CITY OF CORPUS CHRISTI
AMENDMENT NO. 1 TO
CONSTRUCTION MATERIALS TESTING AGREEMENT
The City of Corpus Christi, Texas, a Texas home-rule municipal corporation ("City') and Rock
Engineering & Testina Laboratory. Inc. ("Consultant"), agree to the following amendments to the
Construction Materials Testing Agreement for Elevated Water Storage Tanks ACR Implementation,
Phase 2(Project No. E110121:
Original Contract April 19, 2016 M2016-041 $63,400.00
In the Original Contract, Section 2. Scope of Work shall be amended as set forth in the attached
Amendment No. 1, Exhibit"A".
In the Original Contract, Section 3. Fee shall be amended based on the modified scope of services in
the attached Amendment No. 1, Exhibit"A"for a fee not to exceed$14.000.00,for a total restated fee
not to exceed $77.400.00.
All other terms and conditions of the April 19,2016 Construction Materials Testing Agreement between
the City and Consultant,and of any amendments to that contract,which are not specifically addressed
herein shall remain in full force and effect.
CITY OF CORPU CH ISTI ROCK ENGINEERING&TESTING
LABORATORY,INC.
II , (
�� l
August 21,2018
=rie H. Gra , P.E. Dat is Ro Date
E utive Dire• oro " blic W• § Chief Operating Officer
6817 Leopard Street
rpus Christi, TX 78409
361-883-4555 Office
��
eff H. Edmonds, P.E. ate
Director of Engineering Services
Project No. E11012
APPROVED AS TO LEGAL FORM Accounting Unit:4080-041
' 2018.08.22 Account:550920
� Activity: E11012-01-4080-EXP
09:18:15 -05'00' . Account Category: 50920
Assistant City Attorney Date Fund Name:Water CIP
Encumbrance No.
K:IENGINEERING DATAEXCHANGEICLARISSAPWATER%E11012-ALTERNATIVE CAPACITY REQUIREMENT FOR ELEVATED STORAGE CITY WIDEIROCK ENGINEERING
MID 11TESTING AMENDMENT.DOCX
C2018-541
8/24/18
Rock Engineering & Testing
•. •
0 GEOTECHNICAL ENGINEERING
• CONSTRUCTION MATERIALS
t� O ENGINEERING &TESTING
qe �o • SOILS•ASPHALT•CONCRETE
Agro
9y
Wednesday, August 08, 2018
City of Corpus Christi
P.O. Box 9277
Corpus Christi, Texas 78401
Attn: Mr. J. H. Edmonds, P.E. — Director of Engineering Services
SUBJECT: ESTIMATED CONSTRUCTION MATERIALS TESTING BUDGET
City Project No.: E11012 ELEVATED WATER STORAGE TANKS
Corpus Christi, Texas
RETL Proposal Number: P021816A1 —Amendment 1
Dear Mr. Edmonds,
The following Amendment 1 is an amendment to the original Estimated Testing Budget
P021816A.
The testing exceeded the estimated budget and additional testing is needed to complete the
project. Per the original proposal P070816A, "The actual fees invoiced for this project will be
based on the actual testing performed."The following Amendment 1 is submitted to you so that
Rock Engineering and Testing Laboratory may invoice the City of Corpus Christi for the outstanding
balance from actual work performed and continue testing services through the end of the project.
Our services are performed on an on-call, as-needed basis at the request of the City of Corpus
Christi.
The Original Estimated Testing Budget P021816A $63,400.00. The Proposed Amendment 1
Estimated Testing Budget for this project is$77,400.00. A difference of$14,000.00.
Please do not hesitate to contact me at (361) 883-4555 extension 415 if you have any
questions regarding the amended proposal or would like to discuss further.
Sincerely,
Pablo Schmitt
Project Estimator
Rock Engineering and Testing Laboratory
ROCK ENGINEERING&TESTING LABORATORY,INC.
6817 LEOPARD STREET•CORPUS CHRISTI,TEXAS,78409 EXHIBIT A
OFFICE: (361)883-4555•FAX: (361)883-4711 •www.rocktesting.com
Paae 1 of 1