Loading...
HomeMy WebLinkAboutC2018-565 - 10/11/2018 - NA TASK ORDER NO. 11 This Task Order pertains to a Master Services Agreement for Geotechnical and Construction Materials Testing by and between City of Corpus Christi,Texas(City)and Rock Engineering&Testing Laboratory, Inc.,(Lab)dated January 16, 2018 by Motion No. M2018-005 (Agreement). Lab shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution,this Task Order shall supplement the Agreement as it pertains to the project described below. MSA PROJECT NUMBER/NAME: 17100A Geotechnical and Construction Materials Testing TASK ORDER PROJECT NUMBER/NAME: 17100L Geotechnical and Construction Materials Testing 1. PROJECT DESCRIPTION: 18041A S. Staples St(Kostoryz Rd to Baldwin Blvd) 2. SCOPE OF SERVICES—GeoTech and/or Construction Material Services to observe,test and report for the S. Staples St(Kostoryz Rd to Baldwin Blvd) project, and as more fully described in Exhibit A. 3. COMPENSATION —The total amount not to exceed for this Task Order only is $13,500.00. This Task Order is approved, and Lab may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS CHRISTI ROCK ENGINEERING&TESTING LABORATORY, INC. ' ` ���� 10-OS-18 Jeff H. Edmonds, P.E. ate Cu k ----k Date Director of Engineering Services perating Offic r 6817 Leopard Street Corpus Christi, TX 78409 (361) 883-4555 Office curtis@rocktesting.com Accounting Unit: 3551-051 Account: 550920 Activity: 18095-A-3551-EXP Account Category: 50920 Fund Name: ST2015 GO BD 14 Amount: $13,500.00 C2018-565 Task Order No.11 10/11/18 Testing Agreement Page 1 of 2 Rock Engineering& Testing SCANNED TASK ORDER FUNDING REQUEST FORM CONTRACT MSA#AND TITLE: 17100A Geotechnical and Construction Materials Testing(ROCK) TASK ORDER PROJECT#/TITLE: 17100L Geotechnical and Construction Materials Testing(ROCK) REQUESTING DEPARTMENT:ENGINEERING DEPARTMENT FUND NAME/FUND#-ME: ACCOUNT: ACTIVITY: 3551-051 550920 18095-A-3551-EXP CONSULTANT: Rock Engineering TASK ORDER#: 11 SCOPE OF WORK: SEE PROPOSAL TASK ORDER IS FOR PROJECT(S)LISTED BELOW: PROJECT# FEE PROJECT NAME 18041A $13,500 Staples Street $13,500 Grand Total MARISA ALANIZ PM PRINT NAME: SIGNATURE:4.4&‘*--------1/ 10/8/2018 DATE: *9 TFS, • GEOTECHNICAL ENGINEERING <COx ,�o • CONSTRUCTION MATERIALS I C ENGINEERING&TESTING qe Pie • SOILS•ASPHALT•CONCRETE °94r°Rr .�°oP September 13, 2018 City of Corpus Christi 518 S. Enterprize Pkwy Ste C Corpus Christi, Texas 78405 Attention: Ms. Marisa Alaniz,EIT SUBJECT: PROPOSAL TO PERFORM A SUBSURFACE INVESTIGATION, LABORATORY TESTING PROGRAM,AND PROVIDE GEOTECHNICAL RECOMMENDATIONS FOR THE PROPOSED SOUTH STAPLES STREET RECONSTRUCTION PROJECT Baldwin Boulevard to Kostoryz Road Corpus Christi,Texas RETL Proposal Number: P091318B Dear Ms. Alaniz, Rock Engineering and Testing Laboratory, Inc. (RETL) (TBPE Firm No. 2101) is pleased to submit the following proposal to provide a subsurface investigation, laboratory testing, and a Geotechnical recommendations report to be used during the design of the proposed South Staples Street complete reconstruction project from Baldwin Boulevard to Kostoryz Road located in Corpus Christi,Texas. Based on information provided to RETL, the project will include the complete reconstruction of approximately 4700 LF of an arterial roadway having 2 travel lanes in each direction with a continuous center turn lane. It is understood that the profile grade line of the roadway will remain approximately the same. The major utilities (water, sanitary sewer, natural gas) and storm sewer systems will be upgraded as part of the improvements. As directed by the City of Corpus Christi's Engineering Services Department, RETL will perform six borings to a termination depth of 5-feet,two borings to a termination depth of 15-feet, and two borings to a termination depth of 30-feet at the designated locations provided by the City of Corpus Christi. (Total number of Borings: 10; Total linear feet of Drilling: 120 LF). RETL will obtain pavement cores and sample, identify and measure the pavement constituents at the six boring locations. Additionally,RETL will perform the following: • Evaluate the subsurface soils within the limits of the proposed roadway rehabilitation project by obtaining information on the in-situ soils and groundwater conditions and to provide flexible and rigid pavement sections suitable for 30-year pavement designs. ROCK ENGINEERING&TESTING LABORATORY,INC. Corpus Christi San Antonio Round Rock Office:361.883.4555 Office:210.495.8000 Office:512.284.8022 Fax:361.883.4711 Fax:210.495.8015 Fax:512.284.7764 6817 Leopard St. 10856 Vandale 1 Roundville Ln. Corpus Christi,TX 78409 San Antonio,TX 78216 Round Rock,TX 78664 www.rocktesting.com Exhibit A Page 1 of 5 • Page 2 of 5 PROPOSED SOUTH STAPLES ST.RECONSTRUCTION PROJECT September 13,2018 Baldwin Boulevard to Kostoryz Road Attn: Ms. Marisa Alaniz,EIT City of Corpus Christi RETL Proposal No.:P091318B • Provide recommendations for the use of either reinforced concrete or non-reinforced concrete pavement and the suitability for each option. • Provide soil parameters, trench excavation design parameters, OSHA soil type classification and recommendations needed by the contractor/engineer to design braced excavations for installation of underground utilities. The scope of work is outlined below. Scope of the Proposed Subsurface Investigation • RETL requests that the boring/core locations are staked in the field prior to the field investigation. • Coordination with Texas One Call will be performed by RETL to identify underground utilities in the proximity of the boring/core locations. The borings/cores will be relocated if necessary. • RETL will provide proper traffic control and traffic control devices as required by the City of Corpus Christi during our field investigation. • The borings will be sampled continuously to depths of 10-feet, and at 5-foot intervals thereafter to the termination depth of the borings. • Groundwater readings will be obtained during drilling and immediately upon completion of the drilling operations. • After obtaining the delayed groundwater readings, the open boreholes will be backfilled with excess soils obtained during the drilling operations, the base material will be replaced in the boreholes and patched with cold mix. Scope of Laboratory Testing Program • Supplementary Visual Classification(ASTM D2487) • Water Content Tests (ASTM D2216) • Atterberg Limits Tests(ASTM D4318) • Unconfined Compression Tests (ASTM D2166) • Percent passing No. 200 (ASTM D1140) • Laboratory Electrical Resistivity Tests (ASTM G57) • pH of Soil (ASTM G51) • Soluble Chlorides (ASTM D512) • Soluble Sulfates(ASTM D516) The preceding test methods may be performed on selected samples, depending on the actual subsurface conditions encountered. All phases of the laboratory testing program will be performed in general accordance with applicable ASTM Specifications. All laboratory test results will be provided in the report or included on the boring logs. ROCK ENGINEERING&TESTING LABORATORY,INC. Corpus Christi San Antonio Round Rock Office:361.883.4555 Office:210.495.8000 Office:512.284.8022 Fax:361.883.4711 Fax:210.495.8015 Fax:512.284.7764 6817 Leopard St. 10856 Vandale I Roundville Ln. Corpus Christi,TX 78409 San Antonio,TX 78216 Round Rock,TX 7866Abit A www.rocktesting.com Page 2 of 5 • • Page 3 of 5 PROPOSED SOUTH STAPLES ST.RECONSTRUCTION PROJECT September 13,2018 Baldwin Boulevard to Kostoryz Road Attn:Ms. Marisa Alaniz,EIT City of Corpus Christi RETL Proposal No.: P091318B Projected Schedule After authorization, it is estimated that the drilling operations can begin within 5 to 10 business days and the final report will be submitted within three weeks of the completed fieldwork. RETL will consult with the engineers as field and laboratory test results become available by providing preliminary recommendations as required to assist in design. If adjustments to the proposed timeline are required to meet the existing project schedule, please contact RETL so that we can accommodate your needs. Geotechnical Engineering Report In addition to the field and laboratory testing, a geotechnical engineering report will be prepared that includes a description of the field exploration and laboratory tests, boring logs, a discussion of the engineering properties of the subsurface materials encountered, trench excavation design parameters, OSHA soil type classification, utility trench recommendations and pavement recommendations for the proposed project utilizing the following information provided to RETL by the owner: • Flow Line of Utilities, • Street Elevations, • Traffic Counts, • Projected Percent Growth of Traffic Over Life of Pavement, • Design Vehicles, and • Percent Trucks. Fees and Limitations We understand that we have been chosen to provide these services for this publicly funded project. Therefore, by providing cost information, we are not in violation of the Texas Professional Services Procurement Act. The total fee to perform the scope of work outlined above is $13,500.00. The total project fee includes the field investigation, laboratory testing, geotechnical and pavement recommendations, and report preparation. The following items will be added to the final invoice as required: 1. Additional drilling required due to subsurface conditions: $95.00 per linear foot. 2. Additional HMAC cores: $300.00 per core. 3. Standby time: $275.00 per hour/per company. Please note that the total fee provided above will be honored for 90 days after the date of this proposal. After 90 days, RETL should be contacted to reevaluate the fees and revise the proposal as needed. Services provided for any revisions after the submittal of the final report, approved by the client in a change order,will be invoiced at a rate of$180.00 per hour. ROCK ENGINEERING&TESTING LABORATORY,INC. Corpus Christi San Antonio Round Rock Office:361.883.4555 Office:210.495.8000 Office:512.284.8022 Fax:36 1.883.4711 Fax:210.495.8015 Fax:512.284.7764 6817 Leopard St. 10856 Vandale 1 Roundville Ln. Corpus Christi,TX 78409 San Antonio,TX 78216 Round Rock,TX 7864 www.rocktesting.com xhibit A Page 3 of 5 • • Page 4 of 5 PROPOSED SOUTH STAPLES ST.RECONSTRUCTION PROJECT September 13,2018 Baldwin Boulevard to Kostoryz Road Attn: Ms. Marisa Alaniz, EIT City of Corpus Christi RETL Proposal No.:P091318B The total fee to perform the scope of work does not include site assistance in the event the boring/core locations are inaccessible. Mechanical assistance required to access the boring locations will be assessed based on the subcontractors' hourly fee plus the mobilization fee. Services provided by RETL under this Agreement will be performed in a manner consistent with the degree of care and skill ordinarily exercised by members of the same profession currently practicing under similar circumstances. The Client shall provide for RETL's right to enter the property owned by the Client and/or others and assure that the boring locations are clear of underground utilities and accessible to drilling equipment in order for RETL to fulfill the Scope of Services included hereunder. The Parties to this agreement agree that if any claim is made that RETL failed to comply with any term of this agreement or that it failed to perform its work and/or duties under this agreement properly, the client, upon proof that there was some failure to comply or some mistake in the performance of the work, shall not be entitled to recover any sum greater than the amount paid by the client to RETL for the service performed by RETL or$25,000.00 whichever is less. In addition, and notwithstanding any other provisions of this Agreement, the Client agrees, to the fullest extent permitted by law, to indemnify and hold harmless RETL, his or her officers, directors, employees, agents and sub consultants from and against all damage, liability or cost, including reasonable attorneys' fees and defense costs, arising out of or in any way connected with this project or the performance by any of the above named parties of the services under this Agreement, excepting only those damages, liabilities or costs attributable to the sole negligence or willful misconduct of RETL. Either the Client or RETL may terminate this Agreement at any time with or without cause upon giving the other party 10-calendar days prior written notice. The Client shall within 10 calendar days of termination pay RETL for all services rendered and all costs incurred up to the date of termination, in accordance with the compensation provisions of this contract. ROCK ENGINEERING&TESTING LABORATORY,INC. Corpus Christi San Antonio Round Rock Office:361.883.4555 Office:210.495.8000 Office:512.284.8022 Fax:361.883.4711 Fax:210.495.8015 Fax:512.284.7764 6817 Leopard St. 10856 Vandale 1 Roundville Ln. Corpus Christi,TX 78409 San Antonio,TX 78216 Round Rock,TX 716x/bit A www.rocktesting.com Page 4 of 5 • • • Page 5 of 5 PROPOSED SOUTH STAPLES ST.RECONSTRUCTION PROJECT September 13,2018 Baldwin Boulevard to Kostoryz Road Attn: Ms. Marisa Alaniz, EIT City of Corpus Christi RETL Proposal No.: P091318B Closing If you are in agreement with our proposed scope of work, please authorize us to proceed by signing in the space below and returning one copy to us. Thank you for your consideration of our firm to assist you with this project. If you have any questions, or comments, please call at(361) 883-4555 ext. 320. Sincerely, ACCEPTED AND APPROVED By ,� c Z Print .R. Eichelberger, III, P.E. Senior Project Engineer Date For payment of services, invoice to: Firm: Attn: Address: Title: City: State: Zip Code: Phone: Fax: E-mail address: **Payment is due upon receipt of the invoice. Please remit to the above address and reference your invoice number on payment. ROCK ENGINEERING& TESTING LABORATORY,INC. Corpus Christi San Antonio Round Rock Office:361.883.4555 Office:210.495.8000 Office:512.284.8022 Fax:361.883.4711 Fax:210.495.8015 Fax:512.284.7764 6817 Leopard St. 10856 Vandale 1 Roundville Ln. Corpus Christi,TX 78409 San Antonio,TX 78216 Round Rock,TX 786 .bit A www.rocktesting.com xhi Page 5 of 5