Staff Augm 80,159.70 79,719.70 79,719.70 440.00 0.00 E16264 Water and Wastewater Treatment ( 189,856.27 159,700.22 32,361.05 30,156.05 0.00 E16325 Padre Island Water and Gas Pipelir 29,300.00 29,300.00 29,300.00 0.00 0.00 E16332 CITY OF CORPUS CHRISTI WATE 8,318.96 8,318.96 0.00 0.00 0.00 E16333 Water Emergency Projects 44.16 44.16 44.16 0.00 0.00 E16335 Alameda EST Water Quality Improv 2,026.40 2,026.40 0.00 0.00 0.00 E16427 O.N. Stevens WTP Maintenance 11 913,936.69 912,391.69 907,539.10 1,545.00 0.00 E16455 Chemical Investigation Water Syst€ 4,597.04 4,597.04 0.00 0.00 0.00 E17046 Capital Program Support 319,421.16 301,141.41 74,592.57 18,279.75 0.00 E17047 ONSWTP Raw Water Influent& Ch 118,184.37 77,886.76 0.00 40,297.61 0.00 T17020 TXDOT SH 357, FM 43 21,000.00 21,000.00 0.00 0.00 0.00