HomeMy WebLinkAboutC2017-129 - 4/11/2017 - NA CITY OF CORPUS CHRISTI •
AMENDMENT NO. 2
CONTRACT FOR PROFESSIONAL SERVICES
The City of Corpus Christi, Texas, a Texas home-rule municipal corporation ("City") and Urban Engineering
('Consultant"),agree to the following amendments to the Contract for Professional Services for Nueces River Raw
Water Pump Station (Project No. E110682:
Original Contract March 6, 2013 Administrative Approval i $49,736
Amendment No. 1 July 29, 2014 Motion No. M2014-102 $1,688,299
In the Original Contract, Exhibit A, Scope of Services shall be amended as set forth in the attached Amendment
No.2, Exhibit A.
In the Original Contract, Exhibit A, Fees shall be amended based on the modified scope of services in the attached
Amendment No. 2, Exhibit A for a fee not to exceed$11,900, for a total restated fee not to exceed $1,749,935.
All other terms and conditions of the March 6, 2013 Contract for Professional Services between the City and
Consultant,and of any amendments to that contract,which are not specifically addressed herein shall remain in full
force and effect.
I - URBAN ENGINEERING
�FC• " Cj` �
//° /7 `'- '"- Mar 28, 2017
pm aban(Ma?s, 7J
V ie H. Gra , P.E. 11 I Dat- James L. Urban, P.E. Date
Ex- utive Direc or of 'ublic o s , Principal
2725 Swantner Drive
Corpus Christi,Texas 78404
APPROVED AS TO LEGAL FORM (361) 854-3101 Office
/// (361) 854-6001 Fax
if Aimee Alcorn-Reed
2017.04.05 15:00:32-05'00'
Assistant City Attorney Date
ATTEST
•
V-C-1,U-�C C, rte', �twt
CitySecretary ate
Project Number E11068
Accounting Unit 4093-041
Account 550950
Activity E11068-01-4093-EXP
Account Category 50950
Fund Name Water 2013 RVBD
2017-129
4/11/17
El 1068 NUECES RIVER RAW WATER PUMP STATIONVURBAN\AMENDMENT NO.2\CONTRACT.DOC REV.'011/15
Urban Engineering
INDEXED
Li " URBAN
ENGINEERING Job No. 33760.8301
March 14, 2017
VIA EMAIL
Dr. Daniel Deng, P.E.
Engineering Services
City of Corpus Christi
P. O. Box 9277
Corpus Christi, Texas 78469
Subject: Nueces River Raw Water Pump Station Improvements
City Project No. E11068
Dear Daniel:
As has been discussed, we are requesting an AE contract amendment addressing
the preparation of a physical model of the proposed modifications to the wet well in Pump
Building No. 1. The scope of the subject project includes new larger capacity vertical turbine
pumps and modifications to the existing wet well. The wet well modifications are recommended
due to the new larger pumps and to meet the requirements of the Hydraulic Institutes Pump
Intake Design ANSI 9.8 design criteria (this criteria was not in existence when the original pump
station was designed and constructed). The proposed modifications are shown on the attached
Plan Sheet No. 17. LAN is our sub-consultant on this project, assisting with the technical design
of the pumps in Pump Building No. 1 and the new transmission main from the pump station to
the ONSWTP. After our 60% submission, and with no changes or comments from the City on
the preliminary design, LAN began the detailed design and has highly recommended that a
hydraulic model study with physical scale modeling be performed on the proposed pump station
improvements. Although the proposed design appears to meet the Hydraulic Institutes Pump
Intake Design ANSI 9.8 design criteria, except for the length of channel up to the pump, due to
the critical nature of the pump station LAN is recommending that the physical model study be
performed to confirm the design and identify any possible hydraulic issues. Possible issues
include vortices at the surface, sub-surface or at pump suction bells and their impact of pump
operations.
We have been in discussion with LAN to look at various options to address this issue
and/or various companies to perform the study and their recommendation is to pursue a
physical model and to have Alden Research Laboratory perform the study. Based on
discussions with LAN, pump manufacturers and Alden, no one can say that there are known
absolute modifications that would ensure that there would not be hydraulic issues with the sump
design (other than a major reconstruction of the structure to meet full HIS standards). We
understand that a major reconstruction and/or modifications to the exterior walls of the existing
wet well are not a solution that would be acceptable to the City due to the much higher cost of
construction.
y
(361)854-3101 2725 SWANTNER DR. • CORPUS CHRISTI,TEXAS 78404 FAX(361)854-6001
www.urbaneng.com AMEND. NO. 2
TBPE Firm#145 EXHIBIT A
PAGE 1 OF 6
TBPLS Firm#10032400
Dr. Daniel Deng, P.E.
March 14, 2017
Page 2
The scope of the physical modeling to be done by Alden will be to prepare a small scale
model of the proposed wet well improvements, run the model at various flow rates and evaluate
for acceptable Hydraulic Institute Standards (HIS), provide modifications (baffles, flow
distributors or vanes, curtain walls, fillets and splitters) to the model to bring any identified
objectionable hydraulic conditions to acceptable levels and then provide a final run under the
various flow conditions for fine tuning to bring any remaining objectionable flow conditions to
acceptable levels.
We did not include a physical model study in our original fee proposal. To have a
physical model study performed and recommendations provided we proposed the City issue a
contract directly with Alden Research Laboratory for the physical model and prepare an
amendment with Urban Engineering in the amount of $11,900. Urban Engineering, and our
sub-consultant LAN, will manage the contract with Alden, will provide coordination and
transmittal of information to Alden and review the modeling results and recommendations. A
breakdown of the proposed fee is attached.
Having the modeling performed will obviously have an impact on the completion of the
design of this project. Attached we are providing an updated schedule to show inclusion of the
modeling with the project.
In summary, attached are the following:
1. Plan Sheet 17—showing existing and proposed Pump Building No. 1 wet well.
2. Manhour Breakdown of proposed fee amendment
3. LAN's breakdown of fee amendment
4. Project schedule with modeling
Please review and let me know if any questions. We will be happy to sit down with staff
and discuss at your earliest convenience. If acceptable, please have an AE fee amendment
agreement processed.
Sincerely,
URBAN V,Lc IAA
Mark Maroney, P. E.
MM/
Enclosure
AMEND. NO. 2
EXHIBIT A
PAGE 2 OF 6
9dO£3Jdd
V 1191HXd
Z 'ON 'GNW`d
a
Z
�-1
t�. 7-0•) 11•-I�•
4
19'-7
2-( ]'-DY-0' 3-3. Y-0' D-0
REVISION NO.
DESCRIPTION
RENSON NO.
MlE
DESCRIPTION
NUECES RIVER RAW WATER
PUMP STATION IMPROVEMENTS
PUMP BUILDING NO. 1 —
WET WELL STRUCTURAL PLAN
CITY of CORPUS CHRISTI
TEXAS
Deportment of Engineering Services
•
Illi ENGINEERING
URBAN
PREUMINARY 602 RFVIEW
116 DOCUEN1 6 REIDSED FOR
NUR nE 1410103061 OF
WIN WM.'S PE. 062015
ON 04/10/2116
R 6 301 NIDOE0 m S USED
RR IN MO PDNu2
X
X
•
NUECES RIVER RAW WATER PUMP STATION(E11068) Mark Maroney,P.E.
CITY OF CORPUS CHRISTI Februray 3,2017
Urban Engineering(TBPE#145)
MANHOUR BREAKDOWN OF ADDITIONAL SERVICES
URBAN ENGINEER
Sr.Engr. Engineer IV I Engineer I Cadd Tech Admin Ast Survey LAN Admin Exp. Task
Hrs Total Hrs Total Hrs Total Hrs Total Hrs Total Amt Amt Amt Total
ADDITIONAL SERVICES
1. Pump Building No.1 Physical Modeling 6 1,410 4 680 8.492 1,274 44 011,900
ADDITIONAL SERVICES TOTAL $11,900
AMEND. NO. 2
EXHIBIT A
PAGE 4 OF 6
S:lPfgects133500up13376063301 PSV E ContractlAmendment No 1-Modenng%arm 1 Brkdn 03.06.17.xlsx
•
Urban Engineering
City of Corpus Christi Nueces River Raw Water Pump Station
Phase 1-Pump Building#1
Design Phase Additional Services Fee Estimate
LAN Infrastructure Task Task
Warren Green Scott Paul
QA/QC Project Sr Process Hours Fee
Task Manager Manager Engineer Total Total
ADDITIONAL SERVICES
1 Project Management/Coordination for the Physical Model
a. Coordination of subconsultant agreement/contract 4 4 $ 784
b. Progress meetings(2 via teleconf) 0.5 2 2 4.5 $ 875
c. Transmittal of drawings,collection of data required for model 6 6 $ 1,002
d. Virtual demonstration with Sub 1 4 5 $ 951
e. Review results,reports,recommendations 4 8 12 24 $ 4,880
Subtotal Task 1 PM/Coordination $ 8,492
•
Attachment 2 to
3/6/2017 Exhibit A
AMEND. NO. 2
EXHIBIT A
PAGE 5 OF 6
* ' • ,
. .
. .
DESIGN SCHEDULE UPDATE March 6,2017
NUECES RIVER RAW WATER PUMP STATION ( E11068)
Urban Engineering(Firm No. 145)
Mark Maroney,P.E.
PROJECT TIMELINE
2017 2018
MONTHS 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12
; ; ;
° . I I ., ° t t i t i t
DESIGN COMPLETION .•
1 4 i• i f 4 i• 4 4 4 4 t 4 f•
Modeling AE Amendment
. . . . . . .
Pump Station Physical Modeling I
• : .• : .• : : : .•
I 1 ! • •
V . 4 • : : : • •
: ?
Complete Design i MINi
M i :
1 4. 1 I 4: 4. • t 4 4 i i i. 4 i
City Review I.
Final Design
•. .• .• . .
: : • •
: E E •. : :
: : .• : :
Advertise/Bid/Award : : •
1 ? 4 ? . ? i•
Construction(TBD) 4 4
4 : 4 4 4
INTO 2019
. . . .• : : E i
: .• .• . . i .
• • . . . . . .
IAMEND. NO. 2
EXHIBIT A
PAGE 6 OF 6
SAProjects\33500uA 33760\B301 PS\AE Contract\Amendment No.1-Modeling\Schedule Timeline-3.xlsx