HomeMy WebLinkAboutC2018-584 - 10/19/2018 - NA TASK ORDER NO. 17
This Task Order pertains to a Master Services Agreement for Geotechnical and Construction Materials Testing by
and between City of Corpus Christi, Texas (City)and Tolunav-Wong Engineers, Inc., (Lab)dated January 16,
2018 by Motion No. M2018-005 (Agreement). Lab shall perform services on the project described below as
provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly
signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the
project described below.
MSA PROJECT NUMBER/NAME: 17101A Geotechnical and Construction Materials Testing
TASK ORDER PROJECT NUMBER/NAME: 17101R Geotechnical and Construction Materials Testing
1. PROJECT DESCRIPTION: E12127 North Beach Rd Improvements and Beautification&E12129 North
Beach Breakwater& Shoreline Improvements & Beautification
2. SCOPE OF SERVICES—GeoTech and/or Construction Material Services to observe,test and report for the
North Beach Rd Improvements and Beautification&North Beach Breakwater&Shoreline Improvements&
Beautification project, and as more fully described in Exhibit A.
3. COMPENSATION—The total amount not to exceed for this Task Order only is $44,570.09.
This Task Order is approved, and Lab may proceed. All other terms and conditions of the Agreement remain in
full force and effect.
CITY OF 0 PUS CHRISTI TOLUNAY-WONG ENGINEERS,INC.
/ nn
air 4-• Cod igOCTi . tom. 12-.1at. 10.18 . 19
Je REdmonds, P. . Date Don R. Rokohl, P. E. Date
Dir- .r of Engineering Services Branch Manager
826 South Padre Island Drive
Corpus Christi, TX 78416
(361) 884-5050 Office
drokohl@tweinc.com
Project Number: E12127 & E12129
Accounting Unit: 3549-051
Account: 550920
Activity: $22,285.00-E12127-01-3549-EXP
$22,285.00-E12129-01-3549-EXP
Account Category: 50920
Fund Name: ST2013 GO BD 12
Amount: $44,570.00
C2018-584 Task Order No.17
10/19/18 Testing Agreement
Page 1 of 2
Tolunay-Wong Engineers Inc.
SflANNFI)
TASK ORDER FUNDING REQUEST FORM
CONTRACT MSA#AND TITLE: 17101A Geotechnical and Construction Materials Testing(TWE)
TASK ORDER PROJECT#/TITLE: 17101R Geotechnical and Construction Materials Testing(TWE)
REQUESTING DEPARTMENT:Engineering Services
FUND NAME/FUND#-ME: ACCOUNT: ACTIVITY:
3549-051 550920 E12127-01-3549-EXP
3549-051 550920 E12129-01-3549-EXP
CONSULTANT:TOLUNAY-WONG ENGINEERING,INC.
TASK ORDER#: 17
SCOPE OF WORK:SEE PROPOSAL
TASK ORDER IS FOR PROJECT(S)LISTED BELOW:
PROJECT# FEE PROJECT NAME
E12127& North Beach Rd Improvements and Beautification&North Beach
E12129 $44,570 Breakwater&Shoreline Improv&Beautification
$44,570 Grand Total
SARAH WEST
PM PRINT NAME:
SIG ATURE:
10/15/2018
DATE:
Tolunay-Wong 826 South Padre Island Drive
En ineers lnC. Corpus Christi,Texas 78416
g Phone:(361)884-5050
September 25,2018
City of Corpus Christi
P.0. Box 9277
Corpus Christi,Texas 78469-9277
Via e-Mail:SarahW2@cctexas.com
Phone: (361)826-3500
Attn: Ms.Sarah West
Re: Construction Materials Testing Services For:
E12127 North Beach Road Improvements and Beautification and
E12129 North Beach Breakwater and Shoreline Improvements and Beautification
Corpus Christi,Texas
TWE Proposal No.P18-C119R1
Ms.West:
Tolunay-Wong Engineers (TWE) appreciates the opportunity to submit our revised proposal to provide
construction materials testing and inspection services for the above referenced projects. The proposed scope of
services was based on the testing schedules provided in the projects plans downloaded from the CivCast website
as well as a review of testing requirement by the design civil engineering firm.
The cost estimates contained herein were developed using the testing schedule from the drawings and the unit
rates allowed by the Master Service Agreement (Project No. 17101A) between the City of Corpus Christi and
Tolunay-Wong Engineers, Inc. We understand that the City will issue a Project Task Order upon acceptance of this
proposal in accordance with the MSA and the Task order will serve as our authorization to proceed with our
services for the project.
Tolunay-Wong Engineers has established a reputation for excellence in the materials engineering field through a
business philosophy based on quality professional services responsive to the needs of our clients. We thank you
for the opportunity to serve you with this philosophy and your consideration for this project. Please do not
hesitate to contact us, if you have any questions regarding the proposal or if additional information is needed.
Respectfully submitted,
Tolunay-Wong Engineers,Inc.
14. /1a-fe6/.'(
Don R. Rokohl, P.E.
Branch Manager
drokohl@tweinc.com
DRR/drr
Geotechnical Engineering•Environmental Field and Consulting Services.Construction Materials Testing•Deep Foundations Testing Exhibit A
Page 1 of 5
•
Tolunay-V ong September 25,2018
Engineers, Inc. Proposal No.P18-C119R1
Page 2 of 5
INTRODUCTION
TWE understands the importance of these projects to the City of Corpus Christi and the special needs
associated with construction of a project of this type. Of particular importance is for the overall project team
to be comprised of experienced professionals working together toward a common objective. This objective is
to obtain a quality project, meeting the intent of the project specifications,as well as completion on schedule
and within budget.
From our Corpus Christi facility located at 826 South Padre Island Drive, we will provide experienced
engineering technicians to perform the on-site testing and inspection services. Additionally, we meet the
requirements of ASTM E-329 "Standard Practice for Inspection and Testing Agencies for Concrete, Steel and
Bituminous Materials Used in Construction" regarding qualifications of the testing laboratory. Further, our
Corpus Christi laboratory is accredited in construction materials testing by the American Association for
Laboratory Accreditation(A2LA).
WORK PLAN
TWE's approach to providing materials testing services is to assign qualified engineering technicians, directed
by Senior Professional Engineers, experienced in their respective disciplines. Our assigned Project Manager
will provide communication, service direction, and overall project coordination. It is presumed that the
contractor will be encouraged to provide their own formalized quality control program separate and apart
from our acceptance inspection/testing program stated herein.
We anticipate providing the majority of the required testing services for this particular project on a "part-
time"basis.The anticipated services required on this project are as follows:
A. In-Place Soil Compaction(nuclear method)
B. Cast In-Place Portland Cement Concrete Inspection/Testing
C. Hot Mix Asphalt Concrete Inspection/Testing
All reports of materials tests and inspection services provided will be issued to appropriate members of the
project team. In the event individual reports indicate potential problems or items of non-conformance to the
project specifications,you will be contacted as soon as possible.
SCOPE OF SERVICES
The specific materials monitoring services and laboratory tests anticipated for this project are as follows:
A. In-Place Soil Compaction(Nuclear Method)
• The technician will obtain samples of soil, borrow material, and/or base materials and deliver
them to our laboratory facility for testing. Laboratory testing will include Moisture/Density
Relationships,Atterberg Limit determinations and sieve analysis.
• The technician will perform in-place compaction testing (nuclear method) at the frequency
required by the project specifications to determine the moisture content and degree of
compaction.
Exhibit A
Geotechnical Engineering•Environmental Field and Consulting Services*Construction Materials Testing•Deep Foundations Testing Page 2 of 5
•
•
(BO Tolunav-Wong September 25,2018
Engineers, Inc. Proposal No.P18-C119R1
Page 3 of 5
B. Cast In-Place Portland Cement Concrete Monitoring/Testing
• The technician will sample the concrete in order to perform standard field tests and prepare
test cylinders and/or beams in accordance with project specifications. The frequency of
sampling will also be as directed by the project specifications. Standard field tests include
slump, air content and temperature for normal weight concrete and will also include unit
weight on all samples of lightweight concrete.
• TWE will cure the test specimens and perform compressive strength tests at the age
designated by project specifications.
• The technician will visually estimate the slump of each load of concrete delivered and perform
actual slump tests and other standard field tests when test specimens are prepared, or as
necessary to evaluate concrete consistency.
• The on-site technician will monitor the concrete temperature, ambient temperature, mixing
time, and placement procedures. The technician will also sample concrete at the frequency
specified in the project specifications.
• The technician will record detailed information regarding the location of the placement, date
of the placement,concrete mixture strength requirement and all other pertinent information.
C. Hot Mix Asphalt Concrete Inspection/Testing
• During lay down of hot mix asphalt concrete,the technician will obtain samples for laboratory
testing.
• After lay down and compaction, the asphalt will be cored to determine and record in-place
thickness,%air voids, and laboratory density. The in-place%air voids and in-place theoretical
density will be determined from the asphalt cores in the laboratory.
• The asphalt samples obtained during lay down will tested in the laboratory for extraction and
gradation, laboratory density and stability,and maximum theoretical density(rice method).
COST ESTIMATE&GENERAL NOTES
In this section of the proposal you will find our cost estimate. Additional services or tests requested and
not specifically addressed in this proposal will be invoiced per the standard fees set forth in our 2018 Fee
Schedule.
Based on the testing schedule provided in the project construction documents (plans) provided to us at
this time and the anticipated construction schedule, we have established what we believe is the most
realistic cost estimate for these projects. Please remember that the units stated are only an estimate.
Due to factors beyond our control such as weather, unforeseen conditions, contractor expertise,
contractor scheduling,etc.,the cost of our services may vary from the estimated amount.
We estimate the cost of the construction materials testing for our proposed Scope of Services will be a
total cost of$44,570 ($10,220.00 and $34,350.00 for Part 1 and Part 2, respectively), as detailed in the
following section,although all services will be invoiced on a time and materials basis.
A minimum 4-hour labor equivalent charge is applicable for all field testing and inspection services.
Overtime rates for field personnel are applicable for all hours worked in excess of 8 hours per day,
weekends, and holidays and are assessed at 1.5 times the standard rates. All field hours will be charged
portal to portal from our Corpus Christi laboratory. All sample pick-ups will be charged travel time from
Geotechnical Engineering•Environmental Field and Consulting Services•Construction Materials Testing•Deep Foundations Testing Exhibit A
Page 3 of 5
10 Tolunay-Wong September 25,2018
Engineers, Inc. Proposal No.P18-C119R1
Page 4 of 5
portal to portal and will include associated vehicle charges.Administrative costs, Engineering consultation
and evaluation in connection with field and laboratory testing services will be charged at a rate of
approximately one hour for each 20 hours of field work performed.
Our prices include copies of our reports distributed through e-mail in accordance with your instructions.
Additional copies mailed at$0.50 per page. Direct expenses incurred in connection with the project will
be invoiced at cost plus 15%for handling. Travel and lodging expenses for out of town assignments will
be invoiced at cost plus 15%or$125.00 per day, whichever is greater. Our terms are net 30 days upon
receipt of invoice.Invoices will be submitted on a monthly basis.
COST ESTIMATE SUMMARY
PART 1-E12127 NORTH BEACH ROAD IMPROVEMENTS AND BEAUTIFICATION
Description Unit Quantity Rate Extension
Construction Materials Testing-Soils
1 Standard Compaction Effort-ASTM D 698(Proctor)-Subgrade ea. 1 $160.00 $160.00
i
2 Nuclear Density Gauge, Day ea. 5 $55.00 $275.00
3 Soil Sample Pick-up ea. 1 $175.00 $175.00
4 Construction Materials Technician, HR. ea. 25 $55.00 $1,375.00
5 Vehicle Charge ea. 5 $75.00 $375.00
Construction Materials Testing-Flexible Base
6 Modified Compaction Effort-ASTM D 1557(Proctor) ea. 2 $170.00 $340.00
7 Sieve Analysis,Through No.200 Sieve(ASTM D 422) ea. 2 $65.00 $130.00
8 Atterberg Limits-ASTM D 4318 ea. 2 $65.00 $130.00
9 LA Abrasion Loss of Limestone Base ea. 2 $210.00 $420.00
10 California Bearing Ratio-Single Point(ASTM D 1883) ea. 1 $180.00 $180.00
11 Wet Ball Mill Test ea. 1 $200.00 $200.00
12 TxDOT Triaxial Series per specimen(Tex-117E) ea. 1 $375.00 $375.00
13 Flexible Base Sample Pick-up ea. 2 $175.00 $350.00
14 Construction Materials Technician, HR. ea. 25 $55.00 $1,375.00
15 Vehicle Charge ea. S $75.00 $375.00
Construction Materials Testing-Hot Mix Asphalt
16 Extraction/Gradation-Ignition Method(Tex-236F;DOTD TR 323 ea. 2 $400.00 $800.00
and 309)
17 Hveem Stability(three specimens/set)(ASTM D 1560,Tex-208F) ea. 2 $95.00 $190.00
18 Density of Compacted Bituminuous Mixtures(Set of 3)(ASTM D ea. 2 $75.00 $150.00
1188,Tex-207F)
Maximum Theoretical Specific Gravity(ASTM D 2041,Tex-227F;
19 DOTD TR 327) ea. 2 $75.00 $150.00
20 Asphalt Coring ea. 3 $125.00 $375.00
21 Core Length ea. 3 $15.00 $45.00
22 Core Bulk Density(ASTM D 2726) ea. 3 $60.00 $180.00
Geotechnical Engineering*Environmental Field and Consulting Services*Construction Materials Testing•Deep Foundations Testing Exhibit A
Page 4 of 5
10 Tolunav-Wong September 25,2018
Engineers, Inc. Proposal No.P18-C119R1
Page 5of5
23 Construction Materials Technician, HR. ea. 10 $55.00 $550.00
24 Vehicle Charge ea. 3 $75.00 $225.00
Project Management
25 Project Manager, Hr. ea. 8 $105.00 $840.00
26 Administrative Support, Hr. ea. 8 $60.00 $480.00
Total Cost Estimate $10,220.00
PART 2-E12129 NORTH BEACH BREAKWATER AND SHORELINE IMPROVEMENTS AND BEAUTIFICATION
Description Unit Quantity Rate Extension
Construction Materials Testing-Soils
1 Standard Compaction Effort-ASTM D 698(Proctor)-Trench ea. 1 $160.00 $160.00
Backfill
2 Nuclear Density Gauge, Day ea. 57 $55.00 $3,135.00
3 Soil Sample Pick-up ea. 1 $175.00 $175.00
4 Construction Materials Technician, HR. ea. 228 $55.00 $12,540.00
5 Vehicle Charge ea. 57 $75.00 $4,275.00
Construction Materials Testing-Flexible Base
6 Nuclear Density Gauge, Day ea. 4 $55.00 $220.00
7 Construction Materials Technician, HR. ea. 16 $55.00 $880.00
8 Vehicle Charge ea. 4 $75.00 $300.00
Construction Materials Testing-Concrete
25 Comp.Strength of Concrete Test Cylinders(7,28&Hold) ea. 60 $18.00 $1,080.00
26 Concrete Sample Pick Up, Per Trip ea. 2 $175.00 $350.00
27 Construction Materials Technician,HR. ea. 36 $55.00 $1,980.00
28 Vehicle Charge ea. 9 $75.00 $675.00
Project Management
29 I Project Manager, Hr. ea. 52 $105.00 $5,460.00
30 Administrative Support, Hr. ea. 52 $60.00 $3,120.00
Total Cost Estimate $34,350.00
TOTAL COST ESTIMATE FOR PART 1 AND PART 2 SERVICES $44,570.00
ASSUMPTIONS: The cost estimate is based on the following assumptions and our experience on similar projects:
1. The testing schedule provided in project construction documents and a review of testing requirement by
the design civil engineering firm.
Geotechnical Engineering*Environmental Field and Consulting Services•Construction Materials Testing*Deep Foundations Testing Exhibit A