Loading...
HomeMy WebLinkAboutC2018-578 - 10/15/2018 - NA TASK ORDER NO. 10 This Task Order pertains to a Master Services Agreement for Geotechnical and Construction Materials Testing by and between City of Corpus Christi,Texas(City)and Rock Engineering&Testing Laboratory,Inc.,(Lab)dated January 16, 2018 by Motion No. M2018-005 (Agreement). Lab shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution,this Task Order shall supplement the Agreement as it pertains to the project described below. MSA PROJECT NUMBER/NAME: 17100A Geotechnical and Construction Materials Testing TASK ORDER PROJECT NUMBER/NAME: 17100K Geotechnical and Construction Materials Testing 1. PROJECT DESCRIPTION: E16290 Elevated Water Storage Tanks ACR Implementation Phase 3 2. SCOPE OF SERVICES—GeoTech and/or Construction Material Services to observe,test and report for the Elevated Water Storage Tanks ACR Implementation Phase 3, and as more fully described in Exhibit A. 3. COMPENSATION —The total amount not to exceed for this Task Order only is $40,000.00. This Task Order is approved, and Lab may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPU ►- ISTI ROCK ENGINEERING&TESTING LABORATORY, INC. AIV . ,I (6 �. S .A....A1 GC� 10-12-19 eff H. E•mon•s, P.E. Date urtj.A. Rock Date Director of Engineering Services Chief Operating Officer 6817 Leopard Street Corpus Christi, TX 78409 (361)883-4555 Office curtis@rocktesting.com Accounting Unit: 4098-041 Account: 550920 Activity: E16290-01-4098-EXP Account Category: 50920 Fund Name: Water 2019 CIP Amount: $40,000.00 C2018-578 10/15/18 Task Order No. 10 Testing Agreement Page 1 of 2 Rock Engineering& Testing SCANNED TASK ORDER FUNDING REQUEST FORM CONTRACT MSA#AND TITLE: 17100A Geotechnical and Construction Materials Testing(ROCK) TASK ORDER PROJECT#/TITLE: 17100K Geotechnical and Construction Materials Testing(ROCK) REQUESTING DEPARTMENT:ENGINEERING DEPARTMENT FUND NAME/FUND#-ME: ACCOUNT: ACTIVITY: 4098-041 550920 E16290-01-4098-EXP CONSULTANT: Rock Engineering TASK ORDER#: 10 SCOPE OF WORK:SEE PROPOSAL TASK ORDER IS FOR PROJECT(S)LISTED BELOW: PROJECT# FEE PROJECT NAME E16290 $40,000 Elevated Water Storage Tanks $40,000 Grand Total Alex Barabanov PM PRINT NAME: SIGNATURE: 10/9/2018 DATE: �� 419 • GEOTECHNICAL ENGINEERING � ek ;�� I1C �o • CONSTRUCTION MATERIALS ENGINEERING&TESTING qe0,4IMF Ptd • SOILS•ASPHALT•CONCRETE gr0 oPQOP 4k `0 October 4, 2018 City of Corpus Christi Engineering Services Department 1201 Leopard Street, 3rd Floor Corpus Christi, Texas 78401 Attention: Mr. Cesar Moran,M.S., E.I.T SUBJECT: PROPOSAL TO PERFORM A SUBSURFACE INVESTIGATION, LABORATORY TESTING PROGRAM,AND PROVIDE GEOTECHNICAL RECOMMENDATIONS FOR THE PROPOSED COMPOSITE ELEVATED WATER STORAGE TANKS Nueces Bay Boulevard and Flour Bluff Drive Corpus Christi,Texas RETL Proposal Number: P100218A (Revision 1) Dear Mr. Moran, Rock Engineering and Testing Laboratory, Inc. (RETL) (TBPE Firm No. 2101) is pleased to submit the following proposal to perform a subsurface investigation and laboratory testing program and provide foundation recommendations for the proposed Composite Elevated Water Storage Tanks to be constructed just southeast of the intersection of Nueces Bay Boulevard and West Broadway Street and just northwest of the intersection of Flour Bluff Drive and Division Road in Corpus Christi,Texas. Based on information provided to RETL,the project will include the construction of two new composite elevated water storage tanks at the above locations. Additionally,the proposed project will include the installation of a mat foundation to support an above-ground pipe support system at both sites. The proposed mat is estimated to be on the order of 28-feet by 6-feet by 2-feet. The support system will consist of four evenly spaced supports with an estimated maximum vertical load of approximately 6,000- pounds per support. With this information,the engineers will require the maximum calculated total potential vertical rise(PVR) for the specified structure at each site. Information regarding the proposed structures is provided in the table below: ROCK ENGINEERING&TESTING LABORATORY,INC. Corpus Christi San Antonio Round Rock Office:361.883.4555 Office:210.495.8000 Office:512.284.8022 Fax:361.883.4711 Fax:210.495.8015 Fax:512.284.7764 6817 Leopard St. 10856 Vandale 1 Roundville Ln. Corpus Christi,TX 78409 San Antonio,TX 78216 Round Rock,TX 78664 www.rocktesting.com Exhibit A Page 1 of 6 • • Page 2 of 4 PROPOSED COMPOSITE ELEVATED WATER STORAGE TANKS PROJECT October 4,2018 Corpus Christi,Texas Attn:Mr.Cesar Moran,M.S., EIT RETL Proposal No.: P100218A(Revision 1) Tank Design Composite Elevated Composite Elevated Parameters Water Storage Tank Water Storage Tank Flour Bluff Nueces Bay Tank Capacity(gallons) 2,500,000 1,250,000 Tank Height(ft) ! 193 190 Pedestal Diameter(ft) 54 38 Wind Load(mph) 130 130 Snow Load(psf) 25 25 Earthquake Zone 0 0 Permanent Loads: 5,496 2,898 Structure Weight(kips) Permanent Loads: 7,437 3,643 Foundation Weight(kips) Permanent Loads: 21,484 10,622 Water(kips) Permanent Loads: 211 97 Snow(kips) Total Load(kips) 34,628 17,260 Transient Loads: 59,100 40,560 Wind Moment(k.ft.) Transient Loads: 42,540 21,070 Earthquake Moment(k.ft.) Transient Loads: Out of Plumb Moment 11,874 5,851 jkips) ` RETL has received and reviewed Landmark Structures' Guide for Geotechnical Investigation for a Composite Elevated Water Storage Tank to develop the scope of work for this project. All onsite services will be performed in general accordance with the project specifications contained in Landmark Structures' Guide for Geotechnical Investigation for a Composite Elevated Water Storage Tank. Based on the project information provided above and RETL's experience with soils in the area, RETL proposes to perform three borings to termination depths of 100-feet on the anticipated support wall diameter and one boring to a termination depth of 125-feet at the tank center for the proposed composite elevated water storage tank located near the northwest corner of the intersection of Flour Bluff Boulevard and Division Road and three borings to termination depths of 100-feet on the anticipated support wall diameter for the proposed composite elevated water storage tank located just southeast of the intersection of Nueces Bay Boulevard and West Broadway Street (Total Number of Borings: 7; Total Linear Feet of Drilling: 725 LF). The scope of work is outlined below. ROCK ENGINEERING& TESTING LABORATORY,INC. Corpus Christi San Antonio Round Rock Office:361.883.4555 Office:210.495.8000 Office:512.284.8022 Fax:361.883.4711 Fax:210.495.8015 Fax:512.284.7764 6817 Leopard St. 10856 Vandale I Roundville Ln. Corpus Christi,TX 78409 San Antonio,TX 78216 Round Rock,TX 7864,bit A www.rocktesting.com xhi Page 2 of 6 • • Page 3 of 4 PROPOSED COMPOSITE ELEVATED WATER STORAGE TANKS PROJECT October 4,2018 Corpus Christi,Texas Attn: Mr.Cesar Moran,M.S.,EIT RETL Proposal No.: P100218A(Revision 1) Scope of the Proposed Subsurface Investigation • RETL or a representative of the client shall stake or mark the boring locations in the field prior to the field investigation. • The client shall provide the ground surface elevations for the boring locations, as well as the proposed finished floor elevation. • The client or representative of the client shall obtain the required access requirements, including right of entry, and excavation permits, if applicable. • The client shall perform due diligence to assure RETL that the boring locations are accessible and clear of private utilities and obstructions, such as piping, fences, heavy brush, shrubs and trees. The borings will be relocated if necessary. • Coordination with the Texas 811 system will be performed by RETL to identify underground utilities in the proximity of the boring locations. The borings will be relocated if necessary. • An experienced soil technician will log the borings in the field full-time during the drilling operations. • A truck mounted drilling rig will be utilized to access the boring locations to be performed. • The borings will be sampled every 2.5-feet to a depth of 15-feet, and at 5-foot intervals thereafter to the termination depth of the borings. • Disturbed soil samples will be obtained employing split-barrel sampling procedures in general accordance with the procedures for "Penetration Test and Split-Barrel Sampling of Soils, (ASTM D1586)." • Relatively undisturbed soil samples will be obtained using thin-wall tube sampling procedures in accordance with"Thin Walled Tube Sampling of Soils, (ASTM D1587)," if applicable. • Shear strength of cohesive soils will be estimated using a hand penetrometer, if applicable. • Standard penetration tests (SPT) will be recorded in granular soils. • The borings will be advanced to the depth specified above. • GPS coordinates, obtained in the field at the boring locations, will be recorded using a commercially available Garmin handheld GPS model Etrex Venture using NAD 83 map datum. • Groundwater readings will be obtained during drilling and immediately upon completion of the drilling operations. • After completion of drilling operations, the open boreholes will be backfilled with cuttings from the drilling operations and any remaining material will be spread across the site. Scope of Laboratory Testing Program • Supplementary Visual Classification(ASTM D2487) • Water Content Tests(ASTM D2216) • Atterberg Limits Tests (ASTM D4318) • Unconfined Compressive Strength Tests (ASTM D2166) • Percent Material Finer Than The#200 Sieve Tests (ASTM D1140) • Particle-Size Analysis of Soils Tests, Including Hydrometer Analysis (ASTM D422) • Incremental Consolidation Tests (ASTM D2435) • 1-D Swell Potential Tests (ASTM D4546) (Method B) • Sulfate Ion Concentration Tests (Method 9056) ROCK ENGINEERING& TESTING LABORATORY,INC. Corpus Christi San Antonio Round Rock Office:361.883.4555 Office:210.495.8000 Office:512.284.8022 Fax:361.883.4711 Fax:210.495.8015 Fax:512.284.7764 6817 Leopard St. 10856 Vandale 1 Roundville Ln. Corpus Christi,TX 78409 San Antonio,TX 78216 Round Rock,TX 7864,bit A www.roc ktesting.com xhi Page 3 of 6 • • • Page 4 of 4 PROPOSED COMPOSITE ELEVATED WATER STORAGE TANKS PROJECT October 4,2018 Corpus Christi,Texas Attn: Mr.Cesar Moran, M.S.,EIT RETL Proposal No.: P100218A(Revision 1) The preceding test methods may be performed on selected samples, depending on the actual subsurface conditions encountered. All phases of the laboratory testing program will be performed in general accordance with applicable ASTM Specifications. All laboratory test results will be provided in the report or included on the boring logs. Projected Schedule After authorization, it is estimated that the drilling operations can begin within 5 to 10 business days and the final reports will be submitted within five weeks of the completed fieldwork. RETL will consult with the engineers as field and laboratory test results become available by providing preliminary recommendations as required to assist in design. If adjustments to the proposed timeline are required to meet the existing project schedule,please contact RETL so that we can accommodate your needs. It should be noted that the timeline provided above is subject to change due to completion of the Incremental Consolidation Tests (ASTM D2435), 1-D Swell Potential Tests (ASTM D4546) (Method B) and Sulfate Ion Concentration Tests (Method 9056). Geotechnical Engineering Report In addition to the field and laboratory testing, a geotechnical engineering report will be prepared for each tank that includes a description of the field exploration and laboratory tests, boring logs, and a discussion of the engineering properties of the subsurface materials encountered. It should be noted that RETL will provide the appropriate design criteria required for allowable lateral capacities for deep foundation systems, if applicable. P-Y curves will not be generated by RETL. Fee and Limitations We understand that we have been chosen to provide these services for this publicly funded project. Therefore, by providing cost information, we are not in violation of the Texas Professional Services Procurement Act. The total fee to perform the scope of work outlined above is $40,000.00. The Total Project Fee includes the field investigation, laboratory testing, foundation recommendations, and report preparation. The following items will be added to the total invoice as required: 1. Additional drilling required due to subsurface conditions: $57.00 per linear foot. 2. Inspections, permitting and any standby time due to any unforeseen circumstances: $275.00 per hour/per company. 3. Cores/patches: $335.00 each. Please note that the total fee provided above will be honored for 90 days after the date of this proposal. After 90 days, RETL should be contacted to reevaluate the fees and revise the proposal as needed. ROCK ENGINEERING& TESTING LABORATORY,INC. Corpus Christi San Antonio Round Rock Office:361.883.4555 Office:210.495.8000 Office:512.284.8022 Fax:361.883.4711 Fax:210.495.8015 Fax:512.284.7764 6817 Leopard St. 10856 Vandale I Roundville Ln. Corpus Christi,TX 78409 San Antonio,TX 78216 Round Rock,TX 7864.bit A www.rocktesting.com xhi Page 4 of 6 • • Page 5 of 4 PROPOSED COMPOSITE ELEVATED WATER STORAGE TANKS PROJECT October 4,2018 Corpus Christi,Texas Attn: Mr.Cesar Moran, M.S.,EIT RETL Proposal No.:P100218A(Revision 1) Services provided for any revisions after the submittal of the final report, approved by the client in a change order, will be invoiced at a rate of$180.00 per hour. The total fee to perform the scope of work does not include site assistance in the event the boring locations are inaccessible. Mechanical assistance required to access the boring locations will be assessed based on the subcontractors' hourly fee plus the mobilization fee. If there is a change in the scope of work, RETL should be notified in order to provide a revised scope of work and laboratory testing program. Services provided by RETL under this Agreement will be performed in a manner consistent with the degree of care and skill ordinarily exercised by members of the same profession currently practicing under similar circumstances. The Client shall provide for RETL's right to enter the property owned by the Client and/or others and assure that the boring locations are clear of underground utilities and accessible to drilling equipment in order for RETL to fulfill the Scope of Services included hereunder. The Parties to this agreement agree that if any claim is made that RETL failed to comply with any term of this agreement or that it failed to perform its work and/or duties under this agreement properly, the client, upon proof that there was some failure to comply or some mistake in the performance of the work, shall not be entitled to recover any sum greater than the amount paid by the client to RETL for the service performed by RETL or$25,000.00 whichever is less. In addition, and notwithstanding any other provisions of this Agreement, the Client agrees, to the fullest extent permitted by law, to indemnify and hold harmless RETL, his or her officers, directors, employees, agents and sub consultants from and against all damage, liability or cost, including reasonable attorneys' fees and defense costs, arising out of or in any way connected with this project or the performance by any of the above named parties of the services under this Agreement, excepting only those damages, liabilities or costs attributable to the sole negligence or willful misconduct of RETL. Either the Client or RETL may terminate this Agreement at any time with or without cause upon giving the other party 10-calendar days prior written notice. The Client shall within 10 calendar days of termination pay RETL for all services rendered and all costs incurred up to the date of termination, in accordance with the compensation provisions of this contract. ROCK ENGINEERING&TESTING LABORATORY,INC. Corpus Christi San Antonio Round Rock Office:361.883.4555 Office:210.495.8000 Office:512.284.8022 Fax:361.883.4711 Fax:210.495.8015 Fax:512.284.7764 6817 Leopard St. 10856 Vandale 1 Roundville Ln. Corpus Christi,TX 78409 San Antonio,TX 78216 Round Rock,TX 78 zhibit A www.rocktesting.com Page 5 of 6 • Page 6 of 4 PROPOSED COMPOSITE ELEVATED WATER STORAGE TANKS PROJECT October 4,2018 Corpus Christi,Texas Attn:Mr.Cesar Moran,M.S.,EIT RETL Proposal No.:P100218A(Revision 1) Closing If you are in agreement with our proposed scope of work, please authorize us to proceed by signing in the space below and returning one copy to us. Thank you for your consideration of our firm to assist you with this project. If you have any questions, or comments,please call at(361) 883-4555. Sincerely, ACCEPTED AND APPROVED By Print Brian J. Geiger,P.E. Project Engineer Date For payment of services, invoice to: Finn: Attn: Address: Title: City: State: Zip Code: Phone: Fax: E-mail address: **Payment is due upon receipt of the invoice. Please remit to the above address and reference your invoice number on payment. ROCK ENGINEERING&TESTING LABORATORY,INC. Corpus Christi San Antonio Round Rock Office:361.883.4555 Office:210.495.8000 Office:512.284.8022 Fax:361.883.4711 Fax:210.495.8015 Fax:512.284.7764 6817 Leopard St. 10856 Vandale 1 Roundville Ln. Corpus Christi,TX 78409 San Antonio,TX 78216 Round Rock,TX 784ibit A www.rocktesting.com Page 6 of 6