HomeMy WebLinkAboutC2018-513 - 7/30/2018 - NA CITY OF CORPUS CHRISTI
AMENDMENT NO. 2
CONTRACT FOR PROFESSIONAL SERVICES
The City of Corpus Christi, Texas, hereinafter called"City," and LJA Engineering, Inc., hereinafter called
"Consultant," agree to the following amendment to the Contract for Professional Services for North Beach
Breakwater, Plaza, North Shoreline Repair and Enhancement(Bond 2012) (Project No. E12129) as
authorized and administratively amended by:
Original Contract July 19, 2016 Motion No. M2016-078 $121,358.39
Amendment No. 1 June 23, 2017 Administrative Approval $6,253.90
EXHIBIT A, SECTION 1. SCOPE OF SERVICES, PART A. BASIC SERVICES, Item No. 2 Design
Phase,and Item No.3 Bid Phase shall be amended as set forth in the attached Amendment No. 2, Exhibit
EXHIBIT A, SECTION 3. FEES, SUMMARY OF FEES shall be amended based on the modified scope of
services in the attached Amendment No. 2, Exhibit"A"Summary of Fees for a fee not to exceed $8,374.00
for a total restated fee not to exceed $135,986.29.
All other terms and conditions of the July 19, 2016 Contract for Professional Services between the City
and Consultant, and of any amendments to that contract which are not specifically addressed herein shall
remain in full force and e.-ct.
CITY ' 'U- TI LJ7$EERING .. 23`Jeff H. Edmonds, P.E. Date ictti- : , Jr. P - . Date
Director of Engineering Services Vice President
820 Buffalo Street
Corpus Christi. TX 78401
APPROVED AS TO LEGAL FORM (361) 887-8851 Office
0 2018.07.24 vgutierrez@lja.com
_ ' /4_,,...--„,..
10:42:02-05'00'
Assistant City Attorney Date
ATTEST
t-+(k2,1
i Secretary Date 7/3 L/i g
Accounting Unit 3549-051
Account 550950
Activity E12129-01-3549-EXP
Account Category 50950
Fund Name Street 2013 Bond 2012
C2018-513
7/30/18
LJA Engineering Inc.
114
5656 S Staples
Street.Suite 230.Corpus Christi,Texas 78411
LJA ENGINEERING t 361 991 8550 f 361 993 7569 LJA.com TBPE F-1386 TBPLS 10104001
July 2, 2018
City of Corpus Christi CONTRACT AMENDMENT No. 2
Engineering Services
P.O. Box 9277
Corpus Christi, Texas 78469-9277
Attention: Ms. Sarah West, P.E., CFM
Major Projects Engineer
RE: Engineering Services Agreement Between
City of Corpus Christi and LJA Engineering, Inc.
North Beach Breakwater, Plaza, North Shoreline Repair and Enhancement
(Bond 2012)--City Project No. E12129
Contract Amendment No. 2 — Additionally Requested Services
LJA Proposal No. 15-01736 CO2; LJA Project No. C007-16006A
Dear Ms. West:
SCOPE OF WORK BASIC SERVICES
LJA Engineering, Inc. is pleased to submit this correspondence as our proposal to the City of Corpus
Christi for Contract Amendment No. 2 for providing the requested professional engineering services
required to amend the construction plans and re-bid the project. The Basic Services includes
additional Design Phase and Bid Phase services. Justification for the amendment is as follows:
1. There were no bids received during the first bidding process attempt.
2. The City has completed a portion of the proposed sidewalk ADA improvements, located
along Surfside Boulevard, using a separate contract and contractor under the Street
Preventative Maintenance Program (SPMP).
3. The City has revised the general schedule for the bidding and construction phase work.
LJA proposes to perform the above-described Basic Services work on a Fixed Fee basis as described
below in Section II. BASIS OF COMPENSATION. Not including the City's review time and bidding
schedule, LJA will require 10 business days to complete this portion of the project and to coordinate
all disciplines of work.
II. BASIS OF COMPENSATION
LJA proposes to perform the above-described Basic Services scope of work for a fixed fee of
S8,374.00 as follows:
Basic Services
Additional Design Phase Services $4,304.00
Additional Bid Phase Services $4,070.00
TOTAL ADDITIONAL BASIC SERVICES: S8,374.00
V\LJA ENGINEERING'LJA OPPORTUNITIES-PROPOSALS-PSA 2016-2017`.Corpus Chnsti Opportumues'.2018 Pro Ltr -PSA Contracts 15-01736 AMD NO.2
CO2-North Beach Breakwater,Plaza,North Shoreline Repair 8 Enhancement\North Beach E12129 Amendment 2.docx EXHIBIT"A"
Page 1 of 4
•
114
5656 S Staples Street,Suite 230,Corpus Christi.Texas 78411
LJA ENGINEERING t 361.991.8550 f 361.993.7569 LJA.com TBPE F-1386 TBPLS 10104001
III. SCHEDULE OF PAYMENTS
Invoices shall be prepared, submitted and paid on a monthly basis in accordance with the Original
Contract. We will invoice the City based on upon engineering efforts spent at the time of invoicing.
Please call should you have any questions or require additional information. My office number is 361-
991-8550 and my email is vgutierrezia_7lia.com.
Sincerely,
LJA n ering, Inc.
•
Icto M. Gutie , J ., P .
Vice President
VMG/v
Attachments
V.\LJA ENGINEERINGLJA OPPORTUNITIES•PROPOSALS-PSA 2016-2017\Corpus Christi Opportumties12018 Pro.Ur.-PSA Contracts\15.01736 AMD NO.2
CO2-North Beach Breakwater,Plaza,North Shoreline Repair&Enhancement\North Beach E12129 Amendment 2.docx EXHIBIT"A"
Page 2 of 4
North Beach Breakwater,Plaza,North Shoreline Repair and Enhancement
(BOND 2012)
City Project No.E12129
Proj.Manager/Hr Graduate Engineer Iii CADD Tech II/Hr Administrative/Hr .
TASK DESCRIPTION $188 $140 $116 $64 Task Total
Hours Total Hours! Total Hours Total Hours. Total
ADDITIONAL SERVICES-Additionally-Requested Services for CA#2 •
DESIGN PHASE ADDITIONAL SERVICES-Additionally-Requested Services for CA#2
Modity Construction Plans: Add PP Removals per MBITS, Remove curb ramp 2 $ 376.00 6 $ 840.00 6 $ 696.00 $ - $ 1,912.00
construction along Surfside. Add additional stiping along Surfside. Revise Testing
Schedule and Quantity sheet.Adjust stormwater due to conflicts with Urban's plans.
Remove references to prior Addendums.Coordinate with Urban Eng and MBITS.
Modify Engineers Cost Estimate and Bid Form: Recalculate quantities due to curb 1 $ 188.00 3 $ 420.00 1 $ 116.00 2 $ 128.00 $ 852.00
ramp removal, additional striping and stormwater changes. Review and revise unit
prices to current pricing.Coordinate with MBITS
Modify Contract Documents: Revise Cover, Table of Contents, Invitation to Bid, 1.5 $ 282.00 3 $ 420.00 2 $ 232.00 2 $ 128.00 $ 1,062.00
Agreement, Wage Rates, Supplementary Conditions, Summary of Work,
Allowances,Basis of Payment,and Specifications as needed.Remove references to
prior Addendums.Coordinate with MBITS
Modify the CivCast Spreadsheet 0.5 $ 94.00 1 $ 140.00 1 $ 116.00 2 $ 128.00 $ 478.00
SUBTOTAL DESIGN PHASE ADDITIONAL SERVICES-Requested Services for
CA#2 $ 4,304.00
SECOND BID PHASE-Additionally-Requested Services
Participate in Pre-Bid Conference 2: $ 376.00 0.5 $ 70.00 1 $ 116.00 $ - $ 562.00
Assist City in Solicitation of Bids 2 $ 376.00 1 $ 140.00 1 I $ 116.00 2 $ 128.00 $ 760.00
Review Pre-Bid Questions&Submissions Concerning Bid Documents and prepared 5 $ 940.00 4 $ 560.00 2.5' $ 290.00 2 $ 128.00 $ 1,918.00
necessary Addendums.
Attend Bid Opening, Analyze Bids, Prepare Bid Tabulation and make 2 $ 376.00 1.5 $ 210.00 1 $ 116.00 2 $ 128.00 $ 830.00
Recommendation for Award.
SUBTOTAL SECOND BID PHASE-Additionally-Requested Services $ 4,070.00
_
TOTAL ADDITIONAL SERVICES $3,008.00 $2,800.00 $1,798.00 I $768.001 $8,374.00
co Le z
0-IP
aya
North Beach Breakwater, Plaza, North Shoreline Repair and Enhancement
(BOND 2012)
City Project No. E12129
SUMMARY OF FEES
FEES ORIGINAL AMD.NO.1 AMD NO.2 TOTAL
CONTRACT
Basic Services Fees
1. Preliminary Phase(FF) $ - $ - $ - $ -
2. Design Phase(FF) $ 80,364.28 $ - $ 4,304.00 $ 84,668.28
3. Bid Phase(FF) $ 4,420.66 $ - $ 4,070.00 $ 8,490.66
Subtotal Basic Services Fees $ 84,784.94 $ - $ 8,374.00 $ 93,158.94
Additional Services Fee(Allowance)
1. Permitting: TDLR Registration(FF) (Authorized) $ 844.69 $ - $ - $ 844.69
2. Public Meeting(1 Meeting(FF) (Authorized) $ 2,530.11 $ - $ - $ 2,530.11
3. Construction Phase Assistance(T&M)(Authorized) $ 28,082.54 $ - $ - $ 28,082.54
4. Preparation of Record Drawings(FF) (Authorized) $ 5,116.11 $ - $ 5,116.11
5. Streetlight Coordination&Related Modification of
PSE (FF) (Authorized) $ - $ 6,253.90 $ - $ 6,253.90
Subtotal Additional Services Fees $ 36,573.45 $ 6,253.90 $ - $ 42,827.35
TOTAL FEES $ 121,358.39 $ 6,253.90 $ 8,374.00 $135,986.29
MID NO.2
EXHIBIT"A'
Page 4 of 4