HomeMy WebLinkAboutC2017-134 - 4/14/2017 - NA CITY OF CORPUS CHRISTI AMENDMENT NO. 2 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas hereinafter called "City", and LNV, Inc. hereinafter called "Engineer", agree to the following amendments to the Contract for Engineering Services for Yorktown Boulevard from Lake Travis to Everhart(Project No. E13093) BOND 2014, as authorized and administratively amended by: Original Contract February 11, 2014 Ordinance No. 030085 $994,290 Amendment No. 1 November 6, 2014 Administrative Approval $5,935 In the Original Contract, Exhibit "A", Section I. Scope of Services shall be added as set forth in the attached AMD No. 2, Exhibit"A". In the Original Contract, Exhibit"A", Section III. Fees, Summary of Fees shall be modified as set forth in the attached as AMD No. 2 Exhibit "A" for a fee not to exceed $43,951, for a total restated fee not to exceed$1,044,176. All other terms and conditions of the February 11, 2014 contract between the City and Engineer, and of any amendments to that contract, which are not specifically addressed herein shall remain in full force and effect. CITY OF CORPUS CHRISTI LNV, IN . 41114.117 %• 3/281/7 Margie C. Rose Date r,a -. Leyend cker, P.E. ate City Manager Pr.sident 801 Navigation, Suite 300 Corpus Christi, TX 78408 (361)883-1984 Office RECOMMENDED '7V2 - 9/ Mark Van VleckDate Assi-tant City Mang=r V-7e H. Gray •.• . ¢ l Date Executive Director of P blic o s f 2017-134 4/14/17 AMD. NO. 2 Pa!e1 oft TREETIE13 YORKTOWN FROM LAKE TRAVIS TO EVERHART BOND 2014WMD NO 2 L.NVWMD NO 2.•• LNV Inc. INDEXED APPROVED AS TO LEGAL FORM Project No. E13093 Aimee Alcorn-Reed Fund Source No. 550950-3551-00000-E13093 2017.04.05 15:31:42-05'00' Fund Name: Street CIP BOND 2014 Legal Department Date Encumbrance No. ATTEST Rl3- Ac1---(1-AfA7-C-47 /i Vn Rebecca Huerta Dobe City Secretary AMD.NO.2 Pa!e2of2 KIENGINEERING DATAEXCHANGE NGLEMMTREEnE13O93 YORKTOWN FROM LAKE TRAVIS TO EVERHART BOND 20140MD NO 2 LNVUMD NO 2.ri LIV Solutions Today with a Vision for Tomorrow engineers architects surveyors March 13, 2017 J.H. Edmonds, P.E. Director of Engineering Services City of Corpus Christi P.O. Box 9277 Corpus Christi, TX 78469-9277 RE: Yorktown Boulevard—Lake Travis to Everhart(Bond 2014) City Project No. E13093 Amendment No. 2– Re-Design Pavement Rehabilitation and Utilities Scope Reduction Dear Mr. Edmonds: Please allow this letter to serve as our formal request to amend our Contract for the above referenced project to include the Additional Services as described below. The 100% pre-final design for this project was completed in March 2016. It consists of improvements to the above referenced segment of Yorktown Boulevard including complete street reconstruction and associated utility and storm water improvements. Subsequently, City staff elected to re-design this street in an effort to reduce construction costs. This scope and fee proposal includes professional services required to revise the plans, specifications and estimate(PS&E) documents to reduce the scope of pavement reconstruction work, and eliminate the utility and storm water upgrades as described below: BASIS OF DESIGN 1. Street pavement improvements will be limited to cement-stabilizing the existing base material and laying new HMAC surface course, as specified in the geotechnical report supplement. As stated by the geotechnical consultant during discussions with City staff, this limited paving rehabilitation will not provide a 30-year(or even a 20-year)pavement design life as the original full-depth reconstruction pavement design. This pavement section is an interim solution until funds are available for full-depth pavement reconstruction. No concrete pavement option will be included. 2. Existing curb &gutters to remain in place to the extent possible. Only short sections of severely rolled C&G will be replaced. No changes to the existing C&G grades will be made. 3. Existing sidewalks to remain in place to the extent possible. Proposed minor sidewalk and curb ramp improvements to remain as previously designed. 4. Existing curb inlets to remain in place to the extent possible. 5. No improvements to existing storm water mains or laterals. 6. No waterline improvements. 7. No wastewater improvements. 8. Proposed MIS/ IT conduit to remain at same location as previously designed. 9. Proposed street lighting conduit to remain at same location as previously designed. YORKTOWN BLVD.—LAKE TRAVIS TO EVERHART PAGE 1 OF 2 AMENDMENT NO.2 AMD. NO. 2 EXHIBIT "A" Page 1 of 2 . . LNVSolutions Today with a Vision for Tomorrow engineers i architects I surveyors SCOPE: 1. Scoping meeting and progress meetings (2). 2. Site visits. 3. Review pavement condition with geotechnical engineer at project site. 4. Investigate pavement repair/rehabilitation options with City staff and geotechnical engineer. Incorporate revised recommendations from the geotechnical report supplement in the pavement re-design. 5. Revise drawings (as identified below)to reflect changes discussed above: a. Sheet index, general notes and testing schedule (3 sheets) b. Estimated quantities and removal summary(3 sheets) c. Typical street sections (5 sheets) d. Traffic control & sequence of construction (6 sheets) e. Street plan & profile (16 sheets) f. DELETE non-applicable drawings (33 sheets) g. Re-number all remaining drawings and sheet references (104 sheets). 6. Calculate revised materials quantities. 7. Update opinion of probable construction costs. 8. Internal QA/QC review. 9. Submit revised 100% pre-final PS&E for review 10. Public information meeting (1 additional meeting) FEE: The lump sum fee for these additional services is $43,951 (please see attached manhour breakdown spreadsheet). SCHEDULE: LNV will commence work for these additional services within 5 working days after receiving the approved contract amendment and authorization to proceed,and we anticipate completing this scope of services within 45 working days (9 weeks). We appreciate the opportunity to provide these professional services to the City of Corpus Christi. Sincerely, LNV, Inc. TBPE No. F-366 3/13//7 gan Burton, P.E., CFM rincipal/Vice President cc: Chris Hale, P.E. Marisa Manning I YORKTOWN BLVD.—LAKE TRAVIS TO EVERHART PAGE 2 OF 2 AMENDMENT NO.2 AMD. NO. 2 EXHIBIT "A" Page 2 of 2