Loading...
HomeMy WebLinkAboutC2018-763 - 12/3/2018 - NA CITY OF CORPUS CHRISTI AMENDMENT NO. 2 to the CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas, hereinafter called "CITY," and HDR Engineering, Inc., hereinafter called"CONSULTANT,"agree to the following amendment to the Contract for Professional Services for Packery Channel Restoration(Prolect No. H170191 as authorized and administratively amended by: Original Contract August 8, 2018 Administrative Approval $49,997.00 'Amendment No. 1 September 18, 2018 Motion No. M2018-171 $301,008.00 IN THE ORIGINAL CONTRACT, EXHIBIT A, SCOPE OF SERVICES, shall be modified as shown in the attached Exhibit A. IN THE ORIGINAL CONTRACT,COMPENSATION shall be modified as shown in the attached Exhibit A for an additional fee not to exceed$14,143.00 for a total restated fee not to exceed $365,148.00. All other terms and conditions of the August 8, 2018 contract between the "CITY" and "CONSULTANT" and of any amendments to that contract which are not specifically addressed herein shall remain in full force and effect. CI OF4,- CH HDR ENGINEERING, INC. . /2 /6 4 //V. alerie H. Gray, P.E. D. e Arthur B. Colwell, P.E. Date ir"Executive Director of Public Works Vice President/Managing Principal 555 N. Carancahua, Suite 1600 Corpus Christi,Texas 78401-0850 (361)696-3300 Office Arthur.Colwell@hdrinc.com Af le OF Jeff '. Edmonds, P.E. Dat Director of Engineering Services APPROVED AS TO FORM 9/ 2018.11.27 08:01:55 -06'00' Legal Department Date Accounting Fund Name Unit Account No. Activity No. Amount Packery Ch;TIF 2 3278-717 550950 H17019-01-3278-EXP $14,143.00 Total $14,143.00 Encumbrance No. C2018-763 12/03/18 HDR Engineering Inc. SCANNED November 2, 2018 10130118 11/13/18(Rev 1) Mr. Jeff Edmonds, P.E. Director, Capital Programs City of Corpus Christi P.O. Box 9277 Corpus Christi, TX 78469-9277 RE: PRELIMINARY DESIGN FOR PACKERY CHANNEL RESTORATION (H17019) PROPOSAL FOR AMENDMENT 2: ASSISTANCE WITH ISAC MEETINGS Dear Mr. Edmonds: Thank you for inviting HDR to submit this proposal for professional engineering services for continued support on the Packery Channel Restoration Project. HDR is currently providing preliminary design services for this project. The City has requested a proposal from HDR for additional services to assist with Island Strategic Action Committee (ISAC) meetings. HDR's proposed scope and fee for these additional services is provided below. SCOPE OF SERVICES HDR proposes to provide the following services for assistance with up to four ISAC meetings: - Participate in up to four pre-meetings at City Hall for preparation with City staff prior to scheduled ISAC meetings. - Prepare up to four PowerPoint presentations. - Attend and, if requested by City, provide presentations at up to four ISAC meetings to be held in Corpus Christi on north Padre Island. FEE, DELIVERABLES, AND SCHEDULE HDR proposes to provide these additional services as an amendment to our existing contract on a time and materials basis for a not-to-exceed amount of $14,143, increasing our overall fee from $351,005 to $365,148. A cost summary for these services is provided in Table 1, and a detailed fee breakdown is provided in the attached manhour and expense estimate. Any work outside the proposed Scope will be added, with authorization from the City, through a formal Scope Change Document and associated fee agreement. This proposal is valid for 45 calendar days from the date of this letter. 6drinc.com 555 N. Carancahua, Suite 1600, Corpus Christi,TX 78401 Texas P.E. Firm Registration No. 754 361-696-3300 EXHIBIT A Page 1 of 2 Mr. Jeff Edmonds 10130118 November 13, 2018 Page 2 Table 1. Cost Summary. Original Amendment 1 Proposed Proposed Basic Services: Contract Amendment 2 Total Contract 1. Preliminary Design $49,997.00 $0.00 $0.00 $49,997.00 2. Design Phase $0.00 $183,935.00 $14,143.00 $198,078.00 3. Bid Phase $0.00 $8,625.00 $0.00 $8,625.00 4. Construction Administration Phase(Time&Materials) $0.00 $44,780.00 $0.00 $44,780.00 Subtotal Basic Services Fees $49,997.00 $237,340-00 $14,143.00 $301,480.00 Additional Services: 1. Permit Preparation $0.00 $0.00 $0.00 $0.00 2 ROW Acquisition Survey $0.00 $0.00 $0.00 $0.00 3. Topographic Survey end Parcel Descriptions $0.00 $14,653.00 $0.00 $14,653.00 4. Environmental Issues $0.00 $46,015.00 $0.00 $46,015.00 5. Public Involvement $0.00 $0.00 $0.00 $0.00 6. Subsurface Utility Investigation $0.00 $0.00 $0.00 $0.00 7. Construction Observation Services $0.00 $0.00 $0.00 $0.00 8. Warranty Phase $0.00 $3,000.00 $0.00 $3,000.00 Subtotal Additional Services $0.00 $63,668.00 $0.00 $63,668.00 Summary of Fees Basic Services Fees $49,997.00 $237,340.00 $14,143.00 $301,480.00 Additional Services Fees $0.00 $63,668.00 $0.00 $63,668.00 Total of Fees $49,997.00 $301,008.00 $14,143.00 $365,148.00 Thank you for considering HDR for the additional services described above. Please do not hesitate to contact Dan Heilman at 361-696-3344 if you have questions or require any additional information. Sincerely, HDR ENGINEERING, INC. Z,h7 /1 ✓�2s�1,/Eftom, Daniel J. Heilman, P.E. Arthur B. Colwell, P.E. Project Manager Managing Principal Vice President Cc: Sarah West, P.E., City of Corpus Christi Attachments: Manhour and Expense Estimate (Dated 11/02/2018) 555 N. Carancahua, Suite 1600, Corpus Christi,TX 78401 Texas P.E. Firm Registration No. 754 361-696-3300 EXHIBIT A Page 2 of 2 Sample form for: Payment Request COMPLETE PROJECT NAME AE Contract Project No. XXXX Revised 02/01/17 Invoice No. 12345 Invoice Date 01/01/2017 Total Current Previous Total Remaining Percent Basic Services: Contract Amd No. 1 Amd No. 2 Contract Invoice Invoice Invoice Balance Complete - Preliminary Phase $1,000.00 $0.00 $0.00 $1,000.00 $0.00 $1,000.00 $1,000.00 $0.00 100.0% Design Phase $2,000.00 $1,000.00 $0.00 $3,000.00 $1,000.00 $500.00 $1,500.00 $1,500.00 50.0% Bid Phase $500.00 $0.00 $250.00 $750.00 $0.00 $0.00 $0.00 $750.00 0.0% Construction Phase $2,500.00 $0.00 $1,000.00 $3,500.00 $0.00 $0.00 $0.00 $3,500.00 0.0% Subtotal Basic Services $6,000.00 $1,000.00 $1,250.00 $8,250.00 $1,000.00 $1,500.00 $2,500.00 $5,750.00 30.3% Additional Services: Permitting $2,000.00 $0.00 $0.00 $2,000.00 $500.00 $0.00 $500.00 $1,500.00 25.0% Warranty Phase $0.00 $1,120.00 $0.00 $1,120.00 $0.00 $0.00 $0.00 $1,120.00 0.0% Inspection $0.00 $0.00 $1,627.00 $1,627.00 $0.00 $0.00 $0.00 $1,627.00 0.0% Platting Survey TBD TBD TBD TBD TBD TBD TBD TBD TBD 0 & M Manuals TBD TBD TBD TBD TBD TBD TBD TBD TBD SCADA TBD TBD TBD TBD TBD TBD TBD TBD TBD Subtotal Additional Services $2,000.00 $1,120.00 $1,627.00 $4,747.00 $500.00 $0.00 $500.00 $4,247.00 10.5% Summary of Fees: Basic Services Fees $6,000.00 $1,000.00 $1,250.00 $8,250.00 $1,000.00 $1,500.00 $2,500.00 $5,750.00 30.3% Additional Services Fees $2,000.00 $1,120.00 $1,627.00 $4,747.00 $500.00 $0.00 $500.00 $4,247.00 10.5% Total of Fees $8,000.00 $2,120.00 $2,877.00 $12,997.00 $1,500.00 $1,500.00 $3,000.00 $9,997.00 23.1% Notes: If needed, update this sample form based on the contract requirements. If applicable, refer to the contract for information on what to include with time and materials (T&M). -am III X & 0 CO