AMENDMENT NO. 3
CONTRACT FOR PROFESSIONAL SERVICES
The City of Corpus Christi,Texas,a Texas home-rule municipal corporation("City")and Martinez,Guy&Maybik,
Inc.("Consultant"), agree to the following amendments to the Contract for Professional Services for Carroll Lane
from Houston to McArdle BOND 2014(Project No. E13097):
Original Contract February 11, 2014 Ordinance No. 030087 $534,420
Amendment No. 1 March 2, 2016 Administrative Approval $33,530
Amendment No. 2 March 28, 2016 Administrative Approval $13,500
In the Original Contract, Exhibit"A", Section I. Scope of Services shall be amended as set forth in the attached
Amendment No. 3, Exhibit"A".
In the Original Contract, Section III shall be amended based on the modified scope of services in the attached
Amendment No. 3, Exhibit"A"for a fee not to exceed $3,360, for a total restated fee not to exceed$584,810.
All other terms and conditions of the February 11,2014 Contract for Professional Services between the City and
Consultant,and of any amendments to that contract,which are not specifically addressed herein shall remain in full
force and effect.
CITY OF CORP u HRISTI I ART EZ,GUY&MA ,BIK,INC.
V- - e H. Gra P.E ( ' 'a •icardo Martine , P.:. Da
Exe, tive Director o Public •rksl President
6000 S. Staples " reet., Suite 207
Corpus Christi, TX 78413
361-814-3070 Office
rmartinez@mgm-inc_com
APPROVED AS TO LEGAL FORM
� _44,' Aimee Alcorn-Reed
2017.03.2424 12:1:12:3:3
5-05'00'
Assistant City Attorney Date
ATTEST Project No. E13097
Accounting Unit: 3550-051
1\—)e �/t C\ -�—� t e v�c Account: 550950
�C Activity:
E13097013550EXP
City Secretary Date Account Category: 50950
Li /1)11 -7 Fund Name: Street TN BOND 2014
Encumbrance No.
2017-130
4/11/17 nE13097 CARROLL FROM HOUSTON TO MCARDLE BOND ISSUE 20141AMENDMENT 3 M6M120151115 1001 AMENDMENT TO CONTRACT
REV 1011
Martinez Guy & Maybik Inc.
INDEXED
MARTINEZ,GUY
&MAYBIK, INC.
ENGINEERS&SURVEYORS
6000 S. Staples Suite 207
February 28, 2017 Corpus Christi, Texas 78413
361-814-3070 •Fax 1-888-653-5510
Corpus Chnsti •Houston Eagle Pass/Del Rio Area
Chris Hale, P.E.
Project Manager- City of Corpus Christi Engineering Services
P.O. Box 9277
Corpus Christi, Texas 78469
SUBJECT: Carroll Lane from Houston to McArdle (Bond 2014)
Project No. E13097
Amendment No. 3
Dear Mr. Hale,
As a result of the City's directive given subsequent to the project's Transition Meeting held on
February 03, 2017, please accept this letter as our proposal to perform the additional
professional services desired in developing the Carroll Lane from McArdle to Houston project.
Additional Work Description and Background Information
MGM requests this amendment due to additional scope of work created by the directive given
by City Staff as a result of the Transition Meeting held on February 03, 2017. The new directive
relates to the bicycle facilities along Carroll Lane.
Prior to the Transition Meeting, MGM had reached the 100% Unsealed submittal stage for the
work included in Amendment No. 1, and Amendment No. 2. This change includes a different
configuration for the bicycle facilities along the project corridor on both sides of Carroll Lane.
The cycle track will be a 7' wide path tied to the back of curb and shared with an additional 5'
pedestrian path on each side of the roadway. The directive given subsequent to the Transition
Meeting changed the shared use bicycle/pedestrian path on each side of Carroll Lane removing
the 2' buffer between the back of curb and path. This change caused additional scope of
services as described below:
I
I
RECEIVED
3 2017
AMD. NO. 3 V ..,
EXHIBIT "A" ENGINEERING SER�; .t...,
Page 1 of 3
Additional Scope of Services:
1. Preliminary Phase
• No additional services
2. Design Phase
• Revision of Plan Sheets- The change of cycle track width requires each plan and
profile sheet to be revised to appropriately identify the elements in plan view and the
typical sections. Plan & Profile sheets, Typical Section Sheets, and various other
sheets and details must be revised due to the cycle track now tying with the back of
curb and the removal of the 2' buffer space.
3. Bid Phase
• No additional services
4. Construction Phase
• No additional services
ADDITIONAL SERVICES
Schedule: Please note any changes to the schedule.
1. Preliminary Phase Submittal Due No change
2. Design Phase: 30% Submittal Due No change
60% Submittal Due No change
100% Bid Documents Due To Be Determined
3. Bid Phase To Be Determined
4. Construction Phase Until Final Acceptance by City
AMD. NO. 3 Page 2 of 3
EXHIBIT"A" Amendment No. 3
Page 2 of 3
Summary of A/E Fees
Original Amendment Amendment Amendment
Basic Services Fees Contract No. 1 No. 2 No. 3 Total
1. Preliminary Phase $117,640.00 $0.00 $0.00 $0.00 $117,640.00
2. Design Phase $193,100.00 $27,960.00 $13,500.00 $3,360 $237,920.00
3. Bid Phase $10,810.00 $0.00 $0.00 $0.00 $10,810.00
4. Construction Administration $61,570.00 $0.00 $0.00 $0.00 $61,570.00
Phase
Subtotal Basic Services Fees $383,120.00 $27,960.00 $13,500.00 $3,360 $427,940.00
Additional Services Fees
1. Permit Preparation $14,120.00 $0.00 $0.00 $0.00 $14,120.00
2. ROW Acquisition Survey None $0.00 $0.00 $0.00 None
Anticipated Anticipated
3. Topographic Survey and Parcel $57,350.00 $5,570.00 $.00 $0.00 $62,920.00
Descriptions
4. Environmental Issues $2,110.00 $0.00 $0.00 $0.00 $2,110.00
5. Public Involvement $12,300.00 $0.00 $0.00 $0.00 $12,300.00
( 5. Subsurface Utility Investigation $57,320.00 $0.00 $0.00 $0.00 $57,320.00
7. Construction Observation To Be $0.00 $0.00 $0.00 To Be
Services Determined Determined
8. Warranty Phase $8,100.00 $0.00 $0.00 $0.00 $8,100.00
Sub-Total Additional Services $151,300.00 $5,570.00 $0.00 $156,870.00
Fees Authorized
Total Authorized Fee $534,420.00 $33,530.00 $13,500.00 $3,360 $584,810.00
Ordinance Admin Admin Admin
030087 Approval Approval Approval
2/11/2014 (Submitted (Submittal (Current
Approved By: 1/18/2016) 2/2/2016) Request)
Since ly,
(a'd C"1/41110 'Pr
irm Officer En itled to,E -r Contracts
Ricardo Martine , .
President, MGM, Inc.
AMD. NO. 3 Page 3 of 3
EXHIBIT"A" Amendment No. 3