HomeMy WebLinkAboutC2017-065 - 1/25/2017 - NA TASK ORDER NO. 4
This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus
Christi, Texas (City) and LNV, Inc. (Consultant) dated August 16, 2016 (Agreement). Consultant shall perform
services on the project described below as provided in this Task Order and in the Agreement. This Task Order
shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall
supplement the Agreement as it pertains to the project described below.
TASK ORDER NO. 4
PROJECT NAME: Water and Wastewater Treatment On-Call Support
1. PROJECT DESCRIPTION—This project provides the Utility Department with on-call services to assist with
any technical,operational, maintenance, diagnostic and design concerns for the City's O.N.Stevens Water
Treatment Plant and six wastewater treatment plants.
2. SCOPE OF SERVICES —Water Systems Operations Monitoring and Support
3. COMPENSATION --The total amount not to exceed for Task Order No. 4 only is $167,588.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement
remain in full force and eff-ct.
OFCITY OF CO' S RI=TI LNV, INC'
, tore / ,,, i....7
J. . Edmonds, P.E. Date Dan S. eye .5(cker, P.E. ' Date
Director of Engineering Services Preside
801 Navigation, Suite 300
Corpus Christi, TX 78408
(361) 883-1984 Office
loganb@Invinc.com
Task Order No. 4
Fund Name Accounting Unit Account No. Activity No. Amount
Water 2013 RVBD 4093-062 550950 E16264-01-4093 EXP $167,588
2017-065
1/25/17
LNV Inc. INDEXED
City Project No. E16264
Professional Services Contract
City of Corpus Christi
Water/Wastewater Treatment On-Call Support
Task Authorization No. 4 - Water System Operations
Monitoring and Support
January 10, 2017
Task Order No. 4
Exhibit A
Page 1 of 7
`o�Pus cyq
LNV
O
r
.n SS
SCOPE OF WORK
Project No.E16264
Water and Wastewater Treatment On-Call Support
Task Authorization No. 4-Water System Operations Monitoring and Support
PURPOSE
In response to the water quality challenges that have persisted at the O.N. Stevens Water
Treatment Plant(ONSWTP)and the distribution system,the City staff has implemented a variety
of process modifications and operational changes with respect to the treatment and delivery of
treated water to residents. Updated water quality objectives and operational goals have also been
set to ensure that the changes that have been made result in providing high quality water on a
consistent basis. The sensitivity of the various process modifications and the need to perform
consistent water treatment and distribution require increased monitoring and data analysis.
This task authorization will provide assistance to the City staff by providing licensed
professional engineers (PEs) and additional water quality experts to monitor and analyze water
quality data at ONSWTP and throughout the distribution system to assess the impact of the
various changes that have been implemented by the City. Along with the monitoring and analysis
proposed in this task authorization, the PEs and water quality experts will be authorized to
provide required documentation (e.g., memorandums, presentation material, etc.)to the City staff
for permitting and informational purposes. This task authorization will also allow the PEs and
water quality experts to observe the manner in which the water treatment processes and
distribution system are operated to ensure consistency among the ONSWTP operators and
provide recommendations to address any deficiencies that may be encountered.
SCOPE OF WORK
ADDITIONAL SERVICES:
ITEM 1—Project Management
g
The Engineer will perform the following:
A. Daily Water Quality Review Meetings
1. Participate in daily reviews of water quality data with City staff
2. Schedule for review meeting participation:
• August 15,2016- September 30, 2016: 6 weeks at 10 hours/week
• November 1, 2016-December 31, 2016: 8 weeks at 4 hours/week
B. Biweekly/Weekly Coordination Meeting Preparation and Attendance
1. Prepare agenda and project status updates for each meeting
2. Schedule for coordination meeting attendance and preparation
• August 15, 2016- September 30, 2016: 6 weeks at 12 hours/week
• November 1,2016-December 31,2016: 8 weeks at 8 hours/week
C. City Council Presentation Development and Meeting Attendance
1
Task Order No. 4
Exhibit A
Page 2 of 7
LNV �� t, _
I. Prepare presentations and correspondence for City staff in advance of City
Council presentations
2. Attend City Council meetings at the direction of City staff to respond to technical
and other engineering-related questions related to City's water quality actions
3. Schedule for City Council meeting attendance and preparation
• Up to two (2)City Council meetings per month
• Six(6)hours per meeting for attendance and preparation
• Anticipated Completion Date: January 31,2017
D. Project Coordination Meetings
1. Attend meetings to coordinate recommended ONSWTP operations and
modifications with work conducted by others for the following projects:
• Raw Water Influent Improvements project(City Project No. 8643)
• Facilities Feed Optimization Improvements project (City Project No.
8605)
2. Schedule for coordination meeting attendance and preparation
• August 1, 2016 -January 31, 2017: Monthly meetings at 6 hours/month
E. TCEQ Meeting Preparation and Attendance
F. Water Quality Action Item List Development and Tracking
1. Tracking and compiling all action items associated with water quality
improvements throughout the execution of this task authorization
2. Provide status updates and project recommendations to City staff
G. Emergency Short-term Master List Budget Tracking and Analysis
ITEM 9—General Engineering
The Engineer will perform the following:
A. On-site Operations Support and Data Analysis
1. Daily ONSWTP operations support and plant upgrade coordination including
the following:
i. On-site chemical dosing decision making
ii. Tank operation decision making
iii. Staff interviews
iv. Project execution plan monitoring
v. Evaluation of system upgrades performance
vi. Vendor coordination
vii. Instrumentation&Controls(I&C)support for HMI updates
2. On-site water quality sampling to confirm on-line instrumentation
performance
3. 8-day chloramines residual decay testing
4. Field assessment of handheld water quality instruments
5. Operator training workshops for plant upgrades and operational changes
B. Technical Memorandum Development and Revisions
1. Development and/or revisions of the following documents
i. Free Chlorine as a Distribution System Disinfectant, along with
associated workshop
2 Task Order No. 4
Exhibit A
Page 3 of 7
pilus c,
o q
LNV
At".
• ..77.„
ii. High-Level Communications Graphic
iii. Justification for Localized Boil Water Advisories
iv. Summary of Actions Taken at Water Tanks
v. Impact of Bromamines on Chloramines Stability
vi. Staffing Level Impacts due to Water System Improvements and
Operational Changes
vii. ONSWTP Chlorine Gas System Improvements
viii. Desktop Evaluation:Disinfection and DBP Control Alternatives
ix. Free Chlorine Conversion Schedule
x. Guidelines for Fire Hydrant Water Quality Sampling
xi. Elevated Storage Tank Implementation Plan and Schedule
2. Provide an engineering report that summarizes all work associated with water
quality analysis,system modifications,and operational changes
C. Data Analysis
1. Analysis and graphing of elevated storage tank data trends
2. Analysis of ONSWTP water quality data from online instrumentation and
grab sampling
3. Analysis and review of data from distribution system water quality site
database
4. Analysis of nitrite, nitrate, and ammonia data in ONSWTP process and
recycle streams
D. Nitrification Action Plan(NAP)Revisions/Updates
1. Provide revised NAP targets and action levels
2. Conduct additional NAP workshop
3. Provide interpretation of necessary NAP actions for system operations and
sampling frequencies
DELIVERABLES
Along with revising and finalizing various technical memoranda, as outlined in Task 9.B, the
Engineer will provide a DRAFT engineering report that provides a comprehensive summary of
li all actions taken and recommendations throughout the execution of this task authorization, along
with a compilation of all technical memorandums and pertinent written communication
associated with this project and City Project No. E16332 - Water System Assessment and
Optimization. Upon receipt of comments from the City staff, the Engineer will provide one (1)
hard copy and one (1) electronic copy of the final engineering letter report, signed and sealed by
a professional engineer.
3
Task Order No. 4
Exhibit A
Page 4 of 7
Pus cy
40 9�
LNVva
Desi
SCHEDULE
The Engineer's services shall be performed in a timely manner consistent with sound professional
practices. These tasks outlined in the Scope of Work will be performed according to the following
schedule:
Activity Completion Date
Execution of Task Authorization-Notice to Proceed (NTP) TBD
ITEM 1—Project Management
A. Daily Water Quality Review Meetings
B. Biweekly/Weekly Coordination Meeting Preparation and Attendance
C. City Council Presentation Development and Meeting Attendance
D. Project Coordination Meetings January 31,
2017
E. TCEQ Meeting Preparation and Attendance
F. Water Quality Action Item List Development and Tracking
G. Emergency Short-term Master List Budget Tracking and Analysis
ITEM 9—General Engineering
A. On-site Operations Support and Data Analysis
B. Technical Memorandum Development and Revisions February 28,
C. Data Analysis and Dashboarding 2017
D. Nitrification Action Plan(NAP)Revisions/Updates
The Engineer shall begin work immediately upon receipt of the executed Task Authorization and/or
Notice to Proceed(written or emailed).
FEE
The services will be provided on a Time and Materials (T&M) basis as the project is moved towards
completion.The anticipated amount for this task authorization is $167,588, as shown in ATTACHMENT
A. If the level of effort exceeds this estimate,a separate task authorization will be requested.
1
4 Task Order No. 4
Exhibit A
Page 5 of 7
LNV110
TASK AUTHORIZATION MANAGER
The Task Authorization Manager will be the primary contact person during the performance of this work.
All correspondence or inquiries should be addressed to the Task Authorization Manager. This work task
will be coordinated by:
Daniel Grimsbo, P.E. A.I.C.P.
Interim Assistant Director of Utilities Department
City of Corpus Christi
Office: 361-826-1874
Fax: 361-826-1889
Email: DanGacctexas.com
APPROVAL
The undersigned has reviewed and approved this Task Authorization and authorizes LNV,Inc.to perform
the work as presented:
Authorized by:
(Printed Name)
(Date)
Task Order No. 4
Exhibit A
Page 6 of 7
ITEM 1
Project Management
r`fti
-....Description
ITEM 1
A
,... x.,.., .-:
Project Management
Daily Water Quality Review Meetings
$ 303.00
$ 1060_
3BBOVIWrifr
----------
A
Daily Water Quality Review Meetings1
5 2,830
$ 195
30
$ 5,700
5 4560
$ -
5
$ -
Biweekly/Weekly Coordination Meeting Preparation and Attendance
$ -
5 -
$ -
5 4528
$ -
31
$ 5,89500
B
Biweekly/Weekly Coordination Meeting Preparation and Attendance1
$
5 195
24
$ 4,560
$ 1 818
5 -
5 6,792
$ -
5 -
$ -
5 1,216
$ -
5
$ -
25
$ 4,755.00
C
City Council Presentation Development and Meeting Attendance
6
$ 1,170
8
$ 1,520
$ 3,648
$ -
4
5 460
TCEQ Meeting Preparation and Attendance
5 -
$ 303
5 -
5 283
5 -
18
5 3,150.00
D
Project Coordination Meetings
1
5 195
24
5 4,560
$ 606
5 -
16
5 1,940
5 -
5 -
5 1216
$ -
$
5 -
41
5 6,595.00
E
TCEQ Meeting Preparation and Attendance
1
$ 195
8
5 1,520
$ 1,216
$ -
4
5 460
5 -
$ -
5 -
13
5 2,175.00
F
Water Quality Action Item List Development and Tracking1
$ 195
8
$ 1,520
5 -
5 -
8
$ 920
$ -
$ -
5
$ -
17
$ 2,635.00
G
Emergency Short-term Master List Budget Tracking and Analysis
1
$ 195
8
5 1,520
$ 10944
5 -
8
5 920
Technical Memorandum Development and Revisions
$ -
5 3030
$ -
$ 6792
$ -
17
5 2,635.00
5 10944
120
$ 12,720
C
Data Analysis and Dashboarding
5 -
4
5 1132
4
$ 648
16
$ 2432
8
$ 848
D
Nitrification Action Plan (NAP) Revisions/Updates
4
ITEM 9
General Engineering
$ 2,264
8
$ 1,296
16
5 2,432
8
5 848
A
On-site Operations Support and Data Analysis
5 -
4
$ 760
$ -
54
5 6,210
5 -
5 -
$ -
58
5 6,970.00
B
Technical Memorandum Development and Revisions
2
$ 390
16
5 3,0402
5 330
60
$ 6,900
50
$ 5,250
42
$ 3,780
8
5 640
180
$ 20,330.00
C
Data Analysis and Dashboarding
5 -
8
5 1,520
5 -
24
$ 2,760
5 -
5 -
$ -
32
5 4,280.00
D
Nitrification Action Plan (NAP) Revisions/Updates1
5 195
8
$ 1,520
5 -
16
$ 1,840
$ -
5 -
$ -
25
5 3,555.00
Task Order No. 4
Exhibit A
Page 7 of 7
• azen an • awyer11111:12=111111111111=12/2=Milii
r`fti
-....Description
ITEM 1
A
,... x.,.., .-:
Project Management
Daily Water Quality Review Meetings
$ 303.00
$ 1060_
3BBOVIWrifr
----------
--...:,..:..-
•
®
10
5 2,830
-
5 -
30
5 4560
-
5
B
Biweekly/Weekly Coordination Meeting Preparation and Attendance
-
5 -
16
5 4528
-
5 -
24
5 3,648
_
$
C
City Council Presentation Development and Meeting Attendance
6
$ 1 818
24
5 6,792
5 -
8
5 1,216
5
D
Project Coordination Meetings
4
$ 1,212
8
5 2,264
-
5 -
24
$ 3,648
-
5
E
TCEQ Meeting Preparation and Attendance
$ 303
a
5 283
-
5 -
8
5 1216
-®
F
Water Quality Action Item List Development and Tracking
2
$ 606
2
5 566
5 -
8
5 1216
-
$
G
Emergency Short-term Master List Budget Tracking and Analysis
a
5 303
2
5 566
8
$ 1,216
$
ITEM
General Engineering
-
5 -
-
$ -
-®-®-
5
A
On-site Operations Support and Data Analysis
2
5 606
4
$ 648
72
$ 10944
-®
B
Technical Memorandum Development and Revisions
10
5 3030
24
$ 6792
23
$ 3,726
7z
5 10944
120
$ 12,720
C
Data Analysis and Dashboarding
5 -
4
5 1132
4
$ 648
16
$ 2432
8
$ 848
D
Nitrification Action Plan (NAP) Revisions/Updates
4
5 1,212
8
$ 2,264
8
$ 1,296
16
5 2,432
8
5 848
Task Order No. 4
Exhibit A
Page 7 of 7
EXHIBIT B
TASK ORDER SUMMARY
MASTER SERVICE AGREEMENT
WATER AND WASTEWATER ON-CALL SUPPORT
PROJECT NO. E16264
NOT TO
TASK EXCEED
DESCRIPTION AMOUNT AMOUNT
Original Contract(June 2, 2016) $35,000
Amendment No. 1 Master Service Agreement(August 16, 2016) $600,000
Maximum Contract Amount $635,000
TASK ORDERS:
Task Order No. 1 $14,914
Greenwood Wastewater Treatment Plant Generator Sizing
Task Order No. 2 $14,575
Whitecap Wastewater Treatment Plant South Clarifier Scum System Rehab
Task Order No. 3 $24,350
Electrical Support for ONSWTP Intermediate Sludge Removal Phase 1
Task Order No.4 $167,588
Water System Operations Monitoring and Support
Amount Remaining on Master Service Agreement $413,573
Task Order No.4
Exhibit B
Page 1 of 1