HomeMy WebLinkAboutC2018-763 - 12/3/2018 - NA CITY OF CORPUS CHRISTI
AMENDMENT NO. 2 to the
CONTRACT FOR PROFESSIONAL SERVICES
The City of Corpus Christi, Texas, hereinafter called "CITY," and HDR Engineering, Inc., hereinafter
called"CONSULTANT,"agree to the following amendment to the Contract for Professional Services for
Packery Channel Restoration(Prolect No. H170191 as authorized and administratively amended by:
Original Contract August 8, 2018 Administrative Approval $49,997.00
'Amendment No. 1 September 18, 2018 Motion No. M2018-171 $301,008.00
IN THE ORIGINAL CONTRACT, EXHIBIT A, SCOPE OF SERVICES, shall be modified as shown in
the attached Exhibit A.
IN THE ORIGINAL CONTRACT,COMPENSATION shall be modified as shown in the attached Exhibit
A for an additional fee not to exceed$14,143.00 for a total restated fee not to exceed $365,148.00.
All other terms and conditions of the August 8, 2018 contract between the "CITY" and
"CONSULTANT" and of any amendments to that contract which are not specifically addressed herein
shall remain in full force and effect.
CI OF4,- CH HDR ENGINEERING, INC.
. /2 /6 4 //V.
alerie H. Gray, P.E. D. e Arthur B. Colwell, P.E. Date
ir"Executive Director of Public Works Vice President/Managing Principal
555 N. Carancahua, Suite 1600
Corpus Christi,Texas 78401-0850
(361)696-3300 Office
Arthur.Colwell@hdrinc.com
Af le OF
Jeff '. Edmonds, P.E. Dat
Director of Engineering Services
APPROVED AS TO FORM
9/ 2018.11.27
08:01:55 -06'00'
Legal Department Date
Accounting
Fund Name Unit Account No. Activity No. Amount
Packery Ch;TIF 2 3278-717 550950 H17019-01-3278-EXP $14,143.00
Total $14,143.00
Encumbrance No.
C2018-763
12/03/18
HDR Engineering Inc.
SCANNED
November 2, 2018 10130118
11/13/18(Rev 1)
Mr. Jeff Edmonds, P.E.
Director, Capital Programs
City of Corpus Christi
P.O. Box 9277
Corpus Christi, TX 78469-9277
RE: PRELIMINARY DESIGN FOR PACKERY CHANNEL RESTORATION (H17019)
PROPOSAL FOR AMENDMENT 2: ASSISTANCE WITH ISAC MEETINGS
Dear Mr. Edmonds:
Thank you for inviting HDR to submit this proposal for professional engineering services for
continued support on the Packery Channel Restoration Project. HDR is currently providing
preliminary design services for this project. The City has requested a proposal from HDR for
additional services to assist with Island Strategic Action Committee (ISAC) meetings. HDR's
proposed scope and fee for these additional services is provided below.
SCOPE OF SERVICES
HDR proposes to provide the following services for assistance with up to four ISAC meetings:
- Participate in up to four pre-meetings at City Hall for preparation with City staff prior to
scheduled ISAC meetings.
- Prepare up to four PowerPoint presentations.
- Attend and, if requested by City, provide presentations at up to four ISAC meetings to
be held in Corpus Christi on north Padre Island.
FEE, DELIVERABLES, AND SCHEDULE
HDR proposes to provide these additional services as an amendment to our existing contract
on a time and materials basis for a not-to-exceed amount of $14,143, increasing our overall
fee from $351,005 to $365,148. A cost summary for these services is provided in Table 1, and
a detailed fee breakdown is provided in the attached manhour and expense estimate. Any
work outside the proposed Scope will be added, with authorization from the City, through a
formal Scope Change Document and associated fee agreement. This proposal is valid for 45
calendar days from the date of this letter.
6drinc.com
555 N. Carancahua, Suite 1600, Corpus Christi,TX 78401 Texas P.E. Firm Registration No. 754
361-696-3300
EXHIBIT A
Page 1 of 2
Mr. Jeff Edmonds 10130118
November 13, 2018
Page 2
Table 1. Cost Summary.
Original Amendment 1 Proposed Proposed
Basic Services: Contract Amendment 2 Total Contract
1. Preliminary Design $49,997.00 $0.00 $0.00 $49,997.00
2. Design Phase $0.00 $183,935.00 $14,143.00 $198,078.00
3. Bid Phase $0.00 $8,625.00 $0.00 $8,625.00
4. Construction Administration Phase(Time&Materials) $0.00 $44,780.00 $0.00 $44,780.00
Subtotal Basic Services Fees $49,997.00 $237,340-00 $14,143.00 $301,480.00
Additional Services:
1. Permit Preparation $0.00 $0.00 $0.00 $0.00
2 ROW Acquisition Survey $0.00 $0.00 $0.00 $0.00
3. Topographic Survey end Parcel Descriptions $0.00 $14,653.00 $0.00 $14,653.00
4. Environmental Issues $0.00 $46,015.00 $0.00 $46,015.00
5. Public Involvement $0.00 $0.00 $0.00 $0.00
6. Subsurface Utility Investigation $0.00 $0.00 $0.00 $0.00
7. Construction Observation Services $0.00 $0.00 $0.00 $0.00
8. Warranty Phase $0.00 $3,000.00 $0.00 $3,000.00
Subtotal Additional Services $0.00 $63,668.00 $0.00 $63,668.00
Summary of Fees
Basic Services Fees $49,997.00 $237,340.00 $14,143.00 $301,480.00
Additional Services Fees $0.00 $63,668.00 $0.00 $63,668.00
Total of Fees $49,997.00 $301,008.00 $14,143.00 $365,148.00
Thank you for considering HDR for the additional services described above. Please do not
hesitate to contact Dan Heilman at 361-696-3344 if you have questions or require any
additional information.
Sincerely,
HDR ENGINEERING, INC. Z,h7 /1
✓�2s�1,/Eftom,
Daniel J. Heilman, P.E. Arthur B. Colwell, P.E.
Project Manager Managing Principal
Vice President
Cc: Sarah West, P.E., City of Corpus Christi
Attachments:
Manhour and Expense Estimate (Dated 11/02/2018)
555 N. Carancahua, Suite 1600, Corpus Christi,TX 78401 Texas P.E. Firm Registration No. 754
361-696-3300
EXHIBIT A
Page 2 of 2
Sample form for:
Payment Request
COMPLETE PROJECT NAME AE Contract
Project No. XXXX Revised 02/01/17
Invoice No. 12345
Invoice Date 01/01/2017
Total Current Previous Total Remaining Percent
Basic Services: Contract Amd No. 1 Amd No. 2 Contract Invoice Invoice Invoice Balance Complete -
Preliminary Phase $1,000.00 $0.00 $0.00 $1,000.00 $0.00 $1,000.00 $1,000.00 $0.00 100.0%
Design Phase $2,000.00 $1,000.00 $0.00 $3,000.00 $1,000.00 $500.00 $1,500.00 $1,500.00 50.0%
Bid Phase $500.00 $0.00 $250.00 $750.00 $0.00 $0.00 $0.00 $750.00 0.0%
Construction Phase $2,500.00 $0.00 $1,000.00 $3,500.00 $0.00 $0.00 $0.00 $3,500.00 0.0%
Subtotal Basic Services $6,000.00 $1,000.00 $1,250.00 $8,250.00 $1,000.00 $1,500.00 $2,500.00 $5,750.00 30.3%
Additional Services:
Permitting $2,000.00 $0.00 $0.00 $2,000.00 $500.00 $0.00 $500.00 $1,500.00 25.0%
Warranty Phase $0.00 $1,120.00 $0.00 $1,120.00 $0.00 $0.00 $0.00 $1,120.00 0.0%
Inspection $0.00 $0.00 $1,627.00 $1,627.00 $0.00 $0.00 $0.00 $1,627.00 0.0%
Platting Survey TBD TBD TBD TBD TBD TBD TBD TBD TBD
0 & M Manuals TBD TBD TBD TBD TBD TBD TBD TBD TBD
SCADA TBD TBD TBD TBD TBD TBD TBD TBD TBD
Subtotal Additional Services $2,000.00 $1,120.00 $1,627.00 $4,747.00 $500.00 $0.00 $500.00 $4,247.00 10.5%
Summary of Fees:
Basic Services Fees $6,000.00 $1,000.00 $1,250.00 $8,250.00 $1,000.00 $1,500.00 $2,500.00 $5,750.00 30.3%
Additional Services Fees $2,000.00 $1,120.00 $1,627.00 $4,747.00 $500.00 $0.00 $500.00 $4,247.00 10.5%
Total of Fees $8,000.00 $2,120.00 $2,877.00 $12,997.00 $1,500.00 $1,500.00 $3,000.00 $9,997.00 23.1%