Loading...
HomeMy WebLinkAboutC2018-588 - 10/25/2018 - NA CITY OF CORPUS CHRISTI CONTRACT FOR PROFESSIONAL SERVICES AMENDMENT NO. 1 The City of Corpus Christi, Texas, a Texas home-rule municipal corporation ("City") and Chuck Anastos and Associates, LLC ("Consultant'), agree to the following amendment to the Contract for Professional Services for Protect Name!No.: El 5135 Gas Dept. Chiller Replacement Original Contract April 24, 2018 Administrative Approval $29,048.00 In the Original Contract, Exhibit A,Scope of Services shall be amended as set forth in the attached Amendment No. 1, Exhibit A. In the Original Contract, Exhibit A, Fees shall be amended based on the modified scope of services in the attached Amendment No. 1, Exhibit A for a fee not to exceed $3,500.00,for a total restated fee not to exceed $32,548.00. All other terms and conditions of April 24, 2018 Contract for Professio al ices between the City and Consultant,and of any amendments to that contract,which are not specific7ily ad fir ssed herein shall remain in full force and effect. Cl 1 •F C• ` a • ' ISTI CHUCK AN�r`�7 ! ASSOCIATES, LLC. , i 17 October 2018 -ff H. Edmonds, P.E. D Chuck Anastos, AIA Date Director of Engineering Services 901 S. Staples Street Corpus Christi, TX 78401 APPROVED AS TO LEGAL FORM (361) 884-4422 Office 2018.10.24 14:29:19 caaincarch@aol.com -05'00' Assistant City Attorney Date C2018-588 10/25/18 agave IFMACN.AE Agreement Centrecte FMAC Task Orden',AmentlmerlOCHUCK ANASTOS AME)7 Amenemam No.1 Cont a2 lei PmI,sstnal Sen,CAs Pegs 1 012 Chuck Anastos and Associates SCANNED • 4 . • Ct1UCl( fln1STOS ASSOC IA-f E S, LLC 08 October 2018 Mr.J. H. Edmonds, PE Director of Engineering Services City of Corpus Christi 1201 Leopard Street 3rd Floor,City Hall Corpus Christi,TX 78401 Re: Request for Amendment#01 to Contract AE Fee for the City Gas Department Chiller Replacement, City Project#E15135 Mr. Edmonds: This is a Request for Amendment#01 to Contract AE Fee for the above referenced City Project. The additional AE fees are required for the following: 1. AE Services to provide coordination for temporary HVAC operational in existing building, including multiple site visits with facility maintenance, Malik&AEP. Current Fee for Basic Services: Requested Additional Fee for Basic Services: 1. Preliminary Phase 4 7,500.00 2. Design(Construction Documents)Phase =$ 14,898.00 ADD: $ 3,500.00 3. Bid Phase =$ 0.00 4. Construction Phase =$ 2,650.00 Total Basic Services =$ 25,048.00 ADD: $ 3,500.00 ARCHITECTURE INTERIOR DESIGN Fee for Additional Services Requested Additional Fee for Additional Services: 1. Warranty Inspection(s) _$ 1,500.00 2. Preparation of Record Drawing Set 4 2,500.00 3. Topographic Survey(Provided by City) _$ 0.00 4. TDLR RAS overview only =$ 0.00 5. Supplemental Engineering 4 0.00 6. Furniture Design and Documents =$ 0.00 7. Landscape Plan 4 0.00 Total Additional Services 4 4,000.00 Total Original AE Fee =$ 29,048.00 Total Requested • rease in AE Fee ADD: $ 3,500.00 Total Revised ee ith Amendment#01 $ 32,548.00 Respectfu y, Chuck Anast'.s,AIA STATEMENT of CERTIFICATION:The Texas Board of Architectural Examiners, PO Box 12337,Austin,Texas 78711, Telephone (512)305-9000, has jurisdiction over complaints regarding the professional practices of persons registered as architects in the State of Texas. AE Fee Amendment#01 City Project Number#E15135 Mailing-PO Box 3883,Corpus Christi,TX 78463-3883 Physical-453 Everhart Road,Corpus Christi,TX 78411 Phone-(361)884-4422 Website-anastosassociates.com Exhibit A Page 1 of 1