This ELECTRICAL CONSTRUCTION CONTRACT is between the City of Corpus Christi, a Texas home-
rule municipal corporation ("CITY"), acting through its duly authorized City Manager or designee, the
Director of Engineering Services or City Engineer, and American Electric Power Company, Inc.
("CONTRACTOR"). The parties agree as follows:
1. CONTRACTOR shall construct and complete the following scope of services attached as Exhibit
A and incorporated herein. Contractor agrees to perform all work as provided and as may be considered
necessary to complete the work in a satisfactory and acceptable manner(the"Work").The CITY reserves
the right to make such changes in the plans and specifications and in the character of the work as may
be necessary or desirable. Authorization for all changes must be made in writing. The CONTRACTOR
shall furnish all labor, tools, material, machinery, equipment, and incidentals necessary to the prosecution
of the Work unless otherwise provided by the written terms of the plans and specifications.
2. The work shall be completed no later than TBD
3. In consideration of the completion of the above-described Work, the CITY agrees to pay to
CONTRACTOR in accordance with Exhibit A.
4. Upon completion of work and before acceptance and payment is made, the "CONTRACTOR"
shall clean and remove from the work site all surplus and discarded materials, temporary structures, and
debris of every kind in order to leave the work site in a neat, orderly condition, equal to that which originally
existed.
5. All work shall be performed in a workmanlike manner and to the satisfaction of the CITY. The
CITY shall determine the quality and acceptability of materials furnished, work performed, manner of
performance, rate of progress of the Work, sequence of construction, and interpretation of the plans and
specifications.
6. The CONTRACTOR shall, at all times, observe and comply with City, federal, state and county
laws, ordinances or regulations which in any manner affect the conduct of the Work. The CONTRACTOR
shall be responsible for procuring all legally required building, plumbing, electrical and other permits and
licenses, pay all charges and fees, and give all notices necessary and incidental to the due and lawful
prosecution of the Work, unless otherwise provided by the written terms of the plans and specifications.
7. This Agreement or the Work provided may not be assigned or subcontracted by CONTRACTOR
without the written permission of the CITY.
C2018-521
8/06/18
American Electric Power
SCANNED
IN WITNESS WHEREOF this Agreement is hereby executed on , 201p.
CITY OF COR•US CHRISTI AMERICAN ELECTRIC POWER, INC.
V , lb -P_ l4 .E.
P
aI= .e H. G ay, P. . nate Original Authorized Signatur4
Exe utive Di -'tor atPublic Works
An12+;s L. l4�✓tnJe�� P �.
RECOMMEND D � Print Name and Title
' 9We! AO /� VD C.;1A-01 S4-.
ff H. Edmonds, P.E. Date Address
Director of Engineering Services
(o pu S 6-44.sf- 7x
City, State, ZIP
3, f -oto' - 331
Phone/Fax
a Lk4 Rac, aQ AEP, Ca,
Email
APPROVED
2018.07.31 16:17:42
-05'00'
Assistant City Attorney Date
Fund Name Accounting Account Activity No. Amount
Unit No.
Police2013G0B12 3342-151 550840 E12126-01-3342-EXP $24,652,82
Total $24,652.82
, PE. A s t ►<AR,x;, P.G.
.' _ pL
of Etzi klEF.e��L�'� Cc4 4-o"4,4. Dr dk'/1.
06,-0s-Lg5 7/ss/�g
EXHIBIT A
Page 1 of 1
CLEARING FOR EXCAVATION SHEET
A re-locate is required after 14 days, (excluding Saturdays, Sundays, and legal holidays)if digging has not been started
[[ Legal Holidays]]:: 1st day of January::3rd Monday in January::l9th day of January::3rd Monday in February::2nd day of
March::21 st day of April::Last Monday in May::19th day of June::4th day of July::27th day of August::1 st Monday in
September::)lth day of November::4th Thursday in November::Friday after Thanksgiving::25th day of December.
THIS LOCATE TICKET IS EFFECTIVE ON:
>>>>>>>>>>>>>>>>> THIS LOCATE TICKET EXPIRES ON : ««««««««<
Date & Time Notification Center first called:
Work Order#: DCP0284237 Town: CORPUS CHRISTI
Work Request#: 69678830 County: NUECES
Date Received from RA: Date to Clearing Contractor:
Locate Address: CIVITAN DR.
Locate Number Appointment Date &Time Utility Located Remarks
AEP
Electric
Telephone
Gas
Cable TV
Water
Sewer
Return this Completed Clearing Sheet to AEP by this Date:
Completed By: Date:
Mobile#:
EXHIBIT A-1
Page 1 of 2
•
REMOVE POLE
LOCATION 14
51495955065472
35 FT CLASS 5 WOOD
INSTALL OH XFMR DS1440 B
3-25 KVA-ABC REMOVE OH STL
120-208 V HPS 250W
ESI 10032789464002751
INSTALL PED 14 FT ARM
LOCATION 12
51495835065436
DS2412 SUBSURFACE ,^}� INTERCEPT UNDERGROUND STREET LIGHT CONDUCTOR
INSTALL POLE 11 AND MAKE CONNECTION AT THE PEDESTAL.
51495835065443
40 2
t DS315-A
INSTALL OH SLT
HPS 250W •
DVE POLE ESI 10032789464002751
TION 13 14 FT ALUM ARM
3965065256
-CLASS 5 WOOD
40-B 0/
2 VE STL S INSTALL POLE 10 NS/C�q
0032789464002751 W 51495295065318
ARM . 40 2 e
DS303
.E 9 INSTALL POLE 8
185 51494885065187
40 2
«srnr+ DS316-A
su
SLT
//0,64.„°`&61,
/O
9464002751 65r 42
ARM INSTALL POLE 7 INTERCEPT EXISTING#2 SINGLE PHASE CONDUCTO' AND
41495835065138
40 2 ITS NUETRAL AND ATTACH TO NEW POLE#4.
DS301
INSTALL POLE 6
' 51496785065085
40 2 3 1,0
DS301 �rokL /
41
m INSTALL POLE 5 ,14 6v)
51498145065016 INSTALL POL
40 2 5150079506
DS301 40 4
DS316-A
INSTALL POLE 4
51499465064947 QSP41s
40 2
DS360 i4!
IN- ALL PO/411:2
5 0009506LL POLE 2
,0 2635064886
1S316-A32 DS361
iI
l v
co
4, 7 0
II