Loading...
HomeMy WebLinkAboutC2018-586 - 10/23/2018 - NA TASK ORDER NO. 26B This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and LNV, Inc. (Consultant) dated August 16, 2016 (Agreement). Consultant shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. PROJECT NAME/NUMBER: Water and Wastewater Treatment On-Call Support, E16264 1. PROJECT DESCRIPTION—This project provides the Utility Department with on-call services to assist with any technical, operational, maintenance, diagnostic and design concerns for the City's O.N. Stevens Water Treatment Plant and six wastewater treatment plants. 2. SCOPE OF SERVICES —O. N. Stevens Water Treatment Plant Liquid Chlorine Piping Replacement and more fully described in Exhibit A. 3. COMPENSATION —The total amount not to exceed for Task Order No. 26B only is $0.00. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF COR: HHRII / LNV, INC AZ;e, ,/df !() Z1.01 Ae0•2_9;d6 H. Edmonds, P.E. D:te Da . al•ecker, P.E. Date Director of Engineering Services Presid-nt 801 Navigation, Suite 300 Corpus Christi, TX 78408 (361) 883-1984 Office loganb@Invinc.com Fund Name Accounting Unit Account No. Activity No. Amount Water Operating 4010-31010-062 530000 E16264-01-4010-EXP $0.00 C2018-586 10/23/18 LNV Inc. SCANNFfl City Project No. E16264 Professional Services Contract City of Corpus Christi Water/Wastewater Treatment On-Call Support Supplemental Task Authorization No. 26B — ONSWTP Liquid Chlorine Piping Replacement Additional Technical Support October 19, 2018 UNIiir Task Order No. 26B Exhibit "A" Page 1 of 8 SCOPE OF WORK Project No. E16264 Water and Wastewater Treatment On-Call Support Task Authorization No. 26B-ONSWTP Liquid Chlorine Piping Replacement Additional Technical Support PURPOSE OF SUPPLEMENTAL TASK AUTHORIZATION NO. 26B The purpose of this task authorization is to re-allocate funds from previously approved TA23-Task0002- ClearLogX System Evaluation (which is no longer required) to provide additional technical support for ONSWTP Liquid Chlorine Piping Replacement project(TA26). The additional technical support is anticipated to include but is not limited to providing additional risk mitigation measures, detailed electrical and instrumentation design, isometric piping layout drawings, addition of blower and ventilation system and construction phase technical support. OUTLINE OF SCOPE OF WORK UNDER TASK AUTHORIZATION NO. 26 At the O.N. Stevens Water Treatment Plant, pressurized liquid chlorine is piped from the railcar storage area to the gas measurement building where it is first converted to gas at the evaporators,and then metered at the chlorinators prior to injection. A portion of the liquid piping between the railcars and the exterior wall of the gas measurement building was replaced in the past few years and is still in good condition. However, the piping from the exterior of the building to the feed side of the three evaporators is in very poor condition and needs to be replaced. The purpose of this task authorization is to assist the City in the replacement of the liquid chlorine piping that runs between the outside wall of the gas measurement building and the upstream side of the three evaporators (the portion in poor condition). This task authorization will provide the City with recommendations for replacement of the piping along with the development of a construction package for implementing the recommendations. Additionally, due to the critical nature of the project, this task authorization will also assist the City by providing extensive construction phase services support for the successful replacement of the piping. OUTLINE OF SCOPE OF WORK UNDER SUPPLEMENTAL TASK AUTHORIZATION NO. 26B The notice to proceed for Task Authorization No. 26 was received on April 24, 2018. The project is currently in the design phase and during this phase, additional items were identified by the City staff that are to be included in the scope of work to ensure successful completion of this critical project. This task authorization is proposed as a zero dollar task authorization to address the additional design effort.These additions in design include the following: Task Order No. 26B Exhibit"A" Page 2 of 8 • • Development of isometric drawings, • Development of electrical drawings, • Replacement of a section of chlorine gas piping • Replacement of the existing ventilation system(blower and louver assembly) Apart from revisions to plans and specifications;supplementary site visits,meetings and coordination were required to include the additional design elements in the bid package. In order to ensure successful construction/installation of the additional design elements, this task authorization also proposes to include additional effort for Engineer to perform necessary construction observation services. It is also to be noted that the intent of the design performed under this task authorization was to address the high risk and functionality issues associated with the existing system. The intent of the emergency piping and ventilation system replacement was not to redesign the existing system to meet current codes, but to address system issues by replacing the existing components with similar components. The improvements are anticipated to be in service until the proposed replacement of the system within the next 3-4 years. Proposed improvements have been selected in collaboration with the City to meet their operating needs while the system remains in service. SCOPE OF WORK BASIC SERVICES: The Engineer will perform the following: Task 0001 —Design Phase 1. Develop isometric drawings for the proposed liquid chlorine piping system as requested by City staff. 2. Perform up to two(2)additional site visits to assist in design. 3. Develop additional details and specifications for the replacement of a section of chlorine gas discharge piping identified to be in critical condition. 4. Perform sizing calculations and include notes in drawings specifying make and model of new blower and louver system for the gas measurement building. 5. Specify electrical requirements and connections for proposed blower. 6. Develop additional plan sheets for electrical power plan, conduit and wiring schedule. 7. Provide additional draft bid package submittal to City and conduct submittal workshop to obtain City review comments on revisions/additions made to original draft bid package. Task 0003—Construction Phase 1. Perform up to two (2) additional site visits to observe construction/installation of additional design items. 2. Provide clarifications and respond to RFIs from the contractor. Task Order No. 26B Exhibit"A" Page 3 of 8 • DELIVERABLES The Engineer will prepare final bid package and provide one(1)hard copy and one(1)electronic copy to the designated City Task Authorization Manager specified under this task authorization. The final bid package will include the following: • Construction plans • Technical specifications • Maintenance of Operations Plan • The Chlorine Institute Pamphlet 6-Edition 10-Piping Systems for Chlorine • City of Corpus Christi ONSWTP Instrumentation and Electrical Standards(E13064) SCHEDULE The Engineer's services shall be performed in a timely manner consistent with sound professional practices. The Engineer will complete the work according to the following schedule: Activity Completion Date Contract Execution-Notice to Proceed(NTP) TBD Task 0001—Design Phase • DRAFT Submittal Workshop II August 29,2018 • City review comments on DRAFT bid TBD package submittal II • FINAL Bid Package 2 weeks after receipt of comments Task 0003—Construction Phase TBD based on Contractor's Schedule The time limits set forth in the schedule shall include allowances for reasonable and expected review time by the City and approval by authorities having jurisdiction over this project and shall not be allowed as cause for delay or adjustments to the schedule. Delays caused by review times by the City exceeding those anticipated by the Engineer's schedule are cause for adjustments in the schedule. Any adjustments made to the agreed upon schedule shall be made in writing and accepted by both parties. The Engineer shall begin work immediately upon receipt of the executed Task Authorization and/or Notice to Proceed(written or emailed). FEE This is a zero-dollar task authorization that re-allocates previously approved funds.It reduces the total NTE amount of TA 23-Task0002 by$31,426.05 and increases NTE amount for TA26 by$31,344. The task authorization will be billed on a Time and Materials (T&M). The Engineer will not incur cost in excess of this not-to-exceed the amount without prior written authorization from City. The detailed fee analysis for this task authorization is provided in Attachment A. Task Order No. 26B Exhibit"A" Page 4 of 8 • TASK AUTHORIZATION MANAGER The Task Authorization Manager will be the primary contact person during the performance of this work. All correspondence or inquiries should be addressed to the Task Authorization Manager. This work task will be coordinated by: Dan Grimsbo, P.E. A.LC.P. Executive Director of Utilities Department City of Corpus Christi Office: 361-826-1874 Fax: 361-826-1889 Email: Dan(i[a cctcxas.com APPROVAL The undersigned has reviewed and approved this Task Authorization and recommends LNV, Inc. to perform the work as presented: Recommended by: >> 1(// (.. VE ► ; o l &,1; �, (Printed Name) tl � � � l0 (Date) Task Order No. 26B Exhibit"A" Page 5 of 8 Attachment A Task Authorization No. 26B Man-hour and Fee Analysis Table 1: Summary of Fees for Task Authorization No. 23 AMOUNT TOTAL AUTHORIZED FEE BILLED TO NEW ADJUSTED TASK TASK DESCRIPTION FEE DATE FEE REMAINING REALLOTTED TO • TOTAL FEE TA 26B 0001 Alternate Coagulant Evaluation $ 19,990 $ 5,920.55 $ 14,069.45 $ 19,990 0002 ClearLogX System Evaluation $ 32,200 $ 773.95 $ 31,426.05 $ (31,426.05) $ - 0003 TCEQ Design Report $ 20,350 $ 20,350.00 $ 20,350 Administrative Fee $ 5,418 $ 5,418.00 $ 5,418 $ 77,958 $ 6,694.50 $ 71,263.50 $ (31,426.05) $ 45,758 Table 2: Summary of Fees for Supplemental Task Authorization No. 26B TASK TASK DESCRIPTION PROPOSED FEE AMOUNT REALLOTTED TOTAL FEE FROM TA 23 0001 Design Phase $ 28,134.00 $ (28,134.00) $ - 0002 Bid Phase $ - 0003 Construction Phase $ 3,210.00 $ (3,292.05) $ (82.05) $ 31,344.00 $ (31,426.05) $ (82.05) Task Order No. 26B Exhibit"A" Page 6 of 8 Table 3: Man-hour and Fee Analysis for Task Authorization No. 26 and Supplemental Task Authorization No. 26B Table 3A:Summary of Fees for Task Authorization No. 26(Authorized) TASK TASK DESCRIPTION LNV FEE HAZEN&SAWYER ADMINISTRATIVE FEE TOTAL FEE 0001 Design Phase $ 17,785 $ 25,255 $ 43,040 , 0002 Bid Phase $ 5,855 $ 2,985 $ 8,840 0003 Construction Phase $ 9,480 $ 8,925 $ 18,405 $ 33,120 $ 37,165 $ 3,717 $ 74,000 Table 3B:Man-hour and Fee Analysis for Task Authorization No. 26B(Proposed) LNV Inc. PrincipaWP Project Mgr. Senior Project Engineer Project Engineer EIT II Sr.CADD/GIS Tech CADD Tech LNV TOTAL $ 265.00 $ 205.00 $200.00 $170.00 $120.00 $115.00 $90.00 Total Hrs. Total Fee Task Description Hrs. Sub-total Hrs. Sub-total Hrs. Sub-total Hrs. Sub-total Hrs. Sub-total Hrs. Sub-total Hrs. Sub-total 0001 Design Phase _ Additional design effort for chlorine gas piping,blower and louver $ - 2 $ 410 $ - 8 $ 1,360 12 $ 1,440 2 $ 230 4 $ 360 28 $ 3,800 - Development of Isometric Plans $ - 2 $ 410 $ - $ - 4 $ 480 $ - $ - 6 $ 890 - Development of Electrical Plans $ - 2 $ 410 $ - 2 $ 340 4 $ 480 $ - $ - 8 $ 1,230 - Site Visit(2) $ - 2 $ 410 $ - 4 $ 880 4 $ 480 $ - $ - 10 $ 1,570 - Development of draft bid package ll 1 $ 265 2 $ 410 2 $ 400 4 $ 680 12 $ 1,440 $ - $ - 21 $ 3,195 _ Submittal Workshop II,Internal meetings and Coordination $ - 4 $ 820 $ - 4 $ 800 8 $ 960 $ - $ - 16 $ 2,580 0003 Construction Phase • - Additional construction observation services $ - 2 $ 410 6 $ 1,200 8 $ 1,600 $ - $ - 16 $ 3,210 1 $ 265.00 16 $ 3,280.00 8 $ 1,600.00 30 $5,460.00 44 $ 5,280.00 2 $ 230.00 4 $ 360.00 105 $ 16,475 Task Order No. 26B Exhibit"A" Page 7 of 8 Hazen&Sawyer PrincipalNP QAQC Project Engineer EIT IV CADD Tech Hazen&Sawyer Total $285.00 $ 305.00 $ 165.00 $110.00 $ 90.00 Total Hrs. Total Fee Task Description Hrs. Sub-total Hrs. Sub-total Hrs. Sub-total Hrs. Sub-total Hrs. Sub-total r0001 Design Phase Additional design effort for chlorine gas $ - $ - 8 $ 1,320 10 $ 1,100 $ - 18 $ 2,420 piping,blower and louver - Development of Isometric Plans $ - $ - 12 $ 1,980 6 $ 660 24 $ 2,160 42 $ 4,800 - Development of Electrical Plans $ - $ - 12 $ 1,980 6 $ 660 10 $ 900 28 $ 3,540 - SiteVisit(2) $ - $ - 4 $ 660 4 $ 440 $ - 8 $ 1,100 - Development of draft bid package II 1 $ 285 2 $ 610 2 $ 330 $ - $ - 5 $ 1,225 Submittal Workshop II,htemal meetings and $ - $ - 4 $ 660 4 $ 440 $ - 8 $ 1.100 - Coordination 1 $ 285.00 2 $ 610.00 42 $ 6,930.00 30 $ 3,300.00 34 $ 3,060.00 109 $ 14,185 1 $ 285.00 2 $ 610.00 42 $ 6,930.00 30 $ 3,300.00 34 $ 3,060.00 109 $ 14,185 Administrative Fee(10%of Subconsultant Fee) $ 804 Total Fee $ 14,989 Total fee for Task Authorization No. 26B (proposed) = $31,464 Total fee for Task Authorization No. 26 (authorized) = $74,000 NEW TOTAL FEE=$105,464 Task Order No. 26B Exhibit"A" Page 8 of 8