HomeMy WebLinkAboutC2018-483 - 7/13/2018 - NA TASK ORDER NO. 5
This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus
Christi, Texas(City)and LNV. Inc. (Consultant)dated September 13, 2016(Agreement). Consultant shall perform
services on the project described below as provided in this Task Order and in the Agreement. This Task Order
shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall
supplement the Agreement as it pertains to the project described below.
PROJECT NAME: Water System Process Control & Reliability, E13031
1. PROJECT DESCRIPTION — This project provides services for O.N. Stevens Water Treatment Plant
Analysis and Optimization, Water Distribution System Analysis and Optimization, Information System
Assessment, and SCADA Assessment.
2. SCOPE OF SERVICES — Sand Dollar Pump Station Operational Assessment as more fully described in
Exhibit A.
3. COMPENSATION —The total amount not to exceed for Task Order No. 5 only is $18,543.50.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement
remain in full force and effect.
CITY OF C• --Pit
RIS LNV, INC.
/OF 40e
die P P 773/6# / AD., __..,..„/// /
eff H. Edmonds, P.E. Date /Dan '. • -r cker, P.E. Date
Director of Engineering Services Presid
801 Navigation, Suite 300
Corpus Christi, TX 78408
(361) 883-1984 Office
loganb@Invinc.com
danl@Invinc.com
Fund Name Accounting Unit Account No. Activity No. Amount
Water 2013 RVBD 4096-041 550950 E13031-01-4096-EXP $18,543,50
C2018-483
7/13/18
LNV Inc.
SCANNED
City Project No. E13031
Professional Services Contract
City of Corpus Christi
Water System Process Control & Reliability
Task Authorization No. 5 — Sand Dollar Pump Station
Operational Assessment
July 5, 2018
LINN
EXHIBIT A
Pana 9 of R
LNV „ovusc„4,,,,
0
:Jy
SCOPE OF WORK
Project No. E13031
Water System Process Control & Reliability
Task Authorization No. 5—Sand Dollar Pump Station Operational Assessment
PURPOSE
The Sand Dollar Pump Station (PS) is located at 14201 Sand Dollar Ave., Corpus Christi, Texas
and has a rated capacity of 17.4 MGD. The Sand Dollar PS consists of three (3) 300 horsepower
split case centrifugal pumps operated with variable frequency drives (VFD) to supply the North
Padre Island distribution system. At present, only Pumps #2 and #3 are in operation due to
Pump #1 currently being repaired due to recent failure. Both Pumps #2 and #3 have been limited
at this time to not allow full capacity due to the pumps tripping and drawing excessive amperage.
As a result, the Sand Dollar pump station has put the City into an emergency condition as the
current pumping capacity available is well below the pump stations rated capacity.
The purpose of this task authorization is to provide assistance to the City by performing an
assessment of the Sand Dollar pump station to determine the causes of the recent pumping issues
that have occurred and enable the City to find a solution to the problem. Under this task
authorization, a technical memorandum will be issued to the City detailing the reasons for the
issues occurring and recommendation for remedial measures needed in order to resolve the
issues.
Based on the findings of the assessment, the City will make decisions regarding the future course
of action and a separate task authorization may be issued for the implementation of selected
remedial measures.
SCOPE OF WORK
ADDITIONAL SERVICES:
Task 0001 —Sand Dollar Pump Station Operational Assessment
The Engineer will perform the following:
i. Conduct up to two (2) meetings with City Staff and Water System Operators to
gather input on the existing condition of the pump station, typical operations,
operational difficulties and pumping issues that have occurred.
ii. Conduct one (1) site visit to gather field data for existing pump station to include
pumps, motors, VFDs,and appurtenances. Pump testing will also be required during
the site visit to determine the current output performance for each pump.
iii. Review existing data provided by City staff to include SCADA recorded data (to
include Coral Vines EST levels). recent water consumption data for North Padre
1
EXHIBIT A
C1/�1"1e .1sa
9' �N
•
' O A
LNV0
•
b7
Island distribution system, and AMR data for Nueces County Water District #4 (if
available in 5-minute increments for a period of 2-weeks).
iv. Assess current status/operation of pumps. motors, motor and pump bearing
isolation/groundings, grounding and bonding, and VFDs all in comparison to North
Padre Island system hydraulics. Coordinate with manufacturers as necessary.
v. Prepare a technical memorandum that will provide the following information:
• Suitability of existing pump station design for the current operations of the
North Padre Island distribution system
• Reasons for issues/failures occurring
• Remedial measures
• Associated costs
DELIVERABLES
The Engineer will prepare a DRAFT Memorandum summarizing findings for City review and
comment. Upon receipt of comments, the Engineer will incorporate the necessary changes and
submit one (I) electronic copy of the FINAL Memorandum.
SCHEDULE
The Engineer's services shall be performed in a timely manner consistent with sound
professional practices. The Engineer will complete the work according to the following
schedule:
Activity Completion Date
Contract Execution - Notice to Proceed (NTP) TBD
Task 0001 —Sand Dollar Pump Station
Operational Assessment
• KO Meeting with City Staff 1 week after NTP
• Sand Dollar Pump Station Site Visit 2 weeks after KO Meeting
• DRAFT Memorandum 4 weeks after Site Visit
• Meeting with City Staff to discuss I week after DRAFT Memorandum
Findings
• FINAL Memorandum 2 weeks after City Meeting
The time limits set forth in the schedule shall include allowances for reasonable and expected
review time by the City and approval by authorities having jurisdiction over this project. and
shall not be allowed as cause for delay or adjustments to the schedule. Delays caused by review
times by the City exceeding those anticipated by the Engineer's schedule are cause for
adjustments in the schedule. Any adjustments made to the agreed upon schedule shall be made
in writing and accepted by both parties.
EXHIBIT A
PPUS Ch
•
LNV _
•
The Engineer shall begin work immediately upon receipt of the executed Task Authorization
and/or Notice to Proceed (written or emailed).
FEE
The services for all tasks listed under this task authorization will be provided on a Time and
Materials (T&M) basis. The anticipated amount for this task authorization is $18,543.50. as
shown in ATTACHMENT A. The Engineer will not incur cost in excess of this not-to-exceed
amount without prior written authorization from the City.
3
EXHIBIT A
Pant 4 of R
PpUs�N
O 9
•
L s/
LNV
TASK AUTHORIZATION MANAGER
The Task Authorization Manager will be the primary contact person during the performance of
this work. All correspondence or inquiries should be addressed to the Task Authorization
Manager. This work task will be coordinated by:
Dan Grimsbo, P.E. A.I.C.P.
Executive Director of Utilities Department
City of Corpus Christi
Office: 361-826-1874
Fax: 361-826-1889
Email: DanGiu?cctexas.com
APPROVAL
The undersigned has reviewed and approved this Task Authorization and recommends LNV, Inc.
to perform the work as presented:
Recommended by:
Z/rri.Si V (Printed Name)
,e(s-d (Date)
4
EXHIBIT A
ATTACHMENT A
LNV Inc. Principal Project Manager Project Engineer EIT TOTALS
$ 265.00 $ 205.00 $ 170.00 $ 120.00
Total Hrs. Total Fee
Task Description Hrs. Sub-total Hrs. Sub-total Hrs. Sub-total Hrs. Sub-total
0001 SAND DOLLAR PUMP STATION OPERATIONAL ASSESSMENT
- Kick-off meeting with City Staff S - 1 5 205.00 1 S 170.00 1 S 120.00 3 $ 495.00
Site visit to gather field data for
- existing pumps and perform $ - 4 5 820.00 4 $ 680.00 2 $ 240.00 10 5 1,740.00
pump testing
- Review existing SCADA,water $ - 2 $ 410.00 4 $ 680.00 8 $ 960.00 14 5 2,050.00
consumption,and AMR data
Assess current status/operation
- of pumps in comparison to North 5 - 4 $ 820.00 6 $ 1,020.00 8 S 960.00 18 5 2,800.00
Padre Island system hydraulics
- DRAFT Memorandum 5 - 1 5 205.00 4 $ 680.00 6 $ 720.00 11 $ 1,605.00
- Workshop with City Staff S - 1 $ 205.00 1 $ 170.00 1 $ 120.00 3 S 495.00
- FINAL Memorandum 1 5 265.00 1 5 205.00 2 S 340.00 4 $ 480.00 8 $ 1,290.00
Sub-totals 1 $ 265.00 14 $ 2,870.00 22 $ 3,740.00 30 $ 3,600.00 67 $10,475.00
Admin Fee TOTALS
Bath Engineering Sr.Engineer Engineer Jr.Designer Expenses Fee (10%of
subconsult
$ 175.00 $ 165.00 $ 95.00 ant fee)
Total Hrs. Total Fee
Task Description Hrs. Sub-total Hrs. Sub-total Hrs. Sub-total Sub-total Sub-total Sub-total
0001 SAND DOLLAR PUMP STATION OPERATIONAL ASSESSMENT
- Kick-off meeting with City Staff 1 S 175.00 1 $ 165.00 1 5 95.00 $ 435.00 $ 43.50 3 S 478.50
Site visit to gather field data for
- existing pumps and perform 4 5 700.00 1 S 165.00 $ - S 865.00 $ 86.50 5 S 951.50
pump testing
- Review existing SCADA,VFDs. 4 $ 700.00 3 $ 495.00 $ - $ 1.195.00 S 119.50 7 5 1,314.50
and motor data
Assess current status/operation
0 of VFDs and motors to include
m - motor and pump bearing 5 S 875.00 4 $ 660.00 $ - S 1.535.00 5 153.50 9 S 1,688.50
1 X isolation/grounding,and
grounding and bondings
11 W - DRAFT Memorandum 6 $ 1,050.00 2 $ 330.00 2 $ 190.00 5 1,570.00 $ 157.00 10 $ 1.727.00
mm
h - Workshop with City Staff 1 5 175.00 1 S 165.00 1 $ 95.00 S 435.00 5 43.50 3 5 478.50
r) x).
- FINAL Memorandum 5 5 875.00 2 5 330.00 1 $ 95.00 $ 1,300.00 $ 130.00 8 $ 1,430.00
Sub-totals 26 $ 4,550.00 14 $ 2,310.00 5 $ 475.00 0 $ 7,335.00 $ 733.50 45 $ 8,068.50
CITY OF CORPUS CHRISTI, TEXAS
SUMMARY OF APPROPRIATIONS AND EXPENDITURES
AS OF July 31, 2018
Run: 07/12/2018 at 5:00 AM
4096 -Water 2015 CIP
Expenditures (Includes Expenditures (Current
Project Description Budget Beginning Balance) Year Only) Encumbrance Unencumbered
170062 Park Road 22 Bridge 15,805.74 15,805.74 15,805.74 0.00 0.00
180193 ONS Facilities Feed Optimization 329,999.31 29,206.29 24,805.69 300,788.07 4.a5
180198 Programmed Water Line Lifecycle f 2,050,000.00 2,047,823.17 0.00 2,176.83 0.00
180203 Elevated Water Storage Tanks-City 483.33 483.33 483.33 0.00 0.00
180415 ONS Raw Water Influent Improvem 328,334.70 167,560.70 0.00 160,774.00 0.00
18066 Cost Recovery-Reimbursements 2,165,835.30 0.00 0.00 0.00 2,165,835.30
500030 Reserve Appropriation 443,286.54 0.00 0.00 0.00 443,286.54
55050 55050 4096 Bond Issuance Costs 232,603.15 232,603.15 0.00 0.00 0.00
E10187 ONS WTP Relocate AEP Trans Lin 1,180,759.32 1,180,759.32 0.00 0.00 0.00
E11012 City Wide Alt Capacity Requiremen 750,000.00 750,000.00 0.00 0.00 0.00
E11066 ONS High Service Bldg#3 13,201,756.91 12,269,881.27 6,336,503.61 931,875.64 0.00
E11068 Nueces River Raw Water Pump St 1,097,514.90 602,438.90 30,096.80 495,076.00 0.00
E12004 Staples St Pumping Plant New Pun 196,237.69 195,516.69 68,431.26 721.00 0.00
E12102 Twigg, Shoreline to Broadway 47.58 47.58 47.58 0.00 0.00
E12211 ONS Alum Facilities Replacement 97,818.76 65,147.26 16,228.50 32,671.50 0.00
E13031 System Wide Process Control RellE 34,043.50 15,500.00 0.00 0.00 18,543.50
E13037 Mary Rhodes Ph 1 Segment 1 Unit 0.00 0.00 (35,329.31) 0.00 0.00
E13038 ONS Polymer& Liquid Amonium 40,386.06 40,386.06 0.00 0.00 0.00
E13049 Water Meter&Automater Meter Re 242,163.66 242,163.66 0.00 0.00 0.00
E13050 CC Reservoir Oper Sys Infra Imps 25,500.00 25,500.00 0.00 0.00 0.00
E13051 ONS Site Infrastructure Imp 595,205.06 127,474.07 10,137.93 325,558.92 142,172.07
E13052 ONSWTP Interim Sludge Managerr 433,469.45 433,469.45 0.00 0.00 0.00
E13094 Staples, Alameda to Morgan 13,439.80 0.00 0.00 0.00 13,439.80
E14063 Greenwood Effluent Line to Up Riv( 2,218.84 2,218.84 0.00 0.00 0.00
E14064 Naval Air Station Water Distribution 2,420.04 2,420.04 0.00 0.00 0.00
E15093 Water Transmission Infrastructure ( 129,870.58 129,870.58 0.00 0.00 0.00
E15148 Water Supply Project 150.15 150.15 150.15 0.00 0.00
E16246 ONSWTP Emergency Sludge Rem, 1,516,700.17 1,444,257.67 3,590.66 72,442.50 0.00
E16247 Construction Inspection Staff Augm 80,159.70 79,719.70 79,719.70 440.00 0.00
E16264 Water and Wastewater Treatment ( 189,856.27 159,700.22 32,361.05 30,156.05 0.00
E16325 Padre Island Water and Gas Pipelir 29,300.00 29,300.00 29,300.00 0.00 0.00
E16332 CITY OF CORPUS CHRISTI WATE 8,318.96 8,318.96 0.00 0.00 0.00
E16333 Water Emergency Projects 44.16 44.16 44.16 0.00 0.00
E16335 Alameda EST Water Quality Improv 2,026.40 2,026.40 0.00 0.00 0.00
E16427 O.N. Stevens WTP Maintenance 11 913,936.69 912,391.69 907,539.10 1,545.00 0.00
E16455 Chemical Investigation Water Syst€ 4,597.04 4,597.04 0.00 0.00 0.00
E17046 Capital Program Support 319,421.16 301,141.41 74,592.57 18,279.75 0.00
E17047 ONSWTP Raw Water Influent& Ch 118,184.37 77,886.76 0.00 40,297.61 0.00
T17020 TXDOT SH 357, FM 43 21,000.00 21,000.00 0.00 0.00 0.00