HomeMy WebLinkAboutC2017-220 - 7/10/2017 - NA 2017-220 7/10/17 A. Ortiz Construction and Paving 00 52 23 AGREEMENT This Agreement,for the Project Contract Renewal approved on July 10, 2017 is between the City of Corpus Christi (Owner)and A.Ortiz Construction and Paving, Inc. (Contractor). Owner and Contractor agree as follows: ARTICLE 1—WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as: CONTRACT RENEWAL#1 IDIQ MINOR STREET IMPROVEMENTS FY17-PART 1(Ref E16252/E16253) PROJECT NO. E17048 ARTICLE 2—DESIGNER AND OWNER'S AUTHORIZED REPRESENTATIVE 2.01 The Project has been designed by: ECMS, LLC Felix H. Ocanas,Jr., P.E. 5001 Oakmont Drive Corpus Christi TX 78413 2.02 The Owner's Authorized Representative for this Project is: Ernesto De La Garza,P.E.—Construction Management Engineer City of Corpus Christi—Engineering Services 4917 Holly Rd.,#5 Corpus Christi TX 78411 ARTICLE 3—CONTRACT TIMES 3.01 Contract Times A. The Work is required to be completed within 365 days after the date when the Contract Times commence to run as provided in the Notice to Proceed and is to be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 365 days after the date when the Contract Times commence to run. B. Milestones, and the dates for completion of each, are as defined in SECTION 01 35 00 SPECIAL PROCEDURES. (NOT USED) 3.02 Liquidated Damages A. Owner and Contractor recognize that time limits for specified Milestones,Substantial Completion, and completion and readiness for Final Payment as stated in the Contract Documents are of the essence of the Contract. Owner and Contractor recognize that the Agreement—Contract Renewal#1 00 52 23-1 IDIQ Minor Street Improvements Project E17048(Ref E16252,E16253) Rev01-13-2016 INDEXED CONTRACT DOCUMENTS FOR CONSTRUCTION OF IDIQ MINOR STREET IMPROVEMENTS PROJECT NUMBERS E16250, E16251, E 16252 & E 16253 ffmovERMW MEN= MEOW MEN= C " ty of %® C, Corpus �•e.......me,.... FELIX�. Q NAS,JR. �e a mo eee• .•......••.• .. ••.. 300(3 Christi yA° ECIVIS, LLC 5001 OAKMONT DRIVE, CORPUS CHRISTI, TX 78413 361-549-4576 Record Drawing Number: STR 922 000100 TABLE OF CONTENTS Division/ Title Section Division 00 Procurement and Contracting Requirements 00 21 13 Invitation to Bid and Instructions to Bidders (Rev O1-13-2016) 00 30 00 Bid Acknowledgment Form (Revo1-13-2016) 00 30 01 Bid Form (Rev 01-13-2016) 00 30 02 Compliance to State Law on Nonresident Bidders 00 30 05 Disclosure of Interest(Revo1-13-2016) 00 30 06 Non-Collusion Certification 00 45 16 Statement of Experience(Rev 10-06-2015) 00 52 23 Agreement(Rev 01-13-2016) 00 61 13 Performance Bond (Revo1-13-2016) 00 61 16 Payment Bond (Rev 01-13-2016) 00 72 00 General Conditions (Rev3-23-2015) 00 72 01 Insurance Requirements (Revo1-13-2016) 00 72 02 Wage Rate Requirements (Rev06-12-2015) 00 72 03 Minority/ MBE/ DBE Participation Policy(Revo1-13-2016) 00 73 00 Supplementary Conditions Division 01 General Requirements 011100 Summary of Work(Rev 01-13-2016) 01 23 10 Alternates and Allowances 01 29 00 Application for Payment Procedures (Rev 03-11-2015) 01 29 01 Measurement and Basis for Payment (Rev 01-13-2016) 01 31 00 Project Management and Coordination (Rev 01-13-2016) 01 31 13 Project Coordination 01 31 14 Change Management 01 33 00 Document Management 01 33 01 Submittal Register(Rev 7/3/2014) 01 33 02 Shop Drawings 01 33 03 Record Data 01 33 04 Construction Progress Schedule 01 35 00 Special Procedures 01 40 00 Quality Management Table of Contents 000100-1 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 Division/ Title Section 01 50 00 Temporary Facilities and Controls 01 57 00 Temporary Controls 01 70 00 Execution and Closeout Requirements Part S Standard Specifications SECTION SECTION TITLE 022 EARTHWORK 022020 Excavation & Backfill for Utilities 022021 Control of Ground Water 022022 Trench Safety for Excavations 022040 Street Excavation 022060 Channel Excavation 022080 Embankment 022100 Select Material 022420 Silt Fence 0252 ROADWAY 0252... SU BG RAD ES AND BASES 025202 Scarifying and Reshaping Base Course 025205 Pavement Repair, Curb, Gutter, Sidewalk& Driveway Replacement 025208 Soil-Cement Base (5-17) 025210 Lime Stabilization 025223 Crushed Limestone Flexible Base 0254 ASPHALTS AND SURFACES 025402 Planning Asphalt Surfaces 025404 Asphalts Oils& Emulsions 025410 Asphalt Crack Sealing 025412 Prime Coat 025414 Aggregate For Surface Treatment 025416 Seal Coat 025418 Surface Treatment 025419 Slurry Seal Table of Contents 000100-2 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 Division/ Title Section 025424 Hot Mix Asphalt Concrete Pavement 0256 CONCRETE WORK 025608 Inlets 025610 Concrete Curb&Gutter 025612 Concrete Sidewalks& Driveways 025614 Concrete Curb Ramps 025620 Portland Cement Concrete Pavement 0258 TRAFFIC CONTROLS&DEVICES 025802 Temporary Traffic Controls During Construction 025803 Traffic Signal Adjustments 025805 Work Zone Pavement Markings 025807 Pavement Markings (Paint and Thermoplastic) 025813 Preformed Thermoplastic Striping, Words& Emblems 025816 Raised Pavement Markers 025818 Reference Specification-TxDOT DMS-4200 Pavement Markers (Reflectorized) 025828 Reference Specification-TxDOT DMS-6130 Bituminous Adhesive For Pavement Marker END OF SECTION Table of Contents 000100-3 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 00 21 13 INVITATION TO BID AND INSTRUCTIONS TO BIDDERS ARTICLE 1—DEFINED TERMS 1.01 Terms used in this Invitation to Bid and Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. ARTICLE 2—GENERAL NOTICE 2.01 The City of Corpus Christi,Texas (Owner) is requesting Bids for the construction of the following Project: IDIQ MINOR STREET IMPROVEMENTS PROJECT PROJECT NO. E16250, E16251, E16252, E16253 A. This project is an Indefinite Delivery Indefinite Quantity(IDIQ) construction contract to perform minor street pavement repairs throughout the City, including minor street pavement rehabilitation/replacement, base repairs with limestone, and sub-grade stabilization. Work may include saw cutting, crack sealing, seal coating, milling, curb & gutter, driveway replacement, curb ramps, and minor utility manhole ring&cover and valve adjustments. The Work will be issued in individual work orders called "Delivery Orders"that provide specific scope and requirements. The City intends to award this contract for an initial one-year/12-month period, with the option to administratively renew for two (2) additional one-year/12-month periods. The City's Department of Engineering Services will determine whether to exercise an option to renew based on the Contractor's successful performance of the work and all Delivery Orders, the recommendation of the City's Design Engineer, Construction Management& Inspection Team, approval by the City's Director of Engineering Services, and the concurrence of the Contractor. The contract allows for a City-approved economic adjustment to apply to a renewal period if based upon published cost-of-construction indices acceptable to the City. B. The two bid schedules under this single bid invitation includes a "Part 1" and a "Part 2." Part 1 will be dedicated specifically to that part of the City to the West of Ayers Street and Part 2 will be dedicated to that part of the City Eost of Ayers Street.The City intends to award Part 1 to the lowest responsible bidder for Part 1, and to award Part 2 to the lowest responsible bidder for Part 2. If the same bidder submits the lowest bid for both Part 1 and Part 2, then both Part 1 and Part 2 may only be awarded to that one lowest bidder if the bidder can demonstrate the capability and resources to complete the work of both Parts 1 and 2 concurrently and continuously, within the 365 days, and in accordance with the Contract Documents, and to be able to show, to the City's satisfaction,the ability to employ two full crews working concurrently and continuously, one full crew for Part 1 and one full crew for Part 2. Otherwise, should such bidder who has submitted the lowest bids for both Part 1 and Part 2, not qualify to perform both Parts 1 and Part 2 as described above, then such bidder will be awarded the contract with the highest of his two bids. Invitation to Bid and Instructions to Bidders 002113-1 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 01-13-2016 2.02 The Engineer's Opinion of Probable Construction Cost for the Project is$4,000,000 total for Parts 1 and 2, $2,000,000 for Part 1 and $2,000,000 for Part 2. The Project is to be finally completed and ready for operation within 365 days. 2.03 Advertisement and bidding information for the Project can be found at the following website: www.civcastusa.com 2.04 Contract Documents may be downloaded or viewed free of charge at this website. This website will be updated periodically with Addenda, lists of interested parties, reports, or other information relevant to submitting a Bid for the Project. ARTICLE 3— DELIVERY AND OPENING OF BIDS 3.01 Bids must be received no later than April 6,2:00 PM to be accepted. Bids received after this time will not be accepted. It is the sole responsibility of the Bidder to deliver the Bid, electronic or hard copy, by the specified deadline. 3.02 Complete and submit the Bid Form, the Bid Bond and the Bid Acknowledgement Form along with all required documents identified in the Bid Acknowledgement Form. 3.03 Electronic Bids may be submitted to the CivCast website at www.civcastusa.com. 3.04 If submitting a hard copy bid or bid security by cashier's check or money order, please address envelopes or packages to: City of Corpus Christi City Secretary's Office City Hall Building, 1st Floor 1201 Leopard Street Corpus Christi,Texas 78401 Attention: City Secretary Bid - IDIQ MINOR STREET IMPROVEMENTS, PN E16250, E16251, E16252, E16253 Corpus Christi,Texas 78401 All envelopes and packages (including FEDEX envelopes) must clearly identify, on the OUTSIDE of the package, the project name and number and that bid documents are enclosed. 3.05 Bids will be publicly opened and read aloud at 2:00 PM,April 6,2016 at the following location: City Hall Building— City of Corpus Christi First Floor City Council Staff Room or Council Chambers 1201 Leopard Street Corpus Christi,Texas 78401 3.06 The Owner will read aloud the names of the Bidders and the apparent Bid amounts shown on the Bid Summary for all Bids received in time to be considered. Invitation to Bid and Instructions to Bidders 002113-2 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 01-13-2016 ARTICLE 4—PRE-BID CONFERENCE 4.01 A non-mandatory pre-bid conference for the Project will be held on March 22,2016, 10:30 AM at the following location: City Hall Building—Engineering Services Conference Room 1 or 2 3rd floor, Engineering Services 1201 Leopard Street, Corpus Christi,Texas 78401 ARTICLE 5—COPIES OF CONTRACT DOCUMENTS 5.01 Obtain a complete set of the Contract Documents as indicated in SECTION 00 52 23 AGREEMENT. 5.02 Use complete sets of Contract Documents in preparing Bids; Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete sets of Contract Documents. 5.03 OPT makes copies of Contract Documents available for the sole purpose of obtaining Bids for completion of the Project and does not confer a license or grant permission or authorization for any other use. ARTICLE 6—EXAMINATION OF CONTRACT DOCUMENTS 6.01 Before submitting a Bid: A. Examine and carefully study the Contract Documents, including any Addenda and related supplemental data. B. Become familiar with all federal, state, and local Laws and Regulations that may affect cost, progress, or the completion of Work. C. Carefully study and correlate the information available to the Bidder with the Contract Documents, Addenda, and the related supplemental data. D. Notify the OAR of all conflicts, errors, ambiguities, or discrepancies that the Bidder discovers in the Contract Documents, Addenda, and the related supplemental data. E. Determine that the Contract Documents, Addenda, and the related supplemental data are generally sufficient to indicate and convey understanding of all terms and conditions for completion of Work. 6.02 The submission of a Bid will constitute an incontrovertible representation by the Bidder that the Bidder has complied with every requirement of this Article 6, that without exception the Bid is premised upon completion of Work required by the Contract Documents, Addenda, and the related supplemental data,that the Bidder has given the OAR written notice of all conflicts, errors, ambiguities, and discrepancies that the Bidder has discovered in the Contract Documents, Addenda, and the related supplemental data and the written resolutions provided by the OAR are acceptable to the Bidder, and that the Contract Documents, Addenda, and the Invitation to Bid and Instructions to Bidders 002113-3 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 01-13-2016 related supplemental data are generally sufficient to indicate and convey understanding of all terms and conditions for completion of Work. ARTICLE 7—INTERPRETATIONS AND ALTERNATE BIDS 7.01 Submit all questions about the meaning or intent of the Contract Documents, Addenda, and the related supplemental data using the Owner's Bidding Website at www.civcastusa.com. Responses to questions submitted will be posted on the website by the Owner for the benefit of all Bidders. Responses will be posted for questions submitted by 5:00 p.m. seven (7) days prior to the date of the bid opening. Inquiries made after this period may not be addressed. 7.02 Submit any offer of alternate terms and conditions, or offer of Work not in strict compliance with the Contract Documents to the OAR no later than 14 days prior to the date for opening of Bids. OAR and Designer will issue Addenda as appropriate if any of the proposed changes to the Contract Documents are accepted. A Bid submitted with clarifications or taking exceptions to the Contract Documents, except as modified by Addenda, may be considered non-responsive. 7.03 Addenda may be issued to clarify, correct, or change the Contract Documents, Addenda or the related supplemental data as deemed advisable by the Owner or Designer. Modifications to the Contract Documents prior to the award of contract can only be made by Addenda. Only answers in Addenda authorized by the Owner will be binding. Oral and other interpretations or clarifications will be without legal effect. ARTICLE 8—BID SECURITY 8.01 Bidders must submit an acceptable Bid Security with their Bid as a guarantee that the Bidder will enter into a contract for the Project with the Owner within 10 days of Notice of Award of the Contract. The security must be payable to the City of Corpus Christi,Texas in the amount of 5 percent (5%) of the greatest amount bid. 8.02 Bid Security may be in the form of a Bid Bond or a cashier's check, certified check, money order, or bank draft from a chartered financial institution authorized to operate in the State of Texas. Bidders submitting bids electronically through the CivCast System at www.civcastusa.com shall scan and upload a copy of Bid Bond as an attachment to their bid. Cashier's check, certified check, money order or bank draft must be enclosed in a sealed envelope, plainly identified on the outside as containing bid documents, the bidder's name and the job name and number and delivered as required in Article 8.03 below. 8.03 Bid Bond Requirements: 1. A Bid Bond must guarantee, without qualification or condition,that the Owner will be paid a sum equal to 5 percent (5%) of the greatest amount bid if,within 10 calendar days of Notice of Award of the Contract, the Bidder/Principal: a. fails to enter into a contract for the Project with the Owner; or b. fails to provide the required Performance and Payment Bonds. 2. A Bid Bond may not limit the sum payable to the Owner to be the difference between the Bidder/Principal's bid and the next highest bidder. Invitation to Bid and Instructions to Bidders 002113-4 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 01-13-2016 3. The Bid Bond must reference the Project by name as identified in Article 1. 4. Bidders may provide their surety's standard bid bond form if revised to meet these Bid Bond Requirements. 8.04 Failure to provide an acceptable Bid Security will constitute a non-responsive Bid which will not be considered. 8.05 Failure to provide the required Performance and Payment Bonds will result in forfeiture of the Bid Security to the City as liquidated damages. 8.06 Owner may annul the Notice of Award and the Bid Security of the Bidder will be forfeited if the apparent Selected Bidder fails to execute and deliver the Agreement or Amendments to the Agreement. The Bid Security of other Bidders whom the Owner believes to have a reasonable chance of receiving the award may be retained by the Owner until the earlier of 7 days after the Effective Date of the Contract or 90 days after the date Bids are opened. 8.07 Bid Securities are to remain in effect until the Contract is executed. The Bid Securities of all but the three lowest responsible Bidders will be returned within 14 days of the opening of Bids. Bid Securities become void and will be released by the Owner when the Contract is awarded or all Bids are rejected. ARTICLE 9—PREPARATION OF BID 9.01 The Bid Form is included with the Contract Documents and has been made available at the Owner's Bidding Website. Complete all blanks on the Bid Form by typing or printing in ink. Indicate Bid prices for each Bid item or alternate shown. 9.02 Execute the Bid Acknowledgement Form as indicated in the document and include evidence of authority to sign. 9.03 Acknowledge receipt of all Addenda by filling in the number and date of each Addendum. Provide a signature as indicated to verify that the Addenda were received. A Bid that does not acknowledge the receipt of all Addenda may be considered non-responsive. 9.04 Provide the name, address, email, and telephone number of the individual to be contacted for any communications regarding the Bid in the Bid Acknowledgement Form. 9.05 Provide evidence of the Bidder's authority and qualification to do business in the State of Texas or covenant to obtain such qualification prior to award of the Contract. ARTICLE 10—CONFIDENTIALITY OF BID INFORMATION 10.01 In accordance with Texas Government Code 552.110, trade secrets and confidential information in Bids are not open for public inspection. Bids will be opened in a manner that avoids disclosure of confidential information to competing Bidders and keeps the Bids from the public during considerations. All Bids are open for public inspection after the Contract is awarded, but trade secrets and confidential information in Bids are not typically open for public inspection. The Owner will protect this information to the extent allowed by Laws and Regulations. Clearly indicate which specific documents are considered to be trade secrets or confidential information by stamping or watermarking all such documents with the word "confidential" prominently on Invitation to Bid and Instructions to Bidders 002113-5 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 01-13-2016 each page or sheet or on the cover of bound documents. Place "confidential" stamps or watermarks so that they do not obscure any of the required information on the document, either in the original or in a way that would obscure any of the required information in a photocopy of the document. Photocopies of"confidential" documents will be made only for the convenience of the selection committee and will be destroyed after the Effective Date of the Contract. Original confidential documents will be returned to the Bidder after the Effective Date of the Contract if the Bidder indicates that the information is to be returned with the Bid, and arrangements for its return are provided by the Bidder. ARTICLE 11—MODIFICATION OR WITHDRAWAL OF BID 11.01 A Bid may be withdrawn by a Bidder, provided an authorized individual of the Bidder submits a written request to withdraw the Bid prior to the time set for opening the Bids. 11.02 A Bidder may withdraw its Bid within 24 hours after Bids are opened if the Bidder files a signed written notice with the Owner and promptly, but no later than 3 days, thereafter demonstrates to the reasonable satisfaction of the Owner that there was a material and substantial mistake in the preparation of its Bid. The Bid Security will be returned if it is clearly demonstrated to the Owner that there was a material and substantial mistake in its Bid. A Bidder that requests to withdraw its Bid under these conditions may be disqualified from responding to a reissued invitation to Bid for the Work to be furnished under these Contract Documents. ARTICLE 12—BIDS REMAIN SUBJECT TO ACCEPTANCE 12.01 All Bids will remain subject to acceptance for 90 days, but the Owner may, at its sole discretion, release any Bid and return the Bid Security prior to the end of this period. ARTICLE 13—STATEMENT OF EXPERIENCE 13.01 The three lowest Bidders must submit the information required in SECTION 0045 16 STATEMENT OF EXPERIENCE within 5 days of the date Bids are due to demonstrate that the Bidder meets the minimum requirements to complete the Work. ARTICLE 14—EVALUATION OF BIDS 14.01 The Owner will consider the amount bid,the Bidder's responsibilities, the Bidder's safety record, the Bidder's indebtedness to Owner, the Bidder's capacity to perform the work within the contract period and/or whether the Bidder has met the minimum specific project experience requirements. 14.02 Owner may conduct such investigations as it deems necessary to establish the responsibility of the Bidder and any Subcontractors, individuals, or entities proposed to furnish parts of the Work in accordance with the Contract Documents. 14.03 Submission of a Bid indicates the Bidder's acceptance of the evaluation technique and methodology as well as the Bidder's recognition that some subjective judgments must be made by the Owner during the evaluation. Each Bidder agrees to waive any claim it has or may have against the OPT and their respective employees, arising out of or in connection with the administration, evaluation, or recommendation of any Bid. Invitation to Bid and Instructions to Bidders 002113-6 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 01-13-2016 ARTICLE 15—AWARD OF CONTRACT 15.01 The Bidders selected for award of the Contract will be the lowest responsible Bidders that submits a responsive bid. Owner reserves the right to reject any and all Bids, including without limitation, non-conforming, non-responsive or conditional Bids. The Owner reserves the right to adopt the most advantageous interpretation of the Bids submitted in the case of ambiguity or lack of clearness in stating Bid prices and/or waive any or all formalities. 15.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work shall be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest. ARTICLE 16—MINORITY/ MBE/ DBE PARTICIPATION POLICY 16.01 Selected Contractor is required to comply with the Owner's Minority/ MBE/DBE Participation Policy as indicated in SECTION 00 72 03 MINORITY/ MBE/ DBE PARTICIPATION POLICY. 16.02 Minority participation goal for this Project has been established to be 45%. 16.03 Minority Business Enterprise participation goal for this Project has been established to be 15%. ARTICLE 17—BONDS AND INSURANCE 17.01 Article 6 of the General Conditions and SECTION 00 72 01 INSURANCE REQUIREMENTS sets forth the Owner's requirements as to Bonds and insurance. When the Selected Bidder delivers the executed Agreement to the Owner, it must be accompanied by the required Bonds and evidence ofinsurance. 17.02 Provide Performance and Payment Bonds for this Project that fully comply with the provisions of Texas Government Code Chapter 2253. Administration of Bonds will conform to Texas Government Code Chapter 2253 and the provisions of these Contract Documents. ARTICLE 18—SIGNING OF AGREEMENT 18.01 The City Engineer or Director of Capital Programs will submit recommendation for award to the City Council for those project awards requiring City Council action. The Selected Bidder will be required to deliver the required Bonds and insurance certificates and endorsements along with the required number of counterparts (1) of the Agreement and attached documents to the Owner within 14 days.The Contract will be signed by the City Manager or his/her designee after award and the Bidder's submission of required documentation and signed counterparts. The Contract will not be binding upon Owner until it has been executed by both parties. Owner will process the Contract expeditiously. However, Owner will not be liable for any delays prior to the award or execution of Contract. ARTICLE 19—SALES AND USE TAXES 19.01 The Owner generally qualifies as a tax exempt agency as defined by the statutes of the State of Texas and is usually not subject to any City or State sales or use taxes, however certain items such as rented equipment may be taxable even though Owner is a tax-exempt agency. Assume Invitation to Bid and Instructions to Bidders 002113-7 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 01-13-2016 responsibility for including any applicable sales taxes in the Contract Price and assume responsibility for complying with all applicable statutes and rulings of the State of Texas Comptroller. 19.02 It is the Owner's intent to have this Contract qualify as a "separated contract." ARTICLE 20—WAGE RATES 20.01 This Contract is subject to Texas Government Code Chapter 2258 concerning payment of prevailing wage rates. Requirements for paying the prevailing wage rates are discussed in SECTION 00 72 02 WAGE RATE REQUIREMENTS. Bidders must pay not less than the minimum wage shown on this list and comply with all statutes and rulings of the State of Texas Comptroller. ARTICLE 21—BIDDER'S CERTIFICATION OF NO LOBBYING 21.01 In submitting its Bid, Bidder certifies that it has not lobbied the City or its officials, managers, employees, consultants, or contractors in such a manner as to influence or to attempt to influence the bidding process. In the event it reasonably appears that the Bidder influenced or attempted to influence the bidding process,the City may, in its discretion, reject the Bid. ARTICLE 22—CONFLICT OF INTEREST 22.01 Bidder agrees to comply with Chapter 176 of the Texas Local Government Code and file Form CIQ with the City of Corpus Christi City Secretary's Office, if required. For more information on Form CIQ and to determine if you need to file a Form CIQ, please review the information on the City Secretary's website at http://www.cctexas.com/government/city-secretary/conflict- disclosure/index. ARTICLE 23—CERTIFICATE OF INTERESTED PARTIES 23.01 Bidder agrees to comply with Texas Government Code section 2252.908 and complete Form 1295 Certificate of Interested Parties as part of this contract, if required. For more information, please review the information on the Texas Ethics Commission website at https://www.ethics.state.tx.us. ARTICLE 24- REJECTION OF BID 24.01 The following will be cause to reject a Bid: A. Bids which are not signed by an individual empowered to bind the Bidder. B. Bids which do not have an acceptable Bid Security, with Power of Attorney, submitted as required by Article 7. C. More than one Bid for same Work from an individual, firm, partnership or corporation. D. Evidence of collusion among Bidders. E. Sworn testimony or discovery in pending litigation with Owner which discloses misconduct or willful refusal by bidder to comply with subject contract or instructions of Owner. F. Failure to have an authorized agent of the Bidder attend the mandatory Pre-Bid Conference, if applicable. Invitation to Bid and Instructions to Bidders 002113-8 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 01-13-2016 G. Bids received from a Bidder who has been debarred or suspended by Owner. H. Bids received from a Bidder when Bidder or principals are currently debarred or suspended by Federal, State or City governmental agencies. 24.02 The following may be cause to reject a Bid or cause to deem a Bid non-responsive or irregular. The City reserves the right to waive any irregularities and any or all formalities: A. Poor performance in execution of work under a previous City of Corpus Christi contract. B. Failure to achieve reasonable progress on an existing City of Corpus Christi contract. Evidence of Bidder's recurring failure to complete an item of work within a timeframe acceptable to the City or in accordance with a City-accepted schedule is evidence of Bidder's failure to achieve reasonable progress under this subsection. C. Default on previous contracts or failure to execute Contract after award. D. Evidence of failure to pay Subcontractors, Suppliers or employees in accordance with Contract requirements. E. Bids containing omissions, alterations of form, additions, qualifications or conditions not called for by Owner, or incomplete Bids may be rejected. In any case of ambiguity or lack of clarity in the Bid, OWNER reserves right to determine most advantageous Bid or to reject the Bid. F. Failure to acknowledge receipt of Addenda. G. Failure to submit post-Bid information specified in Section 00 45 16 STATEMENT OF EXPERIENCE within the allotted time(s). H. Failure to timely execute Contract after award. I. Previous environmental violations resulting in fines or citations by a governmental entity (i.e. U.S. Environmental Protection Agency,Texas Commission on Environmental Quality, etc.). J. Bidder's Safety Experience. K. Failure of Bidder to demonstrate,through submission of the Statement of Experience, the experience required as specified in Section 00 45 16 STATEMENT OF EXPERIENCE, if that Section is included in the bidding documents. L. Evidence of Bidder's lack of sufficient resources,workforce, equipment or supervision, if required by inclusion of appropriate requirements in Section 00 45 16 STATEMENT OF EXPERIENCE. M. Evidence of poor performance on previous Projects as documented in Owner's project performance evaluations. N. Unbalanced Unit Price Bid: "Unbalanced Bid" means a Bid, which includes a Bid that is based on unit prices which are significantly less than cost for some Bid items and significantly more than cost for others. This may be evidenced by submission of unit price Bid items where the costs are significantly higher/lower than the costs of the same Bid items submitted by other Bidders on the project. O. Evidence of Bidder's lack of capacity to perform the Work. Evidence of Bidder's lack of capacity. Evidence of capacity to perform the Work will include a factual review of(i) all Invitation to Bid and Instructions to Bidders 002113-9 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 01-13-2016 remaining work or incomplete work items under any existing city or non-city contract; (ii) ability to perform the Work with remaining sufficient resources,workforce, equipment and supervision/supervisory staff; (iii) ability in the past to timely complete the same or similar work in a good and workmanlike manner utilizing same or similar remaining resources or under the same or similar conditions. Evidence of incomplete work items under any existing City-awarded IDIQ or other contract for similar work may constitute a lack of capacity to perform the Work. END OF SECTION Invitation to Bid and Instructions to Bidders 002113-10 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 01-13-2016 00 30 00 BID ACKNOWLEDGEMENT FORM ARTICLE 1—BID RECIPIENT 1.01 In accordance with the Drawings, Specifications, and Contract Documents, this Bid Proposal is submitted by_ (type or print name of company) on: [TBD]for IDIQ MINOR STREET IMPROVEMENTS PROJECT, PROJECT NO. E16250, E16251, E16252, E16253. 1.02 Submit Bids, Bid Security and all attachments to the Bid (See Section 7.01 below)to the City's electronic bidding website at www.civcastusa.com. If submitting hard copy bids or bid security in the form of a cashier's or certified check, please send to: The City of Corpus Christi,Texas City Secretary's Office 1201 Leopard Street Corpus Christi,Texas 78401 Attention: City Secretary Bid—IDIQ Minor Street Improvements Project, Project No. E16250, E16251,E16252, E16253 All envelopes and packages (including FEDEX envelopes) must clearly identify, on the OUTSIDE of the package, the project name and number and that bid documents are enclosed. ARTICLE 2—BIDDERS'S ACKNOWLEDGMENTS 2.01 Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner on the form included in the Contract Documents, to perform all Work specified or indicated in Contract Documents for the Contract Price indicated in this Bid or as modified by Contract Amendment. Bidder agrees to complete the Work within the Contract Times established in the Agreement or as modified by Contract Amendment and comply with the all other terms and conditions of the Contract Documents. 2.02 Bidder accepts all of the terms and conditions of SECTION 00 2113 INVITATION AND INSTRUCTIONS TO BIDDERS, including those dealing with required Bonds. The Bid will remain subject to acceptance for 90 days after the opening of Bids. 2.03 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of its failure to complete Work in accordance with the schedule set forth in the Agreement. 2.04 Bidder acknowledges receipt of the following Addenda: Addendum No. Addendum Date Signature Acknowledging Receipt Bid Acknowledgement Form 003000-1 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 ARTICLE 3—BIDDER'S REPRESENTATIONS 3.01 The Bidder has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. 3.02 The Bidder has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. 3.03 The Bidder is familiar with Laws and Regulations that may affect cost, progress, and performance of the Work. 3.04 The Bidder has carefully studied the following Site-related reports and drawings as identified in the Supplementary Conditions: A. Geotechnical Data Reports regarding subsurface conditions at or adjacent to the Site; B. Drawings of physical conditions relating to existing surface or subsurface structures at the Site; C. Underground Facilities referenced in reports and drawings; D. Reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site; and E. Technical Data related to each of these reports and drawings. 3.05 The Bidder has considered the: A. Information known to Bidder; B. Information commonly known to contractors doing business in the locality of the Site; C. Information and observations obtained from visits to the Site; and D. The Contract Documents. 3.06 The Bidder has considered the items identified in Paragraphs 3.04 and 3.05 with respect to the effect of such information, observations, and documents on: A. The cost, progress, and performance of the Work; B. The means, methods,techniques, sequences, and procedures of construction to be employed by Bidder; and C. Bidder's safety precautions and programs. 3.07 Based on the information and observations referred to in the preceding paragraphs, Bidder agrees that no further examinations, investigations, explorations,tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. 3.08 The Bidder is aware of the general nature of Work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. 3.09 The Bidder has correlated the information known to the Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and Bid Acknowledgement Form 003000-2 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. 3.10 The Bidder has given the OAR written notice of all conflicts, errors, ambiguities, or discrepancies that the Bidder has discovered in the Contract Documents, and the written resolution provided by the OAR is acceptable to the Bidder. 3.11 The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 3.12 Bidder's entry into this Contract constitutes an incontrovertible representation by Bidder that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. ARTICLE 4—BASIS OF BID 4.01 Bidder will complete the Work in accordance with the Contract Documents at the unit prices shown in the BID FORM. A. Extended amounts have been computed in accordance with Paragraph 13.03 of the General Conditions. B. Bidder acknowledges that the estimated quantities are not guaranteed, and final payment for all Unit Price items will be based on actual quantities provided, measured as provided in the Contract Documents. C. Unit Price and figures column will be used to compute the actual Bid price. ARTICLE 5—EVALUATION OF BIDDERS 5.01 The contract may be awarded either to the lowest responsible bidder or to the bidder who provides the best value for the Owner. The Owner will consider the amount bid,the Bidder's responsibility, the Bidder's safety record, the Bidder's indebtedness to Owner and whether the Bidder has met the minimum specific project experience requirements to determine the lowest responsible Bidder.The Owner reserves the right to waive any and all irregularities in determining the Bidders' responsibility or value, and whether the Bidder has met the minimum specific project experience requirements, and reserves the right to require the submission of additional information. 5.02 The Owner has the right to accept a Bid, reject any and all Bids, to waive any and all irregularities in the Bids, or to reject non-conforming, non-responsive or conditional Bids. In addition, the Owner reserves the right to reject any Bid where circumstances and developments have, in the opinion of the Owner, changed the responsibility of the Bidder. 5.03 Material misstatements in the documentation submitted to determine the Bidder's responsibility, including information submitted per SECTION 00 45 16 STATEMENT OF EXPERIENCE, may be grounds for rejection of the Bidder's Bid on this Project. Any such misstatement, if discovered after award of the Contract to such Bidder, may be grounds for immediate termination of the Contract. Additionally, the Bidder will be liable to the Owner for any additional costs or damages to the Owner resulting from such misstatements, including costs and attorney's fees for collecting such costs and damages. Bid Acknowledgement Form 003000-3 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 ARTICLE 6—TIME OF COMPLETION 6.01 Bidder will complete the Work required to be finally completed within 365 days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions. 6.02 Bidder agrees that the Work will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within the number of days indicated. ARTICLE 7—ATTACHMENTS TO THIS BID In compliance with the Bid Requirements in SECTION 00 2113 INVITATION TO BID AND INSTRUCTIONS TO BIDDERS,the following are made a condition of this Bid: A. Bid Security. B. SECTION 00 30 00 BID ACKNOWLEDGEMENT FORM and documentation of signatory authority. C. SECTION 00 30 01 BID FORM. D. SECTION 00 30 02 COMPLIANCE TO STATE LAW ON NONRESIDENT BIDDERS. E. SECTION 00 30 05 DISCLOSURE OF INTEREST. F. SECTION 00 30 06 NON-COLLUSION CERTIFICATION. ARTICLE 8—DEFINED TERMS 8.01 The terms used in this Bid have the meanings indicated in the General Conditions and the Supplementary Conditions. The significance of terms with initial capital letters is described in the General Conditions. ARTICLE 9—VENUE 9.01 Bidder agrees that venue shall lie exclusively in Nueces County,Texas for any legal action. ARTICLE 10—SIGNATORY REQUIREMENTS FOR BIDDERS 10.01 Bidders must include their correct legal name, state of residency, and federal tax identification number in the Bid Form. 10.02 The Bidder, or the Bidder's authorized representative, shall sign and date the Bid Form to accompany all materials included in the submitted Bid. Bids which are not signed and dated in this manner, or which do not contain the required documentation of signatory authority may be rejected as non-responsive. The individual(s) signing the Bid must have the authority to bind the Bidder to a contract, and if required, shall attach documentation of signatory authority to the Bid Form. 10.03 Bidders who are individuals ("natural persons" as defined by the Texas Business Organizations Code §1.002), but who will not be signing the Bid Form personally, shall include in their bid a notarized power of attorney authorizing the individual designated as their authorized representative to submit the Bid and to sign on behalf of the Bidder. Bid Acknowledgement Form 003000-4 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 10.04 Bidders that are entities who are not individuals shall identify in their Bid their charter or Certificate of Authority number issued by the Texas Secretary of State and shall submit with their Bid a copy of a resolution or other documentation approved by the Bidder's governing body authorizing the submission of the Bid and designating the individual(s) authorized to execute documents on behalf of the Bidder. Bidders using an assumed name (an "alias") shall submit a copy of the Certificate of Assumed Name or similar document. 10.05 Bidders that are not residents of the State of Texas must document their legal authority to conduct business in Texas. Nonresident Bidders that have previously registered with the Texas Secretary of State may submit a copy of their Certificate of Authority. Nonresident Bidders that have not previously registered with the Texas Secretary of State shall submit a copy of the Bidder's enabling documents as filed with the state of residency, or as otherwise existing. ARTICLE 11—BID SUBMITTAL 11.01 This Bid is submitted by: Bidder: (typed or printed full legal name of Bidder) By: (individual's signature) Name: (typed or printed) Title: (typed or printed) Attest: (individual's signature) State of Residency: Federal Tax Id. No. Address for giving notices: Phone: Email: (Attach evidence of authority to sign if the authorized individual is not the Bidder, but an individual signing on behalf of another individual Bidder, or if the authorized individual is a representative of a corporation, partnership, or joint venture.) END OF SECTION Bid Acknowledgement Form 003000-5 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 00 30 01 BID FORM EXHIBIT A Project IDIQ Minor Street Improvements Project Name: Project E16253 East 1A&E16252 East 1B Number: Owner: City of Corpus Christi Bidder: OAR: Designer: ECMS, LLC Felix H. Ocanas,Jr., P.E. Basis of Bid for Part 1A & 1B - East of Ayers Street Item DESCRIPTION UNIT ESTIMATED UNIT PRICE EXTENDEDAMOUNT QUANTITY Base Bid E16253 East 1A Part 1A-A-General(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) 1A-A1 Mobilization/Bonds/Ins/(not to exceed 5%-total bid) LS 1 1A-A2 Traffic Control, Residential Streets Day 280 1A-A3 Traffic Control,Arterial Streets Day 93 1A-A4 Ozone Days EA 5 SUBTOTAL PART 1A-A-GENERAL(Items 1A-A1 thru 1A-A4) Part 1A-B-STREET IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) 1A-131 Seal Coat, per single course SY 1,600 1A-132 Crack Seal,0-1"wide LF 1,000 Planing(Milling), 2" 1A-133 SY 1,600 1,000 to 2,000 SY minimum per Delivery Order Planing(Milling),Additional 1" 1A-134 SY 1,600 1000 to 2,000 SY minimum per Delivery Order 1A-135 Cement Stabilized Base with 4%Cement, existing limestone SY 700 base, 3-6", complete in place per SY Pot Hole Crew: Provide a 3-man pot hole repair crew to 8-Hr. 1A-136 80 include labor, materials, equipment& incidentals Day HMAC,Type"D" material for pot hole repair,TxDOT 1A-137 Standard Specification for Construction Item 340, including Ton 760 SS 1 emulsion for tack coat All-Season Pre-Coated Patching mixture (ASPPM),TxDOT 1A-138 Ton 760 DMS 9202.5, including SS1 emulsion for tack coat 1A-139 lAllowance for Unanticipated Street Improvements LS 1 $ 20,000.00 $ 20,000.00 Range 1 to 100 SY- Localized Flexible Pavement Structure Repairs with saw cutting existing roadway; subgrade, base and surface treatment/repair using asphalt concrete(HMAC). Items 1A-810 to 1A-814 1A-1310 Subgrade Repair up to 4-6" Depth (lime stabilization 6%) SY 100 1A-1311 Base Repair, Upper 2" Depth (Limestone) SY 3,000 1A-B12 Base Repair,Additional 1" Depth (Limestone) SY 6,000 1A-B13 Surface Treatment Repair Upper 2" HMAC SY 3,000 1A-B14 ISurface Treatment Repair Additional 1" Depth HMAC I SY 1 3,000 00 30 01 Bid Form Exhibit A Page 1 of 5 IDIQ Minor Street Pavement Improvements Project#E16253 East 1A#E16252 East 1B Rev 03-02-2016 00 30 01 BID FORM EXHIBIT A Item DESCRIPTION UNIT ESTIMATED I UNIT PRICE EXTENDEDAMOUNT QUANTITY Range 100 to 250 SY- Localized Flexible Pavement Structure Repairs with saw cutting existing roadway; subgrade, base and surface treatment/repair using asphalt concrete (HMAC). Items 1A-815 to 1A-819 1A-B15 Subgrade Repair up to 4-6" Depth (lime stabilization 6%) SY 100 1A-B16 Base Repair, Upper 2" Depth (Limestone) SY 2,400 1A-B17 Base Repair,Additional 1" Depth (Limestone) SY 7,000 1A-B18 Surface Treatment Repair Upper 2" HMAC SY 6,000 1A-B19 Surface Treatment Repair Additional 1" Depth HMAC SY 6,000 Range 250 to 1000 SY- Localized Flexible Pavement Structure Repairs with saw cutting existing roadway; subgrade, base and surface treatment/repair using asphalt concrete (HMAC). Items 1A-820 to 1A-824 1A-1320 Subgrade Repair up to 4-6" Depth (lime stabilization 6%) SY 112 1A-1321 Base Repair, Upper 2" Depth (Limestone) SY 6,000 1A-1322 Base Repair,Additional 1" Depth (Limestone) SY 6,000 1A-1323 Surface Treatment Repair Upper 2" HMAC SY 6,000 1A-B24 ISurface Treatment Repair Additional 1" Depth HMAC I SY 6,000 SUBTOTAL PART 1A-B-STREET IMPROVEMENTS(Items 1A-B1 thru 1A-B24) Part 1A-C-ADA IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) 1A-C1 New ADA Curb Ramp: Concrete Curb Ramps, meeting TDLR SF 300 requirements,complete in place 1A-C2 Remove& Replace ADA curb ramp: Removal & Replacement SF 300 of ADA ramps not in compliance w/TDLR SUBTOTAL PART 1A-C-ADA IMPROVEMENTS(1A-C1 THRU 1A-C2) Part 1A-D-DRAINAGE IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) 1A-D1 Removal & Replacement of Curb&Gutter, complete in place LF 1,000 Removal & Replacement of driveway approaches, complete 1A-D2 SF 1,000 and in place 1A-D3 Removal & Replacement of Sidewalks SF 500 Storm Water Manhole Ring&Cover Adjustment,w/new 1A-D4 Manhole Ring and Cover Assembly w/new Concrete Height Each 5 Adjustment Rings&w/Concrete Collar, complete in place SUBTOTAL PART 1A-D-DRAINAGE IMPROVEMENTS(1A-D1 THRU 1A-D4) Part 1A-E-WATER IMROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) 1A-E1 Water Valve Box Adjustment w/Concrete Collar, complete in Each 5 Fplace SUBTOTAL PART 1A-E-WATER IMPROVEMENTS(1A-E1) Part 1A-F-WASTEWATER IMROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) Sanitary Sewer Manhole Ring&Cover Adjustment, including 1A-F1 New Manhole Ring&Cover Assembly w/new HDPE Height Each 5 Adjustment Rings,Stainless Steel Inflow Inhibitor and w/ Concrete Collar, complete in place SUBTOTAL PART 1A-F-WASTEWATER IMPROVEMENTS(1A-F1) 00 30 01 Bid Form Exhibit A Page 2 of 5 IDIQ Minor Street Pavement Improvements Project#E16253 East 1A#E16252 East 1B Rev 03-02-2016 00 30 01 BID FORM EXHIBIT A Item DESCRIPTION UNIT ESTIMATED UNIT PRICE EXTENDEDAMOUNT QUANTITY Base Bid E16252 East 1B Part 1 B-A-General(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) 113-A1 Mobilization/Bonds/Ins/(not to exceed 5%-total bid) LS 1 1B-A2 Traffic Control, Residential Streets Day 130 1B-A3 Traffic Control,Arterial Streets Day 130 1B-A4 Ozone Days EA 2 SUBTOTAL PART 113-A-GENERAL(Items 113-A1 thru 1B-A4) Part 1 B-B-STREET IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) Planing(Milling), 2" 113-131 SY 1,000 1,000 to 2,000 SY minimum per Delivery Order Planing(Milling),Additional 1" 113-132 SY 1,000 1000 to 2,000 SY minimum per Delivery Order 113-133 Cement Stabilized Base with 4%Cement, existing limestone SY 300 base, 3-6", complete in place per SY 113-134 Allowance for Unanticipated Street Improvements j LS j 1 j $ 20,000.00 j $ 20,000.00 Range 1 to 100 SY- Localized Flexible Pavement Structure Repairs with saw cutting existing roadway; subgrade, base and surface treatment/repair using asphalt concrete(HMAC). Items 113-135 to 113-139 113-135 Subgrade Repair up to 4-6" Depth (lime stabilization 6%) SY 100 113-136 Base Repair, Upper 2" Depth (Limestone) SY 1,500 113-137 Base Repair,Additional 1" Depth (Limestone) SY 1,500 113-138 Surface Treatment Repair Upper 2" HMAC SY 1,500 113-139 ISurface Treatment Repair Additional 1" Depth HMAC I SY 1,500 Range 100 to 250 SY- Localized Flexible Pavement Structure Repairs with saw cutting existing roadway; subgrade, base and surface treatment/repair using asphalt concrete (HMAC). Items 1B-B10 to 113-1314 113-1310 Subgrade Repair up to 4-6" Depth (lime stabilization 6%) SY 100 113-1311 Base Repair, Upper 2" Depth (Limestone) SY 1,000 113-1312 Base Repair,Additional 1" Depth (Limestone) SY 1,000 113-1313 Surface Treatment Repair Upper 2" HMAC SY 1,000 113-1314 ISurface Treatment Repair Additional 1" Depth HMAC I SY 1 1,000 Range 250 to 1000 SY- Localized Flexible Pavement Structure Repairs with saw cutting existing roadway; subgrade, base and surface treatment/repair using asphalt concrete (HMAC). Items 1B-B15 to 113-1319 113-1315 Subgrade Repair up to 4-6" Depth (lime stabilization 6%) SY 100 113-1316 Base Repair, Upper 2" Depth (Limestone) SY 1,700 113-1317 Base Repair,Additional 1" Depth (Limestone) SY 1,700 113-1318 Surface Treatment Repair Upper 2" HMAC SY 1,700 113-1319 Surface Treatment Repair Additional 1" Depth HMAC SY 1,700 SUBTOTAL PART 113-13-STREET IMPROVEMENTS(Items 113-131 thru 113-1319) 00 30 01 Bid Form Exhibit A Page 3 of 5 IDIQ Minor Street Pavement Improvements Project#E16253 East 1A#E16252 East 1B Rev 03-02-2016 00 30 01 BID FORM EXHIBIT A Item DESCRIPTION UNIT ESTIMATED UNIT PRICE EXTENDEDAMOUNT QUANTITY Part 1113-C-ADA IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) 1B-C1 New ADA Curb Ramp: Concrete Curb Ramps, meeting TDLR SF 400 requirements,complete in place 1B-C2 Remove& Replace ADA curb ramp: Removal & Replacement SF 300 of ADA ramps not in compliance w/TDLR SUBTOTAL PART 113-C-ADA IMPROVEMENTS(113-C1 THRU 1B-C2) Part 1 B-D-DRAINAGE IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) 1B-D1 Removal & Replacement of Curb&Gutter, complete in place LF 1,000 Removal & Replacement of driveway approaches, complete 1B-D2 SF 1,000 and in place 1B-D3 Removal & Replacement of Sidewalks SF 500 Storm Water Manhole Ring&Cover Adjustment,w/new 1B-D4 Manhole Ring and Cover Assembly w/new Concrete Height Each 2 Adjustment Rings&w/Concrete Collar, complete in place SUBTOTAL PART 113-13-DRAINAGE IMPROVEMENTS(113-131 THRU 113-134) Part 113-E-WATER IMROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) 1B-E1 pl ater Valve Box Adjustment w/Concrete Collar, complete in Each 2 ace SUBTOTAL PART 113-E-WATER IMPROVEMENTS(113-E1) Part 1B-F-WASTEWATER IMROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) Sanitary Sewer Manhole Ring&Cover Adjustment, including 1B-F1 New Manhole Ring&Cover Assembly w/new HDPE Height Each 2 Adjustment Rings,Stainless Steel Inflow Inhibitor and w/ Concrete Collar, complete in place SUBTOTAL PART 1B-F-WASTEWATER IMPROVEMENTS(11341) 00 30 01 Bid Form Exhibit A Page 4 of 5 IDIQ Minor Street Pavement Improvements Project#E16253 East 1A#E16252 East 1B Rev 03-02-2016 00 30 01 BID FORM EXHIBIT A Item DESCRIPTION UNIT ESTIMATED I UNIT PRICE EXTENDEDAMOUNT QUANTITY PROJECT E16253 EAST 1A - BID SUMMARY - PART 1A SUBTOTAL PART 1A-A-GENERAL(Items 1A-A1 thru 1A-A4) SUBTOTAL PART 1A-B-STREET IMPROVEMENTS(Items 1A-B1 thru 1A-B24) SUBTOTAL PART 1A-C-ADA IMPROVEMENTS(Items 1A-C1 thru 1A-C2) SUBTOTAL PART 1A-D- DRAINAGE IMPROVEMENTS(Items 1A-D1 thru 1A-D4) SUBTOTAL PART 1A-E-WATER IMPROVEMENTS(Item 1A-E1) SUBTOTAL PART 1A-F-WASTEWATER IMPROVEMENTS(Item 1A-F1) TOTAL PROJECT BASE BID(PARTS 1A-A THRU 1A-F) PROJECT E16252 EAST 1B - BID SUMMARY - PART 1B SUBTOTAL PART 113-A-GENERAL(Items 113-A1 thru 1B-A4) SUBTOTAL PART 113-13-STREET IMPROVEMENTS(Items 113-131 thru 113-1319) SUBTOTAL PART 113-C-ADA IMPROVEMENTS(Items 113-C1 thru 1B-C2) SUBTOTAL PART 113-D- DRAINAGE IMPROVEMENTS(Items 1B-D1 thru 1B-D4) SUBTOTAL PART 113-E-WATER IMPROVEMENTS(Item 1B-E1) SUBTOTAL PART 113-F-WASTEWATER IMPROVEMENTS(Item 11341) TOTAL PROJECT BASE BID(PARTS 113-A THRU 1134) TOTAL PROJECT BASE BID(PARTS East 1A&East 1B) Contract Times Bidder agrees to reach Final Completion in 365 Days 00 30 01 Bid Form Exhibit A Page 5 of 5 IDIQ Minor Street Pavement Improvements Project#E16253 East 1A#E16252 East 1B Rev 03-02-2016 00 30 01 BID FORM EXHIBIT A Project IDIQ Minor Street Improvements Project Name: Project E16251 West 2A&E16250 West 2B Number: Owner: City of Corpus Christi Bidder: OAR: Designer: ECMS, LLC Felix H. Ocanas,Jr., P.E. Basis of Bid for Part 2A & 2B - West of Ayers Street Item DESCRIPTION UNIT ESTIMATED UNIT PRICE EXTENDED AMOUNT QUANTITY Base Bid E16251 West 2A Part 2A-A-General(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) 2A-A1 Mobilization/Bonds/Ins/(not to exceed 5%-total bid) LS 1 2A-A2 Traffic Control, Residential Streets Day 280 2A-A3 Traffic Control,Arterial Streets Day 93 2A-A4 Ozone Days EA 5 SUBTOTAL PART 2A-A-GENERAL(Items 2A-A1 thru 2A-A4) Part 2A-B-STREET IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) 2A-131 Seal Coat, per single course SY 1,600 2A-132 Crack Seal,0-1"wide LF 1,000 Planing(Milling), 2" 2A-133 SY 1,600 1,000 to 2,000 SY minimum per Delivery Order Planing(Milling),Additional 1" 2A-134 SY 1,600 1000 to 2,000 SY minimum per Delivery Order 2A-135 Cement Stabilized Base with 4%Cement, existing limestone SY 700 base, 3-6", complete in place per SY Pot Hole Crew: Provide a 3-man pot hole repair crew to 8-Hr. 2A-136 70 include labor, materials, equipment& incidentals Day HMAC,Type"D" material for pot hole repair,TxDOT 2A-137 Standard Specification for Construction Item 340, including Ton 660 SS 1 emulsion for tack coat All-Season Pre-Coated Patching mixture (ASPPM),TxDOT 2A-138 Ton 660 DMS 9202.5, including SS1 emulsion for tack coat 2A-139 lAllowance for Unanticipated Street Improvements LS 1 $ 20,000.00 $ 20,000.00 Range 1 to 100 SY- Localized Flexible Pavement Structure Repairs with saw cutting existing roadway; subgrade, base and surface treatment/repair using asphalt concrete (HMAC). Items 2A-1310 to 2A-B14 2A-1310 Subgrade Repair up to 4-6" Depth (lime stabilization 6%) SY 100 2A-1311 Base Repair, Upper 2" Depth (Limestone) SY 2,200 2A-B12 Base Repair,Additional 1" Depth (Limestone) SY 4,400 2A-B13 Surface Treatment Repair Upper 2" HMAC SY 2,200 2A-B14 ISurface Treatment Repair Additional 1" Depth HMAC I SY 2,200 00 30 01 Bid Form Exhibit A Page 1 of 5 IDIQ Minor Street Pavement Improvements Project#E16251 West 2A#E16250 West 2B Rev 03-02-2016 00 30 01 BID FORM EXHIBIT A Item DESCRIPTION UNIT ESTIMATED QUANTITY UNIT PRICE EXTENDED AMOUNT Range 100 to 250 SY- Localized Flexible Pavement Structure Repairs with saw cutting existing roadway; subgrade, base and surface treatment/repair using asphalt concrete (HMAC). Items 2A-B15 to 2A-B19 2A-B15 Subgrade Repair up to 4-6" Depth (lime stabilization 6%) SY 100 2A-B16 Base Repair, Upper 2" Depth (Limestone) SY 2,400 2A-B17 Base Repair,Additional 1" Depth (Limestone) SY 7,000 2A-B18 Surface Treatment Repair Upper 2" HMAC SY 6,000 2A-B19 ISurface Treatment Repair Additional 1" Depth HMAC I SY 6,000 Range 250 to 1000 SY- Localized Flexible Pavement Structure Repairs with saw cutting existing roadway; subgrade, base and surface treatment/repair using asphalt concrete (HMAC). Items 2A-B20 to 2A-B24 2A-B20 Subgrade Repair up to 4-6" Depth (lime stabilization 6%) SY 112 2A-B21 Base Repair, Upper 2" Depth (Limestone) SY 6,000 2A-B22 Base Repair,Additional 1" Depth (Limestone) SY 6,000 2A-B23 Surface Treatment Repair Upper 2" HMAC SY 6,000 2A-B24 ISurface Treatment Repair Additional 1" Depth HMAC I SY 6,000 SUBTOTAL PART 2A-B-STREET IMPROVEMENTS(Items 2A-131 thru 2A-B24) Part 2A-C-ADA IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) 2A-C1 New ADA Curb Ramp: Concrete Curb Ramps, meeting TDLR SF 300 requirements,complete in place 2A-C2 Remove& Replace ADA curb ramp: Removal & Replacement SF 300 of ADA ramps not in compliance w/TDLR SUBTOTAL PART 2A-C-ADA IMPROVEMENTS(2A-C1 THRU 2A-C2) Part 2A-D-DRAINAGE IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) 2A-D1 Removal & Replacement of Curb&Gutter, complete in place LF 3,000 Removal & Replacement of driveway approaches, complete 2A-D2 SF 2,000 and in place 2A-D3 Removal & Replacement of Sidewalks SF 1 1,000 Storm Water Manhole Ring&Cover Adjustment,w/new 2A-D4 Manhole Ring and Cover Assembly w/new Concrete Height Each 10 Adjustment Rings&w/Concrete Collar, complete in place SUBTOTAL PART 2A-D-DRAINAGE IMPROVEMENTS(2A-D1 THRU 2A-D4) Part 2A-E-WATER IMROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) Water Valve Box Adjustment w/Concrete Collar, complete in 2A-E1 Each 10 Fplace SUBTOTAL PART 2A-E-WATER IMPROVEMENTS(2A-E1) 00 30 01 Bid Form Exhibit A Page 2 of 5 IDIQ Minor Street Pavement Improvements Project#E16251 West 2A#E16250 West 2B Rev 03-02-2016 00 30 01 BID FORM EXHIBIT A Item DESCRIPTION UNIT ESTIMATED I UNIT PRICE EXTENDED AMOUNT QUANTITY Part 2A-F-WASTEWATER IMROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) Sanitary Sewer Manhole Ring&Cover Adjustment, including 2A-F1 New Manhole Ring&Cover Assembly w/new HDPE Height Each 10 Adjustment Rings,Stainless Steel Inflow Inhibitor and w/ Concrete Collar, complete in place SUBTOTAL PART 2A-F-WASTEWATER IMPROVEMENTS(2A-F1) Base Bid E16250 West 2B Part 213-A-General(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) 213-A1 Mobilization/Bonds/Ins/(not to exceed 5%-total bid) LS 1 2B-A2 Traffic Control, Residential Streets Day 130 2B-A3 Traffic Control,Arterial Streets Day 130 2B-A4 Ozone Days EA 2 SUBTOTAL PART 213-A-GENERAL(Items 213-A1 thru 2B-A4) Part 213-13-STREET IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) Planing(Milling), 2" 213-131 SY 1,000 1,000 to 2,000 SY minimum per Delivery Order Planing(Milling),Additional 1" 213-132 SY 1,000 1000 to 2,000 SY minimum per Delivery Order 213-133 Cement Stabilized Base with 4%Cement, existing limestone SY 300 base, 3-6", complete in place per SY 213-134 Allowance for Unanticipated Street Improvements LS 1 $ 20,000.00 $ 20,000.00 Range 1 to 100 SY- Localized Flexible Pavement Structure Repairs with saw cutting existing roadway; subgrade, base and surface treatment/repair using asphalt concrete (HMAC). Items 213-135 to 213-139 213-135 Subgrade Repair up to 4-6" Depth (lime stabilization 6%) SY 100 213-136 Base Repair, Upper 2" Depth (Limestone) SY 1,000 213-137 Base Repair,Additional 1" Depth (Limestone) SY 1,000 213-138 Surface Treatment Repair Upper 2" HMAC SY 1,000 213-139 ISurface Treatment Repair Additional 1" Depth HMAC I SY 1 1,000 Range 100 to 250 SY- Localized Flexible Pavement Structure Repairs with saw cutting existing roadway; subgrade, base and surface treatment/repair using asphalt concrete (HMAC). Items 213-1310 to 213-1314 213-1310 Subgrade Repair up to 4-6" Depth (lime stabilization 6%) SY 100 213-1311 Base Repair, Upper 2" Depth (Limestone) SY 1,500 213-1312 Base Repair,Additional 1" Depth (Limestone) SY 1,500 213-1313 Surface Treatment Repair Upper 2" HMAC SY 1,500 213-1314 ISurface Treatment Repair Additional 1" Depth HMAC I SY 1,500 Range 250 to 1000 SY- Localized Flexible Pavement Structure Repairs with saw cutting existing roadway; subgrade, base and surface treatment/repair using asphalt concrete (HMAC). Items 213-1315 to 213-1319 213-1315 Subgrade Repair up to 4-6" Depth (lime stabilization 6%) SY 100 213-1316 Base Repair, Upper 2" Depth (Limestone) SY 1,500 213-1317 Base Repair,Additional 1" Depth (Limestone) SY 1,500 213-1318 Surface Treatment Repair Upper 2" HMAC SY 1,500 213-1319 Surface Treatment Repair Additional 1" Depth HMAC SY 1,500 SUBTOTAL PART 213-13-STREET IMPROVEMENTS(Items 213-131 thru 213-1319) 00 30 01 Bid Form Exhibit A Page 3 of 5 IDIQ Minor Street Pavement Improvements Project#E16251 West 2A#E16250 West 2B Rev 03-02-2016 00 30 01 BID FORM EXHIBIT A Item DESCRIPTION UNIT ESTIMATED I UNIT PRICE EXTENDED AMOUNT QUANTITY Part 213-C-ADA IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) 213-C1 New ADA Curb Ramp: Concrete Curb Ramps, meeting TDLR SF 300 requirements,complete in place 213-C2 Remove& Replace ADA curb ramp: Removal & Replacement SF 300 of ADA ramps not in compliance w/TDLR SUBTOTAL PART 213-C-ADA IMPROVEMENTS(213-C1 THRU 2B-C2) Part 2B-D-DRAINAGE IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) 213-D1 Removal & Replacement of Curb&Gutter, complete in place LF 1,000 Removal & Replacement of driveway approaches, complete 2B-D2 SF 1,300 and in place 213-D3 Removal & Replacement of Sidewalks SF 500 Storm Water Manhole Ring&Cover Adjustment,w/new 213-D4 Manhole Ring and Cover Assembly w/new Concrete Height Each 4 Adjustment Rings&w/Concrete Collar, complete in place SUBTOTAL PART 2B-D-DRAINAGE IMPROVEMENTS(2B-D1 THRU 2B-D4) Part 213-E-WATER IMROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) 2B-E1 pl ater Valve Adjustment w/Concrete Collar, complete in Each 5 ace SUBTOTAL PART 213-E-WATER IMPROVEMENTS(213-E1) Part 2B-F-WASTEWATER IMROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) Sanitary Sewer Manhole Ring&Cover Adjustment, including 213-F1 New Manhole Ring&Cover Assembly w/new HDPE Height Each 5 Adjustment Rings,Stainless Steel Inflow Inhibitor and w/ Concrete Collar, complete in place SUBTOTAL PART 2B-F-WASTEWATER IMPROVEMENTS(21341) 00 30 01 Bid Form Exhibit A Page 4 of 5 IDIQ Minor Street Pavement Improvements Project#E16251 West 2A#E16250 West 2B Rev 03-02-2016 00 30 01 BID FORM EXHIBIT A Item DESCRIPTION UNIT ESTIMATED UNIT PRICE EXTENDED AMOUNT QUANTITY PROJECT E16251 WEST 2A - BID SUMMARY PART 2A SUBTOTAL PART 2A-A-GENERAL(Items 2A-A1 thru 2A-A4) SUBTOTAL PART 2A-B-STREET IMPROVEMENTS(Items 2A-131 thru 2A-B24) SUBTOTAL PART 2A-C-ADA IMPROVEMENTS(Items 2A-C1 thru 2A-C2) SUBTOTAL PART 2A-D- DRAINAGE IMPROVEMENTS(Items 2A-D1 thru 2A-D4) SUBTOTAL PART 2A-E-WATER IMPROVEMENTS(Item 2A-E1) SUBTOTAL PART 2A-F-WASTEWATER IMPROVEMENTS(Item 2A-F1) TOTAL PROJECT BASE BID(PARTS 2A-A THRU 2A-F) PROJECT E16250 WEST 2B - BID SUMMARY PART 2B SUBTOTAL PART 213-A-GENERAL(Items 213-A1 thru 2B-A4) SUBTOTAL PART 213-13-STREET IMPROVEMENTS(Items 213-131 thru 213-1319) SUBTOTAL PART 213-C-ADA IMPROVEMENTS(Items 2B-C1 thru 2B-C2) SUBTOTAL PART 213-D- DRAINAGE IMPROVEMENTS(Items 2B-D1 thru 2B-D4) SUBTOTAL PART 213-E-WATER IMPROVEMENTS(Item 2B-E1) SUBTOTAL PART 2B-F-WASTEWATER IMPROVEMENTS(Item 21341) TOTAL PROJECT BASE BID(PARTS 213-A THRU 2134) TOTAL PROJECT BASE BID(PARTS West 2A&West 2B) Contract Times Bidder agrees to reach Final Completion in 365 Days 00 30 01 Bid Form Exhibit A Page 5 of 5 IDIQ Minor Street Pavement Improvements Project#E16251 West 2A#E16250 West 2B Rev 03-02-2016 00 30 02 COMPLIANCE TO STATE LAW ON NONRESIDENT BIDDERS Chapter 2252 of the Texas Government Code applies to the award of government contract to nonresident bidders. This law provides that: "a government entity may not award a governmental contract to a nonresident bidder unless the nonresident underbids the lower bid submitted by a responsible resident bidder by an amount that is not less than the amount by which a resident bidder would be required to underbid the nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located." "Nonresident bidder" refers to a person who is not a resident of Texas. "Resident bidder" refers to a person whose principal place of business is in this state, including a contractor whose ultimate parent company or majority owner has its principal place of business in this state. Check the statement that is correct for Bidder. ❑ Bidder qualifies as a nonresident bidder whose principal place of business or residency is in the State of ❑ Bidder (includes parent company or majority owner) qualifies as a resident bidder whose principal place of business is in the State of Texas. The Owner will use the information provided in the State of Texas Comptroller's annual publication of other states' laws on contracts to evaluate the Bids of nonresident Bidders. Bidder: Company Name: (typed or printed) By: (signature--attach evidence of authority to sign) Name: (typed or printed) Title: Business address: Phone: Email: END OF SECTION Compliance to State Law on Nonresident Bidders 003002-1 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 00 30 05 City of Corpus Christi Disclosure of Interest SUPPLIER NUMBER TO BE ASSIGNED BYCTr'Y-- PURCHASING DIVISION ~ f CITY OF CORPUS CHRISTI City of Carpus DISCLOSURE OF INTEREST Christi City of Corpus Christi Ordinance 17112,as amended,requires all persons or firms seeking to do business with the City to provide the following information. Every question must be answered. If the question is not applicable, answer with "NA". See reverse side for Filing Requirements, Certifications and definitions. COMPANY NAME: P.O.BOX: STREET ADDRESS: CITY: ZIP: - FIRM IS: 1. Corporation 8 2. Partnership 8 3. Sole Owner ❑ 4. Association S. Other DISCLOSURE QUESTIONS If additional space is necessary,please use the reverse side of this page or attach separate sheet. 1. State the names of each "employee" of the City of Corpus Christi having an "ownership interest" constituting 3%or more of the ownership in the above named"firm." Name Job Title and City Department(if known) 2. State the names of each "official" of the City of Corpus Christi having an "ownership interest" constituting 3%or more of the ownership in the above named"firm." Name Title 3. State the names of each"board member" of the City of Corpus Christi having an "ownership interest" constituting 3%or more of the ownership in the above named"firm." Name Board,Commission or Committee 4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi who worked on any matter related to the subject of this contract and has an "ownership interest" constituting 3%or more of the ownership in the above named"firm." Name Consultant City of Corpus Christi 003005-1 Disclosure of Interest Rev 01-13-2016 FILING REQUIREMENTS If a person who requests official action on a matter knows that the requested action will confer an economic benefit on any City official or employee that is distinguishable from the effect that the action will have on members of the public in general or a substantial segment thereof,you shall disclose that fact in a signed writing to the City official,employee or body that has been requested to act in the matter, unless the interest of the City official or employee in the matter is apparent. The disclosure shall also be made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2-349(d)] CERTIFICATION I certify that all information provided is true and correct as of the date of this statement,that I have not knowingly withheld disclosure of any information requested; and that supplemental statements will be promptly submitted to the City of Corpus Christi,Texas as changes occur. Certifying Person: Title: Signature of Certifying Date: Person: DEFINITIONS a. "Board member." A member of any board, commission, or committee appointed by the City Council of the City of Corpus Christi,Texas. b. "Economic benefit". An action that is likely to affect an economic interest if it is likely to have an effect on that interest that is distinguishable from its effect on members of the public in general or a substantial segment thereof. c. "Employee." Any person employed by the City of Corpus Christi, Texas either on a full or part- time basis,but not as an independent contractor. d. "Firm." Any entity operated for economic gain,whether professional, industrial or commercial,and whether established to produce or deal with a product or service, including but not limited to,entities operated in the form of sole proprietorship, as self-employed person, partnership, corporation,joint stock company,joint venture, receivership or trust, and entities which for purposes of taxation are treated as non-profit organizations. e. "Official." The Mayor, members of the City Council, City Manager, Deputy City Manager, Assistant City Managers, Department and Division Heads,and Municipal Court Judges of the City of Corpus Christi,Texas. f. "Ownership Interest." Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent, trust, estate, or holding entity. "Constructively held" refers to holdings or control established through voting trusts, proxies, or special terms of venture or partnership agreements." g. "Consultant."Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the purpose of professional consultation and recommendation. City of Corpus Christi 003005-2 Disclosure of Interest Rev 01-13-2016 00 30 06 NON-COLLUSION CERTIFICATION STATE OF TEXAS COUNTY OF NUECES OWNER: City of Corpus Christi,Texas 1201 Leopard Street Corpus Christi,Texas 78401 CONTRACT: IDIQ Minor Street Improvements Project Project Number- E16250, E16251, E16252, E16253 Bidder certifies that it has not been a party to any collusion among Bidders in the restraint of freedom of competition by agreement to submit a Bid at a fixed price or to refrain from bidding; or with any official or employee of the Owner as to quantity, quality, or price in the prospective contract, or any other terms of said prospective contract; or in any discussion between Bidders and any official of the Owner concerning exchange of money or other thing of value for special consideration in the letting of a contract. Company Name: (typed or printed) By: (signature--attach evidence of authority to sign) Name: (typed or printed) Title: Business address: Phone: Email: END OF SECTION Non-Collusion Certification 003006-1 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 11-25-2013 00 45 16 STATEMENT OF EXPERIENCE ARTICLE 1—REQUIREMENT TO PROVIDE A STATEMENT OF EXPERIENCE 1.01 To be considered a responsive Bidder, the three lowest Bidders must complete and submit the Statement of Experience within 5 days after the date Bids are due to demonstrate the Bidders' responsibility and ability to meet the minimum requirements to complete the Work. Failure to submit the required information in the Statement of Experience may result in the Owner considering the Bid non-responsive and result in rejection of the Bid by the Owner. The Bid Security of the Bidder will be forfeited if Bidder fails to deliver the Statement of Experience in an attempt to be released from its Bid. Bidders may be required to provide supplemental information if requested by the Owner to clarify, enhance or supplement the information provided in the Statement of Experience. 1.02 Bidders must provide the information requested in this Statement of Experience using the forms attached to this Section. A copy of these forms can be provided in Microsoft Word to assist with the preparation of the Statement of Experience. Information in these forms must be provided completely and in detail. Information that cannot be totally incorporated in the form may be included in an attachment to the form. This attachment must be clearly referenced by attachment number in the form, and the attached material must include the attachment number on every sheet of the attachment. The attachment must include only the information that responds to the question or item number to which the attachment information applies. 1.03 The Bidder may also be required to supply a financial statement, prepared no later than 90 days prior to the City Engineer's request, signed and dated by the Bidder's owner, president or other authorized party, specifying all current assets and liabilities. ARTICLE 2—EXPERIENCE REQUIREMENTS 2.01 The Bidder agrees that, in addition to determining the apparent low Bid, the Owner will consider the responsiveness of the Bids and the responsibility of the Bidders in awarding a Contract for this Project. Information that indicates the Bidder or a Subcontractor is not responsible or that might negatively impact a Bidder's ability to complete the Work within the Contract Time and for the Contract Price may result in the Owner rejecting the Bid. 2.02 If none of the three apparent low Bidders are deemed responsible, the Owner may notify the next apparent low Bidders in order, who will then be required to submit the Statement of Experience for review, until a Contract is awarded or all Bids have been rejected. 2.03 The Bidder is responsible for the accuracy and completeness of all of the information provided by the Bidder or a proposed Subcontractor in response to this Statement of Experience. 2.04 Provide general information about the organization as required in Table 1. Describe the organizational structure of the Bidder's organization as it relates to this Project in Table 2. 2.05 Provide resumes for the key personnel that will be actively working on this Project. A. Key personnel include the Project Manager, Project Superintendent, Safety Manager and Quality Control Manager. If key personnel are to fulfill more than one of the roles listed above, provide a written narrative describing how much time will be devoted to each function, their qualifications to fulfill each role, and the percentage of their time that will be devoted to each role. If the individual is not to be devoted solely to this Project, indicate how that individual's time is to be divided between this Project and other assignments. B. The Bidder may provide resumes for an alternate individual if the Bidder is not able to commit to one individual for the Project at the time the Bid is submitted. Qualifications of these individuals will be considered in determining whether the experience of the Bidder meets the minimum requirements. The Bidder must provide the services of the proposed key personnel for the life of the Project as a condition of Statement of Experience 004516-1 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 10-6-2015 qualification. Failure to provide the proposed Key Personnel may result in the disqualification of the Bidder and may void the award of the Contract. C. Provide information for each primary and alternate candidate that includes: technical experience, managerial experience,education and formal training and a work history which describes project experience, including the roles and responsibilities for each assignment. Additional information demonstrating experience that meets the minimum requirements should also be included. D. The Project Manager and Project Superintendent must have at least 5 years of recent experience in the management and oversight of projects of a similar size and complexity to this Project. This experience must include scheduling of manpower and materials, safety, coordination of Subcontractors, experience with the submittal process, Federal and State wage rate requirements and contract close-out procedures. The Project Superintendent is to be present at the Site at all times that Work is being performed. Foremen must have at least 5 years of recent experience in similar work and be subordinate to the Project Superintendent. Foremen cannot act as a superintendent without prior written approval from the Owner. 2.06 Provide information on the project experience and past performance of the organization. A. Provide information on projects that have been awarded to the Organization in the last 5 years in Table 3. Attach additional pages if necessary. Experience must include the satisfactory completion of at least five similar projects within the last 5 years for the Bidder's organization that are equal to or greater in size and magnitude than the current Project. B. In determining the responsibility of the Bidder, the Owner will consider the Bidder's past projects and any substandard quality of workmanship on completed projects. The Owner will consider whether the Bidder's past project experience shows substandard quality of workmanship, issues related to a substandard appearance of the completed work, the amount of warranty or rework required, problems with durability and maintainability of the completed project, and problems with the lack of quality of documentation provided. In addition to the work produced, the Owner may consider issues related to the quality of construction practices, responsiveness to the owner's needs during construction, an inability to work in the spirit of partnering and any non-responsiveness of the Bidder to make warranty corrections. Information to make this determination will come from Owner's interviews with references provided for this project. By listing reference contact information in this Statement of Experience, Bidder indicates its approval for OPT to contact the individuals listed as a reference. ARTICLE 3—PROVIDE INFORMATION TO DEMONSTRATE THE ABILITY OF THE BIDDER TO PROVIDE SUBCONTRACTING OPPORTUNITIES THAT WILL MEET THE OWNER'S ESTABLISHED GOALS FOR MINORITY, MBE,AND DBE PARTICIPATION IN THE PROJECT. LIST ALL WORK TO BE PERFORMED BY QUALIFIED MINORITY,MBE AND DBE-PROPOSED SUBCONTRACTORS OR SUPPLIERS IN TABLE 4. INCLUDE PERCENTAGES OF WORK SUBCONTRACTED TO EACH TO DEMONSTRATE COMPLIANCE WITH OWNER'S STATED GOALS.STATEMENT OF EXPERIENCE REQUIREMENTS 3.01 Provide one printed copy of the Statement of Experience using the referenced tables and narrative descriptions as described in Article 2. Pages are to be 8-1/2 x 11 pages using a minimum font size of 10. A limited number of 11 x 17 sheets may be used, and must be folded to the size of an 8-1/2 x 11 page. 3.02 Provide a digital copy of the Statement of Experience in Portable Document Format(PDF) on a CD, portable drive, or other digital recording device. This digital copy is to include all information required to evaluate the Bid and should match the content of the printed copy of the Bid. When creating the digital copy: A. Create PDF documents from native format files. B. Rotate pages so that the top of the document appears at the top of the file when opened in PDF viewing software. Statement of Experience 004516-2 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 10-6-2015 C. Submit PDF documents with adequate resolution to allow documents to be printed in a format equivalent to the original documents. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. D. Submit color PDF documents if color is used in the printed version of the documents. Statement of Experience 004516-3 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 10-6-2015 Table 1—Organization Information Organization doing business as: Business Address of Principal Office Telephone No. I Website Form of Business (check one) ❑ Corporation ❑ Partnership ❑ Individual If a Corporation State of Incorporation Date of Incorporation Chief Executive Officer's Name President's Name Vice President's Name(s) Secretary's Name Treasurer's Name If a Partnership Date of Organization Form of Partnership: ❑ General ❑ Limited If an Individual Name Ownership of Organization List of companies, firms, or organizations that own any part of the organization. Names of Companies, Firms, or Organizations Percent Ownership Organization History List of names that this organization currently, has, or anticipates operating under including the names of related companies presently doing business. Names of Organizations From Date To Date Indicators of Organization Size Average number of current full-time employees Average estimate of revenue for the current year Statement of Experience 004516-4 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 10-6-2015 Table 1—Organization Information Organization doing business as: Previous History with City of Corpus Christi List the 5 most recent projects that have been completed with the City of Corpus Christi. Project Name Year 1 2 3 4 5 Construction Site Safety Experience Provide Bidders Experience Modification Ratio (EMR) History for the last 3 years. Provide documentation of the EMR. Year EMR Year EMR Year EMR Previous Bidding and Construction Experience Has Bidder or a predecessor organization been disqualified as a bidder within the last 10 years? List Projects below and provide full details in a separate attachment if yes. Has Bidder or a predecessor organization been released from a bid or proposal in the past 10 years? List Projects below and provide full details in a separate attachment if yes. Has Bidder or a predecessor organization ever defaulted on a project or failed to complete any work awarded to it? List Projects below and provide full details in a separate attachment if yes. Has Bidder or a predecessor organization been involved in claims or litigation involving project owners within the last 10 years? List Projects below and provide full details in a separate attachment if yes. Have liens or claims for outstanding unpaid invoices been filed against the Bidder for services or materials on any projects begun within the preceding 3 years? Specify the name and address of the party holding the lien or making the claim, the amount and basis for the lien or claim, and an explanation of why the lien has not been released or that the claim has not been paid if yes. Statement of Experience 004516-5 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 10-6-2015 Table 2—Project Information Organization doing business as: Proposed Project Organization Provide a brief description of the organizational structure proposed for this project indicating the names and functional roles of proposed key personnel and alternates. Provide resumes for Project Manager,Superintendent, Safety Manager and Quality Control Manager. Position Primary Alternate Project Manager Superintendent Safety Manager Quality Control Manager Division of work between Bidder and Proposed Subcontractor and Suppliers Provide a list of Work to be self-performed by the Bidder and the Work contracted to Subcontractors and Suppliers for more than 10 percent of the Work(based on estimated subcontract or purchase order amounts and the Contract Price). Description of Work Name of Entity Performing the Estimated Percentage Work of Contract Price Subcontractor Construction Site Safety Experience Provide Experience Modification Ratio (EMR) History for the last 3 years for Subcontractors that will provide Work valued at 25%or more of the Contract Price. Provide documentation of the EMR. Subcontractor Year EMR Year EMR Year EMR Subcontractor Year EMR Year EMR Year EMR Statement of Experience 004516-6 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 10-6-2015 Table 3—Projects Awarded during the Last 5 Years Organization doing business as: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Final Contract #Contract # Days Contract Price Price Days Late Issues/Claims/ Litigation: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Final Contract #Contract # Days Contract Price Price Days Late Issues/Claims/ Litigation: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Final Contract #Contract # Days Contract Price Price Days Late Issues/Claims/ Litigation: Statement of Experience 004516-7 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 10-6-2015 Table 3—Projects Awarded during the Last 5 Years—Not including City of Corpus Christi Projects Organization doing business as: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Final Contract #Contract # Days Contract Price Price Days Late Issues/Claims/ Litigation: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Final Contract #Contract # Days Contract Price Price Days Late Issues/Claims/ Litigation: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Final Contract #Contract # Days Contract Price Price Days Late Issues/Claims/ Litigation: Statement of Experience 004516-8 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 10-6-2015 Statement of Experience 004516-9 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 10-6-2015 Table 3—Projects Awarded during the Last 5 Years—Not including City of Corpus Christi Projects Organization doing business as: Project Information Project Description Name Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Final Contract #Contract # Days Contract Price Price Days Late Issues/Claims/ Litigation: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Final Contract #Contract # Days Contract Price Price Days Late Issues/Claims/ Litigation: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Final Contract #Contract # Days Contract Price Price Days Late Issues/Claims/ Litigation: Statement of Experience 004516-10 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 10-6-2015 Statement of Experience 004516-11 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 10-6-2015 Table 4—Demonstrated Minority, MBE, DBE Participation Organization doing business as Project Subcontractors and Suppliers Provide a list of anticipated Minority, MBE, DBE Subcontractors or Suppliers contracts that will be used to demonstrate compliance with the Owner's Minority/ MBE/ DBE Participation Policy Name Work to be Provided Estimated%of Contract Price Statement of Experience 004516-12 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 10-6-2015 ARTICLE 4—CERTIFICATION 4.01 By submitting this Statement of Experience and related information, Bidder certifies that it has read this Statement of Experience and that Bidder's responses are true and correct and contain no material misrepresentations and that the individual signing below is authorized to make this certification on behalf of the Bidder's organization. The individual signing this certification shall attach evidence of individual's authority to bind the organization to an agreement. Bidder: (typed or printed) By: (individual's signature) Name: (typed or printed) Title: (typed or printed) Designated Representative: Name: Title: Address: Telephone No.: Email: END OF SECTION Statement of Experience 004516-13 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 10-6-2015 00 52 23 AGREEMENT This Agreement, for the Project awarded on (TBD) is between the City of Corpus Christi (Owner) and (Contractor). Owner and Contractor agree as follows: ARTICLE 1—WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as: IDIQ MINOR STREET IMPROVEMENTS PROJECT PROJECT NO. E16250, E16251, E16252, E16253 ARTICLE 2—DESIGNER AND OWNER'S AUTHORIZED REPRESENTATIVE 2.01 The Project has been designed by: ECMS, LLC Felix H. Ocanas,Jr., P.E. 5001 Oakmont Drive Corpus Christi TX 78413 2.02 The Owner's Authorized Representative for this Project is: (TBD) ARTICLE 3—CONTRACT TIMES 3.01 Contract Times A. The Work is required to be completed within 365 days after the date when the Contract Times commence to run as provided in the Notice to Proceed and is to be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 365 days after the date when the Contract Times commence to run. B. Milestones, and the dates for completion of each, are as defined in SECTION 0135 00 SPECIAL PROCEDURES. (NOT USED) 3.02 Liquidated Damages A. Owner and Contractor recognize that time limits for specified Milestones, Substantial Completion, and completion and readiness for Final Payment as stated in the Contract Documents are of the essence of the Contract. Owner and Contractor recognize that the Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 3.01 and as adjusted in accordance with Paragraph 11.05 of the General Conditions. Owner and Contractor also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if Agreement 005223-1 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty): 1. Substantial Completion: Contractor shall pay Owner$500 for each day that expires after the time specified in Paragraph 3.01 for Substantial Completion until the Work is substantially complete. 2. Completion of the Remaining Work: Contractor agrees to pay Owner$500 for each day that expires after the time specified in Paragraph 3.01 for completion and readiness for final payment until the Work is completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions. 3. Liquidated damages for failing to timely attain Substantial Completion and Final Completion are not additive and will not be imposed concurrently. 4. Milestones: Contractor agrees to pay Owner liquidated damages as stipulated in SECTION 0135 00 SPECIAL PROCEDURES for failure to meet Milestone completions. 5. The Owner will determine whether the Work has been completed within the Contract Times. B. Owner is not required to only assess liquidated damages, and Owner may elect to pursue its actual damages resulting from the failure of Contractor to complete the Work in accordance with the requirements of the Contract Documents. ARTICLE 4—CONTRACT PRICE 4.01 Owner will pay Contractor for completion of the Work in accordance with the Contract Documents at the unit prices shown in the attached BID FORM. Unit prices have been computed in accordance with Paragraph 13.03 of the General Conditions. Contractor acknowledges that estimated quantities are not guaranteed, and were solely for the purpose of comparing Bids, and final payment for all unit price items will be based on actual quantities, determined as provided in the Contract Documents. Total Base Bid Price $ ARTICLE 5—PAYMENT PROCEDURES 5.01 Submit Applications for Payment in accordance with Article 15 of the General Conditions. Applications for Payment will be processed by the OAR as provided in the General Conditions. 5.02 Progress Payments; Retainage: A. The Owner will make progress payments on or about the 25th day of each month during performance of the Work. Payment is based on Work completed in accordance with the Schedule of Values established as provided in the General Conditions. B. Progress payments equal to 95 percent of the total earned value to date for completed Work and properly stored materials will be made prior to Substantial Completion. The balance will be held as retainage. Agreement 005223-2 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 C. Payment will be made for the amount determined per Paragraph 5.02.13, less the total of payments previously made and less set-offs determined in accordance with Paragraph 15.01 of the General Conditions. D. At the Owner's option, retainage may be required at a higher percentage rate if progress on the Project is considered to be unsatisfactory. If retainage in excess of the amount described above is held prior to Substantial Completion, the Owner will place the additional amount in an interest bearing account. Interest will be paid in accordance with Paragraph 6.01. E. At the Owner's option, Owner may pay Contractor 100 percent of the Work completed, less amounts withheld in accordance with Paragraph 15.01 of the General Conditions and less 200 percent of OAR's estimate of the value of Work to be completed or corrected to reach Substantial Completion. Owner may, at its sole discretion, elect to hold retainage in the amounts set forth above for progress payments prior to Substantial Completion if Owner has concerns with the ability of the Contractor to complete the remaining Work in accordance with the Contract Documents or within the time frame established by this Agreement. Release or reduction in retainage is contingent upon and consent of surety to the reduction in retainage. 5.03 Owner will pay the remainder of the Contract Price as recommended by OAR in accordance with Paragraph 15.06 of the General Conditions upon Final Completion and acceptance of the Work. ARTICLE 6—INTEREST ON OVERDUE PAYMENTS AND RETAINAGE 6.01 The Owner is not obligated to pay interest on overdue payments except as required by Texas Government Code Chapter 2251. 6.02 The Owner is not obligated to pay interest on moneys not paid except as provided in Texas Government Code Chapter 2252. ARTICLE 7—CONTRACTOR'S REPRESENTATIONS 7.01 The Contractor makes the following representations: A. The Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. B. The Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. The Contractor is familiar with Laws and Regulations that may affect cost, progress, and performance of the Work. D. The Contractor has carefully studied the following Site-related reports and drawings as identified in the Supplementary Conditions: 1. Geotechnical Data Reports regarding subsurface conditions at or adjacent to the Site; 2. Drawings of physical conditions relating to existing surface or subsurface structures at the Site; Agreement 005223-3 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 3. Underground Facilities referenced in reports and drawings; 4. Reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site; and 5. Technical Data related to each of these reports and drawings. E. The Contractor has considered the: 1. Information known to Contractor; 2. Information commonly known to contractors doing business in the locality of the Site; 3. Information and observations obtained from visits to the Site; and 4. The Contract Documents. F. The Contractor has considered the items identified in Paragraphs 7.01.D and 7.01.E with respect to the effect of such information, observations, and documents on: 1. The cost, progress, and performance of the Work; 2. The means, methods, techniques, sequences, and procedures of construction to be employed by Contractor; and 3. Contractor's safety precautions and programs. G. Based on the information and observations referred to in the preceding paragraphs, Contractor agrees that no further examinations, investigations, explorations,tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. H. The Contractor is aware of the general nature of Work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. I. The Contractor has correlated the information known to the Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations,tests, studies, and data with the Contract Documents. J. The Contractor has given the OAR written notice of all conflicts, errors, ambiguities, or discrepancies that the Contractor has discovered in the Contract Documents, and the written resolution provided by the OAR is acceptable to the Contractor. K. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. L. Contractor's entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. ARTICLE 8—ACCOUNTING RECORDS 8.01 Accounting Record Availability: The Contractor shall keep such full and detailed accounts of materials incorporated and labor and equipment utilized for the Work consistent with the requirements of Paragraph 13.01 of the General Conditions and as may be necessary for proper Agreement 005223-4 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 financial management under this Agreement. Subject to prior written notice, the Owner shall be afforded reasonable access during normal business hours to all of the Contractor's records, books, correspondence, instructions, drawings, receipts, vouchers, memoranda, and similar data relating to the Cost of the Work and the Contractor's fee. The Contractor shall preserve all such documents for a period of 3 years after the final payment by the Owner. ARTICLE 9—CONTRACT DOCUMENTS 9.01 Contents: A. The Contract Documents consist of the following: 1. Specifications, forms, and documents listed in SECTION 00 0100 TABLE OF CONTENTS. 2. Drawings listed in the Sheet Index. 3. Addenda. 4. Exhibits to this Agreement: a. Contractor's Bid Form. 5. Documentation required by the Contract Documents and submitted by Contractor prior to Notice of Award. B. There are no Contract Documents other than those listed above in this Article. C. The Contract Documents may only be amended, modified, or supplemented as provided in Article 11 of the General Conditions. ARTICLE 10—CONTRACT DOCUMENT SIGNATURES One original of the signed Agreement will be required. The sequence of signatures will be completed in the following order: A. CONTRACTOR—Agreement must be signed by a person authorized to bind the firm or company. If Contractor is a Corporation, agreements must be Attested; B. ASSISTANT CITY ATTORNEY for the City; C. DIRECTOR OF ENGINEERING SERVICES; D. CITY SECRETARY for the City Agreement 005223-5 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 ATTEST CITY OF CORPUS CHRISTI Rebecca Huerta J.H. Edmonds, P.E. City Secretary Director of Engineering Services APPROVED AS TO LEGAL FORM: Janet L. Kellogg Assistant City Attorney ATTEST(IF CORPORATION) CONTRACTOR (Seal Below) By: Note: Attach copy of authorization to sign if Title: person signing for CONTRACTOR is not President, Vice President, Chief Executive Officer,or Chief Financial Officer Address City State Zip Phone Fax EMail END OF SECTION Agreement 005223-6 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 00 61 13 PERFORMANCE BOND BOND NO. Contractor as Principal Surety Name: Name: Mailing address(principal place of business): Mailing address(principal place of business): Physical address(principal place of business): Owner Name: City of Corpus Christi,Texas Mailing address(principal place of business): Engineering Services Surety is a corporation organized and existing 1201 Leopard Street under the laws of the state of: Corpus Christi,Texas 78401 By submitting this Bond,Surety affirms its authority to do business in the State of Texas and Contract its license to execute bonds in the State of Texas. Project name and number: Telephone(main number): Telephone(for notice of claim): Local Agent for Surety Name: Award Date of the Contract: Address: Contract Price: Bond Telephone: E-Mail Address: Date of Bond: (Date of Bond cannot be earlier than Award Date The address of the surety company to which any of the Contract) notice of claim should be sent may be obtained Said Principal and Surety have signed and sealed from the Texas Dept. of Insurance by calling the this instrument in 4 copies, each one of which shall following toll-free number:1-800-252-3439 be deemed an original. Performance Bond 006113-1 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 01-13-2016 Surety and Contractor, intending to be legally bound and obligated to Owner do each cause this Performance Bond to be duly executed on its behalf by its authorized officer, agent or representative. The Principal and Surety bind themselves, and their heirs, administrators, executors,successors and assigns,jointly and severally to this bond. The condition of this obligation is such that if the Contractor as Principal faithfully performs the Work required by the Contract then this obligation shall be null and void;otherwise the obligation is to remain in full force and effect. Provisions of the bond shall be pursuant to the terms and provisions of Chapter 2253 and Chapter 2269 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter to the some extent as if it were copied at length herein. Venue shall lie exclusively in Nueces County, Texas for any legal action. Contractor as Principal Surety Signature: Signature: Name: Name: Title: Title: Email Address: Email Address: (Attach Power of Attorney and place surety seal below) END OF SECTION Performance Bond 006113-2 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 Rev 01-13-2016 00 61 16 PAYMENT BOND BOND NO. Contractor as Principal Surety Name: Name: Mailing address(principal place of business): Mailing address(principal place of business): Physical address(principal place of business): Owner Name: City of Corpus Christi,Texas Mailing address(principal place of business): Engineering Services Surety is a corporation organized and existing 1201 Leopard Street under the laws of the state of: Corpus Christi,Texas 78401 By submitting this Bond,Surety affirms its authority to do business in the State of Texas and Contract its license to execute bonds in the State of Texas. Project name and number: Telephone(main number): Telephone(for notice of claim): Local Agent for Surety Name: Award Date of the Contract: Address: Contract Price: Bond Telephone: E-Mail Address: Date of Bond: (Date of Bond cannot be earlier than Award Date The address of the surety company to which any of Contract) notice of claim should be sent may be obtained Said Principal and Surety have signed and sealed from the Texas Dept. of Insurance by calling the this instrument in 4 copies, each one of which shall following toll-free number:1-800-252-3439 be deemed an original. Payment Bond Form 006116-1 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252,E16253 Rev.01-13-2016 Surety and Contractor, intending to be legally bound and obligated to Owner do each cause this Payment Bond to be duly executed on its behalf by its authorized officer, agent or representative. The Principal and Surety bind themselves, and their heirs, administrators, executors,successors and assigns,jointly and severally to this bond. The condition of this obligation is such that if the Contractor as Principal pays all claimants providing labor or materials to him or to a Subcontractor in the prosecution of the Work required by the Contract then this obligation shall be null and void;otherwise the obligation is to remain in full force and effect. Provisions of the bond shall be pursuant to the terms and provisions of Chapter 2253 and Chapter 2269 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter to the some extent as if it were copied at length herein. Venue shall lie exclusively in Nueces County, Texas for any legal action. Contractor as Principal Surety Signature: Signature: Name: Name: Title: Title: Email Address: Email Address: (Attach Power of Attorney and place surety seal below) END OF SECTION Payment Bond Form 006116-2 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252,E16253 Rev.01-13-2016 00 72 00 GENERAL CONDITIONS Table of Contents Page Article 1—Definitions and Terminology.......................................................................................................6 1.01 Defined Terms...............................................................................................................................6 1.02 Terminology................................................................................................................................11 Article 2—Preliminary Matters...................................................................................................................12 2.01 Delivery of Bonds and Evidence of Insurance.............................................................................12 2.02 Copies of Documents..................................................................................................................13 2.03 Before Starting Construction ......................................................................................................13 2.04 Preconstruction Conference; Designation of Authorized Representatives................................13 Article 3—Contract Documents: Intent, Requirements, Reuse.................................................................13 3.01 Intent...........................................................................................................................................13 3.02 Reference Standards...................................................................................................................15 3.03 Reporting and Resolving Discrepancies......................................................................................15 3.04 Interpretation of the Contract Documents.................................................................................16 3.05 Reuse of Documents...................................................................................................................16 Article 4—Commencement and Progress of the Work..............................................................................16 4.01 Commencement of Contract Times; Notice to Proceed.............................................................16 4.02 Starting the Work........................................................................................................................16 4.03 Progress Schedule.......................................................................................................................17 4.04 Delays in Contractor's Progress..................................................................................................17 Article 5—Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental Conditions...................................................................................................................................................18 5.01 Availability of Lands....................................................................................................................18 5.02 Use of Site and Other Areas........................................................................................................18 5.03 Subsurface and Physical Conditions............................................................................................19 5.04 Differing Subsurface or Physical Conditions...............................................................................19 5.05 Underground Facilities................................................................................................................21 5.06 Hazardous Environmental Conditions at Site.............................................................................22 Article 6—Bonds and Insurance .................................................................................................................24 6.01 Performance, Payment, and Other Bonds..................................................................................24 6.02 Licensed Sureties ........................................................................................................................24 General Conditions 007200- 1 Corpus Christi Standards-Regular Projects 03-23-2015 6.03 Insurance.....................................................................................................................................25 Article 7—Contractor's Responsibilities.....................................................................................................25 7.01 Supervision and Superintendence..............................................................................................25 7.02 Labor; Working Hours.................................................................................................................25 7.03 Services, Materials, and Equipment ...........................................................................................26 7.04 Concerning Subcontractors, Suppliers, and Others....................................................................26 7.05 Patent Fees and Royalties...........................................................................................................27 7.06 Permits........................................................................................................................................28 7.07 Taxes...........................................................................................................................................28 7.08 Laws and Regulations..................................................................................................................28 7.09 Safety and Protection .................................................................................................................29 7.10 Safety Representative.................................................................................................................30 7.11 Hazard Communication Programs..............................................................................................30 7.12 Emergencies................................................................................................................................30 7.13 Contractor's General Warranty and Guarantee.........................................................................30 7.14 Indemnification...........................................................................................................................31 7.15 Delegation of Professional Design Services................................................................................32 Article 8—Other Work at the Site...............................................................................................................33 8.01 Other Work.................................................................................................................................33 8.02 Coordination...............................................................................................................................34 8.03 Legal Relationships......................................................................................................................34 Article 9—Owner's and OPT's Responsibilities...........................................................................................35 9.01 Communications to Contractor ..................................................................................................35 9.02 Replacement of Owner's Project Team Members......................................................................35 9.03 Furnish Data................................................................................................................................35 9.04 Pay When Due.............................................................................................................................35 9.05 Lands and Easements; Reports and Tests...................................................................................35 9.06 Insurance.....................................................................................................................................35 9.07 Modifications..............................................................................................................................35 9.08 Inspections,Tests, and Approvals...............................................................................................35 9.09 Limitations on OPT's Responsibilities .........................................................................................35 9.10 Undisclosed Hazardous Environmental Condition......................................................................36 9.11 Compliance with Safety Program................................................................................................36 General Conditions 007200-2 Corpus Christi Standards-Regular Projects 03-23-2015 Article 10—OAR's and Designer's Status During Construction ..................................................................36 10.01 Owner's Representative..........................................................................................................36 10.02 Visits to Site.............................................................................................................................36 10.03 Resident Project Representatives...........................................................................................36 10.04 Rejecting Defective Work........................................................................................................36 10.05 Shop Drawings, Modifications and Payments.........................................................................36 10.06 Decisions on Requirements of Contract Documents and Acceptability of Work...................37 10.07 Limitations on OAR's and Designer's Authority and Responsibilities.....................................37 Article 11—Amending the Contract Documents; Changes in the Work ....................................................37 11.01 Amending and Supplementing the Contract Documents.......................................................37 11.02 Owner-Authorized Changes in the Work................................................................................38 11.03 Unauthorized Changes in the Work........................................................................................38 11.04 Change of Contract Price........................................................................................................39 11.05 Change of Contract Times.......................................................................................................40 11.06 Change Proposals....................................................................................................................40 11.07 Execution of Change Orders ...................................................................................................40 11.08 Notice to Surety......................................................................................................................41 Article12—Claims.......................................................................................................................................42 12.01 Claims......................................................................................................................................42 12.02 Claims Process.........................................................................................................................42 Article 13—Cost of the Work; Allowances; Unit Price Work......................................................................43 13.01 Cost of the Work.....................................................................................................................43 13.02 Allowances..............................................................................................................................46 13.03 Unit Price Work.......................................................................................................................46 13.04 Contingencies..........................................................................................................................47 Article 14—Tests and Inspections; Correction, Removal, or Acceptance of Defective Work....................47 14.01 Access to Work........................................................................................................................47 14.02 Tests, Inspections, and Approvals...........................................................................................47 14.03 Defective Work.......................................................................................................................48 14.04 Acceptance of Defective Work................................................................................................49 14.05 Uncovering Work....................................................................................................................49 14.06 Owner May Stop the Work.....................................................................................................49 14.07 Owner May Correct Defective Work.......................................................................................50 General Conditions 007200-3 Corpus Christi Standards-Regular Projects 03-23-2015 Article 15—Payments to Contractor; Set-Offs; Completion; Correction Period........................................50 15.01 Progress Payments..................................................................................................................50 15.02 Contractor's Warranty of Title................................................................................................52 15.03 Substantial Completion...........................................................................................................52 15.04 Partial Utilization.....................................................................................................................53 15.05 Final Inspection.......................................................................................................................53 15.06 Final Payment..........................................................................................................................53 15.07 Waiver of Claims.....................................................................................................................54 15.08 Correction Period....................................................................................................................54 Article 16—Suspension of Work and Termination.....................................................................................55 16.01 Owner May Suspend Work.....................................................................................................55 16.02 Owner May Terminate for Cause............................................................................................55 16.03 Owner May Terminate For Convenience................................................................................56 Article 17— Final Resolution of Disputes....................................................................................................57 17.01 Methods and Procedures........................................................................................................57 Article18—Miscellaneous..........................................................................................................................57 18.01 Computation of Times.............................................................................................................57 18.02 Owner's Right to Audit Contractor's Records.........................................................................57 18.03 Independent Contractor.........................................................................................................58 18.04 Cumulative Remedies .............................................................................................................58 18.05 Limitation of Damages............................................................................................................58 18.06 No Waiver...............................................................................................................................58 18.07 Severability..............................................................................................................................58 18.08 Survival of Obligations............................................................................................................59 18.09 No Third Party Beneficiaries ...................................................................................................59 18.10 Assignment of Contract...........................................................................................................59 18.11 No Waiver of Sovereign Immunity..........................................................................................59 18.12 Controlling Law.......................................................................................................................59 18.13 Conditions Precedent to Right to Sue.....................................................................................59 18.14 Waiver of Trial by Jury.............................................................................................................59 18.15 Attorney Fees..........................................................................................................................59 18.16 Compliance with Laws.............................................................................................................59 18.17 Enforcement............................................................................................................................60 General Conditions 007200-4 Corpus Christi Standards-Regular Projects 03-23-2015 18.18 Subject to Appropriation.........................................................................................................60 18.19 Contract Sum...........................................................................................................................60 18.20 Contractor's Guarantee as Additional Remedy......................................................................60 General Conditions 007200-5 Corpus Christi Standards-Regular Projects 03-23-2015 ARTICLE 1—DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. A term with initial capital letters, including the term's singular and plural forms, has the meaning indicated in this paragraph wherever used in the Bidding Requirements or Contract Documents. In addition to the terms specifically defined,terms with initial capital letters in the Contract Documents may include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda - Documents issued prior to the receipt of Bids which clarify or modify the Bidding Requirements or the proposed Contract Documents. 2. Agreement-The document executed between Owner and Contractor covering the Work. 3. Alternative Dispute Resolution -The process by which a disputed Claim may be settled as an alternative to litigation, if Owner and Contractor cannot reach an agreement between themselves. 4. Application for Payment-The forms used by Contractor to request payments from Owner and the supporting documentation required by the Contract Documents. 5. Award Date—The date the City Council of the City of Corpus Christi (City) authorizes the City Manager or designee to execute the Contract on behalf of the City. 6. Bid -The documents submitted by a Bidder to establish the proposed Contract Price and Contract Times and provide other information and certifications as required by the Bidding Requirements. 7. Bidding Documents-The Bidding Requirements, the proposed Contract Documents, and Addenda. 8. Bidder-An individual or entity that submits a Bid to Owner. 9. Bidding Requirements-The Invitation for Bids, Instructions to Bidders, Bid Security, Bid Form and attachments, and required certifications. 10. Bid Security-The financial security in the form of a bid bond provided by Bidder at the time the Bid is submitted and held by Owner until the Agreement is executed and the evidence of insurance and Bonds required by the Contract Documents are provided. A cashier's check, certified check, money order or bank draft from any State or National Bank will also be acceptable. 11. Bonds - Performance Bond, Payment Bond, Maintenance Bond, and other Surety instruments executed by Surety. When in singular form, refers to individual instrument. 12. Change Order-A document issued on or after the Effective Date of the Contract and signed by Owner and Contractor which modifies the Work, Contract Price, Contract Times, or terms and conditions of the Contract. General Conditions 007200-6 Corpus Christi Standards-Regular Projects 03-23-2015 13. Change Proposal -A document submitted by Contractor in accordance with the requirements of the Contract Documents: a. Requesting an adjustment in Contract Price or Contract Times; b. Contesting an initial decision concerning the requirements of the Contract Documents or the acceptability of Work under the Contract Documents; C. Challenging a set-off against payment due; or d. Seeking a Modification with respect to the terms of the Contract. 14. City Engineer-The Corpus Christi City Engineer and/or his designated representative as identified at the preconstruction conference or in the Notice to Proceed. 15. Claim -A demand or assertion by Owner or Contractor submitted in accordance with the requirements of the Contract Documents. A demand for money or services by an entity other than the Owner or Contractor is not a Claim. 16. Constituent of Concern -Asbestos, petroleum, radioactive materials, polychlorinated biphenyls (PCBs), hazardous wastes, and substances, products,wastes, or other materials that are or become listed, regulated, or addressed pursuant to: a. The Comprehensive Environmental Response, Compensation and Liability Act,42 U.S.C. §§9601 et seq. ("CERCLA"); b. The Hazardous Materials Transportation Act, 49 U.S.C. §§5501 et seq.; C. The Resource Conservation and Recovery Act, 42 U.S.C. §§6901 et seq. ("RCRA"); d. The Toxic Substances Control Act, 15 U.S.C. §§2601 et seq.; e. The Clean Water Act, 33 U.S.C. §§1251 et seq.; f. The Clean Air Act,42 U.S.C. §§7401 et seq.; or g. Any other Laws or Regulations regulating, relating to, or imposing liability or standards of conduct concerning hazardous, toxic, or dangerous waste, substance, or material. 17. Contract-The entire integrated set of documents concerning the Work and describing the relationship between the Owner and Contractor. 18. Contract Amendment-A document issued on or after the Effective Date of the Contract and signed by Owner and Contractor which: a. Authorizes new phases of the Work and establishes the Contract Price, Contract Times, or terms and conditions of the Contract for the new phase of Work; or b. Modifies the terms and conditions of the Contract, but does not make changes in the Work. 19. Contract Documents -Those items designated as Contract Documents in the Agreement. 20. Contract Price -The monetary amount stated in the Agreement and as adjusted by Modifications, and increases or decreases in unit price quantities, if any, that Owner has agreed to pay Contractor for completion of the Work in accordance with the Contract Documents. General Conditions 007200-7 Corpus Christi Standards-Regular Projects 03-23-2015 21. Contract Times-The number of days or the dates by which Contractor must: a. Achieve specified Milestones; b. Achieve Substantial Completion; and C. Complete the Work. 22. Contractor-The individual or entity with which Owner has contracted for performance of the Work. 23. Contractor's Team -Contractor and Subcontractors, Suppliers, individuals, or entities directly or indirectly employed or retained by them to perform part of the Work or anyone for whose acts they may be liable. 24. Cost of the Work-The sum of costs incurred for the proper performance of the Work as allowed by Article 13. 25. Defective -When applied to Work, refers to Work that is unsatisfactory,faulty, or deficient in that it: a. Does not conform to the Contract Documents; b. Does not meet the requirements of applicable inspections, reference standards, tests, or approvals referred to in the Contract Documents; or C. Has been damaged or stolen prior to OAR's recommendation of final payment unless responsibility for the protection of the Work has been assumed by Owner at Substantial Completion in accordance with Paragraphs 15.03 or 15.04. 26. Designer-The individuals or entity named as Designer in the Agreement and the subconsultants, individuals, or entities directly or indirectly employed or retained by Designer to provide design or other technical services to the Owner. Designer has responsibility for engineering or architectural design and technical issues related to the Contract Documents. Designers are Licensed Professional Engineers or Registered Architects qualified to practice their profession in the State of Texas. 27. Drawings -The part of the Contract that graphically shows the scope, extent, and character of the Work. Shop Drawings and other Contractor documents are not Drawings. 28. Effective Date of the Contract-The date indicated in the Agreement on which the City Manager or designee has signed the Contract. 29. Field Order-A document issued by OAR or Designer requiring changes in the Work that do not change the Contract Price or the Contract Times. 30. Hazardous Environmental Condition -The presence of Constituents of Concern at the Site in quantities or circumstances that may present a danger to persons or property exposed to Constituents of Concern. The presence of Constituents of Concern at the Site necessary for the execution of the Work or to be incorporated in the Work is not a Hazardous Environmental Condition provided these Constituents of Concern are controlled and contained pursuant to industry practices, Laws and Regulations, and the requirements of the Contract. General Conditions 007200-8 Corpus Christi Standards-Regular Projects 03-23-2015 31. Indemnified Costs-All costs, losses, damages, and legal or other dispute resolution costs resulting from claims or demands against Owner's Indemnitees. These costs include fees for engineers, architects, attorneys, and other professionals. 32. Laws and Regulations; Laws or Regulations -Applicable laws, statutes, rules, regulations, ordinances, codes, and orders of governmental bodies, agencies, authorities, and courts having jurisdiction over the Project. 33. Liens -Charges, security interests, or encumbrances upon Contract related funds, real property, or personal property. 34. Milestone-A principal event in the performance of the Work that Contractor is required by Contract to complete by a specified date or within a specified period of time. 35. Modification -Change made to the Contract Documents by one of the following methods: a. Contract Amendment; b. Change Order; C. Field Order; or d. Work Change Directive. 36. Notice of Award -The notice of Owner's intent to enter into a contract with the Selected Bidder. 37. Notice to Proceed -A notice to Contractor of the Contract Times and the date Work is to begin. 38. Owner-The City of Corpus Christi (City), a Texas home-rule municipal corporation and political subdivision organized under the laws of the State of Texas, acting by and through its duly authorized City Manager and his designee, the City Engineer(the Director of Engineering Services), and the City's officers, employees, agents, or representatives, authorized to administer design and construction of the Project. 39. Owner's Authorized Representative or OAR -The individual or entity named as OAR in the Agreement and the consultants, subconsultants, individuals, or entities directly or indirectly employed or retained by them to provide construction management services to the Owner. The OAR may be an employee of the Owner. 40. Owner's Indemnitees- Each member of the OPT and their officers, directors, members, partners, employees, agents, consultants, and subcontractors. 41. Owner's Project Team or OPT-The Owner, Owner's Authorized Representative, Resident Project Representative, Designer, and the consultants, subconsultants, individuals, or entities directly or indirectly employed or retained by them to provide services to the Owner. 42. Partial Occupancy or Use- Use by Owner of a substantially completed part of the Work for the purpose for which it is intended (or a related purpose) prior to Substantial Completion of all the Work. General Conditions 007200-9 Corpus Christi Standards-Regular Projects 03-23-2015 43. Progress Schedule-A schedule prepared and maintained by Contractor, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Times. 44. Project-The total undertaking to be accomplished for Owner under the Contract Documents. 45. Resident Project Representative or RPR -The authorized representative of OPT assigned to assist OAR at the Site. As used herein, the term Resident Project Representative includes assistants and field staff of the OAR. 46. Samples- Physical examples of materials, equipment, or workmanship representing some portion of the Work that are used to establish the standards for that portion of the Work. 47. Schedule of Documents-A schedule of required documents, prepared, and maintained by Contractor. 48. Schedule of Values -A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for Contractor's Applications for Payment. 49. Selected Bidder-The Bidder to which Owner intends to award the Contract. 50. Shop Drawings-All drawings, diagrams, illustrations, schedules, and other data or information that are specifically prepared or assembled and submitted by Contractor to illustrate some portion of the Work. Shop Drawings, whether approved or not, are not Drawings and are not Contract Documents. 51. Site- Lands or areas indicated in the Contract Documents as being furnished by Owner upon which the Work is to be performed. The Site includes rights-of-way, easements, and other lands furnished by Owner which are designated for use by the Contractor. 52. Specifications-The part of the Contract that describes the requirements for materials, equipment, systems, standards, and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable to the Work. 53. Subcontractor-An individual or entity having a direct contract with Contractor or with other Subcontractors or Suppliers for the performance of a part of the Work. 54. Substantial Completion -The point where the Work or a specified part of the Work is sufficiently complete to be used for its intended purpose in accordance with the Contract Documents. 55. Supplementary Conditions-The part of the Contract that amends or supplements the General Conditions. 56. Supplier-A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with Subcontractors or other Suppliers to furnish materials or equipment to be incorporated in the Work. 57. Technical Data -Those items expressly identified as Technical Data in the Supplementary Conditions with respect to either: a. Subsurface conditions at the Site; General Conditions 007200- 10 Corpus Christi Standards-Regular Projects 03-23-2015 b. Physical conditions relating to existing surface or subsurface structures at the Site, except Underground Facilities; or C. Hazardous Environmental Conditions at the Site. 58. Underground Facilities-All underground pipelines, conduits, ducts, cables,wires, manholes,vaults, tanks, tunnels, other similar facilities or appurtenances, and encasements containing these facilities which are used to convey electricity, gases, steam, liquid petroleum products, telephone or other communications, fiber optic transmissions, cable television, water,wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 59. Unit Price Work-Work to be paid for on the basis of unit prices. 60. Work-The construction of the Project or its component parts as required by the Contract Documents. 61. Work Change Directive -A directive issued to Contractor on or after the Effective Date of the Contract ordering an addition, deletion, or revision in the Work. The Work Change Directive serves as a memorandum of understanding regarding the directive until a Change Order can be issued. 1.02 Terminology A. The words and terms discussed in this Paragraph 1.02 are not defined, but when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. It is understood that the cost for performing Work is included in the Contract Price and no additional compensation is to be paid by Owner unless specifically stated otherwise in the Contract Documents. Expressions including or similar to "at no additional cost to Owner," "at Contractor's expense," or similar words mean that the Contractor is to perform or provide specified operation of Work without an increase in the Contract Price. C. The terms "day" or"calendar day" mean a calendar day of 24 hours measured from midnight to the next midnight. D. The meaning and intent of certain terms or adjectives are described as follows: 1. The terms "as allowed," "as approved," "as ordered," "as directed," or similar terms in the Contract Documents indicate an exercise of professional judgment by the OPT. 2. Adjectives including or similar to "reasonable," "suitable," "acceptable," "proper," "satisfactory," or similar adjectives are used to describe a determination of OPT regarding the Work. 3. Any exercise of professional judgment by the OPT will be made solely to evaluate the Work for general compliance with the Contract Documents unless there is a specific statement in the Contract Documents indicating otherwise. 4. The use of these or similar terms or adjectives does not assign a duty or give OPT authority to supervise or direct the performance of the Work, or assign a duty or give authority to the OPT to undertake responsibilities contrary to the provisions of Articles 9 or 10 or other provisions of the Contract Documents. General Conditions 007200- 11 Corpus Christi Standards-Regular Projects 03-23-2015 E. The use of the words "furnish," "install," "perform," and "provide" have the following meanings when used in connection with services, materials, or equipment: 1. Furnish means to supply and deliver the specified services, materials, or equipment to the Site or other specified location ready for use or installation. 2. Install means to complete construction or assembly of the specified services, materials, or equipment so they are ready for their intended use. 3. Perform or provide means to furnish and install specified services, materials, or equipment, complete and ready for their intended use. 4. Perform or provide the specified services, materials, or equipment complete and ready for intended use if the Contract Documents require specific services, materials, or equipment, but do not expressly use the words "furnish," "install," "perform," or "provide." F. Contract Documents are written in modified brief style: 1. Requirements apply to all Work of the same kind, class, and type even though the word "all" is not stated. 2. Simple imperative sentence structure is used which places a verb as the first word in the sentence. It is understood that the words "furnish," "install," "perform," "provide," or similar words include the meaning of the phrase "The Contractor shall..." before these words. 3. Unless specifically stated that action is to be taken by the OPT or others, it is understood that the action described is a requirement of the Contractor. G. Words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with this recognized meaning unless stated otherwise in the Contract Documents. H. Written documents are required where reference is made to notices, reports, approvals, consents, documents, statements, instructions, opinions or other types of communications required by the Contract Documents. Approval and consent documents must be received by Contractor prior to the action or decision for which approval or consent is given. These may be made in printed or electronic format through the OPT's project management information system or other electronic media as required by the Contract Documents or approved by the OAR. I. Giving notice as required by the Contract Documents may be by printed or electronic media using a method that requires acknowledgment of the receipt of that notice. ARTICLE 2—PRELIMINARY MATTERS 2.01 Delivery of Bonds and Evidence of Insurance A. Provide required Bonds with the executed Agreement. B. Provide evidence of insurance required by the Contract Documents with the executed Agreement. General Conditions 007200- 12 Corpus Christi Standards-Regular Projects 03-23-2015 2.02 Copies of Documents A. OPT is to furnish one fully executed Agreement and one copy of the executed Contract Documents in electronic portable document format (PDF). This document is the Project Record Copy of the Contract Documents. 2.03 Before Starting Construction A. Provide the following preliminary documents in accordance with the Contract Documents within 10 days after the Effective Date of the Contract: 1. Progress Schedule; 2. Schedule of Documents; and 3. Schedule of Values and projected cash flow information. 2.04 Preconstruction Conference; Designation of Authorized Representatives A. Attend the preconstruction conference as required by the Contract Documents. B. Designate the specific individuals authorized to act as representatives of the Contractor. These individuals must have the authority to transmit and receive information, render decisions relative to the Contract, and otherwise act on behalf of the Contractor. C. Owner is to designate the specific individuals authorized to act as representatives of the Owner and the limits of their authority with regard to acting on behalf of the Owner. ARTICLE 3—CONTRACT DOCUMENTS: INTENT, REQUIREMENTS, REUSE 3.01 Intent A. Requirements of components of the Contract Documents are as binding as if required by all Contract Documents. It is the intent of the Contract Documents to describe a functionally complete Project. The Contract Documents do not indicate or describe all of the Work required to complete the Project. Additional details required for the correct installation of selected products are to be provided by the Contractor and coordinated with the OPT. 1. The Contract requirements described in the General Conditions, Supplementary Conditions, and General Requirements (Division 01 Sections of the Specifications) apply to Work regardless of where it is described in the Contract Documents, unless specifically noted otherwise. 2. In offering a Bid for this Project and in entering into this Contract, Contractor represents: a. Contractor has studied the Contract Documents, the Work, the Site, local conditions, Laws and Regulations, and other conditions that may affect the Work; b. Contractor has studied the Technical Data and other information referred to in the Contract Documents and has or will make additional surveys and investigations as deemed necessary for the performance of the Work; C. Contractor has correlated these studies and observations with the requirements of the Contract Documents; and General Conditions 007200- 13 Corpus Christi Standards-Regular Projects 03-23-2015 d. Contractor has taken all of this information into consideration in developing the Contract Price offered and that the Contract Price offered provides full compensation for providing the Work in accordance with the Contract Documents. 3. Organization of the Contract Documents is not intended to control or lessen the responsibility of the Contractor when dividing Work among Subcontractors or Suppliers, or to establish the extent of Work to be performed by trades, Subcontractors, or Suppliers. Specifications or details do not need to be indicated or specified in each Specification or Drawing. Items shown in the Contract Documents are applicable regardless of their location in the Contract Documents. 4. Standard paragraph titles and other identifications of subject matter in the Specifications are intended to aid in locating and recognizing various requirements of the Specifications. Titles do not define, limit, or otherwise restrict Specification text. 5. Provide the labor, documentation, services, materials, or equipment that may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result, whether specifically called for in the Contract Documents or not. Include these related costs in the offered Contract Price. B. Provide equipment that is functionally complete as described in the Contract Documents. The Drawings and Specifications do not indicate or describe all of the Work required to complete the installation of products purchased by the Owner or Contractor. Additional details required for the correct installation of selected products are to be provided by the Contractor and coordinated with the Designer through the OAR. C. Comply with the most stringent requirements where compliance with two or more standards is specified and they establish different or conflicting requirements for the Work, unless the Contract Documents indicate otherwise. D. Provide materials and equipment comparable in quality to similar materials and equipment incorporated in the Project or as required to meet the minimum requirements of the application if the materials and equipment are shown in the Drawings but are not included in the Specifications. E. The Project Record Copy of the Contract Documents governs if there is a discrepancy between the Project Record Copy of the Contract Documents and subsequent electronic or digital versions of the Contract Documents, including printed copies derived from these electronic or digital versions. F. The Contract supersedes all prior written or oral negotiations, representations, and agreements. The Contract Documents comprise the entire Agreement between Owner and Contractor. The Contract Documents may be modified only by a Modification. G. Request clarification from OAR for a decision before proceeding if Contractor is not clear on the meaning of the Contract Documents. OAR is to issue clarifications and interpretations of the Contract Documents in accordance with the Contract Documents. General Conditions 007200- 14 Corpus Christi Standards-Regular Projects 03-23-2015 3.02 Reference Standards A. Standard Specifications, Codes, Laws and Regulations: 1. Reference in the Contract Documents to standard specifications, manuals, reference standards, or codes of technical societies, organizations, or associations, or to Laws or Regulations,whether specific or implied, are those in effect at the time Contractor's Bid is submitted or when Contractor negotiates the Contract Price unless specifically stated otherwise in the Contract Documents. 2. No provision of referenced standard specifications, manuals, reference standards, codes, or instructions of a Supplier changes the duties or responsibilities of OPT or Contractor from those described in the Contract Documents or assigns a duty to or gives authority to the OPT to supervise or direct the performance of the Work or undertake responsibilities inconsistent with the Contract Documents. 3. The provisions of the Contract Documents take precedence over standard specifications, manuals, reference standards, codes, or instructions of a Supplier unless specifically stated otherwise in the Contract Documents. B. Comply with applicable construction industry standards, whether referenced or not. 1. Standards referenced in the Contract Documents govern over standards not referenced but recognized as applicable in the construction industry. 2. Comply with the requirements of the Contract Documents if they produce a higher quality of Work than the applicable construction industry standards. 3. Designer determines whether a code or standard is applicable, which of several are applicable, or if the Contract Documents produce a higher quality of Work. C. Make copies of reference standards available if requested by OAR. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: 1. Carefully study the Drawings and verify pertinent figures and dimensions with respect to actual field measurements before undertaking the Work. Immediately report conflicts, errors, ambiguities, or discrepancies that Contractor discovers or has actual knowledge of to the OAR. Do not proceed with affected Work until the conflict, error, ambiguity, or discrepancy is resolved by a clarification or interpretation from the OAR or by a Modification to the Contract Documents issued pursuant to Paragraph 11.01. 2. Immediately notify the OAR of conflicts, errors, ambiguities, or discrepancies in the Contract Documents or discrepancies between the Contract Documents and: a. Applicable Laws or Regulations; b. Actual field conditions; C. Standard specifications, manuals, reference standards, or codes; or d. Instructions of Suppliers. 3. Do not proceed with affected Work until the conflict, error, ambiguity, or discrepancy is resolved by a clarification or interpretation from the OAR or by a Modification to the General Conditions 007200- 15 Corpus Christi Standards-Regular Projects 03-23-2015 Contract Documents issued pursuant to Paragraph 11.01, except in an emergency as required by Paragraph 7.12. 4. Contractor is liable to the OPT for failure to report conflicts, errors, ambiguities, or discrepancies in the Contract Documents of which Contractor has actual knowledge. 5. Contractor is deemed to have included the most expensive item, system, procedure, etc. in the Contract Price if a conflict, error, ambiguity, or discrepancy in components of the Contract Documents was known, but not reported prior to submitting the Bid or when Contractor negotiates the Contract Price. 3.04 Interpretation of the Contract Documents A. Submit questions concerning the non-technical or contractual/administrative requirements of the Contract Documents to the OAR immediately after those questions arise. OAR is to provide an interpretation of the Contract Documents regarding these questions and will coordinate the response of the OPT to Contractor. B. Submit questions regarding the design of the Project described in the Contract Documents to the OAR immediately after those questions arise. OAR is to request an interpretation of the Contract Documents from the Designer. Designer is to respond to these questions by providing an interpretation of the Contract Documents. OAR will coordinate the response of the OPT to Contractor. C. OPT may initiate a Modification to the Contract Documents through the OAR if a response to the question indicates that a change in the Contract Documents is required. Contractor may appeal Designer's or OAR's interpretation by submitting a Change Proposal. 3.05 Reuse of Documents A. Contractor's Team has no rights to the Contract Documents and may not use the Contract Documents, or copies or electronic media editions of the Contract Documents, other than for the construction of this Project. This provision survives final payment or termination of the Contract. B. Contractor is allowed to retain a copy of the Contract Documents for record purposes, unless specifically prohibited by the Owner for security reasons. Surrender paper and digital copies of the Contract Documents and other related documents and remove these documents from computer equipment or storage devices as a condition of final payment if the Owner so directs. ARTICLE 4—COMMENCEMENT AND PROGRESS OF THE WORK 4.01 Commencement of Contract Times; Notice to Proceed A. The Contract Times commence to run on the date indicated in the Notice to Proceed. 4.02 Starting the Work A. Begin performing the Work on the date indicated in the Notice to Proceed. Do not begin Work prior to having the insurance required in Article 6 in force or before the date indicated in the Notice to Proceed. General Conditions 007200- 16 Corpus Christi Standards-Regular Projects 03-23-2015 4.03 Progress Schedule A. Construct the Work in accordance with the Progress Schedule established in accordance with the Contract Documents. 1. Adjust the Progress Schedule as required to accurately reflect actual progress on the Work. 2. Submit proposed adjustments in the Progress Schedule that change the Contract Times in accordance with the requirements of Article 11. B. Continue performing Work and adhere to the Progress Schedule during disputes or disagreements with Owner. Do not delay or postpone Work pending resolution of disputes or disagreements, or during an appeal process, except as permitted by Paragraph 16.04, or as Owner and Contractor may otherwise agree. 4.04 Delays in Contractor's Progress A. Contractor is entitled to an equitable adjustment in the Contract Times if OPT directly delays, disrupts, or interferes with the performance or progress of the Work. The Contractor agrees to make no Claim for damages for delay in the performance of the Contract occasioned by an act or omission to act of the OPT and agrees that the extension of time provides an equitable adjustment. B. Contractor is not entitled to an adjustment in Contract Price or Contract Times for delays, disruptions, or interference caused by or within the control of Contractor's Team. C. No time extensions are allowed for weather conditions, other than those listed in Paragraph 4.04.D.1, for Projects using calendar days or a fixed date to establish the Contract Time. Contractor is to include the cost associated with weather related delays in the Contract Price and assumes the risks associated with delays related to weather conditions. D. Contractor is entitled to an equitable adjustment in the Contract Times if Contractor's performance or progress is delayed, disrupted, or interfered with by unanticipated causes not the fault of and beyond the control of OPT or Contractor. These unanticipated causes may include: 1. Severe and unavoidable natural catastrophes e.g. fires, floods, hurricanes, epidemics, and earthquakes; 2. Acts or failures to act of utility owners other than those performing other work at or adjacent to the Site by arrangement with the Owner, as contemplated in Article 8; and 3. Acts of war or terrorism. 4. Rain days in excess of the number of days allocated for rain as described in the Supplementary Conditions. E. Delays, disruption, and interference to the performance or progress of the Work resulting from the following are governed by Article 5: 1. The existence of a differing subsurface or physical condition; 2. An Underground Facility not shown or not indicated with reasonable accuracy by the Contract Documents; and General Conditions 007200- 17 Corpus Christi Standards-Regular Projects 03-23-2015 3. Hazardous Environmental Conditions. These adjustments in Contract Times are the Contractor's sole and exclusive remedy for the delays, disruption, and interference described in this paragraph. F. Article 8 governs delays, disruption, and interference to the performance or progress of the Work resulting from the performance of certain other work at or adjacent to the Site. G. Notify the OAR immediately of a potential delaying, disrupting, or interfering event. Submit a Change Proposal seeking an adjustment in Contract Price or Contract Times within 30 days of the commencement of the delaying, disrupting, or interfering event. H. Contractor is only entitled to an adjustment of the Contract Times for specific delays, disruptions, and interference to the performance or progress of the Work that can be demonstrated to directly impact the ability of the Contractor to complete the Work within the Contract Times. No adjustments in Contract Times are allowed for delays on components of the Work which were or could have been completed without impacting the Contract Times. I. Contractor is not entitled to an adjustment in Contract Price or Contract Times for delay, disruption, or interference caused by or within the control of the Owner if this delay is concurrent with a delay, disruption, or interference attributable to or within the control of the Contractor's Team. ARTICLE 5—AVAILABILITY OF LANDS;SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS 5.01 Availability of Lands A. Owner is to furnish the Site and inform the Contractor of encumbrances or restrictions known to Owner related to use of the Site with which Contractor must comply in performing the Work. B. Provide for additional lands and access Contractor requires for temporary construction facilities or storage of materials and equipment, other than those identified in the Contract Documents. Provide documentation of authority to use these additional lands to OAR before using them. 5.02 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Confine construction equipment,temporary construction facilities, the storage of materials and equipment, and the operations of workers to the Site, adjacent areas that Owner or Contractor has arranged to use through construction easements or agreements, and other adjacent areas as permitted by Laws and Regulations. Assume full responsibility for damage or injuries which result from the performance of the Work or from other actions or conduct of the Contractor's Team, including: a. Damage to the Site; b. Damage to adjacent areas used for Contractor's Team's operations; C. Damage to other adjacent land or areas; and General Conditions 007200- 18 Corpus Christi Standards-Regular Projects 03-23-2015 d. Injuries and losses sustained by the owners or occupants of these lands or areas. 2. Take the following action if a damage or injury claim is made by the owner or occupant of adjacent land or area because of the performance of the Work, or because of other actions or conduct of the Contractor's Team: a. Take immediate corrective or remedial action as required by Paragraph 7.09; and b. Attempt to settle the claim through negotiations with the owner or occupant, or otherwise resolve the claim by mediation or other dispute resolution proceeding or at law. 5.03 Subsurface and Physical Conditions A. The Supplementary Conditions identify: 1. Those reports known to OPT of explorations and tests of subsurface conditions at or adjacent to the Site; 2. Those drawings known to OPT of physical conditions related to existing surface or subsurface structures at the Site, except Underground Facilities; and 3. Technical Data contained in these reports and drawings. B. Data contained in boring logs, recorded measurements of subsurface water levels, and the results of tests performed on materials described in geotechnical data reports specifically prepared for the Project and made available to Contractor are defined as Technical Data, unless Technical Data has been defined more specifically in the Supplementary Conditions. C. Contractor may rely upon the accuracy of the Technical Data contained in these reports and drawings, but these reports and drawings are not Contract Documents. Except for this reliance on Technical Data, Contractor may not rely upon or make claims against Owner's Indemnitees with respect to: 1. The completeness of reports and drawings for Contractor's purposes, including aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, or Contractor's safety precautions and programs; 2. Other data, interpretations, opinions, and information contained in these reports or shown or indicated in the drawings; or 3. Contractor's interpretation of or conclusions drawn from Technical Data or other data, interpretations, opinions, or information. 5.04 Differing Subsurface or Physical Conditions A. Notify OAR immediately, but in no event later than 3 days, after becoming aware of a subsurface or physical condition that is uncovered or revealed at the Site, and before further disturbing the subsurface or physical conditions or performing any related Work that: 1. Establishes that the Technical Data on which Contractor is entitled to rely as provided in Paragraph 5.03 is materially inaccurate; 2. Requires a change in the Drawings or Specifications; 3. Differs materially from that shown or indicated in the Contract Documents; or General Conditions 007200- 19 Corpus Christi Standards-Regular Projects 03-23-2015 4. Is of an unusual nature and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents. Do not further disturb or perform Work related to this subsurface or physical condition, except in an emergency as required by Paragraph 7.12, until permission to do so is issued by OAR. B. OAR is to notify the OPT after receiving notice of a differing subsurface or physical condition from the Contractor. Designer is to: 1. Promptly review the subsurface or physical condition; 2. Determine the necessity of OPT's obtaining additional exploration or tests with respect the subsurface or physical condition; 3. Determine if the subsurface or physical condition falls within one or more of the differing Site condition categories in Paragraph 5.04.A; 4. Prepare recommendations to OPT regarding the Contractor's resumption of Work in connection with the subsurface or physical condition in question; 5. Determine the need for changes in the Drawings or Specifications; and 6. Advise OPT of Designer's findings, conclusions, and recommendations. C. OAR is to issue a statement to Contractor regarding the subsurface or physical condition in question and recommend action as appropriate after review of Designer's findings, conclusions, and recommendations. D. Possible Contract Price and Contract Times Adjustments: 1. Contractor is entitled to an equitable adjustment in Contract Price or Contract Times to the extent that a differing subsurface or physical condition causes a change in Contractor's cost or time to perform the Work provided the condition falls within one or more of the categories described in Paragraph 5.04.A. Any adjustment in Contract Price for Work that is paid for on a unit price basis is subject to the provisions of Paragraph 13.03. 2. Contractor is not entitled to an adjustment in the Contract Price or Contract Times with respect to a subsurface or physical condition if: a. Contractor knew of the existence of the subsurface or physical condition at the time Contractor made an offer to Owner with respect to Contract Price and Contract Times; b. The existence of the subsurface or physical condition could have been discovered or revealed as a result of examinations, investigations, explorations, tests, or studies of the Site and contiguous areas expressly required by the Bidding Requirements or Contract Documents prior to when Contractor's Bid is submitted or when Contractor negotiates the Contract Price; or C. Contractor failed to give notice as required by Paragraph 5.04.A. 3. Contractor may submit a Change Proposal no later than 30 days after OAR's issuance of the OPT's statement to Contractor regarding the subsurface or physical condition in question. General Conditions 007200-20 Corpus Christi Standards-Regular Projects 03-23-2015 4. A Change Order is to be issued by the OAR if Owner and Contractor agree that Contractor is entitled to an adjustment in the Contract Price or Contract Times and agree to the amount or extent of adjustments in the Contract Price or Contract Times. 5.05 Underground Facilities A. The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or adjacent to the Site is based on information and data furnished to OPT by the owners of these Underground Facilities or by others. OPT is not responsible for the accuracy or completeness of information or data provided by others that OPT makes available to Contractor. The Contractor is responsible for: 1. Reviewing and checking available information and data regarding existing Underground Facilities at the Site; 2. Complying with Laws and Regulations related to locating Underground Facilities before beginning Work; 3. Locating Underground Facilities shown or indicated in the Contract Documents; 4. Coordinating the Work with the owners, including Owner, of Underground Facilities during construction; and 5. The safety and protection of existing Underground Facilities at or adjacent to the Site and repairing damage resulting from the Work. B. Notify the OAR and the owner of the Underground Facility immediately if an Underground Facility is uncovered or revealed at the Site that was not shown in the Contract Documents, or was not shown with reasonable accuracy in the Contract Documents. Do not further disturb conditions or perform Work affected by this discovery, except in the event of an emergency as required by Paragraph 7.12. C. The Designer is to take the following action after receiving notice from the OAR: 1. Promptly review the Underground Facility and conclude whether the Underground Facility was not shown or indicated in the Contract Documents, or was not shown or indicated with reasonable accuracy; 2. Prepare recommendations to OPT regarding the Contractor's resumption of Work in connection with this Underground Facility; 3. Determine the extent to which a change is required in the Drawings or Specifications to document the consequences of the existence or location of the Underground Facility; and 4. Advise OAR of Designer's findings, conclusions, and recommendations and provide revised Drawings and Specifications if required. D. OAR is to issue a statement to Contractor regarding the Underground Facility in question and recommend action as appropriate after review of Designer's findings, conclusions, and recommendations. E. Contractor is entitled to an equitable adjustment in the Contract Price or Contract Times as provided in Paragraphs 11.04 and 11.05 to the extent that the existing Underground Facility at the Site that was not shown or indicated in the Contract Documents, or was not shown General Conditions 007200-21 Corpus Christi Standards-Regular Projects 03-23-2015 or indicated with reasonable accuracy. Any adjustment in Contract Price for Work that is paid for on a unit price basis is subject to the provisions of Paragraph 13.03. F. Contractor is not entitled an adjustment in the Contract Price or Contract Times with respect to an existing Underground Facility at the Site if: 1. Contractor knew of the existence of the existing Underground Facility at the Site at the time Contractor made an offer to Owner with respect to Contract Price and Contract Times; 2. The existence of the existing Underground Facility at the Site could have been discovered or revealed as a result of examinations, investigations, explorations, tests, or studies of the Site and contiguous areas expressly required by the Bidding Requirements or Contract Documents prior to when Contractor's Bid is submitted or when Contractor negotiates the Contract Price; or 3. Contractor failed to give notice as required by Paragraph 5.05.B. G. Contractor may submit a Change Proposal regarding its entitlement to or the amount or extent of adjustments in the Contract Price or Contract Times no later than 30 days after OAR's issuance of OPT's statement to Contractor regarding the Underground Facility. 5.06 Hazardous Environmental Conditions at Site A. The Supplementary Conditions identify: 1. Those reports and drawings known to OPT relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site; and 2. Technical Data contained in these reports and drawings. B. Contractor may rely upon the accuracy of the Technical Data contained in reports and drawings relating to Hazardous Environmental Conditions identified in the Supplementary Conditions, but these reports and drawings are not Contract Documents. Except for the reliance on expressly identified Technical Data, Contractor may not rely upon or make claims against Owner's Indemnitees with respect to: 1. The completeness of these reports and drawings for Contractor's purposes, including aspects of the means, methods, techniques, sequences and procedures of construction to be employed by Contractor or Contractor's safety precautions and programs related to Hazardous Environmental Conditions; 2. Other data, interpretations, opinions, and information contained in these reports or shown or indicated in the drawings; or 3. Any Contractor interpretation of or conclusion drawn from Technical Data or other data, interpretations, opinions, or information. C. The results of tests performed on materials described in environmental reports specifically prepared for the Project and made available to Contractor are defined as Technical Data unless Technical Data has been defined more specifically in the Supplementary Conditions. D. Contractor is not responsible for removing or remediating Hazardous Environmental Conditions encountered, uncovered, or revealed at the Site unless this removal or General Conditions 007200-22 Corpus Christi Standards-Regular Projects 03-23-2015 remediation is expressly identified in the Contract Documents to be within the scope of the Work. E. Contractor is responsible for controlling, containing, and duly removing and remediating Constituents of Concern brought to the Site by Contractor's Team and paying associated costs. 1. Owner may remove and remediate the Hazardous Environmental Condition and impose a set-off against payments to Contractor for associated costs if Contractor's Team creates a Hazardous Environmental Condition and Contractor does not take acceptable action to remove and remediate the Hazardous Environmental Condition. 2. Contractor's obligation to indemnify Owner's Indemnitees for claims arising out of or related to Hazardous Environmental Conditions are as set forth in Paragraph 7.14. F. Immediately notify the OAR and take the following action if Contractor uncovers or reveals a Hazardous Environmental Condition at the Site or adjacent areas used by the Contractor's Team that was not created by the Contractor's Team: 1. Secure or otherwise isolate this condition; 2. Stop Work in affected areas or connected with the condition, except in an emergency as required by Paragraph 7.12; and 3. Do not resume Work in connection with the Hazardous Environmental Condition or in affected areas until after OPT has obtained required permits and OAR sends notice to the Contractor: a. Specifying that this condition and affected areas are or have been rendered safe for the resumption of Work; or b. Specifying special conditions under which Work may be resumed safely. 4. Owner may order the portion of the Work that is in the area affected by the Hazardous Environmental Condition to be deleted from the Work following the procedures in Article 11 if Contractor does not agree to: a. Resume the Work based on a reasonable belief it is unsafe; or b. Resume the Work under the special conditions provided by the OAR. 5. Owner may have this deleted portion of the Work performed by Owner's own forces or others in accordance with Article 8. G. Contractor may submit a Change Proposal or Owner may impose a set-off if an agreement is not reached within 10 days of OAR's notice regarding the resumption of Work as to whether Contractor is entitled to an adjustment in Contract Price or Contract Times or on the amount or extent of adjustments resulting from this Work stoppage or special conditions under which Contractor agrees to resume Work. H. The provisions of Paragraphs 5.03, 5.04, and 5.05 do not apply to the presence of Constituents of Concern or a Hazardous Environmental Condition uncovered or revealed at the Site. General Conditions 007200-23 Corpus Christi Standards-Regular Projects 03-23-2015 ARTICLE 6—BONDS AND INSURANCE 6.01 Performance, Payment, and Other Bonds A. Furnish Performance and Payment Bonds, each in an amount equal to the Contract Price, as security for the faithful performance and payment of Contractor's obligations under the Contract Documents. These Bonds are to remain in effect until 1 year after the date of final payment. Furnish other Bonds as required by the Contract Documents. B. Bonds furnished by the Contractor must meet the requirements of Texas Insurance Code Chapter 3503,Texas Government Code Chapter 2253, and all other applicable Laws and Regulations. C. Notify OAR immediately if the surety on Bonds furnished by Contractor: 1. Is declared bankrupt, or becomes insolvent; 2. Has its right to do business in Texas terminated; or 3. Ceases to meet the requirements of Paragraph 6.02. Provide a Bond and surety which comply with the requirements of Paragraph 6.02 within 20 days after the event giving rise to this notification. D. Contractor is to use amounts paid by Owner to Contractor under the Contract for the performance of the Contract and to satisfy claims against the Payment Bond. E. Notify the OAR of claims filed against the Payment Bond. Notify the claimant and OAR of undisputed amounts and the basis for challenging disputed amounts when a claimant has satisfied the conditions prescribed by Texas Government Code Chapter 2253. Promptly pay undisputed amount. F. Owner is not liable for payment of costs or expenses of claimants under the Payment Bond. Owner has no obligations to pay,give notice, or take other action to claimants under the Payment Bond. G. Owner may exclude the Contractor from the Site and exercise Owner's termination rights under Article 16 if Contractor fails to obtain or maintain required Bonds. H. OPT will provide a copy of the Payment Bond to Subcontractors, Suppliers, or other persons or entities claiming to have furnished labor or materials used in the performance of the Work that request this information in accordance with Texas Government Code Chapter 2253. 6.02 Licensed Sureties A. Provide Bonds in the form prescribed by the Contract Documents from sureties named in the list of"Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. B. Provide Bonds required by the Contract Documents from surety companies that are duly licensed or authorized to provide bonds in the State of Texas. General Conditions 007200-24 Corpus Christi Standards-Regular Projects 03-23-2015 6.03 Insurance A. Obtain and maintain insurance as required in this Article and in SECTION 00 72 01 INSURANCE REQUIREMENTS. B. Deliver evidence of insurance in accordance with SECTION 00 72 01 INSURANCE REQUIREMENTS to the Owner to demonstrate that Contractor has obtained and is maintaining the policies, coverages, and endorsements required by the Contract. Provide copies of these certificates to each named insured and additional insured as identified in the Supplementary Conditions or otherwise. ARTICLE 7—CONTRACTOR'S RESPONSIBILITIES 7.01 Supervision and Superintendence A. Supervise, inspect, and direct the performance of the Work in accordance with the Contract Documents. Contractor is solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. Provide a competent resident superintendent acceptable to the OPT. The resident superintendent or acceptable qualified assistant is to be present at all times when Work is being done. Do not replace this resident superintendent except under extraordinary circumstances. Provide a replacement resident superintendent equally competent to the previous resident superintendent if replacement is required. Notify the Owner prior to replacing the resident superintendent and obtain Owner's consent to the change in superintendent. 7.02 Labor; Working Hours A. Provide competent, suitably qualified personnel to survey and lay out the Work and perform Work to complete the Project. Maintain good discipline and order at the Site. B. Perform Work at the Site during regular working hours except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent to the Site and except as otherwise stated in the Contract Documents. C. Do not perform Work on a Saturday, Sunday, or legal holiday without OAR's consent. The following legal holidays are observed by the Owner: Holiday Date Observed New Year's Day January 1 Memorial Day Last Monday in May Independence Day July 4 Labor Day First Monday in September Thanksgiving Day Fourth Thursday in November Friday after Thanksgiving Friday after Thanksgiving Christmas Day December 25 General Conditions 007200-25 Corpus Christi Standards-Regular Projects 03-23-2015 D. If a legal holiday falls on a Saturday, it will be observed the preceding Friday. If a legal holiday falls on a Sunday, it will be observed the following Monday. E. Pay additional cost incurred by Owner for services of the OAR or RPR to observe Work constructed outside of regular working hours. OAR will issue a Set-off in the Application for Payment for this cost per Paragraph 15.01.13 7.03 Services, Materials, and Equipment A. Provide services, materials, equipment, labor, transportation, construction equipment and machinery,tools, appliances, fuel, power, light, heat, telephone,water, sanitary facilities, temporary facilities, and other facilities and incidentals necessary for the performance, testing, start-up, and completion of the Work, whether or not these items are specifically called for in the Contract Documents. B. Provide new materials and equipment to be incorporated into the Work. Provide special warranties and guarantees required by the Contract Document. Provide satisfactory evidence, including reports of required tests, as to the source, kind, and quality of materials and equipment as required by the Contract Documents or as requested by the OAR. C. Store, apply, install, connect, erect, protect, use, clean, and condition materials and equipment in accordance with instructions of the applicable Supplier, unless otherwise required by the Contract Documents. 7.04 Concerning Subcontractors, Suppliers, and Others A. Contractor may retain Subcontractors and Suppliers for the performance of parts of the Work. All Subcontractors and Suppliers must be acceptable to Owner. B. Contractor must retain specific Subcontractors, Suppliers, or other individuals or entities for the performance of designated parts of the Work if required to do so by the Contract Documents. C. Submit a list of proposed Subcontractors and Suppliers to OAR prior to entering into binding subcontracts or purchase orders. These proposed Subcontractors or Suppliers are deemed acceptable to Owner unless Owner raises a substantive, reasonable objection within 30 days after receiving this list. D. Contractor is not required to retain Subcontractors, Suppliers, or other individuals or entities to furnish or perform part of the Work after the Effective Date of the Contract if Contractor has reasonable objection. E. Owner may require the replacement of Subcontractors, Suppliers, or other individuals or entities retained by the Contractor. Provide an acceptable replacement for the rejected Subcontractor, Supplier, or other individual or entity. Owner also may require Contractor to retain specific replacements, subject to Contractor's reasonable objections. F. Contractor may be entitled to an adjustment in Contract Price or Contract Times with respect to a replacement of Subcontractors, Suppliers, or other entities required by Owner. The Contractor is not entitled to an adjustment in Contract Price or Contract Time with respect to replacement of any individual deemed unsuitable by the OPT. Notify OAR immediately if a replacement of Subcontractors, Suppliers, or other entity increases the Contract Price or Contract Times. Initiate a Change Proposal for the adjustment within 10 General Conditions 007200-26 Corpus Christi Standards-Regular Projects 03-23-2015 days of Owner's notice to replace a Subcontractor, Supplier, or other entity retained by Contractor to perform part of the Work. Do not make the replacement until the change in Contract Price or Contract Times has been accepted by the Owner if Change Proposal is to be submitted. G. Owner's initial acceptance of Subcontractors, Suppliers, or other individuals or entities, or their replacements, does not constitute a waiver of the obligation of the Contractor to complete the Work in accordance with the Contract Documents. H. Maintain a current and complete list of Subcontractors and Suppliers that are to perform or furnish part of the Work. I. Contractor is fully responsible for the acts and omissions of Subcontractors, Suppliers, and other individuals or entities performing or furnishing Work. J. Contractor is solely responsible for scheduling and coordinating the work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing Work. K. Require Subcontractors, Suppliers, and other individuals or entities performing or furnishing Work to communicate with OPT through Contractor. L. Contracts between the Contractor and their Subcontractors or Suppliers may specifically bind the Subcontractors or Suppliers to the applicable terms and conditions of the Contract Documents. Contractor is responsible for meeting the requirements of the Contract Documents if they choose to not bind the Subcontractors or Suppliers to applicable terms or conditions of the Contract Documents. 1. All Subcontractors employed on this Project must be required to obtain Workers' Compensation Insurance. 2. Proof of this insurance will be required prior to the start of any Work. M. OPT may furnish information about amounts paid to Contractor for Work provided by Subcontractors or Suppliers to the entity providing the Work. N. Nothing in the Contract Documents: 1. Creates a contractual relationship between members of the OPT and members of the Contractor's Team. 2. Creates an obligation on the part of the Owner to pay or to see to the payment of money due members of the Contractor's Team, except as may be required by Laws and Regulations. 7.05 Patent Fees and Royalties A. Pay license fees, royalties, and costs incident to the use of inventions, designs, processes, products, or devices which are patented or copyrighted by others in the performance of the Work, or to incorporate these inventions, designs, processes, products, or devices which are patented or copyrighted by others in the Work. The Contract Documents identify inventions, designs, processes, products, or devices OPT knows are patented or copyrighted by others or that its use is subject to patent rights or copyrights calling for the payment of a license fee or royalty to others. Contractor is to include the cost associated with the use of patented or copyrighted products or processes,whether specified or selected by the Contractor, in the Contract Price. General Conditions 007200-27 Corpus Christi Standards-Regular Projects 03-23-2015 B. Contractor's obligation to indemnify Owner's Indemnitees for claims arising out of or related to infringement of patent rights and copyrights are as set forth in Paragraph 7.14. 7.06 Permits A. Obtain and pay for construction permits and licenses. OPT is to assist Contractor in obtaining permits and licenses when required to do so by applicable Laws and Regulations. Pay governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time the Contractor's Bid is submitted or when Contractor negotiates the Contract Price. 7.07 Taxes A. Contractor is responsible for all taxes and duties arising out of the Work. The Owner generally qualifies as a tax exempt agency as defined by the statutes of the State of Texas and is usually not subject to any city or state sales or use taxes, however certain items such as rented equipment may be taxable even though Owner is a tax-exempt agency. Contractor is responsible for including in the Contract Price any applicable sales and use taxes and is responsible for complying with all applicable statutes and rulings of the State Comptroller. Pay sales, consumer, use, and other similar taxes required to be paid by Contractor in accordance with the Laws and Regulations. B. The Owner is exempt from the Federal Transportation and Excise Tax. Contractor must comply with all federal regulations governing the exemptions. C. Products incorporated into the Work are exempt from state sales tax according to the provisions of Subchapter H, Chapter 151, of the Texas Tax Code. D. Contractor may not include any amounts for sales, use, or similar taxes for which the Owner is exempt in the Contract Price or any proposed Change Order or Application for Payment. E. Obtain tax exemption certificates or other documentation necessary to establish Owner's exemption from such taxes. 7.08 Laws and Regulations A. Give required notices and comply with Laws and Regulations applicable to the performance of the Work. OPT is not responsible for monitoring Contractor's compliance with Laws or Regulations except where expressly required by applicable Laws and Regulations. B. Pay costs resulting from actions taken by Contractor that are contrary to Laws or Regulations. Contractor is not responsible for determining that the design aspects of the Work described in the Contract Documents is in accordance with Laws and Regulations. This does not relieve Contractor of its obligations under Paragraph 3.03. C. Owner or Contractor may give notice to the other party of changes in Laws or Regulations that may affect the cost or time of performance of the Work, including: 1. Changes in Laws or Regulations affecting procurement of permits; and 2. Sales, use, value-added, consumption, and other similar taxes which come into effect after Contractor's Bid is submitted or when Contractor negotiates the Contract Price. General Conditions 007200-28 Corpus Christi Standards-Regular Projects 03-23-2015 D. Contractor may submit a Change Proposal or Owner may initiate a Claim within 30 days of this notice if Owner and Contractor are unable to agree on entitlement to or on the amount or extent of adjustments in Contract Price or Contract Times resulting from these changes. 7.09 Safety and Protection A. Contractor is solely responsible for initiating, maintaining, and supervising safety precautions and programs in connection with the Work. This responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. B. Take necessary precautions for the safety of persons on the Site or who may be affected by the Work, and provide the necessary protection to prevent damage, injury, or loss to: 1. Work and materials and equipment to be incorporated in the Work, whether stored on or off Site; and 2. Other property at or adjacent to the Site, including trees, shrubs, lawns,walks, pavements, roadways, structures, other work in progress, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. C. Comply with applicable Laws and Regulations relating to the safety and protection of persons or property. Erect and maintain necessary safeguards for safety and protection. Notify Owner; the owners of adjacent property, Underground Facilities, and other utilities; and other contractors and utility owners performing work at or adjacent to the Site when prosecution of the Work may affect them. Cooperate with them in the protection, removal, relocation, and replacement of their property or work in progress. 1. Comply with requirements of Underground Facility Damage Prevention and Safety Act, Texas Utilities Code Chapter 251. 2. Comply with all applicable safety rules and regulations of the Federal Occupational Health and Safety Act of 1970 and subsequent amendments (OSHA). D. Remedy damage, injury, or loss to property referred to in Paragraph 7.09.B caused by Contractor's Team. Pay remediation costs unless the damage or loss is: 1. Attributable to the fault of the Contract Documents; 2. Attributable to acts or omissions of OPT; or 3. Not attributable to the actions or failure to act of the Contractor's Team. E. Contractor's duties and responsibilities for safety and protection of persons or the Work or property at or adjacent to the Site continues until Work is completed and resumes whenever Contractor's Team returns to the Site to fulfill warranty or correction obligations or to conduct other tasks. F. Comply with the applicable requirements of the Owner's safety program if required to do so in the Supplementary Conditions. A copy of the Owner's safety program will be provided in the Bidding Documents. General Conditions 007200-29 Corpus Christi Standards-Regular Projects 03-23-2015 7.10 Safety Representative A. Provide a qualified and experienced safety representative at the Site whose duties and responsibilities are the prevention of accidents and maintaining and supervising safety programs. 7.11 Hazard Communication Programs A. Coordinate the exchange of material safety data sheets or other hazard communication information required to be made available or exchanged between or among employers at the Site in accordance with Laws or Regulations. 7.12 Emergencies A. Act to prevent threatened damage, injury, or loss in emergencies affecting the safety or protection of persons or the Work or property at or adjacent to the Site. Notify OAR immediately if Contractor believes that significant changes in the Work or variations from the Contract Documents have been caused or are required as a result of this need to act. A Modification is to be issued by OAR if OPT determines that the incident giving rise to the emergency action was not the responsibility of the Contractor and that a change in the Contract Documents is required because of the action taken by Contractor in response to this emergency. 7.13 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to Owner that Work is in accordance with the Contract Documents and is not Defective. Owner is entitled to rely on Contractor's warranty and guarantee. Assume and bear responsibility for costs and time delays associated with variations from the requirements of the Contract Documents. B. This Contractor's warranty and guarantee excludes defects or damage caused by improper maintenance or operation, abuse, or modification by OPT; or normal wear and tear under normal usage. C. Contractor's obligation to perform and complete Work in accordance with the Contract Documents is absolute. None of the following constitute an acceptance of Defective Work or a release of Contractor's obligation to perform Work in accordance with the Contract Documents: 1. Observations by OPT; 2. Recommendation by OAR or payment by Owner of progress or final payments; 3. The issuance of a Certificate of Substantial Completion; 4. Use or occupancy of part of the Work by Owner; 5. Review and approval of a Shop Drawing or Sample; 6. Inspections,tests, or approvals by others; or 7. Correction of Defective Work by Owner. D. The Contract Documents may require the Contractor to accept the assignment of a contract between the Owner and a contractor or supplier. The specific warranties, guarantees, and General Conditions 007200-30 Corpus Christi Standards-Regular Projects 03-23-2015 correction obligations contained in an assigned contract govern with respect to Contractor's performance obligations to Owner for the Work described in an assigned contract. 7.14 Indemnification A. TO THE FULLEST EXTENT PERMITTED BY LAW,THE CONTRACTOR SHALL INDEMNIFY, DEFEND,AND HOLD HARMLESS THE OWNER'S INDEMNITEES FROM AND AGAINST CLAIMS, DAMAGES, LOSSES AND EXPENSES, INCLUDING BUT NOT LIMITED TO ATTORNEY'S FEES OR DISPUTE RESOLUTION COSTS, ARISING OUT OF OR RESULTING FROM PERFORMANCE OF THE WORK,VIOLATIONS OF LAWS OR REGULATIONS,OR BODILY INJURY, DEATH,OR DESTRUCTION OF TANGIBLE PROPERTY CAUSED BY THE ACTS OR OMISSIONS OF THE CONTRACTOR'S TEAM, REGARDLESS OF WHETHER SUCH CLAIM, DAMAGE, LOSS OR EXPENSE IS ALLEGED TO BE CAUSED IN PART BY AN OWNER'S INDEMNITEE HEREUNDER,SUBJECT TO THE OWNER'S DEFENSES AND LIABILITY LIMITS UNDER THE TEXAS TORT CLAIMS ACT. HOWEVER, NOTHING HEREIN SHALL BE CONSTRUED TO REQUIRE CONTRACTOR TO INDEMNIFY AN OWNER'S INDEMNITEE AGAINST A CLAIM, LOSS, DAMAGE OR EXPENSE CAUSED BY THE(I) NEGLIGENCE OR FAULT, (II) BREACH OR VIOLATION OF A STATUTE,ORDINANCE, GOVERNMENTAL REGULATION,STANDARD OR RULE,OR(III)THE BREACH OF CONTRACT BY AN OWNER'S INDEMNITEE. PROVIDED FURTHER HOWEVER,AND IN ADDITION TO THE ABOVE, CONTRACTOR INDEMNIFIES EACH OF OWNER'S INDEMNITEES AGAINST CLAIMS FOR THE BODILY INJURY OR DEATH OF AN EMPLOYEE OF THE CONTRACTOR'S TEAM OF ANY TIER EVEN IF CAUSED BY THE SOLE OR CONCURRENT NEGLIGENCE OF AN OWNER'S INDEMNITEE. B. TO THE FULLEST EXTENT PERMITTED BY LAW,CONTRACTOR SHALL INDEMNIFY, DEFEND,AND HOLD HARMLESS THE OWNER'S INDEMNITEES FROM AND AGAINST INDEMNIFIED COSTS,ARISING OUT OF OR RELATING TO:(I)THE FAILURE TO CONTROL,CONTAIN,OR REMOVE A CONSTITUENT OF CONCERN BROUGHT TO THE SITE BY CONTRACTOR'S TEAM OR A HAZARDOUS ENVIRONMENTAL CONDITION CREATED BY CONTRACTOR'S TEAM, (II)CONTRACTOR'S TEAM'S ACTION OR INACTION RELATED TO DAMAGES, DELAYS, DISRUPTIONS,OR INTERFERENCE WITH THE WORK OF OWNER'S EMPLOYEES, OTHER CONTRACTORS,OR UTILITY OWNERS PERFORMING OTHER WORK AT OR ADJACENT TO THE SITE,OR(III)THE CORRECTION OF DEFECTIVE WORK. NOTHING IN THIS PARAGRAPH OBLIGATES THE CONTRACTOR TO INDEMNIFY THE OWNER'S INDEMNITEES FROM THE CONSEQUENCES OF THE OWNER'S AND OWNER'S INDEMNITEES OWN NEGLIGENCE. PROVIDED FURTHER HOWEVER,AND IN ADDITION TO THE ABOVE,CONTRACTOR INDEMNIFIES THE OWNER'S INDEMNITEES AGAINST CLAIMS FOR THE BODILY INJURY OR DEATH OF AN EMPLOYEE OF THE CONTRACTOR'S TEAM OF ANY TIER EVEN IF CAUSED BY THE SOLE OR CONCURRENT NEGLIGENCE OF OWNER'S INDEMNITEES. C. TO THE FULLEST EXTENT PERMITTED BY LAW,CONTRACTOR SHALL INDEMNIFY, DEFEND,AND HOLD HARMLESS THE OWNER'S INDEMNITEES FROM AND AGAINST INDEMNIFIED COSTS RESULTING FROM INFRINGEMENT ON PATENT RIGHTS OR COPYRIGHTS BY CONTRACTOR'S TEAM TO THE FULLEST EXTENT PERMITTED BY LAW. D. The indemnification obligations under this paragraph are not limited by the amount or type of damages, compensation, or benefits payable by or for members of the Contractor's Team or other individuals or entities under workers' compensation acts, disability benefit acts, or other employee benefit acts in claims against Owner's Indemnitees by an employee or the survivor or personal representative of employee of Contractor's Team. General Conditions 007200-31 Corpus Christi Standards-Regular Projects 03-23-2015 E. The indemnification obligations of this Paragraph 7.14 do not extend to the liability of Designer arising out of the preparation of the Contract Documents or giving directions or instructions, or failing to give them, to the extent they are obligated to do so if that is the primary cause of the injury or damage. F. Notify the other party within 10 days if Owner or Contractor receives notice of any claim or circumstances that could give rise to an indemnified loss. The notice must include the following: 1. A description of the indemnification event in reasonable detail; 2. The basis on which indemnification may be due; and 3. The anticipated amount of the indemnified loss. This notice does not stop or prevent Owner's Indemnitees from later asserting a different basis for indemnification or a different amount of indemnified loss than that indicated in the initial notice. Owner's Indemnitees do not waive any rights to indemnification except to the extent that Contractor is prejudiced, suffers loss, or incurs expense because of the delay if Owner does not provide this notice within the 10-day period. G. Defense of Indemnification Claims: 1. Assume the defense of the claim with counsel chosen by the Contractor and pay related costs, unless Owner decides otherwise. Contractor's counsel must be acceptable to Owner. Control the defense and any negotiations to settle the claim. Advise Owner's Indemnitees as to its defense of the claim within 10 days after being notified of the indemnification request. Owner's Indemnitees may assume and control the defense If Contractor does not assume the defense. Pay all defense expenses of the Owner's Indemnitees as an indemnified loss. 2. Owner's Indemnitees may retain separate counsel to participate in, but not control, the defense and any settlement negotiations if Contractor defends the claim. Contractor may not settle the claim without the consent or agreement of Owner. Contractor may settle the claim with Owner's consent and agreement unless it: a. Would result in injunctive relief or other equitable remedies or otherwise require Owner's Indemnitees to comply with restrictions or limitations that adversely affect Owner's Indemnitees; b. Would require Owner's Indemnitees to pay amounts that Contractor does not fund in full; or C. Would not result in Owner and Owner's Indemnitees'full and complete release from all liability to the plaintiffs or claimants who are parties to or otherwise bound by the settlement. 7.15 Delegation of Professional Design Services A. Contractor is not required to provide professional design services unless these services are specifically required by the Contract Documents for a portion of the Work or unless these services are required to carry out Contractor's responsibilities for construction means, methods,techniques, sequences, and procedures. Contractor is not required to provide professional services in violation of applicable Laws and Regulations. General Conditions 007200-32 Corpus Christi Standards-Regular Projects 03-23-2015 B. The Contract Documents specify performance and design criteria related to systems, materials, or equipment if professional design services or certifications by a design professional related to systems, materials, or equipment are specifically required of Contractor. These services or certifications must be provided by the licensed Texas Professional Engineer or Registered Architect who prepares, signs, and seals drawings, calculations, specifications, certifications, Shop Drawings, and other documents. C. OPT is entitled to rely upon the adequacy, accuracy, and completeness of the services, certifications, or approvals performed by Contractor's design professionals, provided OPT has specified to Contractor the performance and design criteria that these services must satisfy. D. Pursuant to this Paragraph 7.15, Designer's review and approval of design calculations and design drawings is only for the limited purpose of checking for conformance with the performance and design criteria given and the design concepts expressed in the Contract Documents. Designer's review and approval of Shop Drawings and other documents is only for the purpose stated in the Contract Documents. E. Contractor is not responsible for the adequacy of the performance or design criteria specified by OPT. Advise OPT if the performance or design criteria are known or considered likely to be inadequate or otherwise deficient. ARTICLE 8—OTHER WORK AT THE SITE 8.01 Other Work A. Owner may arrange for other work at or adjacent to the Site which is not part of the Contractor's Work. This other work may be performed by Owner's employees or through other contractors. Utility owners may perform work on their utilities and facilities at or adjacent to the Site. Include costs associated with coordinating with entities performing other work or associated with connecting to this other work in the Contract Price if this other work is shown in the Contract Documents. B. OPT is to notify Contractor of other work prior to starting the work and provide any knowledge they have regarding the start of utility work at or adjacent to the Site to Contractor. C. Provide other contractors: 1. Proper and safe access to the Site; 2. Reasonable opportunity for the introduction and storage of materials and equipment; and 3. Reasonable opportunity to execute their work. D. Provide cutting, fitting, and patching of the Work required to properly connect or integrate with other work. Do not endanger the work of others by cutting, excavating, or otherwise altering the work of others without the consent of OAR and the others whose work will be affected. E. Inspect the work of others and immediately notify OAR if the proper execution of part of Contractor's Work depends upon work performed by others and this work has not been performed or is unsuitable for the proper execution of Contractor's Work. Contractor's General Conditions 007200-33 Corpus Christi Standards-Regular Projects 03-23-2015 failure to notify the OAR constitutes an acceptance of this other work as acceptable for integration with Contractor's Work. This acceptance does not apply to latent defects or deficiencies in the work of others. F. Take adequate measures to prevent damages, delays, disruptions, or interference with the work of Owner, other contractors, or utility owners performing other work at or adjacent to the Site. 8.02 Coordination A. Owner has sole authority and responsibility for coordination of this other work unless otherwise provided in the Contract Documents. The Owner is to identify the entity with authority and responsibility for coordination of the activities of the various contractors, the limitations of their authority, and the work to be coordinated prior to the start of other work at or adjacent to the Site. 8.03 Legal Relationships A. Contractor may be entitled to a change in Contract Price or Contract Times if, while performing other work at or adjacent to the Site for Owner, the OPT, other contractor, or utility owner: 1. Damages the Work or property of Contractor's Team; 2. Delays, disrupts, or interferes with the execution of the Work; or 3. Increases the scope or cost of performing the Work through their actions or inaction. B. Notify the OAR immediately of the event leading to a potential Change Proposal so corrective action can be taken. Submit the Change Proposal within 30 days of the event if corrective action has not adequately mitigated the impact of the actions or inactions of others. Information regarding this other work in the Contract Documents is used to determine if the Contractor is entitled to a change in Contract Price or Contract Times. Changes in Contract Price require that Contractor assign rights against the other contractor or utility owner to Owner with respect to the damage, delay, disruption, or interference that is the subject of the adjustment. Changes in Contract Times require that the time extension is essential to Contractor's ability to complete the Work within the Contract Times. C. Take prompt corrective action if Contractor's Team damages, delays, disrupts, or interferes with the work of Owner's employees, other contractors, or utility owners performing other work at or adjacent to the Site or agree to compensate other contractors or utility owners for correcting the damage. Promptly attempt to settle claims with other contractors or utility owners if Contractor damages, delays, disrupts, or interferes with the work of other contractors or utility owners performing other work at or adjacent to the Site. D. Owner may impose a set-off against payments due to Contractor and assign the Owner's contractual rights against Contractor with respect to the breach of the obligations described in this Paragraph 8.03 to other contractors or utility owners if damages, delays, disruptions, or interference occur. General Conditions 007200-34 Corpus Christi Standards-Regular Projects 03-23-2015 E. Contractor's obligation to indemnify Owner's Indemnitees for claims arising out of or related damages, delays, disruptions, and interference with other work at the Site are as set forth in Paragraph 7.14. ARTICLE 9—OWNER'S AND OPT'S RESPONSIBILITIES 9.01 Communications to Contractor A. OPT issues communications to Contractor through OAR except as otherwise provided in the Contract Documents. 9.02 Replacement of Owner's Project Team Members A. Owner may replace members of the OPT at its discretion. 9.03 Furnish Data A. OPT is to furnish the data required of OPT under the Contract Documents. 9.04 Pay When Due A. Owner is to make payments to Contractor when due as described in Paragraphs 15.01.D and 15.06.D. 9.05 Lands and Easements; Reports and Tests A. Owner's duties with respect to providing lands and easements are described in Paragraph 5.01. OPT will make copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at the Site available to Contractor in accordance with Paragraph 5.03. 9.06 Insurance A. Owner's responsibilities with respect to purchasing and maintaining insurance are described in Article 6. 9.07 Modifications A. Owner's responsibilities with respect to Modifications are described in Article 11. 9.08 Inspections,Tests, and Approvals A. OPT's responsibility with respect to certain inspections, tests, and approvals are described in Paragraph 14.02. 9.09 Limitations on OPT's Responsibilities A. The OPT does not supervise, direct, or have control or authority over, and is not responsible for Contractor's means, methods, techniques, sequences, or procedures of construction, or related safety precautions and programs, or for failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. OPT is not responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. General Conditions 007200-35 Corpus Christi Standards-Regular Projects 03-23-2015 9.10 Undisclosed Hazardous Environmental Condition A. OPT's responsibility for undisclosed Hazardous Environmental Conditions is described in Paragraph 5.06. 9.11 Compliance with Safety Program A. Contractor is to inform the OPT of its safety programs and OPT is to comply with the specific applicable requirements of this program. ARTICLE 10—OAR'S AND DESIGNER'S STATUS DURING CONSTRUCTION 10.01 Owner's Representative A. OAR is Owner's representative. The duties and responsibilities and the limitations of authority of OAR as Owner's representative are described in the Contract Documents. 10.02 Visits to Site A. Designer is to make periodic visits to the Site to observe the progress and quality of the Work. Designer is to determine, in general, if the Work is proceeding in accordance with the Contract Documents based on observations made during these visits. Designer is not required to make exhaustive or continuous inspections to check the quality or quantity of the Work. Designer is to inform the OPT of issues or concerns and OAR is to work with Contractor to address these issues or concerns. Designer's visits and observations are subject to the limitations on Designer's authority and responsibility described in Paragraphs 9.09 and 10.07. B. OAR is to observe the Work to check the quality and quantity of Work, implement Owner's quality assurance program, and administer the Contract as Owner's representative as described in the Contract Documents. OAR's visits and observations are subject to the limitations on OAR's authority and responsibility described in Paragraphs 9.09 and 10.07. 10.03 Resident Project Representatives A. Resident Project Representatives assist OAR in observing the progress and quality of the Work at the Site. The limitations on Resident Project Representatives' authority and responsibility are described in Paragraphs 9.09 and 10.07. 10.04 Rejecting Defective Work A. OPT has the authority to reject Work in accordance with Article 14. OAR is to issue a Defective Work Notice to Contractor and document when Defective Work has been corrected or accepted in accordance with Article 14. 10.05 Shop Drawings, Modifications and Payments A. Designer's authority related to Shop Drawings and Samples are described in the Contract Documents. B. Designer's authority related to design calculations and design drawings submitted in response to a delegation of professional design services are described in Paragraph 7.15. General Conditions 007200-36 Corpus Christi Standards-Regular Projects 03-23-2015 C. OAR and Designer's authority related to Modifications is described in Articles 11. D. OAR's authority related to Applications for Payment is described in Articles 13 and 15. 10.06 Decisions on Requirements of Contract Documents and Acceptability of Work A. OAR is to render decisions regarding non-technical or contractual/administrative requirements of the Contract Documents and will coordinate the response of the OPT to Contractor. B. Designer is to render decisions regarding the conformance of the Work to the requirements of the Contract Documents. Designer will render a decision to either correct the Defective Work, or accept the Work under the provisions of Paragraph 14.04, if Work does not conform to the Contract Documents. OAR will coordinate the response of the OPT to Contractor. C. OAR will issue a Request for a Change Proposal if a Modification is required. OAR will provide documentation for changes related to the non-technical or contractual/ administrative requirements of the Contract Documents. Designer will provide documentation if design related changes are required. D. Contractor may appeal Designer's decision by submitting a Change Proposal if Contractor does not agree with the Designer's decision. 10.07 Limitations on OAR's and Designer's Authority and Responsibilities A. OPT is not responsible for the acts or omissions of Contractor's Team. No actions or failure to act, or decisions made in good faith to exercise or not exercise the authority or responsibility available under the Contract Documents creates a duty in contract, tort, or otherwise of the OPT to the Contractor or members of the Contractor's Team. ARTICLE 11—AMENDING THE CONTRACT DOCUMENTS; CHANGES IN THE WORK 11.01 Amending and Supplementing the Contract Documents A. The Contract Documents may be modified by a Contract Amendment, Change Order, Work Change Directive, or Field Order. 1. Contract Amendment: Owner and Contractor may modify the terms and conditions of the Contract Documents without the recommendation of the Designer using a Contract Amendment. A Contract Amendment may be used for: a. Changes that do not involve: 1) The performance or acceptability of the Work; 2) The design as described in the Drawings, Specifications, or otherwise; or 3) Other engineering, architectural or technical matters. b. Authorizing new phases of the Work and establishing the Contract Price, Contract Times, or terms and conditions of the Contract for the new phase of Work when using phased construction or purchasing Goods and Special Services to be incorporated into the Project. General Conditions 007200-37 Corpus Christi Standards-Regular Projects 03-23-2015 2. Change Order: All changes to the Contract Documents that include a change in the Contract Price or the Contract Times for previously authorized Work, or changes to the Work requiring Designer's approval must be made by a Change Order. A Change Order may also be used to establish modifications of the Contract Documents that do not affect the Contract Price or Contract Times. 3. Work Change Directive: A Work Change Directive does not change the Contract Price or the Contract Times, but is evidence that the parties expect that the modifications ordered or documented by a Work Change Directive are to be incorporated in a subsequently issued Change Order following negotiations on the Contract Price and Contract Times. Contractor must submit a Change Proposal seeking an adjustment of the Contract Price or the Contract Times no later than 30 days after the completion of the Work set out in the Work Change Directive if negotiations are unsuccessful under the terms of the Contract Documents governing adjustments, expressly including Paragraphs 11.04 and 11.05. 4. Field Order: Designer may require minor changes in the Work that do not change the Contract Price or Contract Times using a Field Order. OAR may issue a Field Order for non-technical, administrative issues. Submit a Change Proposal if Contractor believes that a Field Order justifies an adjustment in the Contract Price or Contract Times before proceeding with the Work described in the Field Order. B. Perform added or revised Work under the applicable provisions of the Contract Documents for the same or similar Work unless different Drawings, Specifications, or directions are provided in the Modification. 11.02 Owner-Authorized Changes in the Work A. Owner may order additions, deletions, or revisions in the Work at any time as recommended by the Designer to the extent the change: 1. Involves the design as described in the Contract Documents; 2. Involves acceptance of the Work; or 3. Involves other engineering, architectural or technical matters. B. These changes may be authorized by a Modification. Proceed with the Work involved or, in the case of a deletion in the Work, immediately cease construction activities with respect to the deleted Work upon receipt of the Modification. Nothing in this paragraph obligates the Contractor to undertake Work that Contractor reasonably concludes cannot be performed in a manner consistent with Contractor's safety obligations under the Contract Documents or Laws and Regulations. 11.03 Unauthorized Changes in the Work A. Contractor is not entitled to an increase in the Contract Price or an extension of the Contract Times with respect to Work performed that is not required by the Contract Documents, except in the case of an emergency as provided in Paragraph 7.12, or in the case of uncovering Work as provided in Paragraph 14.05. General Conditions 007200-38 Corpus Christi Standards-Regular Projects 03-23-2015 B. Contractor is responsible for costs and time delays associated with variations from the requirements of the Contract Documents unless the variations are specifically approved by Change Order. 11.04 Change of Contract Price A. The Contract Price can only be changed by a Change Order. Any Change Proposal for an adjustment in the Contract Price must comply with the provisions of Paragraph 11.06. Any Claim for an adjustment of Contract Price must comply with the provisions of Article 12. B. An adjustment in the Contract Price is to be determined as follows: 1. By applying unit prices to the quantities of the items involved, subject to the provisions of Paragraph 13.03,where the Work involved is covered by unit prices in the Contract Documents; 2. By a mutually agreed lump sum where the Work involved is not covered by unit prices in the Contract Documents; or 3. Payment on the basis of the Cost of the Work determined as provided in Paragraph 13.01 plus a Contractor's fee for overhead and profit determined as provided in Paragraph 11.04.D when the Work involved is not covered by unit prices in the Contract Documents or the parties do not reach a mutual agreement to a lump sum. C. The original Contract Price may not be increased by more than 25 percent or the limit set out in Texas Local Government Code 252.048 or its successor statute. Owner may decrease the Work by up to 25 percent of the Contract Price without adjusting Contractor's fee. D. Contractor's Fee: Determine the Contractor's fee for overhead and profit as follows: 1. A mutually acceptable fixed fee; or 2. A fee based on the following percentages of the various portions of the Cost of the Work: a. The Contractor's fee is 15 percent for costs incurred under Paragraphs 13.01.C.1 and 13.01.C.2; b. The Contractor's fee is 5 percent for costs incurred under Paragraph 13.01.C.3; C. Fees are to be determined as follows where one or more tiers of subcontracts are used: 1) The Subcontractor's fee is 15 percent for costs incurred under Paragraphs 13.01.C.1 and 13.01.C.2 for the Subcontractor that actually performs the Work at whatever tier; and 2) The Contractor and Subcontractors of a tier higher than that of the Subcontractor that actually performs the Work are to be allowed a fee of 5 percent of the fee plus underlying costs incurred by the next lower tier Subcontractor; d. No fee is payable on the basis of costs itemized under Paragraphs 13.01.C.4, and 13.01.D; e. Five percent of the net decrease in the cost is to be deducted for changes which result in a net decrease in Contract Price; and General Conditions 007200-39 Corpus Christi Standards-Regular Projects 03-23-2015 3. The adjustment in Contractor's fee is based on the net change in accordance with Paragraphs 11.04.D.2.a through 11.04.D.2.e, inclusive when both additions and credits are involved in any one change. 11.05 Change of Contract Times A. The Contract Times can only be changed by Change Order. Any Change Proposal for an adjustment in the Contract Times must comply with the provisions of Paragraph 11.06. Any Claim for an adjustment in the Contract Times must comply with the provisions of Article 12. B. An adjustment of the Contract Times is subject to the limitations described in Paragraph 4.04. 11.06 Change Proposals A. Submit a Change Proposal to the OAR to: 1. Request an adjustment in the Contract Price or Contract Times; 2. Appeal an initial decision by OPT concerning the requirements of the Contract Documents or relating to the acceptability of the Work under the Contract Documents; 3. Contest a set-off against payment due; or 4. Seek other relief under the Contract Documents. B. Notify the OAR immediately if a Change Proposal is to be submitted. Submit each Change Proposal to OAR no later than 30 days after the event initiating the Change Proposal. Submit the following as part of the Change Proposal: 1. Any proposed change in Contract Price, Contract Times, or other relief, accompanied by a statement that the requested Change Order is the entire adjustment to which Contractor believes it is entitled; 2. The reason for the proposed change; and 3. Supporting data, accompanied by a statement that the supporting data is accurate and complete. C. OAR is to advise OPT regarding the Change Proposal. OPT is to review each Change Proposal and Contractor's supporting data, and within 30 days after receipt of the documents, direct the OAR to either approve or deny the Change Proposal in whole or in part. OAR is to issue a Change Order for an approved Change Proposal. The Contractor may deem the Change Proposal to be denied if OAR does not take action on the Change Proposal within 30 days and start the time for appeal of the denial under Article 12. 11.07 Execution of Change Orders A. Owner and Contractor are to execute Change Orders covering: 1. Changes in the Contract Price or Contract Times which are agreed to by Owner and Contractor, including undisputed sums or amount of time for Work actually performed in accordance with a Work Change Directive; General Conditions 007200-40 Corpus Christi Standards-Regular Projects 03-23-2015 2. Changes in Contract Price resulting from Owner set-offs unless the set-off has been successfully challenged by Contractor; 3. Changes in the Work which are: a. Ordered by Owner pursuant to Paragraph 11.02.A, b. Required because Defective Work was accepted under Paragraph 14.04 or Owner's correction of Defective Work under Paragraph 14.07, or C. Agreed to by the Owner and Contractor; and 4. Changes in the Contract Price or Contract Times, or other changes under Paragraph 11.06 or Article 12. B. Acceptance of a Change Order by Contractor constitutes a full accord and satisfaction for any and all claims and costs of any kind, whether direct or indirect, including but not limited to impact, delay, or acceleration damages arising from the subject matter of the Change Order. Each Change Order must be specific and final as to prices and extensions of time, with no reservations or other provisions allowing for future additional money or time as a result of the particular changes identified and fully compensated in the Change Order. The execution of a Change Order by Contractor constitutes conclusive evidence of Contractor's agreement to the ordered changes in the Work. This Contract, as amended, forever releases any claim against Owner for additional time or compensation for matters relating to or arising out of or resulting from the Work included within or affected by the executed Change Order. This release applies to claims related to the cumulative impact of all Change Orders and to any claim related to the effect of a change on unchanged Work. C. All Change Orders require approval by either the City Council or Owner by administrative action. The approval process requires a minimum of 45 days after submission in final form with all supporting data. Receipt of Contractor's submission by Owner constitutes neither acceptance nor approval of a Bid, nor a warranty that the Bid will be authorized by City Council or administrative action. The time required for the approval process may not be considered a delay and no extensions to the Contract Times or increase in the Contract Price will be considered or granted as a result of the process. Contractor may proceed with Work if a Work Change Directive is issued. D. A Change Order is deemed to be in full force as if executed by Contractor if the Contractor refuses to execute a Change Order that is required to be executed under the terms of this Paragraph 11.07. 11.08 Notice to Surety A. Notify the surety of Modifications affecting the general scope of the Work, changes in the provisions of the Contract Documents, or changes in Contract Price or Contract Times. Adjust the amount of each Bond when Modifications change the Contract Price. General Conditions 007200-41 Corpus Christi Standards-Regular Projects 03-23-2015 ARTICLE 12—CLAIMS 12.01 Claims A. Follow the Claims process described in this Article for the following disputes between Owner and Contractor: 1. A demand or assertion by Owner to Contractor, submitted in accordance with the requirements of the Contract Documents: a. Seeking an adjustment of Contract Price or Contract Times; b. Contesting an initial decision by Designer concerning the requirements of the Contract Documents or the acceptability of Work under the Contract Documents; C. Contesting Designer's decision regarding a Change Proposal; d. Seeking resolution of a contractual issue that OAR has declined to address; or e. Seeking other relief with respect to the terms of the Contract. 2. A demand or assertion by Contractor to Owner, submitted in accordance with the requirements of the Contract Documents: a. Contesting OPT's decision regarding a Change Proposal; or b. Seeking resolution of a contractual issue that OPT has declined to address. 12.02 Claims Process A. Claims must be initiated by written notice. B. Claims by Contractor must be in writing and delivered to the Owner, Designer, and the OAR within 7 days: 1. After the start of the event giving rise to the Claim; or 2. After a final decision on a Change Proposal has been made. C. Claims by Owner must be submitted by written notice to Contractor. D. The responsibility to substantiate a Claim rests with the entity making the Claim. E. In the case of a Claim by Contractor seeking an increase in the Contract Price or Contract Times, Contractor must certify that the Claim is made in good faith, that the supporting data is accurate and complete, and that to the best of Contractor's knowledge and belief, the amount of time or money requested accurately reflects the full amount to which Contractor is entitled. F. The entity receiving a Claim is to review the Claim giving full consideration to its merits. The Owner and Contractor are to seek to resolve the Claim through the exchange of information and direct negotiations. The Owner and Contractor may extend the time for resolving the Claim by mutual agreement. Notify OAR of actions taken on a Claim. G. Owner and Contractor may mutually agree to mediate the underlying dispute at any time after initiation of a Claim. 1. The agreement to mediate suspends the Claim submittal and response process. General Conditions 007200-42 Corpus Christi Standards-Regular Projects 03-23-2015 2. Owner or Contractor may unilaterally terminate the mediation process after 60 days from the agreement to mediate and resume the Claim submittal and decision process as of the date of the termination. The Claim process resumes as of the date of the conclusion of the mediation, as determined by the mediator, if the mediation is unsuccessful in resolving the dispute. 3. Owner and Contractor are to each pay one-half of the mediator's fees and costs. H. If the entity receiving a Claim approves the Claim in part or denies it in part,this action is final and binding unless the other entity invokes the procedure described in Article 17 for final resolution of disputes within 30 days of this action. I. Notify the OAR if efforts to resolve the Claim are not successful, and the Claim is denied. A denial of the Claim is final and binding unless the other entity invokes the procedure described in Article 17 for the final resolution of disputes within 30 days of the denial. J. The results of the agreement or action on the Claim is to be incorporated in a Change Order by the OAR to the extent they affect the Contract Documents,the Contract Price, or the Contract Times if the Owner and Contractor reach a mutual agreement regarding a Claim. ARTICLE 13—COST OF THE WORK;ALLOWANCES; UNIT PRICE WORK 13.01 Cost of the Work A. The Cost of the Work is the sum of costs described in this Paragraph 13.01, except those excluded in Paragraph 13.01.D, necessary for the proper performance of the Work. The provisions of this Paragraph 13.01 are used for two distinct purposes: 1. To determine Cost of the Work when Cost of the Work is a component of the Contract Price under cost-plus, time-and-materials, or other cost-based terms; or 2. To determine the value of a Change Order, Change Proposal, Claim, set-off, or other adjustment in Contract Price. B. Contractor is entitled only to those additional or incremental costs required because of the change in the Work or because of the event giving rise to the adjustment when the value of the adjustment is determined on the basis of the Cost of the Work. C. Costs included in the Cost of the Work may not exceed the prevailing costs in the proximate area of the Site for similar work unless agreed to by the Owner. Cost of the Work includes only the following items: 1. Payroll costs for Contractor's employees performing the Work, including one foreman per crew, and other required and agreed upon personnel for the time they are employed on the Work. Employees are to be paid according to wage rates for job classifications as agreed to by Owner. Where the Cost of the Work is being used under provisions of Paragraph 13.01.A.2, rates paid for this Work are to be the same as paid for Contract Work as established by certified payroll. Payroll costs may include: a. Actual costs paid for salaries and wages; b. Actual cost paid for fringe benefits, which may include: 1) Social security contributions, General Conditions 007200-43 Corpus Christi Standards-Regular Projects 03-23-2015 2) Unemployment, 3) Excise and payroll taxes, 4) Workers' compensation, 5) Health and retirement benefits, 6) Bonuses, and 7) Paid time off for sick leave, vacations, and holidays; and C. Actual cost of additional compensation paid for performing Work outside of regular working hours, on Saturday, Sunday, or legal holidays,to the extent authorized by Owner. 2. Cost of materials and equipment furnished and incorporated in the Work, including transportation and storage costs and required Suppliers' field services. Contractor may retain cash discounts unless Owner provided funds to the Contractor for early payment of these materials and equipment. Cash discounts are to be credited to Owner if the Owner provides funds for early payment. Make provisions for trade discounts, rebates, refunds, and returns from sale of surplus materials and equipment and reduce the Cost of the Work by these amounts. 3. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. Obtain competitive bids from Subcontractors acceptable to Owner unless Owner agrees to use Subcontractors proposed by the Contractor. Bids are to be opened in the presence of the OAR and other designated members for the OPT. Provide copies of bids to the OAR to use in determining, with the OPT, which bids are acceptable. The Subcontractor's Cost of the Work and fee are determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph 13.01 if the subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee. 4. Supplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work; b. Costs of materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site including transportation and maintenance costs; C. Costs of hand tools not owned by the workers consumed in the performance of the Work. Costs of hand tools not owned by the workers which are used but not consumed in the performance of the Work and which remain the property of Contractor, less their market value when Work is completed; d. Rental of construction equipment, including the costs of transporting, loading, unloading, assembling, dismantling, and removing construction equipment, whether rented from Contractor or others, in accordance with rental agreements approved by Owner. Costs for rental of equipment will not be paid when the equipment is no longer necessary for the Work. Justify idle time for equipment by demonstrating that it was necessary to keep equipment on Site for related future Work; General Conditions 007200-44 Corpus Christi Standards-Regular Projects 03-23-2015 e. Applicable sales, consumer, use, and other similar taxes related to the Work for which the Owner is not exempt, and which Contractor pays consistent with Laws and Regulations; f. Deposits lost for causes other than negligence of Contractor's Team; g. Royalty payments and fees for permits and licenses; h. Cost of additional utilities, fuel, and sanitary facilities at the Site; i. Minor expense items directly required by the Work; and j. Premiums for Bonds and insurance required by the Contract Documents. D. The Cost of the Work does not include the following items: 1. Payroll costs and other compensation of Contractor's officers, executives, principals of partnerships and sole proprietorships, general managers, safety managers, superintendents, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, clerks, and other personnel employed by Contractor, whether at the Site or in Contractor's principal or branch office, for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph 13.01.C.1 or specifically covered by Paragraph 13.01.C.4. These administrative costs are covered by the Contractor's fee. 2. Office expenses other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the actions of Contractor's Team for the correction of Defective Work, disposal of materials or equipment that do not comply with Specifications, and correcting damage to property. 5. Losses, damages, and related expenses caused by damage to the Work or sustained by Contractor in connection with the performance of the Work. Contractor is entitled to recover costs if covered by insurance provided in accordance with Article 6. Such losses may include settlements made with the approval of Owner. Do not include these losses, damages, and expenses in the Cost of the Work when determining Contractor's fee. 6. Any Indemnified Cost paid with regard to Contractor's indemnification of Owner's Indemnitees. 7. Other overhead or general expense costs and the costs of items not described in Paragraphs 13.01.C. E. The Contractor's fee is determined as follows: 1. In accordance with the Agreement when the Work is performed on a cost-plus basis. 2. In accordance with Paragraph 11.04.0 for Work covered by a Modification determined on the basis of Cost of the Work. F. Establish and maintain records in accordance with generally accepted accounting practices and submit these records, including an itemized cost breakdown together with supporting General Conditions 007200-45 Corpus Christi Standards-Regular Projects 03-23-2015 data, in a form and at intervals acceptable to OAR whenever the Cost of the Work is to be determined pursuant to this Paragraph 13.01. 13.02 Allowances A. Include allowances specified in the Contract Documents in the Contract Price and provide Work covered by the allowance as authorized by the Owner through the OAR. B. Contractor agrees that: 1. The cash allowance is used to compensate the Contractor for the cost of furnishing materials and equipment for the Work covered by the allowance item in the Contract Documents. Cost may include applicable taxes. Make provisions for trade discounts, rebates, and refunds and reduce the allowance costs by these amounts. 2. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the cash allowances have been included in the Contract Price and not in the allowances; and 3. Costs for cash allowances and installation costs as described in Paragraphs 13.02.13.1 and 13.02.13.2 above are included in the Contract Price. C. OAR will issue a Change Order to adjust the Contract Price by the difference between the allowance amount and the actual amount paid by Contractor for Work covered by the allowance. The Change Order will be issued at the time costs are incurred by Contractor for Work covered by the allowance and this Work is included on the Application for Payment. 13.03 Unit Price Work A. The initial Contract Price for Unit Price Work is equal to the sum of the unit price line items in the Agreement. Each unit price line item amount is equal to the product of the unit price for each line item times the estimated quantity of each item as indicated in the Agreement. B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparing Bids and determining an initial Contract Price. Payments to Contractor for Unit Price Work are to be based on actual quantities measured for Work in place. C. Each unit price is deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. D. OAR is to determine the actual quantities and classifications of Unit Price Work performed by Contractor to be incorporated into each Application for Payment. OAR's decision on actual quantities is final and binding, subject to the provisions of Paragraph 13.03.E. E. Contractor may submit a Change Proposal, or Owner may file a Claim, seeking an adjustment in the Contract Price within 30 days of OAR's decision under Paragraph 13.03.D, if: 1. The total cost of a particular item of Unit Price Work amounts to 20 percent or more of the total Contract Price and the variation in the quantity of that particular item of Unit Price Work performed by the Contractor differs by more than 20 percent from the estimated quantity of an item indicated in the Agreement; 2. There is no corresponding adjustment with respect to other items of Work; and General Conditions 007200-46 Corpus Christi Standards-Regular Projects 03-23-2015 3. Contractor believes it has incurred additional expense as a result of this condition or if Owner believes that the quantity variation entitles Owner to an adjustment in the Contract Price. 13.04 Contingencies A. Contingency funds may be included in the Contract Price to pay for Work not defined specifically by the Contract Documents that is essential to the completion of the Project. Contingency funds will be as described in the Agreement. B. The contingency funds may be used for costs incurred by the Contractor provided these costs are approved by the Owner. Costs are to be determined and documented in accordance with Paragraph 13.01. The contingency funds are not to be used for the following items: 1. Cost overruns due to changes in material costs after the Contract Price is established, unless specific price escalation provisions are made in the Agreement. 2. Rework required to correct Defective Work. 3. Inefficiencies in completing the Work due to the Contractor's selected means, methods, sequences, or procedures of construction. 4. Work Contractor failed to include in the Contract Price. 5. Changes required by changes in Laws and Regulations enacted after the Contract Price is established. 6. Any Work that does not constitute a change in Scope in the Work included in the Contract Price. C. OAR is to issue a Change Order for approved expenditures from contingency funds. When the Change Order is issued, the costs are to be added to the Application for Payment. Contractor is to maintain a tabulation showing the contingency amount, adjustments to the contingency amount, and amounts remaining as the Project progresses. D. Any contingency amounts that are not included in a Change Order are retained by the Owner. A Change Order will be issued to deduct unused contingency amounts from the Contract Price prior to Final Payment. ARTICLE 14—TESTS AND INSPECTIONS; CORRECTION, REMOVAL,OR ACCEPTANCE OF DEFECTIVE WORK 14.01 Access to Work A. Provide safe access to the Site and the Work for the observation, inspection, and testing of the Work in progress. Contractor can require compliance with Contractor's safety procedures and programs as part of providing safe access. 14.02 Tests, Inspections, and Approvals A. OPT may retain and pay for the services of an independent inspector,testing laboratory, or other qualified individual or entity to perform inspections. Notify OAR when the Work is ready for required inspections and tests. Provide adequate notice to allow for coordination General Conditions 007200-47 Corpus Christi Standards-Regular Projects 03-23-2015 with entities providing inspection or testing as determined by the OAR. Cooperate with inspection and testing personnel and assist with providing access for required inspections, tests, and handling test specimens or Samples. B. Arrange for and facilitate inspections, tests, and approvals required by Laws or Regulations of governmental entities having jurisdiction that require Work to be inspected,tested, or approved by an employee or other representative of that entity. Pay associated costs and furnish OAR with the required certificates of inspection or approval. C. Arrange, obtain, and pay for inspections and tests required: 1. By the Contract Documents, unless the Contract Documents expressly allocate responsibility for a specific inspection or test to OPT; 2. To attain OPT's acceptance of materials or equipment to be incorporated in the Work; 3. By manufacturers of equipment furnished under the Contract Documents; 4. For testing, adjusting, and balancing of mechanical, electrical, and other equipment to be incorporated into the Work; 5. For acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work; 6. For re-inspecting or retesting Defective Work, including any associated costs incurred by the testing laboratory for cancelled tests or standby time; and 7. For retesting due to failed tests. D. Provide independent inspectors,testing laboratories, or other qualified individuals or entities acceptable to OPT to provide these inspections and tests. 14.03 Defective Work A. It is Contractor's obligation to assure that the Work is not Defective. B. OPT has the authority to determine whether Work is Defective and to reject Defective Work. C. OAR is to notify Contractor of Defective Work of which OPT has actual knowledge. D. Promptly correct Defective Work. E. Take no action that would void or otherwise impair Owner's special warranties or guarantees when correcting Defective Work. F. Pay claims, costs, losses, and damages arising out of or relating to Defective Work, including: 1. Costs for correction, removal, and replacement of Defective Work; 2. Cost of the inspection and testing related to correction of Defective Work; 3. Fines levied against Owner by governmental authorities because of Defective Work; and 4. Costs of repair or replacement of work of others resulting from Defective Work. General Conditions 007200-48 Corpus Christi Standards-Regular Projects 03-23-2015 14.04 Acceptance of Defective Work A. Owner may elect to accept Defective Work instead of requiring correction or removal and replacement of Defective Work provided: 1. This acceptance occurs prior to final payment; 2. Designer confirms that the Defective Work is in general accordance with the design intent and applicable engineering or architectural principles; and 3. Designer confirms that acceptance of the Defective Work does not endanger public health or safety. B. Owner may impose a reasonable set-off against payments due under Article 15 for costs associated with OPT's evaluation of Defective Work to determine if it can be accepted and to determine the diminished value of the Work. Owner may impose a reasonable set-off against payments due under Article 15 if the parties are unable to agree as to the decrease in the Contract Price to compensate Owner for the diminished value of Defective Work accepted. OAR is to issue a Modification for acceptance of the Defective Work prior to final payment. Pay an appropriate amount to Owner if the acceptance of Defective Work occurs after final payment. 14.05 Uncovering Work A. OPT has the authority to require inspection or testing of the Work,whether or not the Work is fabricated, installed, or completed. B. Work that is covered prior to approval of the OAR must be uncovered for OPT's observation if requested by OAR. Pay for uncovering Work and its subsequent restoration unless Contractor has given OAR timely notice of Contractor's intention to cover the Work and OAR fails to act with reasonable promptness in response to this notice. C. Provide necessary labor, material, and equipment and uncover, expose, or otherwise make available the portion of the Work suspected of being Defective for observation, inspection, or testing if OPT considers it necessary or advisable that covered Work be observed by Designer or inspected or tested by others as directed by the OAR. 1. Pay for claims, costs, losses, and damages associated with uncovering, exposing, observing, inspecting, and testing if it is found that the uncovered Work is Defective. Pay costs for correction of Defective Work. Pay for reconstruction, repair, or replacement of work of others if it is found that the uncovered Work is Defective. 2. Submit a Change Proposal for an increase in the Contract Price or an extension of the Contract Times directly attributable to this uncovering, exposure, observation, inspection,testing, and reconstruction if the uncovered Work is found to be not Defective. 14.06 Owner May Stop the Work A. Owner may order Contractor to stop the Work if: 1. The Work is Defective; 2. Contractor fails to supply sufficient skilled workers or suitable materials or equipment; or General Conditions 007200-49 Corpus Christi Standards-Regular Projects 03-23-2015 3. Contractor performs Work that may fail to conform to the Contract Documents when completed. This stop work order is to remain in effect until the reason for the stop work order has been eliminated. Owner's right to stop the Work does not create a duty to exercise this right for the benefit of Contractor's Team or surety. 14.07 Owner May Correct Defective Work A. Owner may remedy the following deficiencies after 7 days' notice to Contractor if: 1. Contractor fails to correct Defective Work, or to remove and replace rejected Work as required by OPT; 2. Contractor fails to perform the Work in accordance with the Contract Documents; or 3. Contractor fails to comply with other provisions of the Contract Documents. B. Owner may: 1. Exclude Contractor from the Site; 2. Take possession of the Work and suspend Contractor's services related to the Work; and 3. Incorporate stored materials and equipment in the Work. C. Allow OPT access to the Site and off Site storage areas to enable Owner to exercise the rights and remedies under this Paragraph 14.07. D. All claims, costs, losses, and damages incurred or sustained by Owner in exercising the rights and remedies under this Paragraph 14.07 are to be charged against Contractor as a set-off against payments due under Article 15. These claims, costs, losses, and damages include costs of repair and the cost of replacement of work of others destroyed or damaged by correction, removal, or replacement of Contractor's Defective Work. E. Contractor is not allowed an extension of the Contract Times because of delays in the performance of the Work attributable to the exercise of the Owner's rights and remedies under this Paragraph 14.07. ARTICLE 15—PAYMENTS TO CONTRACTOR;SET-OFFS; COMPLETION; CORRECTION PERIOD 15.01 Progress Payments A. Progress payments are to be submitted to the OAR on the Application for Payment form provided by the OAR following procedures in the Contract Documents. 1. Progress payments for lump sum Work are to be paid on the basis of the earned value to date at the amounts shown in the Schedule of Values submitted as required by Paragraph 2.03. Final payment will be for the total lump sum amount. 2. Progress payments for Unit Price Work are based on the number of units completed as determined under the provisions of Paragraph 13.03. General Conditions 007200-50 Corpus Christi Standards-Regular Projects 03-23-2015 3. Progress payments for Work to be paid on the basis of the Cost of the Work per Paragraphs 13.01, 13.02 and 13.04 are to be paid for Work completed by Contractor during the pay period. B. Reduction in Payment by Owner: 1. Owner is entitled to impose a set-off against payment based on the following: a. Claims made against Owner or costs, losses, or damages incurred by Owner related to: 1) Contractor's conduct in the performance of the Work, including, but not limited to, workplace injuries, non-compliance with Laws and Regulations, or patent infringement; or 2) Contractor's failure to take reasonable and customary measures to avoid damage, delay, disruption, and interference with other work at or adjacent to the Site, including but not limited to, workplace injuries, property damage, and non-compliance with Laws and Regulations. b. Owner has been required to remove or remediate a Hazardous Environmental Condition for which Contractor is responsible; C. Work is Defective, or completed Work has been damaged by Contractor's Team, requiring correction or replacement; d. Owner has been required to correct Defective Work or complete Work in accordance with Paragraph 14.07; e. The Contract Price has been reduced by Change Orders; f. Events have occurred that would constitute a default by Contractor justifying a termination for cause; g. Liquidated damages have accrued as a result of Contractor's failure to achieve Milestones, Substantial Completion, or completion of the Work; h. Liens have been filed in connection with the Work, except where Contractor has delivered a specific Bond satisfactory to Owner to secure the satisfaction and discharge of these Liens; i. Owner has been notified of failure to make payments to Subcontractors, Suppliers, or Employees; j. Failure to submit up-to-date record documents as required by the Contract Documents; k. Failure to submit monthly Progress Schedule updates or revised schedules as requested by the OAR; I. Failure to provide Project photographs required by the Contract Documents; m. Failure to provide Certified Payroll required by the Contract Documents; n. Compensation for OPT for overtime charges of OAR or RPR, third review of documents, review of substitutions, re-inspection fees, inspections or designs related to correction of Defective Work, or other services identified as requiring payment by the Contractor; General Conditions 007200-51 Corpus Christi Standards-Regular Projects 03-23-2015 o. Costs for tests performed by the Owner to verify that Work previously tested and found to be Defective has been corrected; p. OPT has actual knowledge of the occurrence of events that would constitute a default by Contractor and therefore justify termination for cause under the Contract Documents with associated cost impacts; q. Other items entitling Owner to a set-off against the amount recommended; or r. Payment would result in an over-payment of the Contract Price. 2. Compensation for services of OPT staff is to be at the rates established by negotiations between OPT and Contractor. 3. OAR is to notify Contractor stating the amount and the reasons for an imposed set-off. The Owner is to pay the Contractor amounts remaining after deduction of the set-off. Owner is to pay the set-off amount agreed to by Owner and Contractor if Contractor remedies the reasons for the set-off. Contractor may submit a Change Proposal contesting the set-off. C. Delayed Payments: 1. No money shall be paid by Owner upon any claim, debt, demand, or account whatsoever, to any person, firm, or corporation who is in arrears to Owner for taxes; and Owner shall be entitled to counterclaim and automatically offset against any such debt, claim, demand, or account in the amount of taxes so in arrears and no assignment or transfer of such debt, claim, demand, or account after said taxes are due, shall affect the right of Owner to offset said taxes, and associated penalties and interest if applicable, against the same. 2. No payment will be made for Work authorized by a Work Change Directive until the Work Change Directive is incorporated into a Change Order. Payment can be included in an Application for payment when the Change Order is approved. D. The Owner is to pay the amount of payment recommended by the OAR within 30 days after receipt of the Application for Payment and accompanying documentation from the OAR. 15.02 Contractor's Warranty of Title A. Contractor warrants and guarantees that title to the Work, materials, and equipment furnished under the Contract is to pass to Owner free and clear of Liens, title defects, and patent, licensing, copyright, or royalty obligations no later than 7 days after the time of payment by Owner of the Application for Payment which includes these items. 15.03 Substantial Completion A. Notify OAR when Contractor considers the entire Work substantially complete and request a Certificate of Substantial Completion. B. OPT is to inspect the Work after Contractor's notification to determine if the Work is substantially complete. OAR is to either issue the Certificate of Substantial Completion which sets the date of Substantial Completion or notify Contractor of the reasons the Project is not considered to be substantially complete. General Conditions 007200-52 Corpus Christi Standards-Regular Projects 03-23-2015 C. The OPT and Contractor are to meet to discuss Owner's use or occupancy of the Work following Substantial Completion. Items to be discussed at this meeting include: 1. Review of insurance policies with respect to the end of the Contractor's coverage, and confirm the transition to coverage of the Work under a permanent property insurance policy held by Owner; 2. Owner's assumption of responsibility for security, operation, protection of the Work, maintenance, and utilities upon Owner's use or occupancy of the Work; 3. Contractor's obligations for operations and maintenance during performance and acceptance testing; 4. Contractor's access to the Site to complete punch list items; and 5. Procedures for correction of Defective Work during the 1-year correction period. 15.04 Partial Utilization A. Owner may use or occupy substantially completed parts of the Work which are specifically identified in the Contract Documents, or which OPT and Contractor agree constitutes a separately functioning and usable part of the Work prior to Substantial Completion of the Work. Owner must be able to use that part of the Work for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. Contractor and OPT are to follow the procedures of Paragraph 15.03 for this part of the Work. B. No use or occupancy or separate operation of part of the Work may occur prior to compliance with the requirements of Article 6. 15.05 Final Inspection A. OPT is to make a final inspection upon notice from Contractor that the entire Work or portion to be accepted under Paragraph 15.04 is complete. OAR is to notify Contractor of Work determined to be incomplete or Defective. Immediately take corrective measures to complete the Work and correct Defective Work. 15.06 Final Payment A. Make Application for Final Payment after completing required corrections identified during the final inspection and delivering items and documents required by the Contract Documents. Provide the following with the final Application for Payment: 1. Consent of Surety to Final Payment acknowledging unsettled disputes; and 2. Certification of Payment of Debts and Claims or Certification of Release of Liens or furnish receipts or releases in full from Subcontractors and Suppliers. B. OAR is to either recommend payment of the final Application for Payment to Owner if OPT is satisfied that the Work has been completed and Contractor's other obligations under the Contract Documents have been fulfilled or notify the Contractor of the OPT's reasons for not recommending final payment. General Conditions 007200-53 Corpus Christi Standards-Regular Projects 03-23-2015 C. The Work is complete, subject to surviving obligations, when it is ready for final payment as established by the OAR's recommendation of payment of the final Application for Payment to Owner and the issuance of a Certificate of Final Completion. D. The Owner is to pay the amount of final payment recommended by the OAR within 30 days after receipt of the final Application for Payment and accompanying documentation from the OAR. 15.07 Waiver of Claims A. The making of final payment does not constitute a waiver by Owner of claims or rights against Contractor. Owner expressly reserves claims and rights arising from: 1. Unsettled Liens or claims for non-payment; 2. Defective Work appearing after final inspection pursuant to Paragraph 15.05; 3. Contractor's failure to comply with the Contract Documents or the terms of specified special guarantees; or 4. Contractor's continuing obligations under the Contract Documents. B. Contractor waives claims and rights against Owner by accepting final payment with the exception of those Claims made in accordance with the provisions of Article 17 and specifically noted in the Certificate of Final Completion. 15.08 Correction Period A. Promptly correct Defective Work without cost to Owner for 1 year after the date of Substantial Completion or longer periods of time prescribed by the terms of the Contract Documents. B. Promptly correct damages to the Site or adjacent areas that Contractor has arranged to use through construction easements or other agreements. Promptly correct damages to Work or the work of others. Make corrections without cost to Owner. C. Owner may have the Defective Work and damages described in Paragraphs 15.08.A and 15.08.13 corrected if Contractor does not comply with the terms of OAR's instructions, or in an emergency where delay would cause serious risk of loss or damage. D. Contractor's obligation to indemnify Owner's Indemnitees for claims arising out of or related to the correction of Defective Work are as set forth in Paragraph 7.14. E. The correction period starts to run from the date when a specific item of equipment or systems are placed in continuous beneficial use by Owner before Substantial Completion of Work if so provided in the Specifications or if accepted for beneficial use by the Owner. F. The correction period is extended for an additional period of 1 year for Defective Work corrected after the date of Substantial Completion or after the accepted date the correction period starts to run as described in Paragraph 15.08.E. This extended correction period starts to run when Defective Work has been satisfactorily corrected under this Paragraph 15.08. General Conditions 007200-54 Corpus Christi Standards-Regular Projects 03-23-2015 G. Contractor's obligations under this Paragraph 15.08 are in addition to other obligations or warranties. The provisions of this Paragraph 15.08 are not a substitute for, or a waiver of, the provisions of applicable statutes of limitation or repose. ARTICLE 16—SUSPENSION OF WORK AND TERMINATION 16.01 Owner May Suspend Work A. Owner may suspend the Work or a portion of the Work for a period of not more than 90 consecutive days, at any time and without cause, by notice to Contractor. This notice fixes the date on which Contractor is to resume Work. Contractor is entitled to adjustments in the Contract Price and Contract Times directly attributable to this suspension only if efforts are made to mitigate the cost impacts of the suspension. Meet with the Owner within 10 days of the notice of suspension to discuss specific strategies to reduce or eliminate the cost of delays. Submit a Change Proposal seeking an adjustment no later than 30 days after the date fixed for resumption of Work. 16.02 Owner May Terminate for Cause A. The occurrence of one or more of the following events constitutes a default by Contractor and justifies termination for cause: 1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents, including failure to supply sufficient skilled workers or suitable materials or equipment; 2. Failure to adhere to the Progress Schedule; 3. Failure of the Contractor to provide a satisfactory replacement Bond or insurance in the event either is lost or canceled; 4. Failure of Contractor to maintain financial solvency to adequately complete the Project as indicated by one or more of the following: a. A petition of bankruptcy is filed by or against Contractor, b. Contractor is adjudged as bankrupt or insolvent, C. Contractor or surety makes a general assignment for the benefit of creditors, d. A receiver is appointed for the benefit of Contractor's creditors, or e. A receiver is appointed on account of Contractor's insolvency; 5. Contractor's disregard of Laws or Regulations of public bodies having jurisdiction; or 6. Contractor's repeated disregard of the authority of OPT. B. Contractor and surety must provide adequate assurance of future performance in accordance with the Contract Documents that is satisfactory to Owner if Contractor is believed to be in financial distress due to the existence of one or more of the indicators listed in Paragraph 16.02.A.4. Owner may terminate this Contract if Contractor and surety fail to provide adequate documentation satisfactory to Owner within 10 days of OAR's request for this information. General Conditions 007200-55 Corpus Christi Standards-Regular Projects 03-23-2015 C. Owner may declare Contractor to be in default, give notice to Contractor and surety that the Contract is terminated, and enforce the rights available to Owner under the Performance Bond after giving Contractor and surety 10 days' notice that one or more of the events identified in Paragraph 16.02.A has occurred. D. Owner may exclude Contractor from the Site, take possession of the Work, incorporate the materials and equipment stored and complete the Work as Owner may deem expedient if Owner has terminated the Contract for cause. E. Owner may elect not to proceed with termination of the Contract under this Paragraph 16.02 if Contractor begins to cure the cause for termination within 7 days of receipt of notice of intent to terminate. F. Contractor is not entitled to receive further payments until the Work is completed if Owner proceeds as provided in this Paragraph 16.02. The amount of the Contract Price remaining is to be paid to the Contractor if the unpaid balance exceeds the cost to complete the Work. This cost to complete the Work may include related claims, costs, losses, damages, and the fees and charges of engineers, architects, attorneys, and other professionals retained by Owner. Pay the difference to Owner if the cost to complete the Work including related claims, costs, losses, and damages exceeds the unpaid balance of the Contract Price. Claims, costs, losses, and damages incurred by Owner are to be reviewed as to their reasonableness and incorporated in a Change Order by OAR. Owner is not required to obtain the lowest price for the Work performed when exercising its rights or remedies under this paragraph. G. Termination does not affect the rights or remedies of Owner against Contractor or against surety under the Payment Bond or Performance Bond. Owner does not release Contractor from liability by paying or retaining money due Contractor. 16.03 Owner May Terminate For Convenience A. Owner may terminate the Contract without cause after giving 7 days' notice to Contractor of the effective date of termination. Contractor is to be paid for the following if Owner terminates for convenience: 1. Work completed in accordance with the Contract Documents prior to the effective date of termination; 2. Actual costs sustained prior to the effective date of termination for Work in progress, plus a fee calculated in accordance with Paragraph 11.04.D.; and 3. Reasonable expenses directly attributable to termination, including costs incurred to prepare a termination for convenience cost proposal. B. No payment is payable to Contractor for loss of anticipated overhead, profits or revenue, or other economic loss arising out of or resulting from this termination. General Conditions 007200-56 Corpus Christi Standards-Regular Projects 03-23-2015 ARTICLE 17—FINAL RESOLUTION OF DISPUTES 17.01 Methods and Procedures A. The Owner or Contractor may appeal a Claim, approved or denied in part or in full, by: 1. Electing to invoke the dispute resolution process if one is provided for in the Supplementary Conditions; 2. Agreeing with the other party to submit the dispute to a dispute resolution process; or 3. Notifying the other party of the intent to submit the dispute to a court of competent jurisdiction if no dispute resolution process is provided for in the Supplementary Conditions or mutually agreed to. ARTICLE 18—MISCELLANEOUS 18.01 Computation of Times A. Exclude the first day and include the last day when determining dates for a period of time referred to in the Contract Documents by days. The last day of this period is to be omitted from the determination if it falls on a Saturday, Sunday, or a legal holiday. B. All references and conditions for a Calendar Day Contract in the Contract Documents apply for a Fixed Date Contract. A Fixed Date Contract is one in which the calendar dates for reaching Substantial Completion and/or final completion are specified in lieu of identifying the number of days involved. 18.02 Owner's Right to Audit Contractor's Records A. By execution of the Contract, Contractor grants Owner the right to audit, examine, inspect and/or copy, at Owner's election at all reasonable times during the term of this Contract and for a period of four (4) years following the completion or termination of the Work, all of Contractor's written and electronically stored records and billings relating to the performance of the Work under the Contract Documents.The audit, examination or inspection may be performed by an Owner designee,which may include its internal auditors or an outside representative engaged by Owner. Contractor agrees to retain its records for a minimum of four(4)years following termination of the Contract, unless there is an ongoing dispute under the Contract, then, such retention period must extend until final resolution of the dispute. As used in these General Conditions, "Contractor written and electronically stored records" include any and all information, materials and data of every kind and character generated as a result of the work under this Contract. Example of Contractor written and electronically stores records include, but are not limited to: accounting data and reports, billings, books, general ledgers, cost ledgers, invoices, production sheets, documents, correspondences, meeting notes, subscriptions, agreements, purchase orders, leases, contracts, commitments, arrangements, notes, daily diaries, reports, drawings, receipts,vouchers, memoranda, time sheets, payroll records, policies, procedures, Subcontractor agreements, Supplier agreements, rental equipment proposals, federal and state tax filings for any issue in question, along with any and all other agreements, sources of information and matters that may, in Owner's sole judgment, General Conditions 007200-57 Corpus Christi Standards-Regular Projects 03-23-2015 have any bearing on or pertain to any matters, rights, duties or obligations under or covered by any Agreement Documents. B. Owner agrees to exercise the right to audit, examine or inspect Contractor's records only during regular business hours. Contractor agrees to allow Owner and/or Owner's designee access to all of the Contractor's Records, Contractor's facilities and current or former employees of Contractor, deemed necessary by Owner or its designee(s), to perform such audit, inspection or examination. Contractor also agrees to provide adequate and appropriate work space necessary for Owner or its designees to conduct such audits, inspections or examinations. C. Contractor must include this Section in any Subcontractor, supplier or vendor contract. 18.03 Independent Contractor A. Contractor is to perform its duties under this Contract as an independent contractor. The Contractor's Team and their personnel are not considered to be employees or agents of the Owner. Nothing in this Contract is to be interpreted as granting Contractor's Team the right or authority to make commitments for the Owner. This Contract does not constitute or create a joint venture, partnership, or formal business organization of any kind. 18.04 Cumulative Remedies A. The duties and obligations imposed by these General Conditions and the rights and remedies available to the Owner or Contractor by these General Conditions are in addition to, and are not a limitation of, the rights and remedies which are otherwise imposed or available by: 1. Laws or Regulations; 2. Special warranties or guarantees; or 3. Other provisions of the Contract Documents. B. The provisions of this Paragraph 18.03 are as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. 18.05 Limitation of Damages A. Owner's Indemnitees are not liable to Contractor for claims, costs, losses, or damages sustained by Contractor's Team associated with other projects or anticipated projects. 18.06 No Waiver A. The failure of Owner or Contractor to enforce any provision of this Contract does not constitute a waiver of that provision, affect the enforceability of that provision, or the enforceability of the remainder of this Contract. 18.07 Severability A. If a court of competent jurisdiction renders a part of this Contract invalid or unenforceable, that part is to be severed and the remainder of this Contract continues in full force. General Conditions 007200-58 Corpus Christi Standards-Regular Projects 03-23-2015 18.08 Survival of Obligations A. Representations, indemnifications,warranties, guarantees, and continuing obligations required by the Contract Documents survive completion and acceptance of the Work or termination of the Contract. 18.09 No Third Party Beneficiaries A. Nothing in this Contract can be construed to create rights in any entity other than the Owner and Contractor. Neither the Owner nor Contractor intends to create third party beneficiaries by entering into this Contract. 18.10 Assignment of Contract A. This Contract may not be assigned in whole or in part by the Contractor without the consent of the Owner. 18.11 No Waiver of Sovereign Immunity A. The Owner has not waived its sovereign immunity by entering into and performing its obligations under this Contract. 18.12 Controlling Law A. This Contract is governed by the laws of the State of Texas without regard to its conflicts of laws. Venue for legal proceedings lies exclusively in Nueces County,Texas. 18.13 Conditions Precedent to Right to Sue A. Notwithstanding anything herein to the contrary, Contractor will have at least 90 days to give notice of a claim for damages as a condition precedent to the right to sue on the Contract, subject to the contractual Claims and Alternative Dispute Resolution processes set forth herein. 18.14 Waiver of Trial by Jury A. Owner and Contractor agree that they have knowingly waived and do hereby waive the right to trial by jury and have instead agreed, in the event of any litigation arising out of or connected to this Contract, to proceed with a trial before the court, unless both parties subsequently agree otherwise in writing. 18.15 Attorney Fees A. The Parties expressly agree that, in the event of litigation, all parties waive rights to payment of attorneys'fees that otherwise might be recoverable, pursuant to the Texas Civil Practice and Remedies Code Chapter 38,Texas Local Government Code §271.153, the Prompt Payment Act, common law or any other provision for payment of attorney's fees. 18.16 Compliance with Laws A. Comply with the Americans with Disabilities Act of 1990 as amended (ADA) and Texas Architectural Barriers Act and all regulations relating to either statute. General Conditions 007200-59 Corpus Christi Standards-Regular Projects 03-23-2015 B. Comply with all applicable federal, state, and city laws, rules and regulations. 18.17 Enforcement A. The City Manager or designee and the City Attorney or designee, are fully authorized and will have the right to enforce all legal rights and obligations under the Contract without further authorization from City Council. 18.18 Subject to Appropriation A. Funds are appropriated by the Owner on a yearly basis. If for any reason funds are not appropriated in any given year, the Owner may direct immediate suspension or termination of the Contract, with no additional liability to the Owner. If the Contractor is terminated or suspended and the Owner requests remobilization at a later date, the Contractor may request payment for reasonable demobilization/remobilization costs. Such costs shall be addressed through a Change Order to the Contract. Under no circumstances may a provision or obligation under this Contract be interpreted as contrary to this paragraph. 18.19 Contract Sum A. The Contract Sum is stated in the Contract and, including authorized adjustments, is the total maximum not-to-exceed amount payable by Owner to Contractor for performance of the Work under the Contract Documents. Contractor accepts and agrees that all payments pursuant to this Contract are subject to the availability and appropriation of funds by the Corpus Christi City Council. If funds are not available and/or appropriated,this Contract shall immediately be terminated with no liability to any party to this Contract. 18.20 Contractor's Guarantee as Additional Remedy A. The Contractor's guarantee is a separate and additional remedy available to benefit the Owner. Neither the guarantee nor the expiration of the guarantee period will operate to reduce, release, or relinquish any rights or remedies available to the Owner for any claims or causes of action against the Contractor or any other individual or entity. END OF SECTION General Conditions 007200-60 Corpus Christi Standards-Regular Projects 03-23-2015 00 72 01 INSURANCE REQUIREMENTS ARTICLE 1—INSURANCE REQUIREMENTS 1.01 CONTRACTOR'S INSURANCE AMOUNTS A. Provide the insurance coverage for at least the following amounts unless greater amounts are required by Laws and Regulations: Type of Insurance Minimum Insurance Coverage Commercial General Liability including 1. Commercial Form 2. Premises-Operations 3. Explosions and Collapse Hazard 4. Underground Hazard 5. Products/Completed Operations $1,000,000 Per Occurrence Hazard $2,000,000 Aggregate 6. Contractual Liability 7. Broad Form Property Damage 8. Independent Contractors 9. Personal &Advertising Injury Business Automobile Liability-Owned, $1,000,000 Combined Single Limit Non-Owned, Rented and Leased Workers' Compensation Statutory Employer's Liability $500,000/500,000/500,000 Excess Liability/Umbrella Liability $1,000,000 Per Occurrence Contractor's Pollution Liability/ $2,000,000 Per Claim Environmental Impairment Coverage Not limited to sudden and accidental ❑ Required X Not Required discharge. To include long-term environmental impact for the disposal of pollutants/contaminants. Builder's Risk(All Perils including Collapse) Equal to Contract Price ❑ Required X Not Required Installation Floater Equal to Contract Price ❑ Required x Not Required Owner's Protective Liability Equal to Contractor's liability insurance ❑ Required X Not Required 1.02 GENERAL PROVISIONS A. Provide insurance coverages and limits meeting the requirements for insurance in accordance with Article 6 of the General Conditions and this Section. Insurance Requirements 00 72 01-1 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 B. Provide endorsements to the policies as outlined in this Section. C. Obtain insurance from companies that are duly licensed or authorized in the State of Texas to issue insurance policies for the required limits and coverages. Provide insurance from companies that have an A.M. Best rating of A-VIII or better. D. Furnish copies of policies and endorsements, and documentation of applicable self-insured retentions and deductibles upon request by OPT or any named insured or additional insured. Contractor may block out(redact) any confidential premium or pricing information contained in any policy or endorsement furnished under this Contract. E. The name and number of the Project must be referenced on the certificate of insurance. F. OPT's failure to demand such certificates or other evidence of the Contractor's full compliance with the insurance requirements or failure to identify a deficiency in compliance from the evidence provided is not a waiver of the Contractor's obligation to obtain and maintain the insurance required by the Contract Documents. G. Notify the Owner if the Contractor fails to purchase or maintain the insurance required by the Contract Documents. Contractor shall not be allowed to perform any Work on the Project until the required insurance policies are in effect. A Certificate of Liability Insurance shall be submitted to the OPT. H. Owner may exclude the Contractor from the Site and exercise Owner's termination rights under Article 16 of the General Conditions if Contractor fails to obtain or maintain the required insurance. I. Owner does not represent that the insurance coverage and limits established in this Contract are adequate to protect Contractor or Contractor's interests. J. The required insurance and insurance limits do not limit the Contractor's liability under the indemnities granted to Owner's Indemnitees in the Contract Documents. K. Provide for an endorsement that the "other insurance" clause shall not apply to the OPT where the OPT is an additional insured shown on the policy. Contractor's insurance is primary and non-contributory with respect to any insurance or self-insurance carried by the OPT for liability arising out of operations under this Contract. L. Include the Owner and list the other members of the OPT and any other individuals or entities identified in the Supplementary Conditions as additional insureds on all policies with the exception of the workers' compensation policy and Contractor's professional liability policy. 1.03 CONTRACTOR'S INSURANCE A. Purchase and maintain workers' compensation and employer's liability insurance for: 1. Claims under workers' compensation, disability benefits, and other similar employee benefit acts. Obtain workers' compensation coverage through a licensed insurance company in accordance with Texas law and written on a policy and endorsements approved by the Texas Department of Insurance. Provide insurance in amounts to meet all workers' compensation obligations. Provide an "All Other States" endorsement if Contractor is not domiciled in Texas and policy is not written in accordance with Texas Department of Insurance rules. Insurance Requirements 00 72 01-2 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 2. Claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3. United States Longshoreman and Harbor Workers' Compensation Act and Jones Act coverage (if applicable). 4. Foreign voluntary worker compensation (if applicable). B. Purchase and maintain commercial general liability insurance covering all operations by or on behalf of Contractor. Provide coverage on an occurrence basis, against: 1. Claims for damages because of bodily injury, sickness or disease, or death of any person other than Contractor's employees; 2. Claims for damages insured by reasonably available personal injury liability coverage which are sustained; 3. By any person as a result of an offense directly or indirectly related to the employment of such person by Contractor; 4. By any other person for any other reason; and 5. Claims for damages, other than to the Work itself, because of injury to or destruction of tangible property wherever located, including any resulting loss of use. C. Provide Contractor's commercial general liability policy that is written on a 1996 (or later) ISO commercial general liability form (occurrence form) and include the following coverages and endorsements: 1. Products and completed operations coverage as required in this Section. Insurance is to remain in effective for 3 years after final payment. Furnish evidence of the continuation of this insurance at final payment and again each year for 3 years after final payment to Owner and each named insured or additional insured. a. Eliminate the exclusion with respect to property under the care, custody, and control of Contractor. Provide and maintain Installation Floater insurance for property under the care, custody, or control of Contractor in lieu of elimination of the exclusion, or if required by this Section. Provide Installation Floater insurance that is a broad form or"All Peril" policy providing coverage for all materials, supplies, machinery, fixtures, and equipment which will be incorporated into the Work. 1) Provide coverage under the Contractor's Installation Floater that includes: a) Faulty or Defective workmanship, materials, maintenance, or construction; b) Cost to remove Defective or damaged Work from the Site or to protect it from loss or damage; c) Cost to cleanup and remove pollutants; d) Coverage for testing and startup; e) Any loss to property while in transit; f) Any loss at the Site; g) Any loss while in storage, both on and off the Site; and Insurance Requirements 00 72 01-3 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 h) Any loss to temporary Project Works if their value is included in the Contract Price. 2) Coverage cannot be contingent on an external cause or risk or limited to property for which the Contractor is legally liable. Provide limits of insurance adequate to cover the value of the installation. Pay any deductible carried under this coverage and assume responsibility for claims on materials, supplies, machinery,fixture, and equipment which will be incorporated into the Work while in transit or in storage. 2. Blanket contractual liability coverage for Contractor's contractual indemnity obligations in Paragraph 7.14 of the General Conditions, and all other contractual indemnity obligations of Contractor in the Contract Documents. 3. Broad form property damage coverage. 4. Severability of interest. 5. Underground explosion and collapse coverage. 6. Personal injury coverage. 7. Endorsement CG 2032, "Additional Insured - Engineers, Architects or Surveyors Not Engaged by the Named Insured" or its equivalent. D. Purchase and maintain automobile liability insurance against claims for damages because of bodily injury or death of any person or property damage arising out of the ownership, maintenance, or use of any motor vehicle. E. Purchase and maintain umbrella or excess liability insurance written over the underlying employer's liability, commercial general liability, and automobile liability insurance described in the paragraphs above. Provide coverage that is at least as broad as all underlying policies. Provide a policy that provides first-dollar liability coverage as needed. F. Provide Contractor's commercial general liability and automobile liability policies that: 1. Are written on an occurrence basis; 2. Include the individuals or entities identified in the Supplementary Conditions as additional insureds; 3. Include coverage for the respective officers, directors, members, partners, employees, agents, consultants, and subcontractors for each named insured or additional insured; 4. Provide primary coverage for all claims covered by the policies, including those arising from both ongoing and completed operations. G. Purchase and maintain insurance coverage for third-party injury and property damage claims, including clean-up costs that result from Hazardous Environmental Conditions which result from Contractor's operations and completed operations. Provide Contractor's pollution liability insurance that includes long-term environmental impacts for the disposal of pollutants/contaminants and is not limited to sudden and accidental discharge. The completed operations coverage is to remain in effect for 3 years after final payment. The policy must name OPT and any other individuals and entities identified in the Supplementary Conditions as additional insureds. Insurance Requirements 00 72 01-4 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 H. Purchase and maintain applicable professional liability insurance, or have Subcontractors and Suppliers do so, if Contractor or any Subcontractor or Supplier will provide or furnish professional services under this Contract. I. The policies of insurance required by this Section must: 1. Include at least the specific coverages and be written for not less than the limits of liability provided in this Section or required by Laws or Regulations, whichever is greater. 2. Contain a provision that coverage afforded will not be canceled or materially changed until at least 30 days prior written notice has been given to Contractor, Owner, and all named insureds and additional insureds. 3. Remain in effect at all times when Contractor is performing Work or is at the Site to conduct tasks arising from the Contract Documents. 4. Be appropriate for the Work being performed and provide protection from claims resulting from the Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether performed by Contractor, Subcontractor, Supplier, anyone directly or indirectly employed or retained by any of them, or by anyone for whose acts they may be liable. J. The coverage requirements for specific policies of insurance must be met directly by those policies and may not by rely on excess or umbrella insurance provided in other policies to meet the coverage requirement. 1.04 OWNER'S PROTECTIVE LIABILITY INSURANCE A. Purchase and maintain an Owner's Protective Liability insurance policy with the Owner as the named insured and other members of the OPT as additional insureds. Provide a policy that will protect the OPT from claims which arise from operations under the Contract Documents. Provide this coverage in the same amounts required for the Contractor's liability insurance and from the same company that provides the Contractor's liability insurance. 1.05 PROPERTY INSURANCE A. Purchase and maintain builder's risk insurance in the amount of the full replacement cost of the Project. This policy is subject to the deductible amounts requirements in this Section or those required by Laws and Regulations and must comply with the requirements of Paragraph 1.06. This insurance shall: 1. Include the OPT, Contractor, and all Subcontractors, and any other individuals or entities identified in the Supplementary Conditions, as named insureds. 2. Be written on a builder's risk"all risk" policy form that includes insurance for physical loss or damage to the Work, temporary buildings, falsework, and materials and equipment in transit, and insures against at least the following perils or causes of loss: fire; lightning;windstorm; riot; civil commotion;terrorism;vehicle impact; aircraft; smoke;theft;vandalism and malicious mischief; mechanical breakdown, boiler explosion, and artificially generated electric current; earthquake; volcanic activity, and other earth movement; flood; collapse; explosion; debris removal; demolition occasioned by enforcement of Laws and Regulations; water damage (other than that Insurance Requirements 00 72 01-5 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 caused by flood); and such other perils or causes of loss as may be specifically required by this Section. If insurance against mechanical breakdown, boiler explosion, and artificially generated electric current; earthquake;volcanic activity, and other earth movement; or flood, are not commercially available under builder's risk, by endorsement or otherwise, this insurance may be provided through other insurance policies acceptable to Owner and Contractor. 3. Cover expenses incurred in the repair or replacement of any insured property. 4. Cover materials and equipment in transit or stored prior to being incorporated in the Work. 5. Cover Owner-furnished or assigned property. 6. Allow for partial utilization of the Work by Owner. 7. Allow for the waiver of the insurer's subrogation rights as set forth below. 8. Provide primary coverage for all losses and damages caused by the perils or causes of loss covered. 9. Not include a co-insurance clause. 10. Include a broad exception for ensuing losses from physical damage or loss with respect to any Defective workmanship, design, or materials exclusions. 11. Include testing and startup. 12. Be maintained in effect until the Work as a whole is complete, unless otherwise agreed to in writing by Owner and Contractor. B. Evidence of insurance provided must contain a provision or endorsement that the coverage afforded will not be canceled or materially changed or renewal refused until at least 30 days prior written notice has been given to Owner and Contractor and to each named insured. C. Pay for costs not covered by the policy deductible. D. Notify builder's risk insurance provider if Owner will occupy or use a portion or portions of the Work prior to Substantial Completion of all the Work as provided in Paragraph 15.04 of the General Conditions. Maintain the builder's risk insurance in effect during this Partial Occupancy or Use. E. Contractor may purchase other special insurance to be included in or to supplement the builder's risk or property insurance policies provided under this Section. F. Contractor, Subcontractors, or employees of the Contractor or a Subcontractor owning property items, such as tools, construction equipment, or other personal property not expressly covered in the insurance required by the Contract Documents are responsible for providing their own insurance. 1.06 WAIVER OF RIGHTS A. Insurance shall include a waiver of subrogation in favor of the additional insureds identified in SECTION 00 73 00 SUPPLEMENTARY CONDITIONS. B. All policies purchased in accordance with this Section are to contain provisions to the effect that the insurers have no rights of recovery against OPT, named insureds or additional Insurance Requirements 00 72 01-6 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 insureds in the event of a payment for loss or damage. Contractor and insurers waive all rights against the Owner's Indemnities for losses and damages created by or resulting from any of the perils or causes of loss covered by these policies and any other applicable property insurance. None of these waivers extend to the rights Contractor has to the proceeds of insurance as trustee. C. Contractor is responsible for assuring that agreements with Subcontractors contains provisions that the Subcontractor waive all rights against Owner's Indemnitees, Contractor, named insureds and additional insureds, and the officers, directors, members, partners, employees, agents, consultants, and subcontractors of each and any of them, for all losses and damages created by or resulting from any of the perils or causes of loss covered by builder's risk insurance and other property insurance. 1.07 OWNER'S INSURANCE FOR THE PROJECT A. Owner is not responsible for purchasing and maintaining any insurance to protect the interest of the Contractor, Subcontractors, or others in the Work. The stated limits of insurance required are minimum only. Determine the limits that are adequate. These limits may be basic policy limits or any combination of basic limits and umbrella limits. In any event, Contractor is fully responsible for all losses arising out of, resulting from, or connected with operations under this Contract whether or not these losses are covered by insurance. The acceptance of evidence of insurance by the OPT, named insureds, or additional insureds does not release the Contractor from compliance with the insurance requirements of the Contract Documents. ARTICLE 2—EVIDENCE OF INSURANCE 2.01 ACCEPTABLE EVIDENCE OF INSURANCE A. Provide evidence of insurance acceptable to the Owner with the executed Contract Documents. Provide the following as evidence of insurance: 1. Certificates of Insurance on an acceptable form; 2. Riders or endorsements to policies; and 3. Policy limits and deductibles. B. Provide a list of"Additional Insureds" for each policy. C. Provide evidence that waivers of subrogation are provided on all applicable policies. D. Provide evidence of requirements for 30 days' notice before cancellation or any material change in the policy's terms and conditions, limits of coverage, or change in deductible amount. 2.02 CERTIFICATES OF INSURANCE A. Submit Certificates of Insurance meeting the following requirements: 1. Form has been filed with and approved by the Texas Department of Insurance under Texas Insurance Code §1811.101; or 2. Form is a standard form deemed approved by the Department under Texas Insurance Code §1811.101. Insurance Requirements 00 72 01-7 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 3. No requirements of this Contract may be interpreted as requiring the issuance of a certificate of insurance on a certificate of insurance form that has not first been filed with and approved by the Texas Department of Insurance. B. Include the name of the Project in the description of operations box on the certificate of insurance. 2.03 INSURANCE POLICIES A. Provide a copy of insurance policies, declaration pages and endorsements, and documentation of applicable self-insured retentions and deductibles if requested by the Owner. B. Owner may require the deletion, revision, or modification of particular policy terms, conditions, limitations, or exclusions (except where policy provisions are established by Laws or Regulations binding upon either of the parties hereto or the underwriter of any such policies). Comply with these requests and submit a copy of the replacement certificate of insurance to Owner at the address provided below within 10 days of the requested change. 2.04 CONTINUING EVIDENCE OF COVERAGE A. Provide updated, revised, or new evidence of insurance in accordance this Section prior to the expiration of existing policies. B. Provide evidence of continuation of insurance coverage at final payment and for the following 3 years. 2.05 NOTICES REGARDING INSURANCE A. Submit notices regarding insurance are to be sent to the Owner at the following address: City of Corpus Christi— Engineering Attn: Construction Contract Admin. P.O. Box 9277 Corpus Christi,TX 78469-9277 B. Submit questions regarding insurance requirements to the Construction Contract Administrator by calling 361-826-3530. ARTICLE 3—TEXAS WORKERS' COMPENSATION INSURANCE REQUIRED NOTICE 3.01 WORKERS' COMPENSATION INSURANCE COVERAGE A. Definitions: 1. Certificate of coverage ("certificate") -A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC- 81,TWCC-82,TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the Project. Insurance Requirements 00 72 01-8 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 2. Duration of the Project- includes the time from the beginning of the Work on the Project until the Contractor's/person's Work on the Project has been completed and accepted by the governmental entity. 3. Persons providing services on the Project ("Subcontractor" in §406.096) -includes all persons or entities performing all or part of the services the Contractor has undertaken to perform on the Project, regardless of whether that person contracted directly with the Contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the Project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the Project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all employees of the Contractor providing services on the Project, for the duration of the Project. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the Contract. D. If the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the Project,the Contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. E. The Contractor shall obtain from each person providing services on a project, and provide to the governmental entity: 1. A certificate of coverage, prior to that person beginning Work on the Project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the Project; and 2. No later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project. F. The Contractor shall retain all required certificates of coverage for the duration of the Project and for one year thereafter. G. The Contractor shall notify the governmental entity in writing by certified mail or personal delivery,within 10 days after the Contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the Project. H. The Contractor shall post on each Project Site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the Project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. Insurance Requirements 00 72 01-9 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 I. The Contractor shall contractually require each person with whom it contracts to provide services on a project, to: 1. Provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the Project, for the duration of the Project; 2. Provide to the Contractor, prior to that person beginning Work on the Project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the Project, for the duration of the Project; 3. Provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; 4. Obtain from each other person with whom it contracts, and provide to the Contractor: a. A certificate of coverage, prior to the other person beginning Work on the Project; and b. A new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; 5. Retain all required certificates of coverage on file for the duration of the Project and for one year thereafter; 6. Notify the governmental entity in writing by certified mail or personal delivery,within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the Project; and 7. Contractually require each person with whom it contracts, to perform as required by paragraphs (1) -(7), with the certificates of coverage to be provided to the person for whom they are providing services. J. By signing this Contract or providing or causing to be provided a certificate of coverage,the Contractor is representing to the governmental entity that all employees of the Contractor who will provide services on the Project will be covered by workers' compensation coverage for the duration of the Project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the Contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions. K. The Contractor's failure to comply with any of these provisions is a breach of contract by the Contractor which entitles the governmental entity to declare the Contract void if the Contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. END OF SECTION Insurance Requirements 00 72 01-10 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 00 72 02 WAGE RATE REQUIREMENTS ARTICLE 1—PREVAILING WAGE RATE REQUIREMENTS 1.01 PAYMENT OF PREVAILING WAGE RATES A. Contractor and any Subcontractors employed on this Project shall pay not less than the rates established by the Owner as required by Texas Government Code Chapter 2258. B. Contractor is required to pay Davis-Bacon Wage Rates. 1.02 RECORDS A. In accordance with Tex. Gov't Code §2258.024, the Contractor and its Subcontractors, if any, shall keep a record showing: 1. The name and occupation of each worker employed by the Contractor or Subcontractor in the construction of the Work; and 2. The actual per diem wages paid to each worker. B. The record shall be open at all reasonable hours to inspection by the officers and agents of the Owner. 1.03 LIABILITY; PENALTY; CRIMINAL OFFENSE A. Tex. Gov't Code §2258.003— Liability: An officer, agent, or employee of the Owner is not liable in a civil action for any act or omission implementing or enforcing Chapter 2258 unless the action was made in bad faith. B. Tex. Gov't Code §2258.053(b)—Penalty: Any Contractor or Subcontractor who violates the requirements of Chapter 2258, shall pay to the Owner, on whose behalf the Contract is made, $60 for each worker employed or each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the Contract. C. Tex. Gov't Code §2258.058—Criminal Offense: 1. An officer, agent, or representative of the Owner commits an offense if the person willfully violates or does not comply with a provision of Chapter 2258. 2. Any Contractor or Subcontractor, or an agent or representative of the Contractor or Subcontractor, commits an offense if the person violates Tex. Gov't Code §2258.024. 3. An offense is punishable by: a. A fine not to exceed $500; b. Confinement in jail for a term not to exceed 6 months; or C. Both a fine and confinement. 1.04 PREVAILING WAGE RATES A. The minimum rates for various labor classifications as established by the Owner are shown below: Wage Rate Requirements 007202-1 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 REV 06-12-2015 Wage Determination Construction Type Project Type (WD) No TX-40 Highway Highway Construction Projects (excluding tunnels, building structures in rest area projects & railroad construction; bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction; and other major bridges). END OF SECTION Wage Rate Requirements 007202-2 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 REV 06-12-2015 General Decision Number: TX150040 07/31/2015 TX40 Superseded General Decision Number: TX20140040 State: Texas Construction Type: Highway Counties: Aransas, Calhoun, Goliad, Nueces and San Patricio Counties in Texas. HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction; bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction; and other major bridges) . Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10 .10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10 .10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Modification Number Publication Date 0 01/02/2015 1 07/31/2015 * SUTX2011-010 08/08/2011 Rates Fringes CEMENT MASON/CONCRETE FINISHER (Paving & Structures) . . .$ 12 . 64 FORM BUILDER/FORM SETTER Paving & Curb. . . . . . . . . . . . . . .$ 10. 69 Structures . . . . . . . . . . . . . . . . . .$ 13. 61 LABORER Asphalt Raker. . . . . . . . . . . . . . .$ 11 . 67 Flagger. . . . . . . . . . . . . . . . . . . . .$ 8.81 Laborer, Common. . . . . . . . . . . . . $ 10 .25 Laborer, Utility. . . . . . . . . . . .$ 11 .23 Pipelayer. . . . . . . . . . . . . . . . . . .$ 11 .17 Work Zone Barricade Servicer. . . . . . . . . . . . . . . . . . . .$ 11 .51 PAINTER (Structures) . . . . . . . . . . . . .$ 21 .29 POWER EQUIPMENT OPERATOR: Asphalt Distributor. . . . . . . . .$ 14 .25 Asphalt Paving Machine. . . . . .$ 13.44 Mechanic. . . . . . . . . . . . . . . . . . . .$ 17 .00 Motor Grader, Fine Grade. . . .$ 17 .74 Motor Grader, Rough. . . . . . . . .$ 16.85 TRUCK DRIVER Lowboy-Float. . . . . . . . . . . . . . . .$ 16. 62 Single Axle. . . . . . . . . . . . . . . . .$ 11 . 61 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ---------------------------------------------------------------- Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii) ) . ---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type (s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local) , a survey rate (weighted average rate) or a union average rate (weighted union average rate) . Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014 . PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i .e. , Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014 . Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates . Example: SULA2012-007 5/13/2014 . SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification (s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 1000 of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014 . UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1 . ) Has there been an initial decision in the matter? This can be. * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2 . ) and 3. ) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations . Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2 . ) If the answer to the question in 1 . ) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1 . 8 and 29 CFR Part 7) . Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc. ) that the requestor considers relevant to the issue. 3. ) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board) . Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4 . ) All decisions by the Administrative Review Board are final. ---------------------------------------------------------------- END OF GENERAL DECISION 00 72 03 MINORITY/ MBE/ DBE PARTICIPATION POLICY ARTICLE 1—PARTICIPATION POLICY 1.01 POLICY A. It is the policy of the City of Corpus Christi that maximum opportunity is afforded minorities,women, and Minority Business Enterprises (MBE) to participate in the performance of contracts awarded by the City of Corpus Christi in support of Equal Employment Opportunity goals and objectives of the Affirmative Action Policy Statement of the City dated October 1989, and any amendments thereto. In accordance with such policy,the City has established goals, as stated herein, both for minority and female participation by trade and for Minority Business Enterprise. 1.02 DEFINITIONS A. Prime Contractor: Any person, firm, partnership, corporation, association, or joint venture as herein provided which has been awarded a City contract. B. Subcontractor: Any named person,firm, partnership, corporation, association, or joint venture as herein identified as providing work, labor, services, supplies, equipment, materials, or any combination of the foregoing under contract with a prime contractor on a City contract. C. Minority Business Enterprise: A business enterprise that is owned and controlled by one or more minority person(s). Minority person(s) must collectively own, operate and/or actively manage, and share in payments from such an enterprise in the manner hereinafter set forth: 1. Owned: a. For a sole proprietorship to be deemed a minority business enterprise, it must be owned by a minority person. b. For an enterprise doing business as a partnership, at least 51 percent of the assets or interest in the partnership property must be owned by one or more minority person(s). C. For an enterprise doing business as a corporation, at least 51 percent of the assets or interest in the corporate shares must be owned by one or more minority person(s). 2. Controlled: a. The primary power, direct or indirect, to manage a business enterprise rests with a minority person(s). 3. Share in Payments: a. Minority partners, proprietors, or stockholders of the business enterprise, must be entitled to receive 51 percent or more of the total profits, bonuses, dividends, interest payments, commissions, consulting fees, rents, procurement, and subcontract payments, and any other monetary distribution paid by the business enterprise. Minority/MBE/DBE Participation Policy 007203-1 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 D. Minority: Minority persons include Blacks, Mexican-Americans and other persons of Hispanic origin,American Indians, Alaskan Natives, and Asians or Pacific Islanders. For the purposes of this policy, women are also considered as minorities. E. Female Owned Business Enterprise: A sole proprietorship that is owned and controlled by a woman, a partnership at least 51 percent of whose assets or partnership interests are owned by one or more women, or a corporation at least 51 percent of whose assets or interests in the corporate shares are owned by one or more women. F. Joint Venture: A joint venture means an association of two or more persons, partnerships, corporations, or any combination thereof, founded to carry on a single business activity which is limited in scope and direction. The degree to which a joint venture may satisfy the stated MBE goal cannot exceed the proportionate interest of the MBE as a member of the joint venture in the Work to be performed by the joint venture. For example, a joint venture which is to perform 50 percent of the Work itself and in which a minority joint venture partner has a 50 percent interest, shall be deemed equivalent to having minority participation in 25 percent of the Work. Minority members of the joint venture must have financial, managerial, or technical skills in the Work to be performed by the joint venture. 1.03 GOALS A. The goals for participation by minorities and Minority Business Enterprises expressed in percentage terms for the Contractor's aggregate work force on all construction Work for the Contract award shall be as specified in SECTION 00 2113 INVITATION TO BID AND INSTRUCTIONS TO BIDDERS. B. These goals are applicable to all the construction work (regardless of federal participation) performed in the Contract, including approved Change Orders. The hours of minority employment must be substantially uniform throughout the length of the Contract and in each trade. The transfer of minority employees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's percentage is prohibited. 1.04 COMPLIANCE A. Upon completion of the Project, a final breakdown of MBE participation, substantiated by copies of paid invoices, shall be submitted by the Contractor to the City Engineer. B. Make bi-weekly payroll submittals to the City Engineer. The Contractor is to indicate the percent of minority and female participation, by trade, which has been utilized on the Project. Along with the request for final payment on the Project, the Contractor will indicate, in writing,the overall participation in these areas which have been achieved. The City Engineer may withhold monthly or final payments to the Contractor for failure to submit bi-weekly payrolls in a timely fashion or to submit overall participation information as required. END OF SECTION Minority/MBE/DBE Participation Policy 007203-2 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 00 73 00 SUPPLEMENTARY CONDITIONS These Supplementary Conditions amend or supplement SECTION 00 72 00 GENERAL CONDITIONS and other provisions of the Contract Documents. All provisions not amended or supplemented in these Supplementary Conditions remain in effect. The terms used in these Supplementary Conditions have the meanings stated in the General Conditions. Additional terms used in these Supplementary Conditions have the meanings stated below. ARTICLE 1—DEFINITIONS AND TERMINOLOGY SC-1.01 DEFINED TERMS A. The members of the OPT as defined in Paragraph 1.01.A.41 consists of the following organizations: City of Corpus Christi,Texas ECMS, LLC ARTICLE 4—COMMENCEMENT AND PROGRESS OF THE WORK SC-4.04 DELAYS IN CONTRACTOR'S PROGRESS A. The allocation for delays in the Contractor's progress for rain days as set forth in General Conditions Paragraph 4.04.D are to be determined as follows: 1. Include rain days in developing the schedule for construction. Schedule construction so that the Work will be completed within the Contract Times assuming that these rain days will occur. Incorporate residual impacts following rain days such as limited access to and within the Site, inability to work due to wet or muddy Site conditions, delays in delivery of equipment and materials, and other impacts related to rain days when developing the schedule for construction. Include all costs associated with these rain days and residual impacts in the Contract Price. 2. A rain day is defined as any day in which the amount of rain measured by the National Weather Services at the Power Street Stormwater Pump Station is 0.50 inch or greater. Records indicate the following average number of rain days for each month: Month Day Month Days January 3 July 3 February 3 August 4 March 2 September 7 April 3 October 4 May 4 November 3 June 4 December 3 3. A total of 50 rain days have been set for this Project. An extension of time due to rain days will be considered only after 50 rain days have been exceeded in a calendar year and the OAR has determined that a detrimental impact to the construction schedule resulted from the excessive rainfall. Rain days are to be incorporated into the Supplementary Conditions 007300-1 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 schedule and unused rain days will be considered float time which may be consumed by the Owner or Contractor in delay claims. ARTICLE 5—AVAILABILITY OF LANDS;SUBSURFACE CONDITIONS AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS SC-5.03 SUBSURFACE AND PHYSICAL CONDITIONS A. This Supplementary Condition identifies documents referenced in General Conditions Paragraph 5.03.A which describe subsurface and physical conditions. 1. Geotechnical Reports include the following: NONE 2. Drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities) include the following: NONE B. Subsurface and Physical Conditions No reports of explorations or tests of subsurface conditions at or contiguous to the Site, or drawings of physical conditions relating to existing surface or subsurface structures at the Site, are known to Owner." B. Hazardous Environmental Conditions at Site No reports of explorations or tests for Hazardous Environmental Conditions at or contiguous to the Site are known to Owner." ARTICLE 7—CONTRACTOR'S RESPONSIBILITIES SC-7.04 CONCERNING SUBCONTRACTORS, SUPPLIERS,AND OTHERS The Contractor must perform at least 50 percent of the Work, measured as a percentage of the Contract Price, using its own employees. END OF SECTION Supplementary Conditions 007300-2 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 011100 SUMMARY OF WORK 1.00 GENERAL 1.01 WORK INCLUDED A. Construct Work as described in the Contract Documents. 1. Provide the materials, equipment, and incidentals required to make the Project completely and fully useable. 2. Provide the labor, equipment, tools, and consumable supplies required for a complete Project. 3. The Contract Documents do not indicate or describe all of the Work required to complete the Project. Additional details required for the correct installation of selected products are to be provided by the Contractor and coordinated with the OAR. 1.02 DESCRIPTION OF WORK A. Work is described in general, non-inclusive terms as: 1. This project is for Indefinite Delivery Indefinite Quantity(IDIQ) construction contracts to perform minor street pavement repairs involving minor street pavement rehabilitation and replacement, base repairs with limestone, and sub-grade stabilization throughout the City.The work will be issued in work orders called "delivery orders." Each delivery order issued will provide specific scope and requirements.The work may include saw cutting, crack sealing, seal coats, milling, curb&gutter, driveway replacement, curb ramps, and minor utility manhole ring& cover and valve adjustments. The City intends to award each contract for one initial year; however, each contract contains the provisions necessary to be a multiple-year contract with an initial 12-month period, renewable for up to two (2) additional 12- month periods. Renewal will be based on the Contractor's successful performance of the delivery orders, approval by the City, and concurrence by the Contractor.The renewal will allow for a City-approved economic adjustment based upon published and acceptable cost-of-construction indices.There are two(2) bid schedules for this contract-- Part 1 and Part 2--each of which will be awarded separately. (See Invitation to Bid and Instructions to Bidders, Section 00 2113). 1.03 WORK UNDER OTHER CONTRACTS(NOT USED) 1.04 WORK BY OWNER (NOT USED) 1.05 CONSTRUCTION OF UTILITIES A. Pay for temporary power, including but not limited to construction cost, meter connection fees, and permits. 1.06 USE PRIOR TO FINAL COMPLETION A. Owner has the right to use or operate any portion of the Project that is ready for use after notifying the Contractor of its intent to do so. Summary of Work 011100-1 IDIQ Minor Street Improvements Project,PN E16250, E16251, E16252, E16253 Rev 01-13-2016 B. The execution of Bonds is understood to indicate the consent of the surety to these provisions for use of the Project. C. Provide an endorsement from the insurance carrier permitting use of Project during the remaining period of construction. D. Conduct operations to insure the least inconvenience to the Owner and general public. 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Summary of Work 011100-2 IDIQ Minor Street Improvements Project,PN E16250, E16251, E16252, E16253 Rev 01-13-2016 01 23 10 ALTERNATES AND ALLOWANCES 1.00 GENERAL 1.01 REQUIREMENTS A. Alternates: NONE 1. This Section describes each alternate by number and describes the basic changes to be incorporated into the Work when this alternate is made a part of the Work in the Agreement. 2. Drawings and Specifications will outline the extent of Work to be included in the alternate Contract Price. 3. Coordinate related Work and modify surrounding Work as required to properly integrate the Work under each alternate, and provide a complete and functional Project as required by the Contract Documents. 4. Bids for alternates may be accepted or rejected at the option of the Owner. 5. Owner may incorporate these alternates in the Contract when executed, or may issue a Change Order to incorporate these alternates within 120 days at the prices offered in the Bid, unless noted otherwise. A Request for a Change Proposal may be issued after 120 days or other designated time period to negotiate a new price for incorporating the Work into the Project. B. Allowances: 1. Include specified allowance amount in the Contract Price. 2. The amount of each allowance includes: a. The cost of the product to the Contractor less any applicable trade discounts. b. Delivery to the Site. C. Applicable taxes. 3. Include in the Contract Price all costs for: a. Handling at the Site, including unloading, uncrating, and storage per SECTION 01 3100 PROJECT MANAGEMENT AND COORDINATION. b. Cost for labor and equipment for installation and finishing. C. Cost for related products not specifically listed in the allowance required for installation, including consumable supplies and materials. d. All overhead, profit, and related costs. 4. Assist Owner in the selection of products. a. Identify qualified Suppliers. b. Obtain bids from qualified Suppliers. C. Present available alternates to the Owner through the OAR. Notify OAR of: 1) Any objections to a particular Supplier or product. Alternates and Allowances 012310-1 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 2) Effect on the Construction Schedule anticipated by the selection of each option. 3) Cost of each option. 5. Upon selection of the product: a. Purchase and install the product. b. Contractor's responsibilities for products shall be the same as for products selected by the Contractor. 6. Submit a Change Proposal per SECTION 01 31 14 CHANGE MANAGEMENT to adjust Contract Price if the net cost of the product is more or less than the specified amount. a. Adjust the unit cost applied to the quantities installed per the method of payment described in SECTION 0129 00 APPLICATION FOR PAYMENT PROCEDURES for products specified as Unit Price Work. b. Do not perform Work until selection of alternate has been approved by the Owner. C. Provide actual invoices for the materials. 1.02 DOCUMENT SUBMITTALS: NONE 1.03 DESCRIPTION OF ALTERNATES: NONE 1.04 DESCRIPTION OF ALLOWANCES: UNANTICIPATED STREET IMPROVEMENTS 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Alternates and Allowances 012310-2 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 01 29 00 APPLICATION FOR PAYMENT PROCEDURES 1.00 GENERAL 1.01 WORK INCLUDED A. Submit Applications for Payment for completed Work and for materials and equipment in accordance with the General Conditions, the Supplementary Conditions, the Agreement, and this Section. The Contract Price is to include costs for: 1. Providing the Work in accordance with the Contract Documents; 2. Installing Owner furnished equipment and materials; 3. Providing Work for Alternates and Allowances; 4. Commissioning, start-up, training and initial maintenance and operation; 5. Acceptance testing in manufacturer's facilities or on Site; 6. All home office overhead costs and expenses, including profit made directly or indirectly for the Project; 7. Project management, Contract administration, field office, and field operations staff, including supervision, clerical support, and technology system support; 8. Professional services including design fees, legal fees, and other professional services; 9. Bonds and insurance; 10. Permits, licenses, patent fees, and royalties; 11. Taxes; 12. Providing all documents and Samples required by the Contract Documents; 13. Facilities and equipment at the Site including: a. Field offices, office furnishings, and all related office supplies, software, and equipment, b. Storage facilities for Contractor's use, storage facilities for stored materials and equipment, including spare parts storage, C. Shops, physical plant, construction equipment, small tools, vehicles,technology and telecommunications equipment, d. Safety equipment and facilities to provide safe access and working conditions for workers and for others working at the Site, e. Temporary facilities for power and communications, f. Potable water and sanitation facilities, and g. Mobilization and demobilization for all of these facilities and equipment; 14. Products, materials, and equipment stored at the Site or other suitable location; 15. Products, materials, and equipment permanently incorporated into the Project; Application for Payment Procedures 012900-1 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 03-11-2015 16. Temporary facilities for managing water, including facilities for pumping, storage, and treatment as required for construction and protection of the environment; 17. Temporary facilities for managing environment conditions and Constituents of Concern; 18. Temporary facilities such as sheeting, shoring, bracing, formwork, embankments, storage facilities, working areas, and other facilities required for construction of the Project; 19. Temporary and permanent facilities for protection of all overhead, surface, or underground structures or features; 20. Temporary and permanent facilities for removal, relocation, or replacement of any overhead, surface, or underground structures or features; 21. Products, materials, and equipment consumed during the construction of the Project; 22. Contractor labor and supervision to complete the Project, including that provided through Subcontractors or Suppliers; 23. Correcting Defective Work during the Contract Times, during the Correction Period, or as required to meet any warranty provision of the Contract Documents; 24. Risk associated with weather and environmental conditions, start-up, and initial operation of facilities including equipment, processes, and systems; 25. Contractor's safety programs, including management, administration, and training; 26. Maintenance of facilities, including equipment, processes, and systems until operation is transferred to Owner; 27. Providing warranties, extended or special warranties, or extended service agreements; 28. Cleanup and disposal of any and all surplus materials; and 29. Demobilization of all physical, temporary facilities not incorporated into the Project. B. Include the cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the Contract Price. C. Provide written approval of the surety company providing Bonds for the Schedule of Values, Application for Payment form, and method of payment prior to submitting the first Application for Payment. Submit approval using the Consent of Surety Company to Payment Procedures form provided. Payment will not be made without this approval. D. OAR may withhold processing Applications for Payment if any of the following processes or documentation are not up to date: 1. Progress Schedule per SECTION 0133 04 CONSTRUCTION PROGRESS SCHEDULE. 2. Project photographs per SECTION 0133 05 VIDEO AND PHOTOGRAPHIC DOCUMENTATION. 3. Record Documents per SECTION 01 31 13 PROJECT COORDINATION. 4. Documentation required to comply with Owner's Minority/ MBE/ DBE Participation Policy. Application for Payment Procedures 012900-2 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 03-11-2015 1.02 SCHEDULE OF VALUES A. Submit a detailed Schedule of Values for the Work at least 10 days prior to submitting the first Application for Payment. B. Submit the Schedule of Values in the form for Attachment A-Tabulation of Earned Value of Original Contract Performed. C. Do not submit an Application for Payment until the Schedule of Values has been approved by the OAR. D. Use each unit price line item in the Agreement as a unit price line item in the Schedule of Values. E. Divide lump sum line items, including Subcontractor and Supplier amounts in the Schedule of Values into smaller components to allow more accurate determination of the earned value for each item. 1. Provide adequate detail to allow a more accurate determination of the earned value expressed as a percentage of Work completed for each item. 2. Line items may not exceed $50,000.00, unless they are for products, materials, or equipment permanently incorporated into the Project that cannot be subdivided into units or subassemblies. 3. Lump sum items may be divided into an estimated number of units to determine earned value. a. The estimated number of units times the cost per unit must equal the lump sum amount for that line item. b. Contractor will receive payment for the lump sum for the line item, regardless of the number of units installed, unless an adjustment is made by Change Order. 4. Include Contractor's overhead and profit in each line item in proportion to the value of the line item to the Contract Price. 5. Include the cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the Contract Price for each item. 6. These line items may be used to establish the value of Work to be added or deleted from the Project. 7. The sum of all values listed in the schedule must equal the total Contract Price. F. Subdivide each line item in the Schedule of Values into two payment components. The first component is the direct cost for products, materials, and equipment permanently incorporated into the Project. The second component is all other cost associated with the item in the Agreement. The sum of the two components must equal the value of the line item in the Schedule of Values. G. Where a percentage of the line value is allowed for a specified stage of completion, show the value for each stage of completion as a component of that line item cost. Application for Payment Procedures 012900-3 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 03-11-2015 1.03 SCHEDULE OF ANTICIPATED PAYMENTS AND EARNED VALUE A. Submit a schedule of the anticipated Application for Payments showing the application numbers, submission dates, and the anticipated amount to be requested. Incorporate retainage into the development of this schedule of anticipated payments. B. Submit a tabulation of the anticipated Total Earned Value of Fees, Work, and Materials to create a graphic(curve) representation of the anticipated progress on the Project each month. Adjust this table and curve to incorporate Modifications. Use this curve to compare actual progress on the Project each month by comparing the anticipated cumulative Total Earned Value of Fees,Work, and Materials to the actual Total Earned Value of Fees, Work, and Materials each month. Use the comparison of values to determine performance on budget and schedule. C. Update the Schedule of Payments as necessary to provide a reasonably accurate indication of the funds required to make payments each month to the Contractor for Work performed. 1.04 BASIS FOR PAYMENTS A. Lump Sum Contracts: 1. Payment will be made for the earned value of Work completed during the payment period expressed as a percentage of Work completed for each line item during the payment period per the Contract Documents. 2. Payment amount is the value of Work completed per the Contract Documents multiplied by the percentage of Work completed. 3. Payment for lump sum items divided into an estimated number of units to determine earned value per Paragraph 1.02.E.3 will be made for the measured number of units. 4. Payment for stored materials and equipment will be made per Paragraph 1.05. B. Unit Price Contracts: 1. Payment will be made for the actual quantity of Work completed during the payment period and for materials and equipment stored during the payment period per the Contract Documents. a. Payment amount is the Work quantity measured per the Contract Documents multiplied by the unit prices for that line item in the Agreement. b. Payment for stored materials and equipment will be made per Paragraph 1.05. 2. Measure the Work described in the Agreement for payment. Payment will be made only for the actual measured and/or computed length, area, solid contents, number, and weight, unless other provisions are made in the Contract Documents. Payment on a unit price basis will not be made for Work outside finished dimensions shown in the Contract Documents. Include cost for waste, overages, and tolerances in the unit price for that line item. 1.05 PAYMENT FOR STORED MATERIALS AND EQUIPMENT. A. Store materials and equipment properly at the Site. Application for Payment Procedures 012900-4 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 03-11-2015 1. Payment will be made for the invoice amount less the specified retainage. 2. Payment for materials and equipment show in the Application for Payment on Attachment A or Attachment B-Tabulation of Work on Approved Contract Modifications will be made for the invoice amount, up to the value show in the Schedule of Values for that line item. Costs for material and equipment in excess of the value shown in the Schedule of Values may not be added to other line items. 3. Payment will be made in full for the value shown in the line item for products and materials if invoices for materials and equipment are less than the amount shown in the line item and it can be demonstrated that no additional materials or equipment are required to complete Work described in that item. 4. Provide invoices at the time materials are included on Attachment D -Tabulation of Values for Materials and Equipment. Include invoice numbers on Attachment D so that a comparison can be made between invoices and amounts included on Attachment D. B. Provide a bill of sale, invoice, or other documentation warranting that Owner has received the materials and equipment free and clear of Liens. Provide documentation of payment for materials and equipment with the next Application for Payment. Adjust payment to the amount actually paid if this differs from the invoice amount. Remove items from the tabulation of materials and equipment if this documentation is not provided. Payment will not be made for material and equipment without documentation of payment. C. Contractors can be paid for non-perishable materials on hand stored at the site, provided that invoices are furnished to the City for verification of the material value; and provide documents, satisfactory to the City, that show that the material supplier has been paid for the materials delivered to the work site. D. Provide evidence that the materials and equipment are covered by appropriate property insurance or other arrangements to protect Owner's interest. E. The Work covered by progress payments becomes the property of the Owner at the time of payment. The Contractor's obligations with regard to proper care and maintenance, insurance, and other requirements are not changed by this transfer of ownership until accepted in accordance with the General Conditions. F. Payment for materials and equipment does not constitute acceptance of the product. 1.06 ALTERNATES AND ALLOWANCES A. Include amounts for specified Alternate Work in the Agreement in accordance with SECTION 0123 10 ALTERNATES AND ALLOWANCES. B. Include amounts for specified Allowances for Work in the Agreement in accordance with SECTION 0123 10 ALTERNATES AND ALLOWANCES. 1.07 RETAINAGE AND SET-OFFS A. Retainage will be withheld from each Application for Payment per the Agreement. Retainage will be released per the General Conditions. Application for Payment Procedures 012900-5 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 03-11-2015 B. Reduce payments for set-offs per the General Conditions. Include Attachment C— Tabulation of Set-Offs in the Application for Payment. 1.08 PROCEDURES FOR SUBMITTING AN APPLICATION FOR PAYMENT A. Submit a draft Application for Payment to the OAR each month at least 20 days before the date established in the Agreement for Owner to make progress payments. Do not submit Applications for Payment more often than monthly. Review the draft Application for Payment with the OAR to determine concurrence with: 1. The earned value for each lump sum item including the value of properly stored and documented materials and equipment for each item in the original Contract. 2. The quantity of Work completed for each unit price item. 3. Set-offs included in the Application for Payment. 4. Values requested for materials and equipment consistent with invoices for materials and equipment. B. Submit Applications for Payment monthly through the OAR after agreement has been reached on the draft Application for Payment. 1. Number each application sequentially and include the dates for the application period. 2. Show the total amounts for earned value of original Contract performed, earned value for Work on approved Contract Amendments and Change Orders, retainage, and set- offs. Show total amounts that correspond to totals indicated on the attached tabulation for each. 3. Include Attachment A to show the earned value on each line item in the Schedule of Values for Work shown in the original Contract. 4. Include Attachment B to show the earned value on line item for approved Change Orders. Add items to Attachment B as Change Orders are approved. Change Orders must be approved before payment can be made on Change Order items. 5. Include Attachment C to document set-offs required per the Contract Documents. Show each set-off as it is applied. Show a corresponding line item to reduce the Set off amount if a payment held by a set-off is released for payment. 6. Include Attachment D to allow tracking of invoices used to support amounts requested as materials in Attachments A and B. Enter materials to show the amount of the invoice assigned to each item in Attachment A or B if an invoice includes materials used on several line items. 7. Complete the certification stating that all Work, including materials and equipment, covered by this Application for Payment have been completed or delivered and stored in accordance with the Contract Documents, that all amounts have been paid for Work, materials, and equipment for which previous payments have been made by the Owner, and that the current payment amount shown in this Application for Payment is now due. Application for Payment Procedures 012900-6 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 03-11-2015 C. Submit attachments in Portable Document Format (PDF): 1. Generate attachments to the Application for Payment using the Excel spreadsheet provided. 2. Submit PDF documents with adequate resolution to allow documents to be printed in a format equivalent to the document original. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. 1.09 RESPONSIBILITY OF OWNER'S AUTHORIZED REPRESENTATIVE A. OAR will review draft Application for Payment with Contractor to reach an agreement on the values that will be recommended for payment by the OAR. B. OAR will review Application for Payment submitted by Contractor to determine that the Application for Payment has been properly submitted and is in accordance with the agreed to draft Application for Payment. C. OAR is to either recommend payment of the Application for Payment to Owner or notify the Contractor of the OPT's reasons for not recommending payment. Contractor may make necessary corrections and resubmit the Application for Payment if it is not recommended within 10 days after receipt of the notice. OAR will review resubmitted Application for Payment and reject or recommend payment of the Application for Payment to Owner as appropriate. D. OAR's recommendation of the Application for Payment constitutes a representation by OPT that based on their experience and the information available: 1. The Work has progressed to the point indicated; 2. The quality of the Work is generally in accordance with the Contract Documents; and 3. Requirements prerequisite to payment have been met. E. This representation is subject to: 1. Further evaluation of the Work as a functioning whole; 2. The results of subsequent tests called for in the Contract Documents; or 3. Any other qualifications stated in the recommendation. F. OPT does not represent by recommending payment: 1. Inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work; or 2. Other matters or issues between the parties that might entitle Contractor to additional compensation or entitle Owner to withhold payment to Contractor may or may not exist. G. Neither OPT's review of Contractor's Work for the purposes of recommending payments nor OAR's recommendation of payment imposes responsibility on OPT: 1. To supervise, direct, or control the Work; Application for Payment Procedures 012900-7 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 03-11-2015 2. For the means, methods,techniques, sequences, or procedures of construction, or safety precautions and programs; 3. For Contractor's failure to comply with Laws and Regulations applicable to Contractor's performance of the Work; 4. To make examinations to ascertain how or for what purposes Contractor has used the monies paid on account of the Contract Price; or 5. To determine that title to the Work, materials, or equipment has passed to Owner free and clear of Liens. 1.10 FINAL APPLICATION FOR PAYMENT A. Include adjustments to the Contract Price in the final Application for Payment for: 1. Approved Change Orders and Contract Amendments, 2. Allowances not previously adjusted by Change Order, 3. Deductions for Defective Work that has been accepted by the Owner, 4. Penalties and bonuses, 5. Deductions for liquidated damages, 6. Deduction for all final set-offs, and 7. Other adjustments if needed. B. OAR will prepare a final Change Order reflecting the approved adjustments to the Contract Price which have not been covered by previously approved Change Orders and if necessary reconcile estimate unit price quantities with actual quantities. C. Submit the final Application for Payment per the General Conditions, including the final Change Order. Provide the following with the Final Application for Payment: 1. Evidence of payment or release of liens on the forms provided and as required by the General Conditions. 2. Consent from Surety to Final Payment. 1.11 PAYMENT BY OWNER A. Owner is to pay the amount recommended for monthly payments within 30 days after receipt of the OAR's recommended Application for Payment. 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Application for Payment Procedures 012900-8 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 03-11-2015 01 33 03 RECORD DATA 1.00 GENERAL 1.01 WORK INCLUDED A. Submit Record Data as required by the Contract Documents and as reasonably requested by the OPT. Provide Record Data for all products unless a Shop Drawing is required for the same item. B. Submit Record Data to provide documents that allow the Owner to: 1. Record the products incorporated into the Project for the Owner; 2. Review detailed information about the products regarding their fabrication, installation, commissioning, and testing; and 3. Provide replacement or repair of the products at some future date. C. Contractor's responsibility for full compliance with the Contract Documents is not relieved by the receipt or cursory review of Record Data. Contract modifications can only be approved by Change Order or Field Order. D. Provide various reports or other documents that Contract Documents required be submitted for record purposes. 1.02 QUALITY ASSURANCE A. Submit legible, accurate, and complete documents presented in a clear, easily understood manner. Record Data not meeting these criteria will be rejected. 1.03 CONTRACTOR'S RESPONSIBILITIES A. Submit Record Data for the following items: Specification Section Record Data Description 01-31-13 (1.08) Drawings 01-31-13 (1.08) Specifications 01-31-13 (1.08) Addenda 01-31-13 (1.08) Modifications B. Include Record Data in the Schedule of Documents required by SECTION 0133 00 DOCUMENT MANAGEMENT to indicate the Record Data to be submitted, the dates on which documents are to be sent to the Designer for review, and proposed dates that the product will be incorporated into the Project. C. Complete the following before submitting Record Data: 1. Prepare Record Data and coordinate with Shop Drawings or Samples, other Record Data, and with the requirements of the Work and the Contract Documents; 2. Determine and verify specified performance and design criteria, installation requirements, materials, catalog numbers, and similar information; Record Data 013303-1 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 3. Determine and verify the suitability of materials and equipment offered with respect to the indicated application, fabrication, shipping, handling, storage, assembly, and installation pertaining to the performance of the Work; and 4. Determine and verify information relative to Contractor's responsibilities for means, methods, techniques, sequences, and procedures of construction, and safety precautions and programs incident thereto. D. Determine and verify: 1. Accurate field measurements, quantities, and dimensions are shown on the Record Data; 2. Location of existing structures, utilities, and equipment related to the Record Data have been shown and conflicts between the products existing structures, utilities, and equipment have been identified; 3. Conflicts that impact the installation of the products have been brought to the attention of the OPT through the Designer; 4. Record Data are complete for their intended purpose; and 5. Conflicts between the Record Data related to the various Subcontractors and Suppliers have been resolved. E. Review Record Data prior to submitting to the Designer. Certify that all Record Data has been reviewed by the Contractor and is in strict conformance with the Contract Documents as modified by Addenda, Change Order, Field Order, or Contract Amendment when submitting Record Data. 1.04 RECORD DATA REQUIREMENTS A. Include a complete description of the material or equipment to be furnished, including: 1. Type, dimensions, size, arrangement, model number, and operational parameters of the components; 2. Weights, gauges, materials of construction, external connections, anchors, and supports required; 3. All applicable standards such as ASTM or Federal specification numbers; 4. Fabrication and installation drawings, setting diagrams, manufacturing instructions, templates, patterns, and coordination drawings; 5. Mix designs for concrete, asphalt, or other materials proportioned for the Project; and 6. Complete and accurate field measurements for products which must fit existing conditions. Indicate on the document submittal that the measurements represent actual dimensions obtained at the Site. 1.05 SPECIAL CERTIFICATIONS AND REPORTS A. Provide all required certifications with the Record Data as specified in the individual Specification Sections: Record Data 013303-2 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 1. Certified Test Reports (CTR): A report prepared by an approved testing agency giving results of tests performed on products to indicate their compliance with the Specifications. This report is to demonstrate that the product when installed will meet the requirements and is part of the Record Data. Field tests may be performed by the Owner to determine that in place materials or products meet the same quality as indicated in the CTR submitted as part of the Record Data. 1.06 WARRANTIES AND GUARANTEES A. Provide all required warranties, guarantees, and related documents with the Record Data. The effective date of warranties and guarantees will be the date of acceptance of the Work by the Owner. B. Identify all Extended Warranties, defined as any guarantee of performance for the product or system beyond the 1 year correction period described in the General Conditions. Issue the warranty certificate in the name of the Owner. Provide a Warranty Bond for Extended Warranties if required by Specification Sections. C. Provide a copy of all warranties in a separate document in accordance with SECTION 0170 00 EXECUTION AND CLOSEOUT REQUIREMENTS. 1.07 RECORD DATA SUBMITTAL PROCEDURES A. Submit Record Data through the Designer. Send all documents in digital format for processing. 1. Provide all information requested in the Record Data submittal form. Do not leave any blanks incomplete. If information is not applicable, enter NA in the space provided. The Record Data submittal form is to be the first document in the file. 2. Submit all documents in Portable Document Format (PDF). a. Create PDF document using Bluebeam Revu software or other compatible software that will create files that can be opened and annotated using Bluebeam Revu software. b. Create PDF documents from native format files unless files are only available from scanned documents. C. Rotate pages so that the top of each document appears at the top of the monitor screen when opened in PDF viewing software. d. Submit PDF document with adequate resolution to allow documents to be printed in a format equivalent to the document original. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. e. Submit color PDF documents where color is required to interpret the Record Data. f. Create or convert documents to allow text to be selected for comments or searched using text search features. Run scanned documents through Optical Character Recognition (OCR) software if necessary. g. Flatten markups in documents to prevent markups made by Contractor from being moved or deleted. Flatten documents to allow markup recovery. Record Data 013303-3 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 h. Use Bluebeam Revu software to reduce file size using default settings except the option for "Drop Metadata." Uncheck the "Drop Metadata" box when reducing file size. i. Add footers to each document with the Project name. 3. Submit each specific product, class of material, or product separately so these can be tracked and processed independently. Do not submit Record Data for more than one system in the same Record Data. 4. Submit items specified in different Specification Sections separately unless they are part of an integrated system. 5. Define abbreviations and symbols used in Record Data. a. Use terms and symbols in Record Data consistent with the Contract Drawings. b. Provide a list of abbreviations and their meaning as used in the Record Data. C. Provide a legend for symbols used on Record Data. 6. Mark Record Data to reference: a. Related Specification Sections, b. Drawing number and detail designation, C. Product designation or name, d. Schedule references, e. System into which the product is incorporated, and f. Location where the product is incorporated into the Project. B. Submit a Change Proposal per SECTION 01 31 14 CHANGE MANAGEMENT to request modifications to the Contract Documents, including those for approval of"or equal" products when specifically allowed by the Contract Documents or as a substitution for specified products or procedures. Deviations from the Contract Documents can only be approved by a Modification. C. Complete the certification required by Paragraph 1.03. 1.08 DESIGNER'S RESPONSIBILITIES A. Record Data will be received by the Designer, logged, and provided to Owner as the Project record. 1. Record Data may be reviewed to see that the information provided is adequate for the purpose intended. Record Data not meeting the requirements of Paragraph 1.02 may be rejected as unacceptable. 2. Record Data is not reviewed for compliance with the Contract Documents. Comments may be returned if deviations from the Contract Documents are noted during the cursory review performed to see that the information is adequate. 3. Contractor's responsibility for full compliance with the Contract Documents is not relieved by the review of Record Data. Contract modifications can only be approved by a Modification. Record Data 013303-4 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 B. Designer may take the following action in processing Record Data: 1. File Record Data as received if the cursory review indicates that the document meets the requirements of Paragraph 1.02. Document will be given the status of"Filed as Received" and not further action is required on that Record Data. 2. Reject the Record Data for one of the following reasons: a. The document submittal requirements of the Contract Documents indicate that the document submitted as Record Data should have been submitted as a Shop Drawing. The Record Data will be marked "Rejected" and "Submit Shop Drawing." No further action is required on this document as Record Data and the Record Data process will be closed. Resubmit the document as a Shop Drawing per SECTION 0133 02 SHOP DRAWINGS. b. The cursory review indicates that the document does not meet the requirements of Paragraph 1.02. The Record Data will be marked "Rejected" and "Revise and Resubmit." Contractor is to resubmit the Record Data until it is acceptable and marked "Filed as Received." When Record Data is filed, no further action is required and the Record Data process will be closed. C. The Record Data is not required by the Contract Documents nor is applicable to the Project. The Record Data will be marked "Rejected" and "Cancel - Not Required." No further action is required and the Record Data process will be closed. C. Contractor is to resubmit the Record Data until it is acceptable and marked "Filed as Received." 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Record Data 013303-5 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 013100 PROJECT MANAGEMENT AND COORDINATION 1.00 GENERAL 1.01 WORK INCLUDED A. Furnish resources required to complete the Project with an acceptable standard of quality within the Contract Times. B. Construct Project in accordance with current safety practices. C. Manage Site to allow access to Site and control construction operations. D. Construct temporary facilities to provide and maintain control over environmental conditions at the Site. Remove temporary facilities when no longer needed. E. Provide temporary controls for pollutions, management of water and management of excess earth as required in SECTION 0157 00 TEMPORARY CONTROLS. 1.02 QUALITY ASSURANCE A. Employ competent workmen, skilled in the occupation for which they are employed. Provide Work meeting quality requirements of the Contract Documents. B. Remove Defective Work from the Site immediately unless provisions have been made and approved by the OPT to allow repair of the product at the Site. Clearly mark Work as Defective until it is removed or allowable repairs have been completed. 1.03 DOCUMENT SUBMITTAL A. Provide documents in accordance with SECTION 0133 00 DOCUMENT MANAGEMENT. 1. Provide copies of Supplier's printed storage instructions prior to furnishing materials or products and installation instructions prior to beginning the installation. 2. Incorporate field notes, sketches, recordings, and computations made by the Contractor in Record Drawings. 1.04 PERMITS A. Obtain building permits for the Project from the local authorities having jurisdiction. Pay building permit fees and include this cost in the Contract Price. B. Obtain environmental permits required for construction at the Site. C. Provide required permits for transporting heavy or oversized loads. D. Provide other permits required to conduct any part of the Work. E. Arrange for inspections and certification by agencies having jurisdiction over the Work. F. Make arrangements with private utility companies and pay for fees associated with obtaining services, or for inspection fees. G. Retain copies of permits and licenses at the Site and observe and comply with all regulations and conditions of the permit or license. Project Management and Coordination 013100-1 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 1.05 SAFETY REQUIREMENTS A. Manage safety to protect the safety and welfare of persons at the Site. B. Provide safe access to move through the Site. Provide protective devices to warn and protect from hazards at the Site. C. Provide safe access for those performing tests and inspections. D. Comply with latest provisions of the Occupational Health and Safety Administration and other Laws and Regulation. E. Cooperate with accident investigations. Provide two copies of all reports, including insurance company reports, prepared concerning accidents, injury, or death related to the Project to the OAR as Record Data per SECTION 0133 03 RECORD DATA. 1.06 ACCESS TO THE SITE A. Maintain access to the facilities at all times. Do not obstruct roads, pedestrian walks, or access to the various buildings, structures, stairways, or entrances. Provide safe access for normal operations during construction. B. Provide adequate and safe access for inspections. Leave ladders, bridges, scaffolding, and protective equipment in place until inspections have been completed. Construct additional safe access if required for inspections. C. Use roadways for construction traffic only with written approval of the appropriate representatives of each entity. Roadways may not be approved for construction traffic. Obtain written approval to use roads to deliver heavy or oversized loads to the Site. Furnish copies of the written approvals to the Owner as Record Data per SECTION 0133 03 RECORD DATA. 1.07 CONTRACTOR'S USE OF SITE A. Limit the use of Site for Work and storage to those areas designated on the Drawings or approved by the OAR. Coordinate the use of the premises with the OAR. B. Provide security at the Site as necessary to protect against vandalism and loss by theft. C. Do not permit alcoholic beverages or illegal substances on the Site. Do not allow persons under the influence of alcoholic beverages or illegal substances to enter or remain on the Site at any time. Persons on Site under the influence of alcoholic beverages or illegal substances will be permanently prohibited from returning to the Site. Criminal or civil penalties may also apply. D. Park construction equipment in designated areas only and provide spill control measures as discussed in SECTION 0157 00 TEMPORARY CONTROLS. E. Park employees' vehicles in designated areas only. F. Obtain written permission of the Owner before entering privately-owned land outside of the Owner's property, rights-of-way, or easements. G. Do not allow the use of audio devices, obnoxious,vulgar or abusive language, or sexual harassment in any form. These actions will cause immediate and permanent removal of the offender from the premises. Criminal or civil penalties may apply. Project Management and Coordination 013100-2 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 H. Require Workers to wear clothing that is inoffensive and meets safety requirements. Do not allow sleeveless shirts, shorts, exceedingly torn, ripped, or soiled clothing to be worn on the Project. I. Do not allow firearms or weapons of any sort to be brought on to the Site under any conditions. No exception is to be made for persons with concealed handgun permits. Remove any firearms or weapons and the person possessing these firearms or weapons immediately from the Site. 1.08 PROTECTION OF EXISTING STRUCTURES AND UTILITIES A. Examine the Site and review the available information concerning the Site. Locate utilities, streets, driveways,fences, drainage structures, sidewalks, curbs, and gutters. Verify the elevations of the structures adjacent to excavations. Report any discrepancies from information in the Contract Documents to the OAR before beginning construction. B. Determine if existing structures, poles, piping, or other utilities at excavations will require relocation or replacement. Prepare a Plan of Action per SECTION 0135 00 SPECIAL PROCEDURES. Coordinate Work with local utility company and others for the relocation or replacement. C. Protect buildings, utilities, street surfaces, driveways, sidewalks, curb and gutter,fences, wells, drainage structures, piping, valves, manholes, electrical conduits, and other systems or structures unless they are shown to be replaced or relocated on the Drawings. Restore damaged items to the satisfaction of the OPT and utility owner. D. Carefully support and protect all structures and/or utilities so that there will be no failure or settlement where excavation or demolition endangers adjacent structures and utilities. Do not take existing utilities out of service unless required by the Contract Documents or approved by the OAR. Notify and cooperate with the utility owner if it is necessary to move services, poles,guy wires, pipelines, or other obstructions. E. Protect existing trees and landscaping at the Site. 1. Identify trees that may be removed during construction with OPT. 2. Mark trees to be removed with paint. 3. Protect trees to remain from damage by wrapping trunks with 2 x 4 timbers around the perimeter, securely wired in place, where machinery must operate around existing trees. Protect branches and limbs from damage by equipment. 4. Protect root zone from compaction. 1.09 PRE-CONSTRUCTION EXPLORATORY EXCAVATIONS (NOT APPLICABLE) A. Excavate and expose existing pipelines that cross within 20 feet of Project pipelines prior to any Work. Survey the line to determine its exact vertical and horizontal location at each point the existing pipeline may potentially conflict with the Work. B. Excavate and expose existing parallel pipelines at 300 feet intervals (maximum) for existing pipelines which are within 10 feet of Project pipelines. Survey the line to determine its exact vertical and horizontal location at each point where the line is excavated and exposed. Project Management and Coordination 013100-3 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 C. Prepare a Plan of Action per SECTION 0135 00 SPECIAL PROCEDURES indicating the owner of pipelines excavated and surveyed and all pertinent survey data, including the station where lines cross or conflicts may exist and the distance to the pavement centerline and elevations of the top of existing pipelines. D. Do not perform Work on the Project until all exploratory excavations have been completed and the Plan of Action has been approved by the Designer. E. Include the cost for these pre-construction exploratory excavations in the unit price for pipe construction. Pavement repairs associated with exploratory excavations will be paid for at the unit prices for pavement repair. 1.10 DISRUPTION TO SERVICES/CONTINUED OPERATIONS A. Existing facilities are to continue in service as usual during the construction unless noted otherwise. Owner or utilities must be able to operate and maintain the facilities. Keep disruptions to existing utilities, piping, process piping, or electrical services to a minimum. 1. Do not restrict access to critical valves or operators. 2. Limit operations to the minimum amount of space needed to complete the specified Work. 3. Maintain storm sewers and sanitary sewers in service at all times. Provide temporary service around the construction or otherwise construct the structure in a manner that the flow is not restricted. B. Provide a Plan of Action in accordance with SECTION 0135 00 SPECIAL PROCEDURES if facilities must be taken out of operation. 1.11 FIELD MEASUREMENTS A. Perform complete field measurements prior to purchasing products or beginning construction for products required to fit existing conditions. B. Verify property lines, control lines, grades, and levels indicated on the Drawings. C. Check Shop Drawings and indicate the actual dimensions available where products are to be installed. D. Include field measurements in Record Drawings as required in SECTION 01 31 13 PROJECT COORDINATION. 1.12 REFERENCE DATA AND CONTROL POINTS(NOT APPLICABLE) A. The OPT will provide the following control points: 1. Base line or grid reference points for horizontal control. 2. Benchmarks for vertical control. B. Locate and protect control points prior to starting the Work and preserve permanent reference points during construction. Designated control points may be on an existing structure or monument. Do not change or relocate points without prior approval of the OAR. Notify OAR when the reference point is lost, destroyed, or requires relocation. Replace Project control points on the basis of the original survey. Project Management and Coordination 013100-4 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 C. Provide complete engineering layout of the Work needed for construction. 1. Provide competent personnel. Provide equipment including accurate surveying instruments, stakes, platforms,tools, and materials. 2. Provide surveying with accuracy meeting the requirements established for Category 5 Construction Surveying as established in the Manual of Practice of Land Surveying in Texas published by the Texas Society of Professional Surveyors, latest revision. 3. Record Data and measurements per standards. 1.13 DELIVERY AND STORAGE A. Deliver products and materials to the Site in time to prevent delays in construction. B. Deliver packaged products to Site in original undamaged containers with identifying labels attached. Open cartons as necessary to check for damage and to verify invoices. Reseal cartons and store properly until used. Leave products in packages or other containers until installed. C. Assume full responsibility for the protection and safekeeping of products stored at the Site. D. Store products at locations acceptable to the OAR and to allow Owner access to maintain and operate existing facilities. E. Store products in accordance with the Supplier's storage instructions immediately upon delivery. Leave seals and labels intact. F. Provide additional storage areas as needed for construction. Store products subject to damage by elements in substantial weather-tight enclosures or storage sheds. Provide and maintain storage sheds as required for the protection of products. Provide temperature, humidity control, and ventilation within the ranges stated in the Supplier's instructions. Remove storage facilities at the completion of the Project. G. Protect the pipe interior. Keep all foreign materials such as dirt, debris, animals, or other objects out of the pipe during the Work. Cap or plug ends of installed pipe in an approved manner when pipe is not being installed. Clean or wash out pipe sections that become contaminated before continuing with installation. Take precautions to prevent the pipe from floating or moving out of the proper position during or after laying operations. Immediately correct any pipe that moves from its correct position. H. Provide adequate exterior storage for products that may be stored out-of-doors. 1. Provide substantial platforms, blocking, or skids to support materials and products above ground which has been sloped to provide drainage. Protect products from soiling or staining. 2. Cover products subject to discoloration or deterioration from exposure to the elements, with impervious sheet materials. Provide ventilation to prevent condensation below covering. 3. Store loose,granular materials on clean, solid surfaces, or on rigid sheet materials,to prevent mixing with foreign matter. 4. Provide surface drainage to prevent erosion and ponding of water. Project Management and Coordination 013100-5 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 5. Prevent mixing of refuse or chemically injurious materials or liquids with stored materials. 6. Pipes and conduits stored outdoors are to have open ends sealed to prevent the entrance of dirt, moisture, and other injurious materials. Protect PVC pipe from ultraviolet light exposure. 7. Store light weight products to prevent wind damage. I. Maintain storage facilities. Inspect stored products on a weekly basis and after periods of severe weather to verify that: 1. Storage facilities continue to meet specified requirements; 2. Supplier's required environmental conditions are continually maintained; and 3. Products that can be damaged by exposure to the elements are not adversely affected. J. Replace any stored item damaged by inadequate protection or environmental controls. K. Payment may be withheld for any products not properly stored. 1.14 CLEANING DURING CONSTRUCTION A. Provide positive methods to minimize raising dust from construction operations and provide positive means to prevent air-borne dust from disbursing into the atmosphere. Control dust and dirt from demolition, cutting, and patching operations. B. Clean the Project as Work progresses and dispose of waste materials, keeping the Site free from accumulations of waste or rubbish. Provide containers on Site for waste collection. Do not allow waste materials or debris to blow around or off of the Site. Control dust from waste materials. Transport waste materials with as few handlings as possible. C. Comply with Laws and Regulations. Do not burn or bury waste materials. Remove waste materials, rubbish and debris from the Site and legally dispose of these at public or private disposal facilities. D. Provide a final cleaning to thoroughly clean the entire Site and make ready for acceptance. 1. Remove construction debris, boxes, and trash from the Site. 2. Remove construction storage sheds and field offices. 3. Restore grade to match surrounding condition and remove excess dirt. 4. Sweep all drives and parking lots clean of dirt and debris. Use water trucks or hose down paved site to like new appearance. 1.15 MAINTENANCE OF ROADS, DRIVEWAYS, AND ACCESS A. Maintain roads and streets in a manner that is suitable for safe operations of public vehicles during all phases of construction unless the Owner approves a street closing. Do not close public roads overnight. Project Management and Coordination 013100-6 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 B. Submit a Notification by Contractor for Owner's approval of a street closing. The request shall state: 1. The reason for closing the street. 2. How long the street will remain closed. 3. Procedures to be taken to maintain the flow of traffic. C. Construct temporary detours, including by-pass roads around construction, with adequately clear width to maintain the free flow of traffic at all times. Maintain barricades, signs, and safety features around the detour and excavations. Maintain barricades, signs, and safety features around the Work in accordance with all provisions of the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD). D. Assume responsibility for any damage resulting from construction along roads or drives. 1.16 AREA ACCESS AND TRAFFIC CONTROL A. Provide traffic control measures to assure a safe condition and to provide a minimum of inconvenience to motorists and the public. Provide all-weather access to all residents and businesses at all times during construction. Provide temporary driveways and/or roads of approved material during wet weather. Maintain a stockpile of suitable material on the Site to meet the demands of inclement weather. B. Schedule operations to minimize adverse impact on the accessibility of adjoining properties. Sequence construction to build driveways in half widths, construct temporary ramps, or any other measure required to maintain access to adjoining properties. C. Comply with the Owner's Uniform Barricading Standards and Practices. Copies of this document are available through the Owner's Traffic Engineering Department. Secure required permits from the Owner's Traffic Engineering Department. 1.17 OVERHEAD ELECTRICAL WIRES A. Comply with OSHA safety requirements regarding construction equipment working beneath overhead electrical wires. Prevent and pay for repairs for damage to existing overhead electrical wires or facilities. B. Provide for adequate safety with regard to overhead lines whether overhead lines are or are not shown in the Contract Documents. 1.18 BLASTING A. Blasting is not allowed for any purpose. 1.19 ARCHAEOLOGICAL REQUIREMENTS A. Cease operations immediately and contact the Owner for instructions if historical or archaeological artifacts are found during construction. B. Conduct all construction activities to avoid adverse impact on the Sites where significant historical or archaeological artifacts are found or identified as an area where other artifacts could be found. Project Management and Coordination 013100-7 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 1. Obtain details for Working in these areas. 2. Maintain confidentiality regarding the Site. 3. Adhere to the requirements of the Texas Historical Commission. 4. Notify the OAR and the Texas Historical Commission. C. Do not disturb archaeological sites. 1. Obtain the services of a qualified archaeological specialist to instruct construction personnel on how to identify and protect archaeological finds on an emergency basis. 2. Coordinate activities to permit archaeological work to take place within the area. a. Attempt to archaeologically clear areas needed for construction as soon as possible. b. Provide a determination of priority for such areas. D. Assume responsibility for any unauthorized destruction that might result to such Sites by construction personnel, and pay all penalties assessed by the State or Federal agencies for non-compliance with these requirements. E. Contract Times will be modified to compensate for delays caused by such archaeological finds. No additional compensation will be paid for delays. 1.20 ENDANGERED SPECIES RESOURCES A. Do not perform any activity that is likely to jeopardize the continued existence of a threatened or endangered species as listed or proposed for listing under the Federal Endangered Species Act (ESA), and/or the State of Texas Parks and Wildlife Code on Endangered Species, or to destroy or adversely modify the habitat of such species. B. Cease Work immediately in the area of the encounter and notify the OAR if a threatened or endangered species is encountered during construction. OPT will implement actions in accordance with the ESA and applicable State statutes. Resume construction in the area of the encounter when authorized to do so by the OAR. 1.21 COOPERATION WITH PUBLIC AGENCIES A. Cooperate with all public and private agencies with facilities operating within the limits of the Project. B. Provide a 48-hour notice to any applicable agency when work is anticipated to proceed in the vicinity of any facility by using Texas 811 at 811 and the Lone Star Notification Company at 1-800-669-8344. C. For the Contractor's convenience, the following telephone numbers are listed: Public Agencies/Contacts Phone Number City Engineer 361-826-3500 Project Engineer: Felix H. Ocanas,Jr. 361-549-4576 Designer's name: Felix H. Ocanas,Jr. 361-549-4576 Traffic Engineering 361-826-3547 Project Management and Coordination 013100-8 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 Public Agencies/Contacts Phone Number Police Department 361-882-2600 361-826-1800(361-826-1818 after Water/Wastewater/Stormwater hours) 361-885-6900(361-885-6942 after Gas Department hours) 361-885-5999 (Dispatch after hours) Parks& Recreation Department 361-826-3461 Street Department 361-826-1875 City Street Div. for Traffic Signals 361-826-1610 Solid Waste& Brush 361-826-1973 MIS Department(City Fiber) 361-826-3740 AEP 1-877-373-4858 AT&T 361-881-2511 (1-800-824-4424 after hours) Grande Communications 254-379-4400 Time Warner Communications Crown Castle Communications 1-888-632-0931 Century Tel 361-883-3000 Windstream Regional Transportation Authority 361-289-2712 Port of Corpus Christi Authority Engr. 361-882-5633 TxDOT Area Office 361-808-2500 Corpus Christi ISD 361-886-9005 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Project Management and Coordination 013100-9 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 Rev 01-13-2016 01 31 13 PROJECT COORDINATION 1.00 GENERAL 1.01 WORK INCLUDED A. Administer Contract requirements to construct the Project. Provide documentation per the requirements of this Section. Provide information as requested by the OPT. 1.02 DOCUMENT SUBMITTAL A. Provide documents in accordance with SECTION 0133 00 DOCUMENT MANAGEMENT. B. Use the forms provided for Contract administration, applications for payment, document submittals, documentation of test results, equipment installation and documentation, and Project closeout. A digital copy of the required forms will be provided to the Contractor before or at the pre-construction conference. 1.03 COMMUNICATION DURING THE PROJECT A. The OAR is to be the first point of contact for all parties on matters concerning this Project. B. The Designer will coordinate correspondence concerning: 1. Documents, including Applications for Payment. 2. Clarification and interpretation of the Contract Documents. 3. Contract Modifications. 4. Observation of Work and testing. 5. Claims. C. The OAR will normally communicate only with the Contractor. Any required communication with Subcontractors or Suppliers will only be with the direct involvement of the Contractor. D. Direct written communications to the OAR at the address indicated at the pre-construction conference. Include the following with communications as a minimum: 1. Name of the Owner. 2. Project name. 3. Contract title. 4. Project number. 5. Date. 6. A reference statement. E. Submit communications on the forms referenced in this Section or in SECTION 0133 00 DOCUMENT MANAGEMENT. Project Coordination 013113-1 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E162353 11-25-2013 1.04 PROJECT MEETINGS A. Pre-Construction Conference: 1. Attend a pre-construction conference. 2. The location of the conference will be determined by the OAR. 3. The time of the meeting will be determined by the OAR but will be after the Notice of Award is issued and not later than 15 days after the Notice to Proceed is issued. 4. The OPT, Contractor's project manager and superintendent, representatives of utility companies, and representatives from major Subcontractors and Suppliers may attend the conference. 5. Provide and be prepared to discuss: a. Preliminary construction schedule per SECTION 0133 04 CONSTRUCTION PROGRESS SCHEDULE. b. Schedule of Values and anticipated Schedule of Payments per SECTION 0129 00 APPLICATION FOR PAYMENT PROCEDURES. C. List of Subcontractors and Suppliers. d. Contractor's organizational chart as it relates to this Project. e. Letter indicating the agents of authority for the Contractor and the limit of that authority with respect to the execution of legal documents, Contract Modifications, and payment requests. B. Progress Meetings: 1. Attend meetings with the OAR and Owner. a. Meet on a monthly basis or as requested by the OAR to discuss the Project. b. Meet at the Site or other location as designated by the OAR. C. Contractor's superintendent and other key personnel are to attend the meeting. Other individuals may be requested to attend to discuss specific matters. d. Notify the OAR of any specific items to be discussed a minimum of 1 week prior to the meeting. 2. Provide information as requested by the OAR or Owner concerning this Project. Prepare to discuss: a. Status of overall Project schedule. b. Contractor's detailed schedule for the next month. C. Anticipated delivery dates for equipment. d. Coordination with the Owner. e. Status of documents. f. Information or clarification of the Contract Documents. g. Claims and proposed Modifications to the Contract. Project Coordination 013113-2 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E162353 11-25-2013 h. Field observations, problems, or conflicts. i. Maintenance of quality standards. 3. OAR will prepare minutes of meetings. Review the minutes of the meeting and notify the OAR of any discrepancies within 10 days of the date of the meeting memorandum. The minutes will not be corrected after the 10 days have expired. Corrections will be reflected in the minutes of the following meeting or as an attachment to the minutes. C. Pre-Submittal and Pre-Installation Meetings: 1. Conduct pre-submittal and pre-installation meetings as required in the individual technical Specifications or as determined necessary by the OAR(for example, instrumentation, roofing, concrete mix design, etc.). 2. Set the time and location of the meetings when ready to proceed with the associated Work. Submit a Notification by Contractor in accordance with Paragraph 1.07 for the meeting 2 weeks before the meeting. OPT must approve of the proposed time and location. 3. Attend the meeting and require the participation of appropriate Subcontractors and Suppliers in the meeting. 4. Prepare minutes of the meeting and submit to the OPT for review. OPT will review the minutes of the meeting and notify the Contractor of any discrepancies within 10 days of the date of the meeting memorandum. The minutes will not be corrected after the 10 days have expired. Corrections will be reflected in a revised set of meeting minutes. 1.05 REQUESTS FOR INFORMATION A. Submit Request for Information (RFI) to the Designer to obtain additional information or clarification of the Contract Documents. 1. Submit a separate RFI for each item on the form provided. 2. Attach adequate information to permit a written response without further clarification. Designer will return requests that do not have adequate information to the Contractor for additional information. Contractor is responsible for all delays resulting from multiple document submittals due to inadequate information. 3. A response will be made when adequate information is provided. Response will be made on the RFI form or in attached information. B. Response to an RFI is given to provide additional information, interpretation, or clarification of the requirements of the Contract Documents, and does not modify the Contract Documents. C. Designer will initiate a Request for a Change Proposal (RCP) per SECTION 01 31 14 CHANGE MANAGEMENT if the RFI indicates that a Contract Modification is required. D. Use the Project Issues Log to document decisions made at meetings and actions to be taken in accordance with Paragraph 1.06. E. Use the Action Item Log to document assignments for actions to be taken in accordance with Paragraph 1.06. Project Coordination 013113-3 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E162353 11-25-2013 1.06 DECISION AND ACTION ITEM LOG A. OAR will maintain a Project Decision Log to document key decisions made at meetings, telephone conversation or Site visits using the format provided: 1. Review the log prior to each regular meeting. 2. Report any discrepancies to the OAR for correction or discussion at the next monthly meeting. B. OAR will maintain an Action Item log in conjunction with the Project Decision Log to track assignments made at meetings, telephone conversation, or Site visits using the format provided: 1. Review the Action Item Log prior to each regular meeting. 2. Report actions taken subsequent to the previous progress meeting on items in the log assigned to the Contractor or through the Contractor to a Subcontractor or Supplier to the OAR. Report on status of progress 1 week prior to each progress meeting established in Paragraph 1.04 to allow OAR to update the log prior to the Progress meetings. 3. Be prepared to discuss the status at each meeting. C. Decisions or action items in the log that require a change in the Contract Documents will have the preparation of a Modification as an action items if appropriate. The Contract Documents can only be changed by a Modification. 1.07 NOTIFICATION BY CONTRACTOR A. Notify the OAR of: 1. Need for testing. 2. Intent to work outside regular working hours. 3. Request to shut down facilities or utilities. 4. Proposed utility connections. 5. Required observation by OAR, Designer, or inspection agencies prior to covering Work. 6. Training. B. Provide notification a minimum of 2 weeks in advance in order to allow OPT time to respond appropriately to the notification. C. Use "Notification by Contractor" form provided. 1.08 RECORD DOCUMENTS(NOT APPLICABLE) A. Maintain at the Site one complete set of printed Record Documents including: 1. Drawings. 2. Specifications. 3. Addenda. 4. Modifications. Project Coordination 013113-4 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E162353 11-25-2013 5. Record Data and approved Shop Drawings. 6. Construction photographs. 7. Test Reports. 8. Clarifications and other information provided in Request for Information responses. 9. Reference standards. B. Store printed Record Documents and Samples in the Contractor's field office. 1. Record Documents are to remain separate from documents used for construction. 2. Provide files and racks for the storage of Record Documents. 3. Provide a secure storage space for the storage of Samples. 4. Maintain Record Documents in clean, dry, legible conditions, and in good order. 5. Make Record Documents and Samples available at all times for inspection by the OPT. C. Maintain a digital record of Specifications and Addenda to identify products provided in PDF format. 1. Reference the Record Data number, Shop Drawings number, and O&M manual number for each product and item of equipment furnished or installed. 2. Reference Modifications by type and number for all changes. D. Maintain a digital record of Drawings in PDF format. 1. Reference the Record Data number, Shop Drawings number, and O&M manual number for each product and item of equipment furnished or installed. 2. Reference Modifications by type and number for all changes. 3. Record information as construction is being performed. Do not conceal any Work until the required information is recorded. 4. Mark Drawings to record actual construction, including the following: a. Depths of various elements of the foundation in relation to finished first floor datum or the top of walls. b. Horizontal and vertical locations of underground utilities and appurtenances constructed and existing utilities encountered during construction. C. Location of utilities and appurtenances concealed in the Work. Refer measurements to permanent structures on the surface. Include the following equipment: 1) Piping. 2) Ductwork. 3) Equipment and control devices requiring periodic maintenance or repair. 4) Valves, unions, traps, and tanks. 5) Services entrance. 6) Feeders. Project Coordination 013113-5 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E162353 11-25-2013 7) Outlets. d. Changes of dimension and detail. e. Changes by Modifications. f. Information in Request for Information or included in the Project Issues Log. g. Details not on the original Drawings. Include field verified dimensions and clarifications, interpretations, and additional information issued in response to RFIs. 5. Mark Drawings with the following colors: a. Highlight references to other documents, including Modifications in blue; b. Highlight mark ups for new or revised Work(lines added) in yellow; C. Highlight items deleted or not installed (lines to be removed) in red; and d. Highlight items constructed per the Contract Documents in green. 6. Submit Record Documents to Designer for review and acceptance 30 days prior to Final Completion of the Project. E. Applications for Payment will not be recommended for payment if Record Documents are found to be incomplete or not in order. Final payment will not be recommended without complete Record Documents. 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Project Coordination 013113-6 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E162353 11-25-2013 01 31 14 CHANGE MANAGEMENT 1.00 GENERAL 1.01 REQUESTS FOR CHANGE PROPOSAL A. Designer will initiate Modifications by issuing a Request for a Change Proposal (RCP). 1. Designer will prepare a description of proposed Modifications. 2. Designer will issue the Request for a Change Proposal form to Contractor. A number will be assigned to the Request for a Change Proposal when issued. 3. Return a Change Proposal in accordance with Paragraph 1.02 to the Designer for evaluation by the OPT. 1.02 CHANGE PROPOSALS A. Submit a Change Proposal (CP)to the Designer for Contractor initiated changes in the Contract Documents or in response to a Request for Change Proposal. 1. Use the Change Proposal form provided. 2. Assign a number to the Change Proposal when issued. 3. Include with the Change Proposal: a. A complete description of the proposed Modification if Contractor initiated or proposed changes to the OPT's description of the proposed Modification. b. The reason the Modification is requested, if not in response to a Request for a Change Proposal. C. A detailed breakdown of the cost of the change if the Modification requires a change in Contract Price. The itemized breakdown is to include: 1) List of materials and equipment to be installed; 2) Man hours for labor by classification; 3) Equipment used in construction; 4) Consumable supplies, fuels, and materials; 5) Royalties and patent fees; 6) Bonds and insurance; 7) Overhead and profit; 8) Field office costs; 9) Home office cost; and 10) Other items of cost. d. Provide the level of detail outline in the paragraph above for each Subcontractor or Supplier actually performing the Work if Work is to be provided by a Subcontractor or Supplier. Indicate appropriate Contractor mark-ups for Work Change Management 013114-1 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 provided through Subcontractors and Suppliers. Provide the level of detail outline in the paragraph above for self-performed Work. e. Submit Change Proposals that comply with Article 13 of the General Conditions for Cost of Work. f. Provide a revised schedule. Show the effect of the change on the Project Schedule and the Contract Times. B. Submit a Change Proposal to the Designer to request a Field Order. C. A Change Proposal is required for all substitutions or deviations from the Contract Documents. D. Request changes to products in accordance with SECTION 0133 02 SHOP DRAWINGS. 1.03 DESIGNER WILL EVALUATE THE REQUEST FOR A MODIFICATION. A. Designer will issue a Modification per the General Conditions if the Change Proposal is acceptable to the Owner. Designer will issue a Change Order or Contract Amendment for any changes in Contract Price or Contract Times. 1. Change Orders and Contract Amendments will be sent to the Contractor for execution with a copy to the Owner recommending approval. A Work Change Directive may be issued if Work needs to progress before the Change Order or Contract Amendment can be authorized by the Owner. 2. Work Change Directives, Change Orders, and Contract Amendments can only be approved by the Owner. a. Work performed on the Change Proposal prior to receiving a Work Change Directive or approval of the Change Order or Contract Amendment is performed at the Contractor's risk. b. No payment will be made for Work on Change Orders or Contract Amendments until approved by the Owner. B. The Contractor may be informed that the Request for a Change Proposal is not approved and construction is to proceed in accordance with the Contract Documents. 1.04 EQUAL NON SPECIFIED PRODUCTS A. The products of the listed Suppliers are to be furnished where Specifications list several manufacturers but do not specifically list "or equal" or"or approved equal" products. Use of any products other than those specifically listed is a substitution. Follow the procedures in Paragraph 1.05 for a substitution. B. Contractor may submit other manufacturers' products that are in full compliance with the Specification where Specifications list one or more manufacturers followed by the phase "or equal" or"or approved equal." 1. Submit a Shop Drawing as required by SECTION 0133 02 SHOP DRAWINGS to document that the proposed product is equal or superior to the specified product. 2. Prove that the product is equal. It is not the OPT's responsibility to prove the product is not equal. Change Management 013114-2 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 a. Indicate on a point by point basis for each specified feature that the product is equal to the Contract Document requirements. b. Make a direct comparison with the specified manufacturer's published data sheets and available information. Provide this printed material with the Shop Drawing. C. The decision of the Designer regarding the acceptability of the proposed product is final. 3. Provide a typewritten certification that, in furnishing the proposed product as an equal, the Contractor: a. Has thoroughly examined the proposed product and has determined that it is equal or superior in all respects to the product specified. b. Has determined that the product will perform in the same manner and result in the same process as the specified product. C. Will provide the same warranties and/or bonds as for the product specified. d. Will assume all responsibility to coordinate any modifications that may be necessary to incorporate the product into the construction and will waive all claims for additional Work which may be necessary to incorporate the product into the Project which may subsequently become apparent. e. Will maintain the same time schedule as for the specified product. 4. A Change Proposal is not required for any product that is in full compliance with the Contract Documents. If the product is not in full compliance, it may be offered as a Substitution. 1.05 SUBSTITUTIONS A. Substitutions are defined as any product that the Contractor proposes to provide for the Project in lieu of the specified product. Submit a Change Proposal per Paragraph 1.02 along with a Shop Drawing as required by SECTION 0133 02 SHOP DRAWINGS to request approval of a substitution. B. Prove that the product is acceptable as a substitute. It is not the Designer's responsibility to prove the product is not acceptable as a substitute. 1. Indicate on a point by point basis for each specified feature that the product is acceptable to meet the intent of the Contract Documents requirements. 2. Make a direct comparison with the specified Suppliers published data sheets and available information. Provide this printed material with the documents submitted. 3. The decision of the Designer regarding the acceptability of the proposed substitute product is final. C. Provide a written certification that, in making the substitution request,the Contractor: 1. Has determined that the substituted product will perform in substantially the same manner and result in the same ability to meet the specified performance as the specified product. Change Management 013114-3 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 2. Will provide the same warranties and/or bonds for the substituted product as specified or as would be provided by the manufacturer of the specified product. 3. Will assume all responsibility to coordinate any modifications that may be necessary to incorporate the substituted product into the Project and will waive all claims for additional Work which may be necessary to incorporate the substituted product into the Project which may subsequently become apparent. 4. Will maintain the same time schedule as for the specified product. D. Pay for review of substitutions in accordance with SECTION 0133 02 SHOP DRAWINGS. 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Change Management 013114-4 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 01 33 00 DOCUMENT MANAGEMENT 1.00 GENERAL 1.01 WORK INCLUDED A. Submit documentation as required by the Contract Documents and as reasonably requested by the OPT. 1.02 QUALITY ASSURANCE A. Submit legible, accurate, complete documents presented in a clear, easily understood manner. Documents not meeting these criteria will be returned without review. 1.03 CONTRACTOR'S RESPONSIBILITIES A. Review documents prior to submitting. Make certifications as required by the Contract Documents and as indicated on forms provided. B. Provide a Schedule of Documents to list the documents that are to be submitted,the dates on which documents are to be sent to the Designer for review, and proposed dates that documents must be returned to comply with the Project schedule. Use the form provided for this list. C. Incorporate the dates for processing documents into the Progress Schedule required by SECTION 0133 04 CONSTRUCTION PROGRESS SCHEDULE. 1. Provide documents in accordance with the schedule so construction of the Project is not delayed. 2. Allow a reasonable time for the review of documents when preparing the Progress Schedule. Assume a 14 day review cycle for each document unless a longer period of time is indicated in the Contract Documents or agreed to by Designer and Contractor. 3. Schedule submittal of documents to provide all information for interrelated Work at one time. 4. Allow adequate time for processing documents so construction of the Project is not delayed. 1.04 DOCUMENT SUBMITTAL PROCEDURES A. Submit documents through the Designer. Send all documents in digital format for processing. 1. Provide all information requested with a completed Document Transmittal form. Do not leave any blanks incomplete. If information is not applicable, enter NA in the space provided. 2. The Document Transmittal form is to be the first page in the document submitted. 3. Submit all documents in Portable Document Format (PDF). Document Management 013300-1 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 a. Create PDF document using Bluebeam Revu software or other compatible software that will create files that can be opened and annotated using Bluebeam Revu software. b. Create PDF documents from native format files unless files are only available from scanned documents. C. Rotate pages so that the top of each document appears at the top of the monitor screen when opened in PDF viewing software. d. Submit PDF document with adequate resolution to allow documents to be printed in a format equivalent to the document original. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. e. Submit color PDF documents where color is required to interpret the document. f. Create or convert documents to allow text to be selected for comments or searched using text search features. Run scanned documents through Optical Character Recognition (OCR) software if necessary. g. Flatten markups in documents to prevent markups made by Contractor from being moved or deleted. Flatten documents to allow markup recovery. h. Use Bluebeam Revu software to reduce file size using default settings except the option for"Drop Metadata." Uncheck the "Drop Metadata" box when reducing file size i. Add footers to each document with the Project name. 1.05 DOCUMENT NUMBERING A. Assign a number to the documents originated to allow tracking of the documents during the review process. 1. Assign the number consisting of a prefix, a sequence number, and a letter suffix. Prefixes shall be as follows: Prefix Description Originator AP Application for Payment Contractor CO Change Order OAR CP Change Proposal Contractor CTR Certified Test Report Contractor FO Field Order OAR NBC Notification by Contractor Contractor PD Photographic Documentation Contractor RCP Request for a Change Proposal OAR RD Record Data Contractor RFI Request for Information Contractor SD Shop Drawing Contractor Document Management 013300-2 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 Prefix Description Originator SCH Schedule of Progress Contractor 2. Issue sequence numbers in chronological order for each type of document. 3. Issue numbers for resubmittals that have the same number as the original document followed by an alphabetical suffix indicating the number of times the same document has been sent to the Designer for processing. For example: SD 025 A represents Shop Drawing number 25 and the letter"A" designates that this is the second time this document has been sent for review. 4. Clearly note the document number on each page or sheet of the document. 5. Correct assignment of numbers is essential since different document types are processed in different ways. B. Include reference to the Drawing number and/or Specification Section, detail designation, schedule, or location that corresponds with the data on the document transmittal forms. Other identification may also be required, such as layout drawings or schedules to allow the reviewer to determine where a particular product is to be used. 1.06 DOCUMENT REQUIREMENTS A. Furnish documents as indicated below or in individual Specification Sections. Submit documents per the procedures described in the Contract Documents. B. Submit documents per the Specification Section shown in the following table: Document Type Specification Section Application for Payment 01 29 00 Change Proposal 01 31 14 Certified Test Report 0133 02 for approval of product 0140 00 to demonstrate compliance Notification by Contractor 01 31 13 Photographic Documentation 01 33 05 Progress Schedules 01 33 04 Record Data 01 33 03 Request for Information 01 31 13 Shop Drawing 01 33 02 Schedule of Values 01 29 00 Substitutions 01 31 14 Suppliers and Subcontractors 01 31 13 and 0133 03 Document Management 013300-3 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Document Management 013300-4 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 0133 01 Submittal Register 01 3100 Contractor Quality Control Plan 1.01-A 01 33 04 Progress Schedule 1.04-5A 01 31 13 Pay Applications 1.03-131 01 31 13 Data and Test Results of All Materials 1.03-134 01 31 13 Request for Change Order 1.03-133 013113 Claims 1.03-135 013100 Field Measurements 1.11-D 013100 Street Closing 1.15-D 01 31 13 List of Subcontractors 1.04 01 31 13 Requests for Information 1.05 Submittal Register 013301-1 IDIQ Minor Street Improvements Project,PN E16250,E16251,E16252,E16253 07-03-2014 01 33 02 SHOP DRAWINGS 1.00 GENERAL 1.01 WORK INCLUDED A. Shop Drawings are required for those products that cannot adequately be described in the Contract Documents to allow fabrication, erection, or installation of the product without additional detailed information from the Supplier. B. Submit Shop Drawings as required by the Contract Documents and as reasonably requested by the OPT to: 1. Record the products incorporated into the Project for the Owner; 2. Provide detailed information for the products proposed for the Project regarding their fabrication, installation, commissioning, and testing; and 3. Allow the Designer to advise the Owner if products proposed for the Project by the Contractor conform, in general, to the design concepts of the Contract Documents. C. Contractor's responsibility for full compliance with the Contract Documents is not relieved by the review of Shop Drawings, Samples, or mockups. Contract modifications can only be approved by Change Order or Field Order. 1.02 QUALITY ASSURANCE A. Submit legible, accurate, and complete documents presented in a clear, easily understood manner. Shop Drawings not meeting these criteria will be rejected. B. Demonstrate that the proposed products are in full and complete compliance with the design criteria and requirements of the Contract Documents, or will be if deviations requested per Paragraph 1.10 are approved. C. Furnish and install products that fully comply with the information included in the document submittal. 1.03 CONTRACTOR'S RESPONSIBILITIES A. Provide Shop Drawings for the following items: Specification Section Shop Drawing Description Schedule of shop drawings to be submitted Contractor quality control plan Progress schedules B. Include Shop Drawings in the Schedule of Documents required by SECTION 0133 00 DOCUMENT MANAGEMENT to indicate the Shop Drawings to be submitted, the dates on which documents are to be sent to the Designer for review and proposed dates that the product will be incorporated into the Project. C. Incorporate the dates for processing Shop Drawings into the Progress Schedule required by SECTION 0133 04 CONSTRUCTION PROGRESS SCHEDULE. Shop Drawings 013302-1 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 11-25-2013 1. Submit Shop Drawings in accordance with the schedule so construction of the Project is not delayed. 2. Allow a reasonable time for the review of Shop Drawings when preparing the Progress Schedule. Include time for making revisions to the Shop Drawings and resubmitting the Shop Drawing for at least a second review. Assume a 14 day review cycle for each time a Shop Drawing is submitted for review unless a longer period of time is indicated in the Contract Documents. 3. Schedule document submittals to provide all information for interrelated Work at one time. 4. Allow adequate time for ordering, fabricating, delivering, and installing product so construction of the Project is not delayed. D. Complete the following before submitting a Shop Drawing or Sample: 1. Prepare Shop Drawing Review and coordinate the Shop Drawing or Sample with other Shop Drawings and Samples and with the requirements of the Work and the Contract Documents; 2. Determine and verify specified performance and design criteria, installation requirements, materials, catalog numbers, and similar information with respect to Shop Drawings and Samples; 3. Determine and verify the suitability of materials and equipment offered with respect to the indicated application, fabrication, shipping, handling, storage, assembly, and installation pertaining to the performance of the Work; and 4. Determine and verify information relative to Contractor's responsibilities for means, methods, techniques, sequences, and procedures of construction, and safety precautions and programs incident thereto. E. Determine and verify: 1. Accurate field measurements, quantities, and dimensions are shown on the Shop Drawing; 2. Location of existing structures, utilities, and equipment related to the Shop Drawing have been shown and conflicts between the products existing structures, utilities, and equipment have been identified; 3. Conflicts that impact the installation of the products have been brought to the attention of the OPT through the Designer; 4. Shop Drawing are complete for their intended purpose; and 5. Conflicts between the Shop Drawing related to the various Subcontractors and Suppliers have been resolved. F. Review Shop Drawings prior to submitting to the Designer. Certify that all Shop Drawings have been reviewed by the Contractor and are in strict conformance with the Contract Documents as modified by Addenda, Change Order, Field Order, or Contract Amendment when submitting Shop Drawings except for deviations specifically brought to the Designer's attention on an attached Shop Drawing Deviation Request form in accordance with Paragraph 1.10. Shop Drawings 013302-2 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 11-25-2013 G. Fabrication or installation of any products prior to the approval of Shop Drawings is done at the Contractor's risk. Defective products may be rejected at the Owner's option. H. Payment will not be made for products for which Shop Drawings or Samples are required until these are approved by the Designer. 1.04 SHOP DRAWING REQUIREMENTS A. Provide adequate information in Shop Drawings and Samples so Designer can: 1. Assist the Owner in selecting colors, textures, or other aesthetic features. 2. Compare the proposed features of the product with the specified features and advise Owner that the product does, in general, conform to the Contract Documents. 3. Compare the performance features of the proposed product with those specified and advise the Owner that the product does, in general, conform to the performance criteria specified in the Contract Documents. 4. Review required certifications, guarantees, warranties, and service agreements for compliance with the Contract Documents. B. Include a complete description of the product to be furnished, including: 1. Type, dimensions, size, arrangement, and operational characteristics of the product; 2. Weights, gauges, materials of construction, external connections, anchors, and supports required; 3. All applicable standards such as ASTM or Federal specification numbers; 4. Fabrication and installation drawings, setting diagrams, manufacturing instructions, templates, patterns, and coordination drawings; 5. Mix designs for concrete, asphalt, or other materials proportioned for the Project; and 6. Complete and accurate field measurements for products which must fit existing conditions. Indicate on the document submittal that the measurements represent actual dimensions obtained at the Site. C. Submit Shop Drawings that require coordination with other Shop Drawings at the same time. Shop Drawings requiring coordination with other Shop Drawings will be rejected until a complete package is submitted. 1.05 SPECIAL CERTIFICATIONS AND REPORTS A. Provide all required certifications with the Shop Drawings as specified in the individual Specification Sections: 1. Certified Test Reports (CTR): A report prepared by an approved testing agency giving results of tests performed on products to indicate their compliance with the Specifications. This report is to demonstrate that the product when installed will meet the requirements and is part of the Shop Drawing. Field tests may be performed by the Owner to determine that in place materials or products meet the same quality as indicated in the CTR submitted as part of the Shop Drawing. Shop Drawings 013302-3 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 11-25-2013 2. Certification of Local Field Service (CLS): A certified letter stating that field service is available from a factory or supplier approved service organization located within a 300 mile radius of the Site. List names, addresses, and telephone numbers of approved service organizations on or attach it to the certificate. 3. Certification of Adequacy of Design (CAD): A certified letter from the manufacturer of the equipment stating that they have designed the equipment to be structurally stable and to withstand all imposed loads without deformation, failure, or adverse effects to the performance and operational requirements of the unit. The letter shall state that mechanical and electrical equipment is adequately sized to be fully operational for the conditions specified or normally encountered by the product's intended use. 1.06 WARRANTIES AND GUARANTEES A. Provide all required warranties, guarantees, and related documents with the Shop Drawing. The effective date of warranties and guarantees will be the date of acceptance of the Work by the Owner. B. Identify all Extended Warranties, defined as any guarantee of performance for the product or system beyond the 1 year correction period described in the General Conditions. Issue the warranty certificate in the name of the Owner. Provide a Warranty Bond for Extended Warranties if required by Specification Sections. C. Provide a copy of all warranties in a separate document in accordance with SECTION 0170 00 EXECUTION AND CLOSEOUT REQUIREMENTS. 1.07 SHOP DRAWING SUBMITTAL PROCEDURES A. Submit Shop Drawings through the Designer. Send all documents in digital format for processing. 1. Provide all information requested in the Shop Drawing submittal form. Do not leave any blanks incomplete. If information is not applicable, enter NA in the space provided. The Shop Drawing submittal form is to be the first document in the file submitted. 2. Submit all documents in Portable Document Format (PDF). a. Create PDF document using Bluebeam Revu software or other compatible software that will create files that can be opened and annotated using Bluebeam Revu software. b. Create PDF documents from native format files unless files are only available from scanned documents. C. Rotate pages so that the top of each document appears at the top of the monitor screen when opened in PDF viewing software. d. Submit PDF document with adequate resolution to allow documents to be printed in a format equivalent to the document original. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. e. Submit color PDF documents where color is required to interpret the Shop Drawing. Submit Samples and color charts per Paragraph 1.08.A. Shop Drawings 013302-4 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 11-25-2013 f. Create or convert documents to allow text to be selected for comments or searched using text search features. Run scanned documents through Optical Character Recognition (OCR) software if necessary. g. Flatten markups in documents to prevent markups made by Contractor from being moved or deleted. Flatten documents to allow markup recovery. h. Use Bluebeam Revu software to reduce file size using default settings except the option for "Drop Metadata." Uncheck the "Drop Metadata" box when reducing file size. i. Add footers to each document with the Project name. 3. Submit each specific product or class of material separately so these can be tracked and processed independently. Do not submit Shop Drawings for more than one product in the same Shop Drawing. 4. Submit items specified in different Specification Sections separately unless they are part of an integrated system. 5. Define abbreviations and symbols used in Shop Drawings. a. Use terms and symbols in Shop Drawings consistent with the Contract Drawings. b. Provide a list of abbreviations and their meaning as used in the Shop Drawings. C. Provide a legend for symbols used on Shop Drawings. 6. Mark Shop Drawings to reference: a. Related Specification Sections, b. Drawing number and detail designation, C. Product designation or name, d. Schedule references, e. System into which the product is incorporated, and f. Location where the product is incorporated into the Project. B. Use the following conventions to markup Shop Drawings for review: 1. Make comments and corrections in the color blue. Add explanatory comments to the markup. 2. Highlight items in black that are not being furnished when the Supplier's standard drawings or information sheets are provided so that only the products to be provided are in their original color. 3. Make comments in the color yellow where selections or decisions by the Designer are required, but such selections do not constitute a deviation from the Contract Documents. Add explanatory comments to the markup to indicate the action to be taken by the Designer. 4. Make comments in the color orange that are deviation requests. Include the deviation request number on the Shop Drawing that corresponds to the deviation request on Shop Drawings 013302-5 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 11-25-2013 the Shop Drawing Deviation Request form. Include explanatory comments in the Shop Drawing Deviation Request form. 5. Mark dimensions with the prefix FD to indicate field verified dimensions on the Shop Drawings. C. Submit a Change Proposal per SECTION 01 31 14 CHANGE MANAGEMENT to request modifications to the Contract Documents, including those for approval of"or equal" products when specifically allowed by the Contract Documents or as a substitution for specified products or procedures. D. Designate a Shop Drawing as requiring priority treatment in the comment section of the Shop Drawing submittal form to place the review of the Shop Drawing ahead of other Shop Drawings previously delivered. Shop Drawings are typically reviewed in the order received, unless Contractor requests that a different priority be assigned. Priority Shop Drawings will be reviewed before other Shop Drawings for this Project already received but not yet reviewed. Use of this priority designation for Shop Drawings may delay the review of Shop Drawings previously submitted, pushing the processing of Shop Drawings beyond the 14 day target. Contractor is responsible for delays resulting from the use of the priority designation status on Shop Drawings. E. Complete the certification required by Paragraph 1.03. 1.08 SAMPLE AND MOCKUP SUBMITTAL PROCEDURES A. Submit color charts and Samples for every product requiring color, texture, or finish selection. 1. Submit color charts and Samples only after Shop Drawings for the products have been approved. 2. Deliver all color charts and Samples at one time. 3. Provide Samples of adequate size to clearly illustrate the functional characteristics of the product, with integrally related parts and attachment devices. 4. Indicate the full range of color, texture, and patterns. 5. Deliver color charts and Samples to the field office and store for the duration of the Project. 6. Notify the Designer that color charts and Samples have been delivered for approval using the Notification by Contractor form. 7. Submit color charts and Samples not less than 30 days prior to when these products are to be ordered or released for fabrication to comply with the Project schedule. 8. Remove Samples that have been rejected. Submit new Samples following the same process as for the initial Sample until Samples are approved. 9. Dispose of Samples when related Work has been completed and approved and disposal is approved by the Designer. At Owner's option, Samples will become the property of the Owner. B. Construct mockups for comparison with the Work being performed. Shop Drawings 013302-6 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 11-25-2013 1. Construct mockups from the actual products to be used in construction per detailed Specification Sections. 2. Construct mockups of the size and in the area indicated in the Contract Documents. 3. Construct mockups complete with texture and finish to represent the finished product. 4. Notify the Designer that mockups have been constructed and are ready for approval using the Notification by Contractor form. Allow 2 weeks for OPT to approve of the mockup before beginning the Work represented by the mockup. 5. Remove mockups that have been rejected. Construct new mockups following the same process as for the initial mockup until mockup is approved. 6. Protect mockups until Work has been completed and accepted by the OPT. 7. Dispose of mockups when related Work has been completed and disposal is approved by the Designer. 1.09 REQUESTS FOR DEVIATION A. Submit requests for deviation from the Contract Documents for any product that does not fully comply with the Contract Documents. B. Submit requests for deviation using the Shop Drawing Deviation Request form provided. Identify each deviation request as a separate item. Include all requested deviations that must be approved as a group together and identify them as a single item. C. Include a description of why the deviation is required and the impact on Contract Price or Contract Times. Include the amount of any cost savings to the Owner for deviations that result in a reduction in cost. D. Submit as a Change Proposal prior to submitting the Shop Drawing if the deviation will result in a change in Contract Price or Contract Times. E. A Modification must be issued by the Designer for approval of a deviation. Approval of a requested Shop Drawing deviation by the Designer on the Shop Drawings Deviation Request form indicates approval of the requested deviation only on its technical merits as generally conforming to the Contract Documents. Deviations from the Contract Documents can only be approved by a Modification. 1.10 DESIGNER RESPONSIBILITIES A. Shop Drawings will be received by the Designer. Designer will log the documents and review per this Section for general conformance with the Contract Documents. 1. Designer's review and approval will be only to determine if the products described in the Shop Drawing or Sample will, after installation or incorporation into the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. Designer's review and approval will not extend to means, methods, techniques, sequences, or procedures of construction or to safety precautions or programs incident thereto. Shop Drawings 013302-7 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 11-25-2013 3. Designer's review and approval of a separate item as such will not indicate approval of the assembly in which the item functions. B. Comments will be made on items called to the attention of the Designer for review and comment. Any marks made by the Designer do not constitute a blanket review of the document submittal or relieve the Contractor from responsibility for errors or deviations from the Contract requirements. 1. Designer will respond to Contractor's markups by either making markups directly in the Shop Drawings file using the color green or by attaching a Document Review Comments form with review comments. 2. Shop Drawings that are reviewed will be returned with one or more of the following status designations: a. Approved: Shop Drawing is found to be acceptable as submitted. b. Approved as Noted: Shop Drawing is Approved so long as corrections or notations made by Designer are incorporated into the Show Drawing. C. Not Approved: Shop Drawing or products described are not acceptable. 3. Shop Drawing will also be designated for one of the following actions: a. Final distribution: Shop Drawing is acceptable without further action and has been filed as a record document. b. Shop Drawing not required: A Shop Drawing was not required by the Contract Documents. Resubmit the document per SECTION 0133 03 RECORD DATA. C. Cancelled: This action indicates that for some reason, the Shop Drawing is to be removed from consideration and all efforts regarding the processing of that document are to cease. d. Revise and resubmit: Shop Drawing has deviations from the Contract Documents, significant errors, or is inadequate and must be revised and resubmitted for subsequent review. e. Resubmit with corrections made: Shop Drawing is "Approved as Noted," but has significant markups. Make correction and notations to provide a revised document with markup incorporated into the original document so that no markups are required. f. Returned without review due to excessive deficiencies: Document does not meet the requirement of the Specifications for presentation or content to the point where continuing to review the document would be counterproductive to the review process or clearly does not meet the requirements of the Contract Documents. Revise the Shop Drawing to comply with the requirements of this Section and resubmit. g. Actions a through c will close out the Shop Drawing review process and no further action is required as a Shop Drawing. Actions d through f require follow up action to close out the review process. 4. Drawings with a significant or substantial number of markings by the Contractor may be marked "Approved as Noted" and "Resubmit with corrections made." These Shop Drawings 013302-8 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 11-25-2013 drawings are to be revised to provide a clean record of the Shop Drawing. Proceed with ordering products as the documents are revised. 5. Dimensions or other data that does not appear to conform to the Contract Documents will be marked as "At Variance With" (AVW)the Contract Documents or other information provided. The Contractor is to make revisions as appropriate to comply with the Contract Documents. C. Bring deviations to the Shop Drawings to the attention of the Designer for approval by using the Shop Drawing Deviation Request form. Use a single line for each requested deviation so the Status and Action for each deviation can be determined for that requested deviation. If approval or rejection of a requested deviation will impact other requested deviations, then all related deviations should be included in that requested deviation line so the status and action can be determined on the requested deviation as a whole. D. Requested deviations will be reviewed as possible Modification to the Contract Documents. 1. A Requested deviation will be rejected as "Not Approved" if the requested deviation is unacceptable. Contractor is to revise and resubmit the Shop Drawing with corrections for approval. 2. A Field Order will be issued by the Designer for deviations approved by the Designer if the requested deviation is acceptable and if the requested deviation will not result in a change in Contract Price or Contract Times. Requested deviations from the Contract Documents may only be approved by Field Order. 3. A requested deviation will be rejected if the requested deviation is acceptable but the requested deviation will or should result in a change in Contract Price or Contract Times. Submit any requested deviation that requires as change in Contract Price or Contract Times as a Change Proposal for approval prior to resubmitting the Shop Drawing. E. Contractor is to resubmit the Shop Drawing until it is acceptable and marked Approved or Approved as Noted and is assigned an action per Paragraph 1.10.13 that indicates that the Shop Drawing process is closed. F. Information that is submitted as a Shop Drawings that should be submitted as Record Data or other type of document, or is not required may be returned without review, or may be deleted. No further action is required and the Shop Drawing process for this document will be closed. 1.11 RESUBMISSION REQUIREMENTS A. Make all corrections or changes in the documents required by the Designer and resubmit to the Designer until approved. 1. Revise initial drawings or data and resubmit as specified for the original document. 2. Highlight or cloud in green those revisions which have been made in response to the previous reviews by the Designer. This will include changes previously highlighted or clouded in yellow to direct attention to Designer to items requiring selections or decisions by the Designer or highlighted or clouded in orange for a requested deviation from the Contract Documents. Shop Drawings 013302-9 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 11-25-2013 3. Highlight and cloud new items in yellow where selections or decisions by the Designer are required, but such selections do not constitute a deviation from the Contract Documents. Add explanatory comments to the markup to indicate the action to be taken by the Designer. 4. Highlight and cloud new items in orange that are deviation requests. Include the deviation request number on the Shop Drawing that corresponds to the deviation request on the Shop Drawing Deviation Request form. Numbering for these new items is to start with the next number following the last Shop Drawing deviation requested. Include explanatory comments in the Shop Drawing Deviation Request form. B. Pay for excessive review of Shop Drawings. 1. Excessive review of Shop Drawings is defined as any review required after the original review has been made and the first resubmittal has been checked to see that corrections have been made. 2. Review of Shop Drawings or Samples will be an additional service requiring payment by the Contractor if the Contractor submits a substitution for a product for which a Shop Drawing or Sample has previously been approved, unless the need for such change is beyond the control of Contractor. 3. Cost for additional review time will be billed to the Owner by the Designer for the actual hours required for the review of Shop Drawings by Designer and in accordance with the rates listed in SECTION 00 73 00 SUPPLEMENTARY CONDITIONS. 4. A Set-off will be included in each Application for Payment to pay cost for the additional review to the Owner on a monthly basis. The Set-off will be based on invoices submitted to Owner for these services. 5. Need for more than one resubmission or any other delay of obtaining Designer's review of Shop Drawings will not entitle the Contractor to an adjustment in Contract Price or an extension of Contract Times. 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Shop Drawings 013302-10 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 11-25-2013 01 33 03 RECORD DATA 1.00 GENERAL 1.01 WORK INCLUDED A. Submit Record Data as required by the Contract Documents and as reasonably requested by the OPT. Provide Record Data for all products unless a Shop Drawing is required for the same item. B. Submit Record Data to provide documents that allow the Owner to: 1. Record the products incorporated into the Project for the Owner; 2. Review detailed information about the products regarding their fabrication, installation, commissioning, and testing; and 3. Provide replacement or repair of the products at some future date. C. Contractor's responsibility for full compliance with the Contract Documents is not relieved by the receipt or cursory review of Record Data. Contract modifications can only be approved by Change Order or Field Order. D. Provide various reports or other documents that Contract Documents required be submitted for record purposes. 1.02 QUALITY ASSURANCE A. Submit legible, accurate, and complete documents presented in a clear, easily understood manner. Record Data not meeting these criteria will be rejected. 1.03 CONTRACTOR'S RESPONSIBILITIES A. Submit Record Data for the following items: Specification Section Record Data Description 01-31-13 (1.08) Drawings 01-31-13 (1.08) Specifications 01-31-13 (1.08) Addenda 01-31-13 (1.08) Modifications B. Include Record Data in the Schedule of Documents required by SECTION 0133 00 DOCUMENT MANAGEMENT to indicate the Record Data to be submitted, the dates on which documents are to be sent to the Designer for review, and proposed dates that the product will be incorporated into the Project. C. Complete the following before submitting Record Data: 1. Prepare Record Data and coordinate with Shop Drawings or Samples, other Record Data, and with the requirements of the Work and the Contract Documents; 2. Determine and verify specified performance and design criteria, installation requirements, materials, catalog numbers, and similar information; Record Data 013303-1 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 3. Determine and verify the suitability of materials and equipment offered with respect to the indicated application, fabrication, shipping, handling, storage, assembly, and installation pertaining to the performance of the Work; and 4. Determine and verify information relative to Contractor's responsibilities for means, methods, techniques, sequences, and procedures of construction, and safety precautions and programs incident thereto. D. Determine and verify: 1. Accurate field measurements, quantities, and dimensions are shown on the Record Data; 2. Location of existing structures, utilities, and equipment related to the Record Data have been shown and conflicts between the products existing structures, utilities, and equipment have been identified; 3. Conflicts that impact the installation of the products have been brought to the attention of the OPT through the Designer; 4. Record Data are complete for their intended purpose; and 5. Conflicts between the Record Data related to the various Subcontractors and Suppliers have been resolved. E. Review Record Data prior to submitting to the Designer. Certify that all Record Data has been reviewed by the Contractor and is in strict conformance with the Contract Documents as modified by Addenda, Change Order, Field Order, or Contract Amendment when submitting Record Data. 1.04 RECORD DATA REQUIREMENTS A. Include a complete description of the material or equipment to be furnished, including: 1. Type, dimensions, size, arrangement, model number, and operational parameters of the components; 2. Weights, gauges, materials of construction, external connections, anchors, and supports required; 3. All applicable standards such as ASTM or Federal specification numbers; 4. Fabrication and installation drawings, setting diagrams, manufacturing instructions, templates, patterns, and coordination drawings; 5. Mix designs for concrete, asphalt, or other materials proportioned for the Project; and 6. Complete and accurate field measurements for products which must fit existing conditions. Indicate on the document submittal that the measurements represent actual dimensions obtained at the Site. 1.05 SPECIAL CERTIFICATIONS AND REPORTS A. Provide all required certifications with the Record Data as specified in the individual Specification Sections: Record Data 013303-2 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 1. Certified Test Reports (CTR): A report prepared by an approved testing agency giving results of tests performed on products to indicate their compliance with the Specifications. This report is to demonstrate that the product when installed will meet the requirements and is part of the Record Data. Field tests may be performed by the Owner to determine that in place materials or products meet the same quality as indicated in the CTR submitted as part of the Record Data. 1.06 WARRANTIES AND GUARANTEES A. Provide all required warranties, guarantees, and related documents with the Record Data. The effective date of warranties and guarantees will be the date of acceptance of the Work by the Owner. B. Identify all Extended Warranties, defined as any guarantee of performance for the product or system beyond the 1 year correction period described in the General Conditions. Issue the warranty certificate in the name of the Owner. Provide a Warranty Bond for Extended Warranties if required by Specification Sections. C. Provide a copy of all warranties in a separate document in accordance with SECTION 0170 00 EXECUTION AND CLOSEOUT REQUIREMENTS. 1.07 RECORD DATA SUBMITTAL PROCEDURES A. Submit Record Data through the Designer. Send all documents in digital format for processing. 1. Provide all information requested in the Record Data submittal form. Do not leave any blanks incomplete. If information is not applicable, enter NA in the space provided. The Record Data submittal form is to be the first document in the file. 2. Submit all documents in Portable Document Format (PDF). a. Create PDF document using Bluebeam Revu software or other compatible software that will create files that can be opened and annotated using Bluebeam Revu software. b. Create PDF documents from native format files unless files are only available from scanned documents. C. Rotate pages so that the top of each document appears at the top of the monitor screen when opened in PDF viewing software. d. Submit PDF document with adequate resolution to allow documents to be printed in a format equivalent to the document original. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. e. Submit color PDF documents where color is required to interpret the Record Data. f. Create or convert documents to allow text to be selected for comments or searched using text search features. Run scanned documents through Optical Character Recognition (OCR) software if necessary. g. Flatten markups in documents to prevent markups made by Contractor from being moved or deleted. Flatten documents to allow markup recovery. Record Data 013303-3 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 h. Use Bluebeam Revu software to reduce file size using default settings except the option for "Drop Metadata." Uncheck the "Drop Metadata" box when reducing file size. i. Add footers to each document with the Project name. 3. Submit each specific product, class of material, or product separately so these can be tracked and processed independently. Do not submit Record Data for more than one system in the same Record Data. 4. Submit items specified in different Specification Sections separately unless they are part of an integrated system. 5. Define abbreviations and symbols used in Record Data. a. Use terms and symbols in Record Data consistent with the Contract Drawings. b. Provide a list of abbreviations and their meaning as used in the Record Data. C. Provide a legend for symbols used on Record Data. 6. Mark Record Data to reference: a. Related Specification Sections, b. Drawing number and detail designation, C. Product designation or name, d. Schedule references, e. System into which the product is incorporated, and f. Location where the product is incorporated into the Project. B. Submit a Change Proposal per SECTION 01 31 14 CHANGE MANAGEMENT to request modifications to the Contract Documents, including those for approval of"or equal" products when specifically allowed by the Contract Documents or as a substitution for specified products or procedures. Deviations from the Contract Documents can only be approved by a Modification. C. Complete the certification required by Paragraph 1.03. 1.08 DESIGNER'S RESPONSIBILITIES A. Record Data will be received by the Designer, logged, and provided to Owner as the Project record. 1. Record Data may be reviewed to see that the information provided is adequate for the purpose intended. Record Data not meeting the requirements of Paragraph 1.02 may be rejected as unacceptable. 2. Record Data is not reviewed for compliance with the Contract Documents. Comments may be returned if deviations from the Contract Documents are noted during the cursory review performed to see that the information is adequate. 3. Contractor's responsibility for full compliance with the Contract Documents is not relieved by the review of Record Data. Contract modifications can only be approved by a Modification. Record Data 013303-4 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 B. Designer may take the following action in processing Record Data: 1. File Record Data as received if the cursory review indicates that the document meets the requirements of Paragraph 1.02. Document will be given the status of"Filed as Received" and not further action is required on that Record Data. 2. Reject the Record Data for one of the following reasons: a. The document submittal requirements of the Contract Documents indicate that the document submitted as Record Data should have been submitted as a Shop Drawing. The Record Data will be marked "Rejected" and "Submit Shop Drawing." No further action is required on this document as Record Data and the Record Data process will be closed. Resubmit the document as a Shop Drawing per SECTION 0133 02 SHOP DRAWINGS. b. The cursory review indicates that the document does not meet the requirements of Paragraph 1.02. The Record Data will be marked "Rejected" and "Revise and Resubmit." Contractor is to resubmit the Record Data until it is acceptable and marked "Filed as Received." When Record Data is filed, no further action is required and the Record Data process will be closed. C. The Record Data is not required by the Contract Documents nor is applicable to the Project. The Record Data will be marked "Rejected" and "Cancel - Not Required." No further action is required and the Record Data process will be closed. C. Contractor is to resubmit the Record Data until it is acceptable and marked "Filed as Received." 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Record Data 013303-5 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 01 33 04 CONSTRUCTION PROGRESS SCHEDULE 1.00 GENERAL 1.01 REQUIREMENTS A. Prepare and submit a Progress Schedule for the Work and update the schedule on a monthly basis for the duration of the Project. B. Provide schedule in adequate detail to allow Owner to monitor progress and to relate document processing to sequential activities of the Work. C. Incorporate and specifically designate the dates of anticipated submission of documents and the dates when documents must be returned to the Contractor into the schedule. D. Assume complete responsibility for maintaining the progress of the Work per the schedule submitted. E. Take the requirements of SECTION 0135 00 SPECIAL PROCEDURES into consideration when preparing schedule. 1.02 DOCUMENT SUBMITTAL A. Submit Progress Schedules in accordance with SECTION 0133 00 DOCUMENT MANAGEMENT. B. Submit a preliminary schedule within 10 days after the Notice of Award. The schedule is to be available at the pre-construction conference. C. Submit a detailed schedule at least 10 days prior to the first payment request. D. Submit Progress Schedules updates monthly with Applications for Payment to indicate the progress made on the Project to that date. Failure to submit the schedule may cause delay in the review and approval of Applications for Payment. 1.03 SCHEDULE REQUIREMENTS A. Schedule is to be in adequate detail to: 1. Assure adequate planning, scheduling, and reporting during the execution of the Work; 2. Assure the coordination of the Work of the Contractor and the various Subcontractors and Suppliers; 3. Assist in monitoring the progress of the Work; and 4. Assist in evaluating proposed changes to the Contract Times and Project schedule. B. Provide personnel with 5 years' minimum experience in scheduling construction work comparable to this Project. Prepare the schedule using acceptable scheduling software. C. Provide the schedule in the form of a computer generated critical path schedule which includes Work to be performed on the Project. It is intended that the schedule accomplish the following: 1. Give early warning of delays in time for correction. Construction Progress Schedule 013304-1 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 2. Provide detailed plans for the execution of the Work in the form of future activities and events in sequential relationships. 3. Establish relationships of significant planned Work activities and provide a logical sequence for planned Work activities. 4. Provide continuous current status information. 5. Allow analysis of the Contractor's program for the completion of the Project. 6. Permit schedules to be revised when the existing schedule is not achievable. 7. Log the progress of the Work as it actually occurs. D. Prepare a time scaled CPM arrow or precedence diagram to indicate each activity and its start and stop dates. 1. Develop Milestone dates and Project completion dates to conform to time constraints, sequencing requirements and Contract completion date. 2. Use calendar day durations while accounting for holidays and weather conditions in the projection of the duration of each activity. 3. Clearly indicate the critical path for Work to complete the Project. E. Provide a time scaled horizontal bar chart which indicates graphically the Work scheduled at any time during the Project. The chart is to indicate: 1. Complete sequence of construction by activity; 2. Identification of the activity by structure, location, and type of Work; 3. Chronological order of the start of each item of Work; 4. The activity start and stop dates; 5. The activity duration; 6. Successor and predecessor relationships for each activity; 7. A clearly indicated single critical path; and 8. Projected percentage of completion, based on dollar value of the Work included in each activity as of the first day of each month. F. Provide a schedule incorporating the Schedule of Documents provided in accordance with SECTION 0133 00 DOCUMENT MANAGEMENT indicating: 1. Specific dates each document is to be delivered to the Designer. 2. Specific dates each document must be received in order to meet the proposed schedule. 3. Allow a reasonable time to review documents,taking into consideration the size and complexity of the document, other documents being processed, and other factors that may affect review time. 4. Allow time for re-submission of the each document. Contractor is responsible for delays associated with additional time required to review incomplete or erroneous Construction Progress Schedule 013304-2 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 documents and for time lost when documents are submitted for products that do not meet Specification requirements. 1.04 SCHEDULE REVISIONS A. Revise the schedule if it appears that the schedule no longer represents the actual progress of the Work. 1. Submit a written report if the schedule indicates that the Project is more than 30 days behind schedule. The report is to include: a. Number of days behind schedule; b. Narrative description of the steps to be taken to bring the Project back on schedule; and C. Anticipated time required to bring the Project back on schedule. 2. Submit a revised schedule indicating the action that the Contractor proposes to take to bring the Project back on schedule. B. Revise the schedule to indicate any adjustments in Contract Times approved by Modification. 1. Include a revised schedule with Change Proposals if a change in Contract Times is requested. 2. OPT will deem any Change Proposal that does not have a revised schedule and request for a change in Contract Times as having no impact on the ability of the Contractor to complete the Project within the Contract Times. C. Updating the Project schedule to reflect actual progress is not considered a revision to the Project schedule. D. Applications for Payment may not be recommended for payment without a revised schedule and if required, the report indicating the Contractor's plan for bringing the Project back on schedule. 1.05 FLOATTIME A. Define float time as the amount of time between the earliest start date and the latest start date of a chain of activities on the construction schedule. B. Float time is not for the exclusive use or benefit of either the Contractor or Owner. C. Where several subsystems each have a critical path, the subsystem with the longest time of completion is the critical path and float time is to be assigned to other subsystems. D. Contract Times cannot be changed by the submission of a schedule. Contract Times can only be modified by a Change Order or Contract Amendment. E. Schedule completion date must be the same as the Contract completion date. Time between the end of construction and the Contract completion date is float time. Construction Progress Schedule 013304-3 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Construction Progress Schedule 013304-4 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 01 35 00 SPECIAL PROCEDURES 1.00 GENERAL A. CONSTRUCTION SEQUENCE - NOT APPLICABLE B. Perform the Work as required to complete the entire Project within the Contract Times and in the sequence stipulated below: C. Work shall be completed within the specified time for these items: Description Time N/A D. Consider the sequences, duration limitations, and governing factors outlined in this Section to prepare the schedule for the Work. E. Perform the Work not specifically described in this Section as required to complete the entire Project within the Contract Times. 1.02 PLAN OF ACTION—NOT APPLICABLE A. Submit a written plan of action for approval for shutting down essential services. These include: 1. Electrical power, 2. Control power, 3. Pipelines or wastewater systems, 4. Communications equipment, and 5. Other designated functions. B. Describe the following in the plan of action: 1. Scheduled dates for construction; 2. Work to be performed; 3. Utilities, piping, or services affected; 4. Length of time the service or utility will be disturbed; 5. Procedures to be used to carry out the Work; 6. Plan of Action to handle emergencies; 7. List of manpower, equipment, and ancillary supplies; 8. Backups for key pieces of equipment and key personnel; 9. Contingency plan that will be used if the original schedule cannot be met; and Special Procedures 013500-1 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 C. Submit plan 2 weeks [1 month] prior to beginning the Work. 1.03 CRITICAL OPERATIONS—NOT APPLICABLE A. The Owner has identified critical operations that must not be out of service longer than the designated maximum time out of service and/or must be performed only during the designated times. These have been identified in the table below: Max.Time Hours Operation Liquidated Critical Operation Damages Out of Operation can be Shut Down ($ per hour) N/A B. Submit a written plan of action per Paragraph 1.02 for approval for critical operations. C. Work affecting critical operations is to be performed on a 24-hour a day basis until Owner's normal operations have been restored. D. Provide additional manpower and equipment as required to complete the Work affecting critical operations within the allotted time. E. Liquidated damages will be assessed if Work on critical operations is not completed within the time indicated. 1. These items are critical to the [for operation of the existing distribution system] [other description of critical nature of operations]. 2. Loss of[operation of the existing distribution system] [other description of critical nature of operations] can subject the Owner to loss of revenue, additional operations cost, and fines from regulatory agencies. 3. Liquidated damages have been established for each critical operation. F. Designated Critical Operations are described in more detail as follows: 1. Critical Operation 1 -[Title from Table Above]: a. [Provide detailed description of Critical Operation 1.] 2. Critical Operation 2 -[Title from Table Above]: a. [Provide detailed description of Critical Operation 2.] 3. Critical Operation 3 -[Title from Table Above]: a. [Provide detailed description of Critical Operation 3.] 1.04 OWNER ASSISTANCE—NOT APPLICABLE A. The Owner will assist the Contractor in draining the existing pipelines as much as possible through existing blow-off valves. The Contractor will be responsible for providing dewatering pumps, etc. required to completely dewater the facilities and handle any leakage past closed valves,gates or adjacent structures. Special Procedures 013500-2 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Special Procedures 013500-3 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 01 40 00 QUALITY MANAGEMENT 1.00 GENERAL 1.01 CONTRACTOR'S RESPONSIBILITIES A. Review the OPT's Quality Management Program and prepare and submit the Contractor's Quality Control Plan. B. Implement the Contractor's Quality Control Plan to control the quality of the Work and verify that the Work meets the standards of quality established in the Contract Documents. 1. Inspect products to be incorporated into the Project. Ensure that Suppliers have adequate quality control systems to ensure that products that comply with the Contract Documents are provided. 2. Integrate quality control measures into construction activities to produce Work which meets quality expectations of the Contract Documents. Inspect the Work of the Contractor, Subcontractors, and Suppliers. Correct Defective Work. 3. Provide and pay for the services of an approved professional materials testing laboratory acceptable to the OPT to provide testing that demonstrates that products proposed in Shop Drawings and Record Data for the Project fully comply with the Contract Documents. 4. Provide facilities, equipment, and Samples required for quality control inspections and tests: a. Give the OAR adequate notice before proceeding with Work that would interfere with inspections or testing; b. Notify the OAR and testing laboratories prior to the time that testing is required, providing adequate lead time to allow arrangements for inspections or testing to be made; C. Do not proceed with any Work that would impact the ability to correct defects or Work that would require subsequent removal to correct defects until testing services have been performed and results of tests indicate that the Work is acceptable; d. Cooperate fully with the performance of sampling, inspection, and testing; e. Provide personnel to assist with sampling or to assist in making inspections and field tests; f. Obtain and handle Samples for testing at the Site or at the production source of the product to be tested; g. Provide adequate quantities of representative products to be tested to the laboratory at the designated locations; h. Provide facilities required to store and cure test Samples; i. Provide calibrated scales and measuring devices for the OPT's use in performing inspections and testing; Quality Management 014000-1 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 11-25-2013 j. Provide adequate lighting to allow OPT observations; and k. Make Contract Documents available to testing agencies when requested. 5. Provide safe access for all inspection and testing activities, including those to be conducted as part of the OPT's Quality Management Program. 6. Document Defective Work though Certified Test Reports and Defective Work Notices. Document that corrective actions have been taken to correct any defects and that corrected Work is in compliance with the Contract Documents. 7. Apply quality control measures to documentation provided for the Project. 8. Implement countermeasures to prevent future Defective Work. C. Perform tests as indicated in this and other Sections of the Specifications. Technical Specifications govern if any testing and inspection requirements of this Section conflict with the testing and inspection requirements of the technical Specifications. D. All verification testing is to be observed by the OAR or designated representative. E. Send test reports to the Designer. F. Provide an update on quality control activities at monthly progress meetings required by SECTION 01 31 13 PROJECT COORDINATION. G. Owner will withhold payment for Defective Work, or Work that has not been tested or inspected in accordance with the Contractor's Quality Control Plan, the OPT's Quality Control Program, or the Contract Documents. H. Work performed that is connected or adjacent to Defective Work or Work that would have to be removed to correct Defective Work is also considered to be Defective. Contractor is responsible for all cost with replacing any acceptable Work that must be removed, or might be damaged by corrective actions. 1.02 QUALITY MANAGEMENT ACTIVITIES BY THE OPT A. OPT will perform its own quality assurance tests independent of the Contractor's Quality Control Program. Assist the OPT and testing organizations in performing quality assurance activities per Paragraph 1.01. B. Quality assurance testing performed by the OPT will be paid for by the Owner, except for verification testing required per Paragraph 1.07. C. Quality assurance activities of the OPT, through their own forces or through contracts with consultants and materials testing laboratories are for the purpose of monitoring the results of the Contractor's Work to see that it is in compliance with the requirements of the Contract Documents. Quality assurance activities or non-performance of quality assurance activities by the OPT do not: 1. Relieve the Contractor of its responsibility to provide Work or furnish products that conform with the requirements of the Contract Documents; 2. Relieve the Contractor of its responsibility for providing adequate quality control measures; Quality Management 014000-2 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 11-25-2013 3. Relieve the Contractor of its responsibility for damage to or loss of Work or products before OPT's acceptance; 4. Constitute or imply OPT's acceptance; and 5. Affect the continuing rights of the Owner after OPT's acceptance of the completed Work. D. Work is subject to OPT's quality assurance observations or testing at any time. Products which have been tested or inspected and approved by OPT at a supply source or staging area may be inspected or tested again by the OPT before, during or after incorporation into the Work and rejected if products do not comply with the Contract Documents. 1.03 CONTRACTOR'S USE OF OPT'S TEST REPORTS A. OPT has prepared a Quality Management Plan that describes, in general, the OPT's anticipated quality assurance testing program for this Project. This testing program will be made available to Bidders during the bidding phase. This plan outlines only the testing in general terms and may not reflect actual testing. Actual testing will depend on the Contractors means, methods and procedures of construction which will not be known until the Contractor begins Work and submits their own Quality Control Plan for review. There is no guarantee that all testing will be performed. B. Contractor will receive copies of all test reports documenting OPT's quality assurance activities. Contractor is entitled to rely on the accuracy of these tests results and use these as part of their quality control efforts. C. Contractor is to determine additional testing or inspections that may be required to implement the Contractor's Quality Control Plan. Include cost for additional testing and inspections required to meet Contractors quality control obligations, including the cost for correcting Defective Work in the Contract Price. D. Contractor may submit a Change Proposal if OPT's quality assurance testing program deviates significantly from the OPT's Quality Management Plan, and Contractor can demonstrate that additional cost was incurred to implementing the Contractor's Quality Control Plan resulting from these deviations. 1.04 DOCUMENTATION A. Provide documentation which includes: 1. Contractor's Quality Management Plan that establishes the methods of assuring compliance with the Contract Documents. Submit this plan as a Shop Drawings per SECTION 0133 02 SHOP DRAWINGS. 2. A Statement of Qualification for any proposed testing laboratories that includes a list of the engineers and technical staff that will provide testing services on the Project, descriptions of the qualifications of these individuals, list of tests that can be performed, equipment used with date of last certification, and a list of recent projects for which testing has been performed with references for those projects. 3. Provide Certified Test Reports for products to be incorporated into the Project. Provide reports to indicate that proposed products comply with the Contract Documents or indicate that proposed products do not comply with the Contract Quality Management 014000-3 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 11-25-2013 Documents and why it does not comply. Submit these test reports as part of a Shop Drawings submitted per SECTION 0133 02 SHOP DRAWINGS. 4. Provide Certified Test Reports for inspection and testing required in this Section and in other Specification Sections. Provide reports to indicate that Work complies with the Contract Documents or indicate that Work does not comply with the Contract Documents they are not in compliance and why it does not comply. Submit these test reports on forms provided per SECTION 0133 00 DOCUMENT MANAGEMENT. 1.05 STANDARDS A. Provide testing laboratories that comply with the American Council of Independent Laboratories (ACIL) "Recommended Requirements for Independent Laboratory Qualifications." B. Perform testing per recognized test procedures as listed in the various Sections of the Specifications, standards of the State Department of Highways and Public Transportation, American Society of Testing Materials (ASTM), or other testing associations. Perform tests in accordance with published procedures for testing issued by these organizations. 1.06 DELIVERY AND STORAGE A. Handle and protect test specimens of products and construction materials at the Site in accordance with recognized test procedures. Provide facilities for storing, curing, processing test specimens as required by test standard to maintain the integrity of Samples. 1.07 VERIFICATION TESTING FOR CORRECTED DEFECTS A. Provide verification testing on Work performed to correct Defective Work to demonstrate that the Work is now in compliance with the Contract Documents. Document that Defective Work has been corrected and verify that the OAR closes the item in the Defective Work Register. B. Pay for verification testing. OPT may perform verification testing as part of their Quality Management Program and impose a Set-off to recover the cost for this testing. C. Conduct the same tests or inspections used to determine that the original Work was Defective. Different tests or methods may be used if approved by the OPT. 1.08 TEST REPORTS A. Certified Test Reports are to be prepared for all tests. 1. Tests performed by testing laboratories may be submitted on their standard test report forms if acceptable to the OPT. These reports must include the following: a. Name of the Owner, Project title and number and Contractor; b. Name of the laboratory, address, and telephone number; C. Name and signature of the laboratory personnel performing the test; d. Description of the product being sampled or tested; Quality Management 014000-4 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 11-25-2013 e. Date and time of sampling, inspection, and testing; f. Date the report was issued; g. Description of the test performed; h. Weather conditions and temperature at time of test or sampling; i. Location at the Site or structure where the test was taken; j. Standard or test procedure used in making the test; k. A description of the results of the test; I. Statement of compliance or non-compliance with the Contract Documents; and m. Interpretations of test results, if appropriate. 2. Submit reports on tests performed by Contractor, Subcontractors or Suppliers on the forms provided by the OAR. 3. OPT will prepare test reports on test performed by the OPT. B. Send test report to Designer within 24 hours of completing the test. Flag tests reports with results that do not comply with Contract Documents for immediate attention. C. Payment for Work may be withheld until test reports indicate that the Work is not Defective. 1.09 DEFECTIVE WORK A. Immediately correct any Defective Work or notify the OAR why the Work is not to be corrected immediately and when corrective action will be completed. B. No payment will be made for Defective Work. Remove Work from the Application for Payment if Work paid for on a previous Application for Payment is found to be Defective. 1.10 LIMITATION OF AUTHORITY OF THE TESTING LABORATORY A. The testing laboratory representatives are limited to providing testing services and interpreting the results of the test performed. B. The testing laboratory is not authorized to: 1. Alter the requirements of the Contract Documents; 2. Accept or reject any portion of the Work; 3. Perform any of the duties of the Contractor; or 4. Direct or stop the Work. 1.11 QUALITY CONTROL PLAN A. Submit the Contractor's Quality Control Plan for approval as a Shop Drawing per SECTION 0133 02 SHOP DRAWINGS. Use Contractor's Quality Control Plan Checklist provided to review the document before submitting and include a copy of the completed checklist with the Contractor's Quality Control Plan. Do not begin Work until the Contractor's Quality Control Plan is approved. Submit an interim plan covering only the portion of Work to be Quality Management 014000-5 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 11-25-2013 performed if the Contractor plans to begin Work prior to submitting the Contractor's Quality Control Plan for the Project. Do not begin Work on other parts of the Project until the Contractor's Quality Control Plan is approved or another interim plan covering the additional Work to be started is approved. B. Provide a Contractor's Quality Control Plan that incorporates construction operations at both the Site and production Work at remote locations and includes Work by Subcontractors and Suppliers. The Contractor's Quality Control Plan is to include: 1. A description of the quality control organization, including an organization chart showing lines of authority to control the quality of Work; 2. Documentation describing name, qualifications (in resume format), duties, responsibilities, and level of authority of the Quality Control Manager; 3. The name, qualifications (in resume format), duties, responsibilities, and authorities of other persons assigned a quality control function; 4. Procedures for scheduling, reviewing, certifying, and managing documentation, including documentation provided by Subcontractors and Suppliers; 5. Control, verification, and acceptance testing procedures for each specific test. Include: a. Name of tests to be performed, b. Specification paragraph requiring test, C. Parameters of Work to be tested, d. Test frequency, e. Persons responsible for each test, and f. Applicable industry testing standards and laboratory facilities to be used for the test; 6. Integrate the OPT quality assurance testing into the Contractor's Quality Control Plan, specifically identifying the tests or inspections in Paragraph 1.11.13.5 that will be provided by the OPT as part of their Quality Management Program; 7. Procedures for tracking and documenting quality management efforts. 8. Procedures for tracking Defective Work from initial identification through acceptable corrective action. Indicate how documentation of the verification process for deficiencies will be made. 9. Reporting procedures which incorporate the use of forms provided by the OAR. 10. The name of the proposed testing laboratories along with documentation of qualifications per Paragraph 1.04. C. The Quality Control Manager must have authority to reject Defective Work and redirect the efforts of the Contractor's Team to prevent or correct Defective Work. D. Notify the Designer of any changes to the Contractor's Quality Control Plan or quality control personnel. Quality Management 014000-6 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 11-25-2013 E. Meet with the OPT 7 days after Contractor's Quality Control Plan is submitted and before start of construction to discuss the Contractor's Quality Control Plan and expedite its approval. 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION 3.01 IMPLEMENT CONTRACTOR'S QUALITY CONTROL PLAN A. Perform quality control observations and testing as required in each Section of the Specifications and where indicated on the Drawings. B. Includes the following phases for each definable Work task. A definable Work task is one which is separate and distinct from other tasks, has separate control requirements, may be provided by different trades or disciplines, or may be Work by the same trade in a different environment. 1. Planning Phase: Perform the following before beginning each definable Work task: a. Review the Contract Drawings. b. Review documents and determine that they are complete in accordance with the Contract Documents. C. Check to assure that all materials and/or equipment have been tested, submitted, and approved. d. Examine the work area to assure that all required preliminary Work has been completed and complies with the Contract Documents. e. Examine required materials, equipment, and Sample Work to assure that they are on hand, conform to Shop Drawings and Record Data, and are properly stored. f. Review requirements for quality control inspection and testing. g. Discuss procedures for controlling quality of the Work. Document construction tolerances and workmanship standards for the Work task. h. Check that the portion of the plan for the Work to be performed incorporates document review comments. i. Discuss results of planning phase with the OAR. Conduct a meeting attended by the Quality Control Manager, the OAR, superintendent, other quality control personnel as applicable, and the foreman responsible for the Work task. Instruct applicable workers as to the acceptable level of workmanship required in order to meet the requirements of the Contract Documents. Document the results of the preparatory phase actions by separate meeting minutes prepared by the Quality Control Manager and attached to the quality control report. j. Do not move to the next phase unless results of investigations required for the planning phase indicate that requirements have been met. Quality Management 014000-7 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 11-25-2013 2. Work Phase: Complete this phase after the Planning Phase: a. Notify the OAR at least 24 hours in advance of beginning the Work and discuss the review of the planning effort to indicate that requirements have been met. b. Check the Work to ensure that it is in full compliance with the Contract Documents. C. Verify adequacy of controls to ensure full compliance with Contract Documents. Verify required control inspection and testing is performed. d. Verify that established levels of workmanship meet acceptable workmanship standards. Compare with required Sample panels as appropriate. e. Repeat the Work phase for each new crew to work on-site, or any time acceptable specified quality standards are not being met. 3. Follow-up Phase: Perform daily checks to assure control activities, including control testing, are providing continued compliance with contract requirements: a. Make checks daily and record observations in the quality control documentation. b. Conduct follow-up checks and correct all deficiencies prior to the start of additional Work tasks that may be affected by the Defective Work. Do not build upon nor conceal Defective Work. C. Conduct a review of the Work one month prior to the expiration of the correction period prescribed in the General Conditions with the OPT. Correct defects as noted during the review. C. Conduct additional planning and Work phases if: 1. The quality of on-going Work is unacceptable; 2. Changes are made in applicable quality control staff, on-site production supervision or crews; 3. Work on a task is resumed after a substantial period of inactivity; or 4. Other quality problems develop. END OF SECTION Quality Management 014000-8 IDIQ Minor Street Improvements Project, PN E16250, E16251,E16252, E16253 11-25-2013 01 50 00 TEMPORARY FACILITIES AND CONTROLS 1.00 GENERAL 1.01 WORK INCLUDED (NOT APPLICABLE) A. Provide temporary facilities, including OPT's field office and the Contractor's field offices, storage sheds, and temporary utilities needed to complete the Work. B. Install and maintain temporary Project identification signs. Provide temporary on-site informational signs to identify key elements of the construction facilities. Do not allow other signs to be displayed. 1.02 QUALITY ASSURANCE A. Provide a total electrical heating and cooling system for the OPT's field office capable of maintaining the following conditions: 1. Heating: Minimum 75 degrees ID temp at 10 degrees ambient. 2. Cooling: Minimum 75 degrees ID temp at 105 degrees ambient. 3. Relative humidity: 48 to 54 percent. B. Inspect and test each service before placing temporary utilities in use. Arrange for all required inspections and tests by regulatory agencies, and obtain required certifications and permits for use. 1.03 DELIVERY AND STORAGE A. Arrange transportation, loading, and handling of temporary buildings and sheds. 1.04 JOB CONDITIONS A. Locate buildings and sheds at the Site as indicated or as approved by the OPT. B. Prepare the Site by removing trees, brush, or debris and performing demolition or grubbing needed to clear a space adequate for the structures. C. Pay for the utilities used by temporary facilities during construction. D. Provide each temporary service and facility ready for use at each location when the service or facility is first needed to avoid delay in the performance of the Work. Provide OPT's field office complete and ready for occupancy and use within 7 days of the Notice to Proceed. E. Maintain, expand as required, and modify temporary services and facilities as needed throughout the progress of the Work. F. Remove services and facilities when approved by the OAR. G. Operate temporary facilities in a safe and efficient manner. 1. Restrict loads on temporary services or facilities to within their designed or designated capacities. 2. Provide sanitary conditions. Prevent public nuisance or hazardous conditions from developing or existing at the Site. Temporary Facilities and Controls 015000-1 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 3. Prevent freezing of pipes, flooding, or the contamination of water. 4. Maintain Site security and protection of the facilities. 1.05 OPTIONS A. Construction offices may be prefabricated buildings on skids or mobile trailers. B. Storage sheds may be prefabricated buildings on skids or truck trailers. 2.00 PRODUCTS 2.01 TEMPORARY FIELD OFFICES(NOT APPLICABLE) A. The Contractor must furnish the OPT with a field office at the Site. The field office must contain at least 120 square feet of useable space. The field office must be air-conditioned and heated and must be furnished with an inclined table that measures at least 30 inches by 60 inches and two chairs. The Contractor shall move the field office on the Site as required by the OAR. The field office must be furnished with a telephone (with 24-hour per day answering service) and fax machine paid for by the Contractor. There is no separate pay item for the field office. B. Furnish a field office of adequate size for Contractor's use. Provide conference room space for a minimum of 15 people. C. Other trades may provide their own offices only when space is available at the Site, and the OPT agrees to its size, condition, and location. D. No monthly partial payments will be processed until OPT's field office facilities are completed and approved. 2.02 TEMPORARY STORAGE BUILDINGS A. Furnish storage buildings of adequate size to store any materials or equipment delivered to the Site that might be affected by weather. 2.03 TEMPORARY SANITARY FACILITIES A. Provide sanitary facilities at the Site from the commencement of the Project until Project conclusion. Maintain these facilities in a clean and sanitary condition at all times, and comply with the requirements of the local health authority. On large sites, provide portable toilets at such locations that no point in the Site shall be more than 600 feet from a toilet. B. Use these sanitary facilities. Do not use restrooms within existing or Owner-occupied buildings. 2.04 TEMPORARY HEAT (NOT APPLICABLE) A. Provide heating devices needed to protect buildings during construction. Provide fuel needed to operate the heating devices and attend the heating devices at all times they are in operation, including overnight operations. Temporary Facilities and Controls 015000-2 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 2.05 TEMPORARY UTILITIES(NOT APPLICABLE) A. Provide the temporary utilities for administration, construction, testing, disinfection, and start-up of the Work, including electrical power,water, and telephone. Pay all costs associated with furnishing temporary utilities. 1. Provide a source of temporary electrical power of adequate size for construction procedures. a. Use existing power systems where spare capacity is available. Provide temporary power connections that do not adversely affect the existing power supply. Submit connections to the OAR for approval prior to installation. b. Provide electrical pole and service connections that comply with Laws and Regulations and the requirements of the power company. 2. Provide telephone service to the Site and install telephones inside the Contractor's and the OPT's field office. 2.06 WATER FOR CONSTRUCTION A. Provide temporary water. Potable water may be purchased from the Owner by obtaining a water meter from the Owner and transporting water from a water hydrant. Non-potable water may be used for hydraulic testing of non-potable basins or pipelines. Include the cost of water in the Contract Price. B. Contractor must comply with the City of Corpus Christi's Water Conservation and Drought Contingency Plan as amended (the "Plan"). This includes implementing water conservation measures established for changing conditions. The City Engineer will provide a copy of the Plan to Contractor at the pre-construction meeting. The Contractor will keep a copy of the Plan on the Site throughout construction. 3.00 EXECUTION (NOT USED) 3.01 LOCATION OF TEMPORARY FACILITIES A. Locate temporary facilities in areas approved by the OAR. Construct and install signs at locations approved by the OAR. Install informational signs so they are clearly visible. 3.02 PROJECT IDENTIFICATION AND SIGNS A. The Owner will furnish two Project signs to be installed by the Contractor.The signs must be installed before construction begins and will be maintained throughout the Project period by the Contractor. The locations of the signs will be determined in the field by the OAR. 3.03 TEMPORARY LIGHTING A. Provide temporary lighting inside buildings once buildings are weatherproof. B. Provide lighting that is adequate to perform Work within any space. Temporary lights may be removed once the permanent lighting is in service. Temporary Facilities and Controls 015000-3 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 C. Provide portable flood lights at any time that Work will be performed outside the structure at night. Provide adequate lighting at any location Work is being performed. 3.04 DRINKING WATER A. Provide all field offices with potable water. Provide a dispenser and cooling apparatus if bottled drinking water is provided. B. Pay for water services and maintain daily. 3.05 CONSTRUCTION FENCE A. Install and maintain a construction fence around the Site and off-site storage yards. Fence must be a minimum 6 feet high chain link construction unless shown otherwise. Provide gates with padlocks. 3.06 REMOVAL OF TEMPORARY FACILITIES A. Remove temporary buildings, sheds, and utilities at the conclusion of the Project and restore the Site to original condition or finished in accordance with the Drawings. B. Remove informational signs upon completion of construction. C. Remove Project identification signs, framing, supports, and foundations upon completion of the Project. 3.07 MAINTENANCE AND JANITORIAL SERVICE A. Provide janitorial service (sweeping/mopping) for the OPT's field office on a weekly basis or as requested. Empty trash receptacles daily or as needed. B. Maintain signs and supports in a neat, clean condition. Repair damage to structures, framings, or signs. C. Repair any damage to Work caused by placement or removal of temporary signage. D. Service, maintain, and replace, if necessary,the OPT's field office computer equipment throughout the Project as required by the OPT including replacement cartridges for all office equipment. END OF SECTION Temporary Facilities and Controls 015000-4 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 01 57 00 TEMPORARY CONTROLS 1.00 GENERAL 1.01 WORK INCLUDED A. Provide labor, materials, equipment, and incidentals necessary to construct temporary facilities to provide and maintain control over environmental conditions at the Site. Remove temporary facilities when no longer needed. B. Construct temporary impounding works, channels, diversions, furnishing and operation of pumps, installing piping and fittings, and other construction for control of conditions at the Site. Remove temporary controls at the end of the Project. C. Provide a Storm Water Pollution Prevention Plan (SWPPP) as required by Texas Pollutant Discharge Elimination System (TPDES) General Permit No.TXR150000 for stormwater discharges from construction activities. Comply with all requirements of the Texas Commission on Environmental Quality(TCEQ) and Laws and Regulations. File required legal notices and obtain required permits prior to beginning any construction activity. D. Provide labor, materials, equipment, and incidentals necessary to prevent stormwater pollution for the duration of the Project. Provide and maintain erosion and sediment control structures as required to preventive sediment and other pollutants from the Site from entering any stormwater system including open channels. Remove pollution control structures when no longer required to prevent stormwater pollution. 1.02 QUALITY ASSURANCE A. Construct and maintain temporary controls with adequate workmanship using durable materials to provide effective environmental management systems meeting the requirements of the Contract Documents and Laws and Regulations. Use materials that require minimal maintenance to prevent disruption of construction activities while providing adequate protection of the environment. B. Periodically inspect systems to determine that they are meeting the requirements of the Contract Documents. 1.03 DOCUMENT SUBMITTAL A. Provide documents requiring approval by the OPT as Shop Drawings in accordance with SECTION 0133 02 SHOP DRAWINGS. B. Provide copies of notices, records, and reports required by the Contract Documents or Laws and Regulations as Record Data in accordance with SECTION 0133 03 RECORD DATA. 1.04 STANDARDS A. Provide a SWPPP that complies with all requirements of TPDES General Permit No. TXR150000 and any other applicable Laws and Regulations. B. Perform Work to comply with the City of Corpus Christi Code of Ordinances, Part III, Chapter 14, Article X-titled "STORM WATER QUALITY MANAGEMENT PLANS" and any other applicable Laws and Regulations. Temporary Controls 015700-1 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 1.05 PERMITS A. Submit the following to the TCEQ and the Operator of any Municipal Separate Storm Sewer System (MS4) receiving stormwater discharges from the Site: 1. Notice of Intent(NOI) at least 48 hours prior to beginning construction activity. Construction activity may commence 24 hours after the submittal of an electronic NOI. 2. Notice of Change (NOC) letter when relevant facts or incorrect information was submitted in the NOI, or if relevant information in the NOI changes during the course of construction activity. 3. Notice of Termination (NOT)when the construction Project has been completed and stabilized. B. Post a copy of the NOI at the Site in a location where it is readily available for viewing by the general public and as required by Laws and Regulations prior to starting construction activities and maintain the posting until completion of the construction activities. C. Maintain copies of a schedule of major construction activities, inspection reports, and revision documentation with the SWPPP. 1.06 STORMWATER POLLUTION CONTROL(NOT APPLICABLE) A. Comply with the current requirements of TPDES General Permit No.TXR150000 as set forth by the TCEQ for the duration of the Project: 1. Develop a SWPPP meeting all requirements of the TPDES General Permit. 2. Submit of a Notice of Intent to the TCEQ. 3. Develop and implement appropriate Best Management Practices as established by local agencies of jurisdiction. 4. Provide all monitoring and/or sampling required for reporting to the TCEQ. 5. Submit reports to the TCEQ as required as a condition of the TPDES General Permit. 6. Submit copies of the reports to the Designer as Record Data in accordance with SECTION 0133 03 RECORD DATA. 7. Retain copies of these documents at the Site at all times for review and inspection by the OPT or regulatory agencies. Post a copy of the permit as required by Laws and Regulations. 8. Assume sole responsibility for implementing, updating, and modifying the TPDES General Permit per Laws and Regulations for the SWPPP and Best Management Practices. B. Use forms required by the TCEQ to file the Notice of Intent. Submit the Notice of Intent at least 2 days prior to the start of construction. Develop the SWPPP prior to submitting the Notice of Intent. Provide draft copies of the Notice of Intent, SWPPP, and any other pertinent TCEQ submittal documents to Owner for review prior to submittal to the TCEQ. C. Return any property disturbed by construction activities to either specified conditions or pre-construction conditions as set forth in the Contract Documents. Provide an overall erosion and sedimentation control system that will protect all undisturbed areas and soil Temporary Controls 015700-2 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 stockpiles/spoil areas. Implement appropriate Best Management Practices and techniques to control erosion and sedimentation and maintain these practices and techniques in effective operating condition during construction. Permanently stabilize exposed soil and fill as soon as practical during the Work. D. Assume sole responsibility for the means, methods, techniques, sequences, and procedures for furnishing, installing, and maintaining erosion and sedimentation control structures and procedures and overall compliance with the TPDES General Permit. Modify the system as required to effectively control erosion and sediment. E. Retain copies of reports required by the TPDES General Permit for 3 years from date of Final Completion. 1.07 POLLUTION CONTROL A. Prevent the contamination of soil,water, or atmosphere by the discharge of noxious substances from construction operations. Provide adequate measures to prevent the creation of noxious air-borne pollutants. Prevent dispersal of pollutants into the atmosphere. Do not dump or otherwise discharge noxious or harmful fluids into drains or sewers, nor allow noxious liquids to contaminate public waterways in any manner. B. Provide equipment and personnel and perform emergency measures necessary to contain any spillage. 1. Contain chemicals in protective areas and do not dump on soil. Dispose of such materials at off-site locations in an acceptable manner. 2. Excavate contaminated soil and dispose at an off-site location if contamination of the soil does occur. Fill resulting excavations with suitable backfill and compact to the density of the surrounding undisturbed soil. 3. Provide documentation to the Owner which states the nature and strength of the contaminant, method of disposal, and the location of the disposal site. 4. Comply with Laws and Regulations regarding the disposal of pollutants. C. Groundwater or run-off water which has come into contact with noxious chemicals, sludge, or sludge-contaminated soil is considered contaminated. Contaminated water must not be allowed to enter streams or water courses, leave the Site in a non-contained form, or enter non-contaminated areas of the Site. 1. Pump contaminated water to holding ponds constructed by the Contractor for this purpose, or discharge to areas on the interior of the Site, as designated by the OAR. 2. Construct temporary earthen dikes or take other precautions and measures as required to contain the contaminated water and pump to a designated storage area. 3. Wash any equipment used for handling contaminated water or soil within contaminated areas three times with uncontaminated water prior to using such equipment in an uncontaminated area. Dispose of wash water used to wash such equipment as contaminated water. Temporary Controls 015700-3 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 1.08 EARTH CONTROL A. Remove excess soil, spoil materials, and other earth not required for backfill at the time of generation. Control stockpiled materials to eliminate interference with Contractor and Owner's operations. B. Dispose of excess earth off the Site. Provide written approval from the property owner for soils deposited on private property. Obtain approval of the Owner if this disposal impacts the use of Site or other easements. 1.09 OZONE ADVISORY DAYS A. Do not conduct roofing, priming, or hot-mix paving operations, except for repairs, on days the City Engineer has notified Contractor that an ozone advisory is in effect. An extension of time will be allowed for each day for which priming or hot mix paving was scheduled, crews were prepared to perform this Work and the City Engineer issued ozone alert prevents this Work. Contractor will be compensated at the unit price indicated in the Bid for each day for which an extension of time was granted due to an ozone alert. 1.10 MANAGEMENT OF WATER A. Manage water resulting from rains or ground water at the Site. Maintain trenches and excavations free of water at all times. B. Lower the water table in the construction area by acceptable means if necessary to maintain a dry and workable condition at all times. Provide drains, sumps, casings,well points, and other water control devices as necessary to remove excess water. C. Provide continuous operation of water management actions. Maintain standby equipment to provide proper and continuous operation for water management. D. Ensure that water drainage does not damage adjacent property. Divert water into the same natural watercourse in which its headwaters are located, or other natural stream or waterway as approved by the Owner. Assume responsibility for the discharge of water from the Site. E. Remove the temporary construction and restore the Site in a manner acceptable to the OAR and to match surrounding material at the conclusion of the Work. 1.11 DEWATERING A. This item is considered subsidiary for all dewatering methods other than "well pointing" to the appropriate bid items as described in the Bid Form where dewatering is needed to keep the excavation dry, as approved by the Designer, and shall include all costs to provide a dry foundation for the proposed improvements. B. Storm water that enters an excavation can be pumped out as long as care is taken to minimize solids and mud entering the pump suction and flow is pumped to a location that allows for sheet flow prior to entering a storm water drainage ditch or storm water inlet. C. An alternative to sheet flow is to pump storm water to an area where ponding occurs naturally without leaving the designated work area or by a manmade berm(s) prior to Temporary Controls 015700-4 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 entering the storm water system. Sheet flow and ponding is to allow solids screening and/or settling prior to entering a storm water conduit or inlet. D. Storm water or groundwater shall not be discharged to private property without permission. It is the intent that Contractor discharges groundwater primarily into the existing storm water system, provided that the quality of groundwater is equal to or better than the receiving stream,the [Corpus Christi Bay] [Oso Creek] [Laguna Madre] [CC Ship Channel]. E. Testing of groundwater quality is to be performed by the Owner, at the Owner's expense, prior to commencing discharge and shall be retested by the Owner, at the Owner's expense, a minimum of once a week. Contractor shall coordinate with the Owner on all testing. Tests will also be performed as each new area of construction is started. F. Another option for disposal of groundwater by Contractor would include pumping to the nearest sanitary sewer system. If discharging to temporary holding tanks and trucking to a sanitary sewer or wastewater plant, the costs for these operations shall be negotiated. Other groundwater disposal alternatives or solutions may be approved by the Designer on a case by case basis. G. Prior to Pumping groundwater from a trench to the sanitary sewer system the Contractor shall contact [Tilo Schmidt,Wastewater Pre-treatment Coordinator at 826-1817]to obtain a "no cost" permit from the Owner's Waste Water Department. Owner will pay for any water quality testing or water analysis cost required. The permit will require an estimate of groundwater flow. Groundwater flow can be estimated by boring a hole or excavating a short trench then record water level shortly after completion, allow to sit overnight, record water level again, pump hole or trench dry to a holding tank or vacuum truck then record how long it takes to fill to original level and overnight level. 1.12 DISPOSAL OF CONTAMINATED GROUNDWATER(NOT APPLICABLE) A. An allowance will be included in the Bid for the unanticipated disposal of contaminated groundwater. This allowance may not be needed but is provided in case contaminated groundwater is encountered during the course of the Project and does not meet the water quality requirements for discharge into the storm water or wastewater systems. This allowance includes all materials,tools, equipment, labor, transportation, hauling, coordination, and proper disposal of the contaminated water at an approved landfill, deep water injection well, or other site as agreed to by the Designer. Suggested disposal facilities would be [US Ecology(USET) in Robstown,Texas or Texas Molecular in Corpus Christi,Texas]. B. The payment for this Work will be based on the Contractor's actual costs and will be negotiated. Payment will not include costs associated with dewatering which is paid for under [Bid Items X,Y,Z]. 1.13 DISPOSAL OF HIGHLY CHLORINATED WATER A. Dispose of water used for testing, disinfection, and line flushing. Comply with Owner's requirements and Laws and Regulation regarding the disposal of contaminated water, including water with levels of chlorine, which exceed the permissible limits for discharge into wetlands or environmentally sensitive areas. Comply with the requirements of all regulatory agencies in the disposal of all water used in the Project. Include a description Temporary Controls 015700-5 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 and details for disposal of this water in a Plan of Action per SECTION 0135 00 SPECIAL PROCEDURES. Do not use the Owner's sanitary sewer system for disposal of contaminated water. 1.14 WINDSTORM CERTIFICATION (NOT APPLICABLE) A. All affected materials and installation shall comply with Texas Department of Insurance Requirements for windstorm resistant construction for design wind speed as required by IBC 2009. [Contractor] [Owner] shall be responsible for contracting with a licensed structural engineer in the State of Texas to perform all inspections and provide documentation for windstorm certification to the Texas Board of Insurance. The Contractor shall be responsible for providing all necessary design/assembly documentation for all new windows, doors, louvers, etc. to the windstorm engineer/inspectors required to conform with the requirements of the Texas Department of Insurance. 2.00 PRODUCTS 2.01 MATERIALS A. Provide materials that comply with Laws and Regulations. 3.00 EXECUTION 3.01 CONSTRUCTING, MAINTAINING AND REMOVING TEMPORARY CONTROLS A. Construct temporary controls in accordance with Laws and Regulations. B. Maintain controls in accordance with regulatory requirements where applicable, or in accordance with the requirements of the Contract Documents. C. Remove temporary controls when no longer required, but before the Project is complete. Correct any damage or pollution that occurs as the result of removing controls while they are still required. END OF SECTION Temporary Controls 015700-6 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS 1.00 GENERAL 1.01 WORK INCLUDED A. Comply with requirements of the General Conditions and specified administrative procedures in closing out the Contract. 1.02 DOCUMENT SUBMITTAL A. Submit certifications and releases on forms provided. 1.03 SUBSTANTIAL COMPLETION A. Notify the Designer that the Work or a designated portion of the Work is substantially complete per the General Conditions. Include a list of the items remaining to be completed or corrected before the Project will be considered to be complete. B. OPT will visit the Site to observe the Work within a reasonable time after notification is received to determine the status of the Project. C. Designer will notify the Contractor that the Work is either substantially complete or that additional Work must be performed before the Project will be considered substantially complete. 1. Designer will notify the Contractor of items that must be completed before the Project will be considered substantially complete. 2. Correct the noted deficiencies in the Work. 3. Notify the Designer when the items of Work in the Designer's notice have been completed. 4. OPT will revisit the Site and repeat the process. 5. Designer will issue a Certificate of Substantial Completion to the Contractor when the OPT considers the Project to be substantially complete. The Certificate will include a tentative list of items to be corrected before Final Payment will be recommended. 6. Review the list and notify the Designer of any objections to items on the list within 10 days after receiving the Certificate of Substantial Completion. 1.04 FINAL INSPECTION A. Notify the Designer when: 1. Work has been completed in compliance with the Contract Documents; 2. Equipment and systems have been tested per Contract Documents and are fully operational; 3. Final Operations and Maintenance Manuals have been provided to the Owner and all operator training has been completed; 4. Specified spare parts and special tools have been provided; and Execution and Closeout Requirements 017000-1 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 5. Work is complete and ready for final inspection. B. OPT will visit the Site to determine if the Project is complete and ready for Final Payment within a reasonable time after the notice is received. C. Designer will notify the Contractor that the Project is complete or will notify the Contractor that Work is Defective. D. Take immediate steps to correct Defective Work. Notify the Designer when Defective Work has been corrected. OPT will visit the Site to determine if the Project is complete and the Work is acceptable. Designer will notify the Contractor that the Project is complete or will notify the Contractor that Work is Defective. E. Submit the Request for Final Payment with the closeout documents described in Paragraph 1.06 if notified that the Project is complete and the Work is acceptable. 1.05 REINSPECTION FEES A. Owner may impose a Set-off against the Application for Payment in accordance with the General Conditions to compensate the OPT for additional visits to the Project if additional Work is required. 1.06 CLOSEOUT DOCUMENTS SUBMITTAL A. Record Documents per SECTION 01 31 13 PROJECT COORDINATION. B. Warranties and bonds. C. Equipment installation reports on equipment. D. Shop Drawings, Record Data, and other documents as required by the Contract Documents. E. Evidence of continuing insurance and bond coverage as required by the Contract Documents. F. Final Photographs per SECTION 0133 05 VIDEO AND PHOTOGRAPHIC DOCUMENTATION. 1.07 TRANSFER OF UTILITIES A. Transfer utilities to the Owner when the Certificate of Substantial Completion has been issued and the Work has been occupied by the Owner. B. Submit final meter readings for utilities and similar data as of the date the Owner occupied the Work. 1.08 WARRANTIES, BONDS,AND SERVICES AGREEMENTS A. Provide warranties, bonds, and service agreements required by SECTION 0133 02 SHOP DRAWINGS or by the individual Specification Sections. B. The date for the start of warranties, bonds, and service agreements is established per the General Conditions. C. Compile warranties, bonds, and service agreements and review these documents for compliance with the Contract Documents. Execution and Closeout Requirements 017000-2 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 1. Provide a log of all equipment covered under the 1 year correction period specified in the General Conditions and all products for which special or extended warranties or guarantees are provided. Index the log by Specification Section number on forms provided. Include items 2.e through 2.g below in the tabulation. 2. Provide a copy of specific warranties or guarantees under a tab indexed to the log. Each document is to include: a. A description of the product or Work item; b. The firm name,with the name of the principal, address, and telephone number; C. Signature of the respective Supplier or Subcontractor to acknowledge existence of the warranty obligation for extended warranties and service agreements; d. Scope of warranty, bond, or services agreement; e. Indicate the start date for the correction period specified in the General Conditions for each product and the date on which the specified correction period expires. f. Indicate the start date for extended warranties for each product and the date on which the specified extended warranties period expires. g. Start date,warranty or guarantee period, and expiration date for each warranty bond and service agreement; h. Procedures to be followed in the event of a failure; and i. Specific instances that might invalidate the warranty or bond. D. Submit digital copies of the documents to the Designer for review. E. Submit warranties, bonds and services agreements within 10 days after equipment or components placed in service. 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Execution and Closeout Requirements 017000-3 IDIQ Minor Street Improvements Project, PN E16250, E16251, E16252, E16253 11-25-2013 uPDATtn 04/w/aats gZMAA. -OSZ9Ta VZ TSaM - TSZ9TI moons NM DATE vT ;Sea - £SZ9ia ID IQ MINOR STREET IMPROVEMENTS elOd SNV7d t uno0 opplod uns Op 30 N AV8 IISRIHO S1dL100 -i-i-i-1-,`jS H -i-i.-i-I-11.444 ..yi. .+Ny+.i �n}eg qS pi WEF T 1 11""a e s{ s# � R1 4i; W[illi0Miiii!!!!!Wffiffilifil 111 Eliti,WkWilti., ngga. ren 11111111111111111! $$n}} n n�v, g@wwg{p��tl�ppIppOp ppop ppo:FQM 101.1.1 11.11.1.1.1.11111 @G.FI.C.11! 55''F cF114 MO$�a7 ani+i,,Egc, iP7a.;. s n ��o W aw il.. °B I.$ g' lith+ WT U 1 3 63 �5 ia! llt I f �I ID IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & E16252 -East IB Projects: E16251 -West 2A & E16250 -West 2B J fl'I'Lh SI IEET„ VICINITY MM' CITY of CORPUS CHRISTI TEXAS AND SI@1'sl "I" INDEX DNPARIMENT DF ENGINEERING SERVICES RENNIN N. aaE Bt AVn� ECMS LLC /o7): Reg. No. f-3899 �. 5001 Oakmont Dr. Corpus Christi, Tx. 78413 'Office' 361-986-1202 w Cell: 361.549-4576 UPDATED:04/07/2015 03/1A — OSZ9 IA VZ IsaM — ISZ9I3 ELI Jsua — ZSZ9I3 VI Isua — £SZ9II 01 01 ocor- -<> al -n° z> p m m — 70-0 Hz •=E5 m 1° 73 rn rn DD 5 ), -t sq 33 mco c'T 21 CD 2 co 10 NJ rn 73z-nrnC)0]E00>0 —1c7Dm0 ZH :c 0 rn Cn " CD CD Cr) w 7) —I DC) Cr0mCJ rri o I-- i c) -< C) G) - rn RI 0 si r_rn r_ _1mZ 73 23 rn CD rn rn :c rn 3; corn 0 73 -o D1 -< _< -- -1 „ CD 00 E: :C -n (75 pj mpOrr 33111S MON a) ,6,qur4;..4445;,,4;;S*,614“ EI-)16411,WPW555"""qg5-g4UW 31,i14,,; !TIF4P501111,_,7_,AMV";F--l thi1J:ORMii.""rilg11"' IMEWiEEEnifilEpAllirmAli HUM 2Miirilfwww' -- L7,4F.6'1. MggaR ilnli!tt !4M.V.0 ,712,. v ;g..8gagg g72Rgg W)8 8 8,81M8-8 ' . a ° ' w.- E ? ' - F —I 0 Kpinop opp4pd ups I,z 0 m T8q r- 03 "11 S2 C) On REVISION NO. NATE ST 5) IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East 1A & E16252 -East 1B Pro : E16251 -West 2A & 106250 -West 2B TITLF SHEET, VICINITY MAI' AND SHEET INDEX CITY of CORPUS CHRISTI TEXAS DEPARTMENT OF ENGINEERING SERVICES ECMS LLC Reg. No. F-3899 5001 Oakmont Dr. 1r' Corpus Christi, Tx. 78413 Office: 361-986-1202 Celh 361-549-4576 A D> 8 ‘x,',;4; 82 2 2 x 7 8 2 P g g 5 A i g i '1 28 g i' r F, 21 F, r el i ,-, d 2 F ' ,g. , r , : 2 ' cJ21 'A 61 T 5 qp 21 I$E,r:Ig"'W 37,N51G 0 0 _S -L_ c 0 (#) 4, 8 A g g A rj () E 0 J, X 0 LC I 22221 822121; 1 V ro '11 n PHri 21 ; I P 2 82 A5 6 g § 2 '5 —gtAtAvw g4t2wy 2 WV3' 21 8 4qMOOPiq R 2X21 Vggl r 2) 7 SNOI1V1A380V RE1S1QN DATE BY ION , 4, • ID IQ M NOR STREET IMPROVEMENTS Projects: E16253 -East IA & E16252 -East 115 Projects: E16251 -West 2A & E16250 -West 2B LEGEND AND ABBREVIATIONS CL: r- s Cam polite* IF. or- cll. so •-• intril. as. OCR"..1 '....Of •04'.•:4) •.--..", ..-1".. I ec)-cb ' el ....01 -.11 0 -4, --Y- } 28. §U sEA DI 3711Q3HJS 9NLLS31 3S ONY NOI5O113 2 ) \ DESCRIPTION mm_NOR STREET IMPROVEMENTS P IA & E16252 -East 12 Projects: E16251 -West 2A & E16250 -West 2E1' GENERAL NOTES AND TESTING SCHEDULE ~ILA �as _or _m_ ,... . . . . cp u> 00 ,...., , . , 01 1Range 100 to 250 SY - Localized Flexible Pavement Structure Repairs with saw cutting existing roadway; subgrade, base and surface treatment/repair using asphalt concrete (HMAC). (Items 1-815 thru 1-819) 1-1315 ISubgrade Repair up to 4-6Depth (lime stabilization) I SY I 100 r- e. 00 I, ,..... do NJ Range 1 to 100 SY - Localized Flexible Pavement Structure Repairs with saw cutting existing roadway; subgrade, base and surface treatment/repair using asphalt concrete (HMAC). (Items 1-810 thru 1814) 1-1310 ISubgrade Repair up to 4-6" Depth lime stabilization) I SY I_ 100 i, 00 00 00 01 01 Storm Water Manhole Ring & Cover Adjustment, w/new 1-D4 Manhole Ring and Cover Assembly w/new Concrete Height Each 10 Adjustment Rings & w/ Concrete Collar, complete in place SUBTOTAL PART 1-0 - DRAINAGE IMPROVEMENTS (1-E1 THRU 1-E4) LU t0 1Part1-13 • STREET IMPROVEMENTS (per SECTION 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT) 1-A4 'Ozone Days I EA I 5 SUBTOTAL PART 1-A - GENERAL (Items 1-A1 thru 1-84) ,-. Part 1-A - General (per SECTION 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT) 1 -Al Mobilization/Bonds/Ins/ not to exceed 1% -total bid LS ESTIMATED Item DESCRIPTION UNIT QUANTITY Base Bid [Surface Treatment Repair Upper 2' HMAC 1Surface Treatment Repair Additional 1" Depth HMAC Base Repair, Upper 2" Depth (Limestone) Base Repair, Additional 1" Depth (Limestone) Surface Treatment Repair Upper 2" HMAC Surface Treatment Repair Additional 1" Depth HMAC Base Repair, Upper 2" Depth (Limestone) Base Repair, Additional 1" Depth (Limestone) All -Season Pre -Coated Patching mixture (ASPPM), TOOT DMS 9202.5, including 55 1 emulsion for tack coat Allowance for Unanticipated Street Improvements HMAC, Type "D" material for pot hole repair, TxDOT Standard Specification for Construction Item 340, including 55 1 emulsion for tack coat Pot Hole Crew: Provide a 3 -man pot hole repair crew to include labor, materials, equipment & incidentals Cement Stabilized Base with 4% Cement existing limestone base, 3-6", complete in place per SY Planing (Milling), Additional 1' 1000 to 2,000 SY minimum per Delivery Order Planing (Milling), 2" 1,000 to 2,000 SY minimum per Delivery Order Seal Coat, per single course Crack Seal, 0-1" wide Traffic Control, Residential Streets [Traffic Control, Arterial Streets 0 . 0 71 -0 ' On &nVI -‹ On -0 -N 01 On 01 r UI I<-0 o o . . 000'9 1 000'9 2,400 7,000 2,200 2,200 1.' 0 o o . En 0 0 0 o 70 1 000 0 o b 0 o o0000 o 0 Bidder agrees to reach Fina; Completion in 2 I pi 10 sIseR lawn sJaAvJO Isom- 0 a a 3 fr a ECMS, LLC Felix H. Ocanas, Jr., P.E. snclio3 ;0 Am) 01 00 !DID Minor Street Improvements Project (Part 1 -West of Ayers Street) ITOTAL PROJECT BASE BID (PARTS 1-A THRU 1-F) 'SUBTOTAL PART 1-F - WASTEWATER IMPROVEMENTS (Item 1-F1) SUBTOTAL PART 1-D - DRAINAGE IMPROVEMENTS (Items 1-D1 thru 1-D4) SUBTOTAL PART 1-E - WATER IMPROVEMENTS (Item 1-E1) SUBTOTAL PART 1-6 - STREET IMPROVEMENTS (Items 1-91 thru 1-B24) SUBTOTAL PART 1-C -ADA IMPROVEMENTS (Items 1-C1 thru 1-C2) BID SUMMARY SUBTOTAL PART 1-A - GENERAL (Items 1 -AL thru 1-A4) !SUBTOTAL PART 1-F- WASTEWATER IMPROVEMENTS (1-G1) I -1 . IPart 1-F -WASTEWATER IMROVEMENTS (per SECTION 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT) I 1-E1 Water Valve Box Adjustment w/ Concrete Collar, complete in 1 place SUBTOTAL PART 1-E WATER IMPROVEMENTS (1-F1) !Part 1-F - WATER IMROVEMENTS (per SECTION 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT) Storm Water Manhole Ring & Cover Adjustment, w/new 1-D4 Manhole Ring and Cover Assembly w/new Concrete Height Each 10 Adjustment Rings & w/ Concrete Collar, complete in place SUBTOTAL PART 1-0 - DRAINAGE IMPROVEMENTS (1-E1 THRU 1-E4) , ,... NJ ...... IPait 1•D • DRAINAGE IMPROVEMENTS (per SECTION 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT) Remove & Replace ADA curb ramp: Removal & Replacement of 1-C2 SF 300 ADA ramps not in compliance w/ TDLR SUBTOTAL PART 1-C - ADA IMPROVEMENTS (1-01 THRU 1-02) ,-. Part 1•C • ADA IMPROVEMENTS (per SECTION 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT) 14124 'Surface Treatment Repair Additional 1" Depth HMAC I SY I 6,000 SUBTOTAL PART 1-8 - STREET IMPROVEMENTS (Items 1-81 thea 1-824) , ,--• t, n) ..... 1-, 0 Range 250 to 1000 SY - Localized Flexible Pavement Structure Repairs with saw cutting existing roadway; subgrade, base and surface treatment/repair using asphalt concrete (HMAC). (Items 1-820 thru 1-824) ESTIMATED Item DESCRIPTION UNIT QUANTNY Base Repair, Additional 1" Depth (Limestone) Surface Treatment Repair Upper 2" I-IMAC Subgrade Repair up to 4-6" Depth (lime stabilization) Base Repair, Upper 2" Depth (Limestone) 1New ADA Curb Ramp: Concrete Curb Ramps, meeting TDLR [requirements, complete in place 1Removal & Replacement of driveway approaches, complete and in place Removal & Replacement of Sidewalks Removal & Replacement of Curb & Gutter, complete in place Sanitary Sewer Manhole Ring & Cover Adjustment, including New Manhole Ring & Cover Assembly w/ new HOPE Height Adjustment Rings, Stainless Steel Inflow Inhibitor and w/ Concrete Collar, complete in place . 0 71 r- rn 1 ii § 8 § r~1 o o . . o . a o 000001P000 ts 103rOad ADD 8 I I. iv 6 N) • ID IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & E16252 -East III Projects: E16251 -West 24 & E16250 -West 21 SCIIEDUTE OF ESTIMATED QUANTITIES PART - I C:ca rep apC Ii! t e 4C a* Fe. *tam 0 ar-sor que ra n seA 1040 Lb (7‘ -a AJ , Sn f 0 e res*. v1)O • 0'•4 44. nrl 000 kl,V02,6%S. ,i, Co Co do Range 100 to 250 SY- Localized Flexible Pavement Structure Repairs with saw cutting existing roadway; subgrade, base and surface treatment/repair using asphalt concrete (FIMAC), (Items 2-815 thru 2-819) 2-B15 JSubgrade Repair up to 4-6" Depth (lime stabilization) I SY A 100 co co co cro Range I to 100 SY - Localized Flexible Pavement Structure Repairs with saw cutting existing roadway; subgrade, base and surface treatment/repair using asphalt concrete (HMAC(. (Items 2-810 thru 2-814) 2-B10 ISubgrade Repair up to 4-6" Depth (lime stabilization) SY j 100 CO 00 6 co 03 00 at 00 at W co Co NO FJ. Part 2-13 • STREET IMPROVEMENTS (per SECTION 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT) All -Season Pre -Coated Patching mixture (ASPPM), TxDOT DMS 9202.5, including SS 1 emulsion for tack coat Allowance For Unanticipated Street Improvements HMAC, Type "D" material for pot hole repair, TxDOT Standard Specification for Construction Item 340, including SS 1 emulsion for tack coat Pot Hole Crew: Provide a 3 -man pot hole repair crew to include labor, materials, equipment & incidentals Cement Stabilized Base with 4% Cement, existing limestone base, 3-6", complete in place per SY Planing (Milling), Additional 1' 1000 to 2,000 SY minimum per Delivery Order !Planing (Milling), 2" 1,000 to 2,000 SY minimum per Delivery Order ISeal Coat, per single course !Crack Seal, 0-1" wide [ Surface Treatment Repair Upper 2" HMAC 7 lSurface Treatment Repair Additional 1" Depth HMAC [Base Repair, Upper 2" Depth (Limestone) Base Repair, Additional 1" Depth (Limestone) Surface Treatment Repair Upper 2" HMAC Surface Treatment Repair Additional 1" Depth HMAC 'Base Repair, Upper 2" Depth (Limestone) Base Repair, Additional 1" Depth (Limestone) c.. SS) t_,.<, ,00 , ., I-, 760 8 700 1 a o 2,400 7,000 b 8 8 Bidder agrees to reach Final Completion in 00 V, ROd) 018 3009 .1.33IONd 1010 SUBTOTAL PART 2-F - WASTEWATER IMPROVEMENTS (Item 2 - SUBTOTAL PART 2-E - WATER IMPROVEMENT OTAL PART 2-D - DRAINAGE IMPROVEMENTS 00 2 3 NJ GI rn 3 r— t" 5 00 2 CO SUBTOTAL PART 2-F - WASTEWATER IMPROVEMENTS (2-F1) V, Part 2-F -WASTEWATER IMROVEMENTS (per SECTION 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT) - V-2 ultra -Rumens 00 5 0 00 2 co SUBTOTAL PART 2-E - WATER IMPROVEMENTS (2-E1) Water Valve Box Adjustment w/ Concrete Collar, complete in r -2 -El place I I Sto rmWater ManholeRi ng & Cover Adjustment,w/newManhole 12-D4RingandcoverAssembiywiewconcreteHeightAdiustment Each I 5 I SUBTOTAL PIARRiTngD-sEg'- wD/ CoNnAcGrEetiemCpoRlolavEr, rocomplete -Di n1 niplaceluj2-041 I I iPart 2-E - WATER IMROVEMENTS (per SECTION 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT) A Item DESCRIPTION UI Range 250 to 1000 SY- Localized Flexible Pavement Structure Repairs with saw cutting existini base and surface treatment/repair using asphalt concrete WIMAC). (Iterns 2-820 thru 2-824) NJ N Part2.0 DRAINAGE IMPROVEMENTS (per SECTION 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT) 2-D1 Removal & Replacement of Curb & Gutter, complete in place LF 1,000 NJ NI 6 u., 6 . Removal & Replacement of driveway approaches, complete and in place Removal & Replacement of Sidewalks -< -< 6,000 6,000 o co 00 a 0 0 0 0 00 00 3 A BTOTAL PART Z -C - ADA IMPROVEMENTS (2-C1 THRU 2-C2) rs' F., 00 00 3 1,9 3 3 00 El r- 8 0 00 r SECTION 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT) Basis of Bid for Part 2 -East of Ayers Stree 2 3 a. a rtm '3'd ‘-.11 ‘Ft'oe30 H Mai DTI 'S Ils!AD snd.a3 101(0 Minor Street Improvements Project (Part 2- East of Ayers Stre 24324 Surface Treatment Repair Additional 1" Depth HMAC I SY I 6,000 SUBTOTAL PART 2-8 - STREET IMPROVEMENTS (Items 2431 thru 2-824) w 00 CO 03 Item DESCRIPTION UI Range 250 to 1000 SY- Localized Flexible Pavement Structure Repairs with saw cutting existini base and surface treatment/repair using asphalt concrete WIMAC). (Iterns 2-820 thru 2-824) NJ N N./ NJ Base Repair, Additional 1" Depth (Limestone) Surface Treatment Repair Upper HMAC Subgrade Repair up to 4-6" Depth (lime stabilization) Base Repair, Upper 2" Depth (Limestone) V, ln VI W --< -< -< -< 6,000 6,000 o co 0 ,c, 0 SION NO. TE BY POOH tr, ID IQ M NOR STREET IMPROVEMENTS Projects: E I6253 -East IA & E16252 -East IB Projects: E16251 -West 2A & E16250 -West 2B SCI-IEDU LE OF ESTIMATED QI.JANTITIFs PART - 2 r-ip, 31333.J.J., C) -4 . 044 00 z 3 -201 $9 445. Y SPEW.), (USUAL) Is' IB' Po N E 1 BY DESCRIPTIO REVISION N0. DATE BY ID IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & E16252 -East IB Projects: E16251 -West 2A & E16250 -West 2B CITY OF CORPUS CHRISTI CURB, GUTTER AND SIDEWALK STANDARD DETAILS C czrrs Li CIn r'S IIF" rogrzaainn as 0E50 I CMS LLC Reg. No. f-3899 5001 Oakmont Dr.. Corpus Christi, Tx. 7841 Office361-9861202 Cell: 361-549-4576 Z tt REVISION NO. DATE DESCRIPTION II) IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & [16252 -East IB Projects: [16251 -West 2A & [16250 -West 2B CITY OF CORPUS CHRISTI DRIVEWAY STANDARD DETAILS 1 OF 3 REVISION NO, DATE 0ESCRIP ECMS LLC Reg. No. g-3899 5001 Oakmont Dr. Corpus Christi, Tx. 711413 Office: 361-986-1202 Cell: 361-549-4576 _.. SUMMARY OF CONCRETE DRIVEWAYS F i �CC m s ...� D N Z A V � L ~n� V m REVISION NO. DATE DESCRIPTION II) IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & [16252 -East IB Projects: [16251 -West 2A & [16250 -West 2B CITY OF CORPUS CHRISTI DRIVEWAY STANDARD DETAILS 1 OF 3 REVISION NO, DATE 0ESCRIP ECMS LLC Reg. No. g-3899 5001 Oakmont Dr. Corpus Christi, Tx. 711413 Office: 361-986-1202 Cell: 361-549-4576 0 It PRONE/11r NW RE ISION NO. OATS 03 SORPTION 0E20J00 NO. DATE ID IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East JA & E16252 -East 1B Projects: E16251 -West 2A & E16250 -West 213 CITY OF CORPUS CHRISTI DRIVEWAY STANDARD DETAILS 2 ON 3 .2ak2»if It a III ECMS LLC Reg. No, F-3899 5001 Oakmont Dr. Corpus Christi, Tx. 784 Office: 361-96-1202 Cell: 361-549-4576 4 !t r* 8C (C) (5) II (C) 8 \ (Al) A2) GRADE BREAK) (AI) 2 A 0 (s A s P A ,N pl • (A2) G.B. (GRADE BREAK) DESCRIPTION SLOPE WRUESSA P IS ( A ) REPS NO. 8 8 6 F BREAD) SLOPE NANCE 50,1 TD 100, F? TE VALUE OF F MAY BE CHANGED BY ENG. RANGE OF NOitVALLY ACCEPTABLE VALVES. g , 2 2.55 ?B t tn 0 11 STANDARD DRIVEWAY DIMENSION . u .• 8 8 g 2 2 . 's '':' g .' f' 8 g-- ' 8 0 A GSARIP IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & E16252 -East IB Projects: E16251 -West 2A & E16250 -West CITY OF CORPUS CHRISTI DRIVEWAY STANDARD DETAILS 3 OF 3 ejr r- Fr, 3,1C 0-1 r"RI RC a goo lit Ask aia inn ECMS LLC Reg. No, F-3899 5001 Oakmont Dr. Corpus Christi, Tx, 78413 Office: 361-986-1202 Cell: 361-549-4576 PEV-151 DATE DE5CRIPTI 111 a AIX INIQr NOISNPVX3 4 2 , l-3/4 T/3 PAVEMENT IlitCNNESS ID IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & E16252 -East ID Projects: E16251 -West 2A & E16250 -West 213 CITY OF CORPUS CHRISTI CONCRETE PAVEMENT STANDARD DETAILS ECMS LLC Reg. No. F-3899 5001 Oakmont Dr. Corpus Christi, Tx. 78413 Office: 361-986-1202 Cell: 361-549-4576 7/r0/179 Room TO mar JorAc OW 217 (MEV sy OESV.IFTION EQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & E16252 -East 18 Projects: E16251 -West 2A & E16250 -West 2B PATE SANITARY SEWER STANDARD DETAILS OF 5 (.121-1t- 1ti 4Caelo prittes tim.tr.o.go ran rule gig Dominos ECMS LLC Reg, No, F-3899 5001 Oakmont Ur. Corpus Christi, Tx. 78413 Office: 361-986-1202 Cell: 361-549-4576 II Cl a. yy REVISION NO. 1/10(09 000 CATE BY DESCRIPTION 30 00 044P 211 (70(01 ID IQ MINOR STREET IMPROVEMENTS Projects: [16253 -East IA & E16252 -East 1B Projects: E16251 -West 2A & E16250 -West 211 SANITARY SEWER STANDARD DETAILS R0./191014 No DA DES 2 OF 5 tC ass Fa tt am 0.or-c-)<0 r ECMS LLC Reg. No. F-3899 5001 Oakmont Dr. Corpus Christi, TX. 78413 Office: 361-986-1202 Cell: 361-549-4576 a. A g 1,,10ceo uhJIuflhIu h pH iim ccc 0 10 TAO UN P 217 GUS) ID IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & E16252 -East I Projects: E16251 -West 2A & E16250 -West 211 SANITARY SEWER STANDARD DETAILS r p t.A S i ICat rsiltin IrCb V.ins 15; ECMS LLC Reg. No, F-3899 5001 Oakmont Dr. Corpus Christi, Tx, 7841 Office: 36l -986-1202 Cell: 361-549-4576 ro MW 30 TAC .20 D IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & E16252 -East 113 Projects: E16251 -West 2A & E16250 -West 213 SANITARY SEWER STANDARD DETAILS 4 OF 5 rMti pi It IF.arciosio ores rIrm ON EC S LLC Reg. No. F-3899 5001 Oakmont Dr. Corpus Christi, Tx. 78413<,. Office: 361-986-1202 Cell: 361-549-4576 •-•.*'`4,1s a I/10/04 OA CFO, eIp IQ MINOR STREET IMPROVEMENTS Projects: £16253 -East IA & £16252 -East 1B P 'eels: E16251 -West 2A & £16250 -West 2B SANITARY SEWER STANDARD DETAILS 5 OF 5 (jtsr'ttt ar.: a. ip• a it am laoe t er-,es s-arla ECMS LLC Reg. No, F-3899 5001 Oakmont Dr. Corpus Christi, Tx, 78413 Office: 361-986-1202 Cell: 361-549-4576 REVISION NO. REVISION NO DATE 1110 IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & E16252 -East 1B Projects: E16251 -West 2A & E16250 -West 2B CITY OF CORPUS CHRISTI STORM WATER STANDARD DETAILS OF C S LLC Reg. No. F-3899 5001 Oakmont Dr. Corpus Christi, Tx. 78413 Office. 361-986-1202 Cell, 361-549-4576 9 g ID 1Q MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & E16252 -East 1B Projects: E16251 -West 2A & E16250 -West 2B DATE CITY OF CORPUS CHRISTI STORM WATER STANDARD DETAILS 2 OF 3 orF Js CYir Ca p itemI Proy.- mas ECMS LLC Reg. No. F-3899 5001 Oakmont Dr. Corpus Christi, Tx. 78413 Office: 361-986-1202 Cell: 361-549-4576 04. f FINAL NACKNIL!. (nrp S -O" ( P) NEY1SION NO. OESCRIONON ONGN OF CORO REVISION NO. ID IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & E16252 -East 113 Projects: E16251 -West 2A & E16250 -West 213 CITY OF CORPUS CHRISTI STORM WATER STANDARD DETAILS 30F 3 ECM LLC Reg No. F-3899 5001 Oakmont Dr. Corpus Christi, Tx. 7841 Office361-986-1202 Cell; 361-549-4576 81 ,,-,T, 6 Alo k ''' A „ , ' t '.! . 1 v ' , _ ', 'gr TABLE 1 BEMB__MB_LBUI_BeKin.L 'BELOW PIPE TO 12- ABOVE PIPET a a .. a A „ A 0 F, TAB E 7 MALSKISELl GREATER THAN 12- ABOVE PIPEI UNPAVED AREAS PAVED AREAS °-. t, 5 T i', 555 "-IR q 4 co 9 5‘ i VV '.1.,”' ,. ' " W . =. NEY1SION NO. OESCRIONON ONGN OF CORO REVISION NO. ID IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & E16252 -East 113 Projects: E16251 -West 2A & E16250 -West 213 CITY OF CORPUS CHRISTI STORM WATER STANDARD DETAILS 30F 3 ECM LLC Reg No. F-3899 5001 Oakmont Dr. Corpus Christi, Tx. 7841 Office361-986-1202 Cell; 361-549-4576 U) 1-1 CC Ui Cl H ry„,„'SCX • ",,Z11,1 7,36 XX, 3 333Y'.. fi.,1-2 6. e44 H rx, X X Ci Ci n CC CC 41 Cl DESCRIPTION REVISION NO CCNOUNI) 0) D IQ MINOR STREET IMPROVEMENTS Projects: F 16253 -East IA & E16252 -East 113 Projects: E16251 -West 2A & [16250 -West 2B CITY OF CORPUS CHRISTI PEDITS IRIAN CURB KAMP AN1 Al' C,oF 4 l=aeso gas tan II IF*rOfai liras rare mg ECMS LLC Reg. No. F-3899 5001 Oakmont Dr, Corpus Christi, Tx, 78413 Office: 361-986-1202 Cell: 361-549-4576 ESCRICTION _22 ,a1 ID IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & 116252 -East 1B Projects: E16251 -West 2A & [16250 -West 2B ANC Oh COCCUS CHh4SE I PCISSSTICAN 0103 RAMP S I AN DAHOS 2 CF 4 19.5101,1 59, LA 5 :.I -s.— 5 't ono pro it.. II IF> ro quo eatflS ECMS LLC Reg, No. F-3899 5001 Oakmont Dr. Corpus Christi, Tx. 78413 Office: 361-986-1202 Cell: 361-549-4576 soIn :4 < 141Co CD t SIDEZZILI, a _2 0 ZZ SZA-1,VAIX r (r) r n ))1 () .;):3 A Co Ci 4)) )ti) 0AD2C) T1 PHOIZZVED ZONE 11 2.L2 [NI c3 C3 :31 HAs ' C) 2225,25 50. DATE 50 GES4RIPTION REVISION NO. AESORIP00,1 In IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & E16252 -East IB Projects: E16251 -West 211 & E16250 -West 2B CITY Of' CORPUS CHRIST) PEDESTRIAN CURH RAMP STANDARDS 3 OF 4 aere aro if It as* rams ECMS LLC Reg. No. F-3899 5001 Oakmont Dr. Corpus Christi, Ts 784 1:3 Office: 361-986-1202 Cell: 361-549-4576 *a CV "At Sf— it INNA•2406— ( MA. /0/ f,r,-,ft, JcP,,V0. DIRK,: llon / 0000000n, orr0000cao ..,— o,70000000c nonoon0000 ,000000000C P, .)op000000co 0 oonoup0000, oo,,000000N) CF) MIN 7ri Z ) In(1)r- 7.) C ▪ U ,1 c > 7.) cn 555 C) u c 'cc, Di IF ."r-1 IHI CH) Cl > :...T10 55555 :55 CUm H Ln IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East 1A & E16252 -East 1B Projects: E16751 -West 2B & E16250 -West 213 015coRnJs (5S]5CH '1.01 MAN CliPI-3 RAMS SIANDAHW: 4 OH 4 Gcs, avoltam I rO sip rams MI,GWCON ECMS LLC Res. No. F-3899 5001 Oakmont Dr. Corpus Christi, Tx. 78413 Office: 361-986-1202 Cell: 361-549-4576 Ci I Avow. ID IQ MINOR STREET IMPROVEMENTS Projects: El6253-East IA & E16252 -East IB Projects: E16251 -West 2A & E16250 -West 28 BARRICADE AND CONSTRUCTION GENERAL NOTES AND REQUIREMENTS ; WORK AREAS IN MULTIPLE LOCATIONS WITHIN CSJ LAW'S SAMPLE LAYOUT OF SiGNING FOR WORK BEGINNING AT -0- I • OK' UI z NO11336631N1-1 TYPICAL CONSTRUCTION WARNING SIGN SIZE AND SPACING DA 0 ORIMON ID IQ M NOR STREET IMPROVEMENTS Projects: E16253 -East 14 & E16252 -East 1B Projects: E16251 -West 2A & E16250 -West 2B BARRICADE AND CONSTRUCTION PROJECT LIMIT STANDARD '''"""•;•••••• Fs itI an I€ e to or toe um sea gf e ev, c) II vs."2";•. ci? g'\)'Tis-V,A74 .glEiCAliV,1,:tg4i UI z NO11336631N1-1 TYPICAL CONSTRUCTION WARNING SIGN SIZE AND SPACING DA 0 ORIMON ID IQ M NOR STREET IMPROVEMENTS Projects: E16253 -East 14 & E16252 -East 1B Projects: E16251 -West 2A & E16250 -West 2B BARRICADE AND CONSTRUCTION PROJECT LIMIT STANDARD '''"""•;•••••• Fs itI an I€ e to or toe um sea gf e ev, c) II vs."2";•. ci? g'\)'Tis-V,A74 o, + f 21 rr � o \ II y \$ $ o ° a / _o a m 0 /( + }\/ ; {0 ƒ s. JK S !§ _d ID IQ St NOR STREET IMPROVEMENTS Projects: E16253 -East IA & E16252.e. E16251 -West 2A dz E16250 - _.m _.c» AND CONmuam WORK ZONE +nmaSTAN_: oreus cVI t Ern V..'tam . e - _ors %a m_ ,710g Lip C) T10 NFIWINIIN WOld).1 S FOR LONG TERM AND INTERMEDIATE TERM SIGNS 154 r BE TE OESOR ION IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & E16252 -East 10 Projects: E16251 -West 2A & E16250 -West 2B BARRICADE AND CONSTRUCTION TEMPORARY SIGN NOTES STANDARD Is r- sti ,G MU pita% 1 IP sr oto. calram arra sa d 03/wnow omo 0 Li SQUARE STEEL TUaNG SIGN SUPPORTS SKID MOUNTED WOOD SIGN SUPPORTS 3 § f!ri Si PERFORATED SQUARE METAL TUBING 141 ROAMS NO. COTE BY ID IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & E16252 -East 1B Projects: E16251 -West 2A & E16250 -West 28 BARRICADE AND CONSTRUCTION TYPICAL SIGN SUPPORT STANDARD r - 4G Jos lit am Co Aga Ca ens 0 00 S 0 P. ,FrIN'T SION Cts PESOS ID IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & I6252 -East I B Projects: E16251 -West 2A & E16250 -West 2B BARRICADE AND CONSTRUCTION PORTABLE CHANGEABLE MESSAGE SIGN (PCMS) STANDARD a.Jchrti Gat gar i • SE! ircti:c5 rrl frV.1) f Nk, 0cy. 144;-• t k (4- • .00101164 11, I f I - S " of •*fri rrj?; - .1' 1 ai ,T q i! i t. . ' g i e t r k 0 00 S 0 P. ,FrIN'T SION Cts PESOS ID IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & I6252 -East I B Projects: E16251 -West 2A & E16250 -West 2B BARRICADE AND CONSTRUCTION PORTABLE CHANGEABLE MESSAGE SIGN (PCMS) STANDARD a.Jchrti Gat gar i • SE! ircti:c5 rrl frV.1) f Nk, 0cy. 144;-• t k (4- • .00101164 11, A PENNON W. H2,1HV8 C)C) C) C) OJ 7.0 m 73 2: rn C) U) C) "T1 C) 73 73 P1 OATE OESORIPOON ID IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & E16252 -East I B Projects: E16251 -West 2A & E16250 -West 2B BARRICADE AND CONSTRUCTION ARROW PANEL REFLECTORS, WARNING LIGHTS & AT FENUATOR STANDARD C) RENI N TE 0 I I II) IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & E16252 -East 113 Projects: E16251 -West 2A & E16250 -West 2B BARRICADE AND CONSTRUCTION CHANNELIZING DEVICES STANDARD . n $sa • • . 4 -I 1s . , ie..-- ..,,,, **•:":•A 0 • c:,:c. co •:-e,-, 6, c, f'r-i--4rr, 8 , 0 rev.15 CO ° . •-•e 0 1 ,t'l • P.) 41 ....y . O.z- Sn :4,0 ..--K l%. P3` • • -';i:c"-% — -_ Veil' % * .....or -.-- u•N‘......"7" r s CIEs up Nit sem I so lir all WWII Sfiii -11111,!Ik - !lig; RMS1ON NO. TE RI ON ID IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & E16252 -East IB Projects: E16251 -West 2A & E16250 -West 2B BARRICADE AND CONSTRUCTION CHANNEUZING DEVICES STANDARD t_aChr-Yti 4E11itAft I W-47. 1,11119111re 1 1 1 1 I 1 1 1 I 1 1 1 `;';'<a! TYPE Ilf BARRICADE (POST AND SKID) T YPGAL APPLICATION e e 10 WIDENING OR OTHER ISOLATED WORK WITHIN THE PROJECT LIMY Rt.ISION NO. TE 113 IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & El6252-East 1B Projects: E16251 -West 24 & E16250-Wes1 2B BARRICADE AND CONSTRUCTION CHANNELIZING DEVICES STANDARD V.1 Is-• .,.....C4agano.F.....1111c. 1 n rse - • '''', )1_..,-0-33c) oc"-(-1 cq. er-,r,, 0 :x. -II fr I rec.-op 0) ..,--'' io • Alio El 0.% ec.S) REVISION NO M OR000I ID IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & E16252 -East 1B Projects: E16251 -West 2A & EI6250-West 2B CA W n BARRICADE AND CONSTRUCTION PAVEMENT MARKING STANDARD car-OuS t -h rSti Cres pitam i IP•ro so ra rl'ma N Ha NATE 00 RI ON ID IQ MINOR STREET IMPROVEMENTS Projects: E16253 -East IA & E16252 -East IR Projects: E16251 -West 2A & E16250 -West 213 BARRICADE AND CONSTRUCTION PAVEMENT MARKING PATTERNS STANDARD 'Thc) r- i MI II Faw gr-.=. 4igp Jelli 111,1". 009101 ADDENDUM NUMBER: I Project Number.E16250, Project: IDIQ MINORE IMPROVEMENTS Owner.n e f i City Engineer. J.H.Edmonds,P.E. Designer. E 5,LL ai 1111111-11111111-1111111 Addendum No. 1 i 009101 Issue Acknowledge receipt of this Addendum in the Old Acknowledgement Farm submitted for this Projea Failure i In the old basismay render the Bid as non-responsive and serve as the for rejecting1 . Make the additions, i o or deletions to the Contract DocumentsIn this Addendum. Approved reviseOF I Date Addendum items: To bid opening date. '• New i date:March 30,20162: . ......«....................... .� OCARAS Invitation tb Bid,Section 1 13( ac ent 1 ......w........................0 Drawings, Bets i of 34,4 of 34 and 5 of 34(Attachment 233006 tr c w. dw ECK Ur,Reg.Na la r : E nrj ' Fell*H.OcImar,Jr.,"'P.E. i r Addendum iz x 009101-1 IDIQ Minor Street Imprvmments,PN E16250,E16251,E16252,El M-13-2016 ARTICLE 1—BIDDING REQUIREMENTS 1.01 ACKNOWLEDGE ADDENDA A. Acknowledge receipt of this Addendum in the Bid Acknowledgement Form submitted for this Project. Failure to acknowledge receipt of this addendum in the Bid Acknowledgement Form may render the Bid as non-responsive and serve as the basis for rejecting the Bid. 1.02 MODIFICATIONS TO THE BIDDING REQUIREMENTS A. SECTION 002113 INVITATION TO BID AND INSTRUCTIONS TO BIDDERS-Article 3 1. The date for receipt of Bids has been changed to Wednesday.March 30 2016,2:00 2. The location for the receipt of Bids is unchanged. ARTICLE 3-MODIFICATIONS TO THE DRAWINGS 3.01 ADD OR DELETE DRAWINGS A. DELETE the following Drawings: Deleted Drawings Sheet I of 34,Title Sheet,Vicinity Map and Sheet Index Sheet 4 of 34,Schedule of Estimated Quantities,Part 1 Sheet 5 of 34,Schedule of Estimated Quantities,Part 2 B. ADD the following Drawings: Added Drawings Sheet I of 34 a ,Title Sheet,Vicinity M R and Sheet Index Sheet 4 of 34 Schedule of Estimated Quantities,Part 1-East Sheet 5 of 34,Schedule of Estimated Nantities,Part 2-West ARTICLE 4—CLARIFICATIONS 4.01 QUESTIONS A. Question: What is the materials for line items 1A-B7 and 1A-B8 respectively going to be used? Answer: The materials are for items 1A-B6 and 2A-86. B. Question: The Specifications end with the General Requirements:None of the Standard Specifications are Included. Will these be provided? Answer:The specifications were uploaded on March 221 2016. Addendum No.1 00 9101-2 IDIQ Minor Street Improvements,PN E16250,E16251,E16252,E16253 Rev 01-13-2016 4.02 CLARIFICATIONS A. The drawings title sheet was revised to correct the Part 1-East and the Part 2-West designations and sheets 4 and 5 corrected the schedules of estimated quantities. B. The question asked at the pre-bid meeting:Is one bid bond required for each part? The answer provided was Yes,a bid bond is required for Part 1 and a separate bid bond is required for Part 2. END OF ADDENDUM NO. 1 Addendum No.1 00 9101-3 IDIQ Minor Street Improvements,PN E16250,E16251,E16252,E16253 Rev 01-13-2016 ADDENDUM NO. 1 ATTACHMENT NO. I O02113 INVITATION TOBID AND INSTRUCTIONS TO BIDDERS PAGE 1 OF 10 ARTICLE 1—DEFINED TERMS 1.01 Terms used in this Invitation to Bid and Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. ARTICLE 2—GENERAL NOTICE 2.1 The City of Corpus Christi,Texas(Owner) is requesting Bids for the construction of thefollowing Project: IDIQ MINOR STREET IMPROVEMENTS PROJECT PROJECT NO. E16250, E16251,E16252,E16253 A. This project is an Indefinite Delivery Indefinite Quantity(IDIQ) construction contract to perform minor street pavement repairs throughout the City, including minorstreet pavement rehabilitation/replacement, base repairs with limestone,and sub-grade stabilization.Work may include saw cutting,crack sealing,seal coating, milling, curb& gutter,driveway replacement, curb ramps,and minor utility manhole ring Qicoverand va|veadjustments.TheVVorkvvU| be|ssuedinindiv|duo|workmmdmrscaUed"De|ivery Orders"that provide specific scope and requirements.The City intends to award this contract for an initial one-year/12-month period,with the option to administratively renew for two(2)additional one-year/12-month periods.The City's Department of Engineering Services will determine whether to exercise an option to renew based on the Contractor's successful performance of the work and all Delivery Orders,the recommendation of the City's Design Engineer,Construction Management&Inspection Team,approval bythe City's Director ofEngineering Services,and the concurrence mfthe Contractor. The contract allows for a City-approved economic adjustment to applyto a renewal periodif based upon published cost-of-construction indices acceptable to the City. B. The two bid schedules under this single bid invitation includes a "Part I"and a"Part2." Part 1will bededicated specifically tothat part ofthe City tothe West of Ayers Streetmnd Part 2will bededicated tothat part ofthe City East ofAyers Street.The City intends to award Part 1 to the lowest responsible bidder for Part 1,and to award Part 2 to the lowest responsible bidder for Part 2. If the same bidder submits the lowest bid for both Part 1 and Part 2,then both Part 1and Part 2may only beawarded tuthat one lowest bidder ifthe bidder can demonstrate the capability and resources toco mtetheworkofbothParts1 [ and Zconcurrently and continuously,within the 355day , �jinaccordance with the Contract Documents,and to be able toshow,tuthe City's satisfaction,the ability toemploy two full crews working concurrently and continuously,one full crew for Part 1 and one full crew for Part 2.Otherwise,should such bidder who has submitted the lowest bids forboth Part 1and Part 2' not qualify toperform both Parts 1and Part 2asdescribed above,then such bidder will beawarded the contract with the highest ofhis two bids. Invitation tmBid and Instructions toBidders 002113-1 I0Q Minor Street improvements Project,PNE1625Q,E162S1,E16252,G16253 Rev 01-13-2016 ADDENDUM NO. 1 ATTACHMENT NO, 1 PAVE 2 OF 10 2.2 The Engineer's Opinion of Probable Construction Cost for the Project is$4,000,000 totalfor Parts 1 and 2,$2,000,000 for Part 1 and$2,000,000 for Part 2.The Project is to befinally completed and ready for operation within 365 days. 2.3 Advertisement and bidding information for the Project can be found at the following website;www.civcastusa.com 2.4 Contract Documents may be downloaded or viewed free of charge at this website.Thiswebsite will be updated periodically with Addenda, lists of interested parties, reports,or other information relevant to submitting a Bid for the Project. ARTICLE 3—DELIVERY AND OPENING OF BIDS 3.1 Bids must be received no later than March 2016 2:00 PM to be accepted. Bids received after this time will not be accepted. It is the sole responsibility of the Bidder to deliver the Bid, electronic or hard copy, by the specified deadline. 3.2 Complete and submit the Bid Form,the Bid Bond and the Bid Acknowledgement Form along with all required documents identified in the Bid Acknowledgement Form. 3.3 Electronic Bids may be submitted to the CivCast website at www.civcastusa.com. 3.4 If submitting a hard copy bid or bid security by cashier's check or money order, please address envelopes or packages to: City of Corpus Christi City Secretary's Office City Hall Building, 1st Floor 1201 Leopard Street Corpus Christi,Texas 78401 Attention: City5ecretary Bid-IDIQ MINOR STREET IMPROVEMENTS, N E16250,E16251, E1 252,E16253 Corpus Christi,Texas 78401 All envelopes and packages(including FEDEX envelopes) must clearly identify,on theOUTSIDE of the package,the project name and number and that bid documents areenclosed. .5 Bids will be publicly opened and read aloud at 2:00 PM,March 30 2016 at the following location: City Hall Building-- City of Corpus Christi First Floor City Council Staff Room or Council Chambers 1201 Leopard Street Corpus Christi,Texas 78401 Invitation to Bid and Instructions to Bidders 002113-2 IDIQ Minor street improvements Project, PN E16250, E16251, E16252,E16253 Revo3 13.2016 ADDENDUM NO. I ATTACHMENT O. 1. PAGE 3 OF 10 ................................................................................................................................................................ 3.6 The Owner will read aloud the names of the Bidders and the apparent Bid amounts shown on the Bid Summary for all Bids received in time to be considered. ARTICLE 1—PRE-BID CONFERENCE 4.01 A non-mandatory pre-bid conference for the Project will be held on March 22,2016, 10:30 AM at the following location: City Hall Building—Engineering Services Conference Room I ort 3',floor,Engineering Services 1201 Leopard Street, Corpus Christi,Texas 78401 ARTICLE 5—COPIES OF CONTRACT DOCUMENTS 5.1 Obtain a complete set of the Contract Documents as indicated in SECTION 00 5223 AGREEMENT. 5.2 Use complete sets of Contract Documents in preparing Bids; Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete sets of Contract Documents. 5.3 OPT makes copies of Contract Documents available for the sole purpose of obtaining Bids for completion of the Project and does not confer a license or grant permission or authorization for any other use. ARTICLE 6—EXAMINATION OF CONTRACT DOCUMENTS 6.1 Before submitting a Bid: A. Examine and carefully study the Contract Documents,including any Addenda and related supplemental data. B. Become familiar with all federal,state,and local Laws and Regulations that may affect cost, progress,or the I ompletion of Work. C. Carefully study and correlate the information available to the Bidder with the Colract Documents,Addenda, and the related supplemental data. D. Notify the OAR of all conflicts,errors,ambiguities,or discrepancies that the Bidder discovers in the Contract Documents,Addenda,and the related supplemental data. E. Determine that the Contract Documents,Addenda,and the related supplemental data are generally sufficient to indicate and convey understanding of all terms and conditions for completion of Work. 6.2 The submission of a Bid will constitute an incontrovertible representation by the Bidder that the Bidder has complied with every requirement of this Article 6,that without exception the Bid is premised upon completion of Work required by the Contract Documents,Addenda,and the related supplemental data,that the Bidder has given the OAR written notice of all conflicts, Invitation to Bid and Instructions to Bidders 002113-3 IDIQ Minor Street Improvements Project,PN E16250, E16251,E16252,E16253 Rey 01.13-2016 ADDENDUM NO. 1 ATTACHMENT NO. I PAGE 4 OF 10 errors,ambiguities, and discrepancies that the Bidder has discovered in the Contract Documents,Addenda,and the related supplemental data and the written resolutions provided by the OAR are acceptable to the Bidder,and that the Contract Documents,Addenda, and the related supplemental data are generally sufficient to indicate and convey understanding of all terms and conditions for completion of Work. ARTICLE 1—I RP ATI NS AND ALTERNATE BIDS 7.1 Submit all questions about the meaning or intent of the Contract Documents,Addenda, and the related supplemental data using the Owner's Bidding Website at www.civcastusa.com. Responses to questions submitted will be posted on the website by the Owner for the benefit of all Bidders. Responses will be posted for questions submitted by 5:00 p.m.seven (7)days prior to the date of the bid opening. Inquiries made after this period may not be addressed, 7.2 Submit any offer of alternate terms and conditions,or offer of Work not in strict compliance with the Contract Documents to the OAR no later than 14 days prior to the date for opening of Bids. OAR and Designer will issue Addenda as appropriate if any of the proposed changes to the Contract Documents are accepted, A Bid submitted with clarifications or taking exceptionsto the Contract Documents,except as modified by Addenda, may be considered non-responsive. 7.3 Addenda may be issued to clarify, correct,or change the Contract Documents,Addenda orthe related supplemental data as deemed advisable by the Owner or Designer. Modifications to the Contract Documents prior to the award of contract can only be made by Addenda. Only answers in Addenda authorized by the Owner will be binding. Oral and other interpretations or clarifications will be without legal effect. ARTICLE 3—BID SECURITY 8.1 Bidders must submit an acceptable Bid Security with their Bid as a guarantee that the Bidderwill enter into a contract for the Project with the Owner within 10 days of Notice of Award of the Contract.The security must be payable to the City of Corpus Christ!,Texas in the amount of5 percent(5%)of the greatest amount bid. 8.2 Bid Security may be in the form of a Bid Bond or a cashier's check,certified check, moneyorder, or bank draft from a chartered financial institution authorized to operate in the State of Texas. Bidders submitting bids electro rl ically through the CivCast System at www.civcastusa.com shall scan and upload a copy of Bid Bond as an attachment to their bid.Cashier's check,certified check, money order or bank draft must be enclosed in a sealed envelope, plainly identified on the outside as containing bid documents,the bidder's name and the job name and number and delivered as required in Article 8.03 below. 8.3 Bid Bond Requirements: 1. A Bid Bond must guarantee,without qualification or condition,that the Owner will be paid a sum equal to 5 percent(5%)of the greatest amount bid if,within 10 calendar days of Notice of Award of the Contract,the Bidder/Principal: a.fails to enter into a contract for the Project with the Owner;or b.fails to provide the required Performance and Payment Bonds. Invitation to Bid and Instructions to Bidders 00 2113 4 IDIQ Minor Street improvements Project,PN E16250, E16251,E16252,E16253 Rev o1-13°2®l6 ADDENDUM NO. 1 ATTACHMENT NO. 1 PAGE 5 OF 10 Z A Bid Bond may not limit the sum payable to the Owner to be the difference between the Bidder/Principal's bid and the next highest bidder. 3, The Bid Bond must reference the Project by name as identified in Article 1. 4. Bidders may provide their surety's standard bid bond form if revised to meet these Bid Bond Requirements. 8.4 Failure to provide an acceptable Bid Security will constitute a non-responsive Bid which will not be considered. 8.5 Failure to provide the required Performance and Payment Bonds will result in forfeiture of the Bid Security to the City as liquidated damages. 8.6 Owner may annul the Notice of Award and the Bid Security of the Bidder will be forfeited if the apparent Selected Bidder fails to execute and deliver the Agreement or Amendments to the Agreement.The Bid Security of other Bidders whom the Owner believes to have a reasonable chance of receiving the award may be retained by the Owner until the earlier of 7 days afterthe Effective Date of the Contract or 90 days after the date Bids are opened, 8.7 Bid Securities are to remain in effect until the Contract is executed,The Bid Securities of all but the three lowest responsible Bidders will be returned within 14 days of the opening of Bids. Bid Securities become void and will be released by the Owner when the Contract is awarded or all Bids are rejected. ARTICLE 3—PREPARATION OF BID 9.1 The Bid Form is included with the Contract Documents and has been made available atthe Owner's Bidding Website. Complete all blanks on the Bid Form by typing or printing in ink. Indicate Bid prices for each Bid item or alternate shown. 9.2 Execute the Bid Acknowledgement Form as indicated in the document and include evidence of authority to sign. 9.3 Acknowledge receipt of all Addenda by filling in the number and date of each Addendum. Provide a signature as indicated to verify that the Addenda were received.A Bid that does not acknowledge the receipt of all Addenda may be considered non-responsive. 9.4 Provide the name,address,email,and tel phone number of the individual to be contacted for any communications regarding the Bid in the Bid Acknowledgement Form. 9.5 Provide evidence of the Bidder's authority and qualification to do business in the State of Texas or covenant to obtain such qualification prior to award of the Contract. ARTICLE 10—CONFIDENTIALITY OF BID INFORMATION 10.01 In accordance with Texas Government Code 552.110,trade secrets and confidential information in Bids are not open for public inspection. Bids will be opened in a manner that avoids disclosure of confidential information to competing Bidders and keeps the Bids from the public during considerations.All Bids are open for public inspection after the Contract is awarded,but trade secrets and confidential information in Bids are not typically open for public inspection. The Owner will protect this information to the extent allowed by Laws and Regulations, Clearly Invitation to Bid and Instructions to Bidders 002113-5 IDI Q Minor Street improvements Project,PN E16250,E16251,E16252,E16253 Reval 13 2016 ADDENDUM NO. I ATTACHMENT NO. 1 PAGE 6 OF 10 indicate which specific documents are considered to be trade secrets or confidential information by stamping or watermarking all such documents with the word "confidential" prominentlyon each page or sheet or on the cover of bound documents. Place "confidential"stamps or watermarks so that they do not obscure any of the required information on the document, either in the original or in a way that would obscure any of the required information in a photocopy of the document. Photocopies of"confidential" documents will be made only forthe convenience of the selection committee and will be destroyed after the Effective Date of the Contract.Original confidential documents will be returned to the Bidder after the Effective Date of the Contract if the Bidder indicates that the information is to be returned with the Bid,and arrangements for its return are provided by the Bidder. ARTICLE 11— DIFI T! R WITHDRAWAL OF BID 11.1 A Bid may be withdrawn by a Bidder, provided an authorized individual of the Bidder submits a written request to withdraw the Bid prior to the time set for opening the Bids. 11.2 A Bidder may withdraw its Bid within 24 hours after Bids are opened if the Bidder files a signed written notice with the Owner and promptly, but no later than 3 days,thereafter demonstrates to the reasonable satisfaction of the Owner that there was a material and substantial mistake in the preparation of its Bid.The Bid Security will be returned if it is clearly demonstrated to the Owner that there was a material and substantial mistake in its Bid. A Bidder that requeststo withdraw its Bid under these conditions may be disqualified from responding to a reissued invitation to Bid for the Work to be furnished under these Contract Documents. ARTICLE 12—BIDS REMAIN SUBJECT TOACCEPTANCE 12.01 All Bids will remain subject to acceptance for 90 days,but the Owner may,at its sole discretion, release any Bid and return the Bid Security prior to the end of this period. ARTICLE 10—STATEMENT OF EXPERIENCE 13.01 The three lowest Bidders must submit the information required in SECTION 00 45 16 STATEMENT OF EXPERIENCE within 5 days of the date Bids are due to demonstrate that the Bidder meets the minimum requirements to complete the Work. ARTICLE 11—EVALUATION OF BIDS 14.1 The Owner will consider the amount bid,the Bidder's responsibilities,the Bidder's safety record, the Bidder's indebtedness to Owner,the Bidder's capacity to perform the work within the contract period and/or whether the Bidder has met the minimum specific project experience requirements. 14.2 Owner may conduct such investigations as it deems necessary to establish the responsibility of the Bidder and any Subcontractors, individuals,or entities proposed to furnish parts of the Work in accordance with the Contract Documents. 14.3 Submission of a Bid indicates the Bidder's acceptance of the evaluation technique and methodology as well as the Bidder's recognition that some subjective judgments must be made by the Owner during the evaluation. Each Bidder agrees to waive any claim it has or mayhave Invitation to Bid and Instructions to Bidders 002113-6 IOIQ Minor Street improvements Project,PN E16250,E16251,E16252,E16253 Rev 01 r 13 2016 ADDENDUM NO. 1 ATTACHMENT NO. 1 PAGE 7 OF 10 against the OPT and their respective employees, arising out of or in connection with the administration,evaluation, or recommendation of any Bid. ARTICLE 15—AWARD OF CONTRACT 15.1 The Bidders selected for award of the Contract will be the lowest responsible Bidders that submits a responsive bid.Owner reserves the right to reject any and all Bids, including without limitation, non-conforming, non-responsive or conditional Bids.The Owner reserves the rightto adopt the most advantageous interpretation of the Bids submitted in the case of ambiguity or lack of clearness in stating Bid prices and/or waive any or all formalities. 15.2 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work shall be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest. ARTICLE 16—MINORITY/MBE/ DBE PARTICIPATION POLICY 16.1 Selected Contractor is required to comply with the Owner's Minority/MBE/DBE Participation Policy as indicated in SECTION 00 72 03 MINORITY/MBE/DBE PARTICIPATION POLICY. 16.2 Minority participation goal for this Project has been established to be 45%. 16.3 Minority Business Enterprise participation goal for this Project has been established to be 15%. ARTICLE 11—BON AND INSURANCE 17.1 Article 6 of the General Conditions and SECTION 00 72 01INSURANCE REQUIREMENTS sets forth the Owner's requirements as to Bonds and insurance.When the Selected Bidder delivers the executed Agreement to the Owner, it must be accompanied by the required Bonds and evidence ofinsurance. 17.2 Provide Performance and Payment Bonds for this Project that fully comply with the provisions of Texas Government Code Chapter 2253.Administration of Bonds will conform to Texas Government Code Chapter 2253 and the provisions of these Contract Documents, ARTICLE 10—SIGNING OF AGREEMENT 18.01 �I The City Engineer or Director of Capital Programs will submit recommendation for award to the City Council for those project awards requiring City Council action.The Selected Bidder will be required to deliver the required Bonds and insurance certificates and endorsements alongwith the required number of counterparts(1)of the Agreement and attached documents to the Owner within 14 days.The Contract will be signed by the City Manager or his/her designee after award and the Bidder's submission of required documentation and signed counterparts. The Contract will not be binding upon Owner until it has been executed by both parties, Ownerwill process the Contract expeditiously. However,Owner will not be liable for any delays prior to the award or execution of Contract. Invitation to Bid and Instructions to Bidders 002113-7 IQ Minor Street improvements Project,PN E16250,E16251,E16252,E16253 Rev 01.13-2016 ADDENDUM NO. 1 A17ACHMENT NO. I PAGE 8 OF 10 ................. ARTICLE 10—SALES AND USE TAXES 19.1 The Owner generally qualifies,as a tax exempt agency as defined by the statutes of the State of Texas and is usually not subject to any City or State sales or use taxes, however certain items such as rented equipment may be taxable even though Owner is a tax-exempt agency. Assume responsibility for including any applicable sales taxes in the Contract Price and assume responsibility for complying with all applicable statutes and rulings of the State of Texas Comptroller. 19.2 It is the Owner's intent to have this Contract qualify as a "separated contract." ARTICLE 10— AGE RATES 20.01 This Contract is subject to Texas Government Code Chapter 2258 concerning payment of prevailing wage rates. Requirements for paying the prevailing wage rates are discussed in SECTION 00 72 02 WAGE RATE REQUIREMENTS. Bidders must pay not less than therninimurn wage shown on this list and comply with all statutes and rulings of the State of Texas Comptroller. ARTICLE 21—BIDDER's CERTIFICATION OF NO LOBBYING 21.01 In submitting its Bid, Bidder certifies that it has not lobbied the City or its officials, managers, employees,consultants,or contractors in such a manner as to influence or to attempt to influence the bidding process. In the event it reasonably appears that the Bidder influencedor attempted to influence the bidding process,the City may,in its discretion, reject the Bid. ARTICLE 12—CONFLICT OF INTEREST 22.01 Bidder agrees to comply with Chapter 176 of the Texas Local Government Code and file Form CIQ with the City of Corpus Christi City Secretary's Office, if required. For more information on Form CIQ and to determine if you need to file a Form CIO, please review the information onthe City Secretary's website at ict- disclosurelindex. ARTICLE 234—CE TIFI E OF INTERESTED PARTIES 23.01 Bidder arees to comply with Texas Government Code section 2252.908 nd complete Form 1295 CePicate of Interested Parties as part of this contract, if required.lFor more information, please review the information on the Texas Ethics Commission website at https:/Zwww.et ics.state.tx.us. ARTICLE 24-REJECTION OF BID 241 The following will be cause to reject a Bid: A. Bids which are not signed by an individual empowered to bind the Bidder. B. Bids which do not have an acceptable Bid Security,with Power of Attorney,submitted as required by Article 7. C. More than one Bid for same Work from an individual,firm, partnership or corporation. D� Evidence of collusion among Bidders. Invitation to Bid and Instructions to Bidders 002113,8 IDIQ Minor Street improvements Project,PN E16250, E16251,E16252,E16253 Rev O1-13 2016 ADDENDUM NO. I ATTACHMENT NO. 1 PAGE 9 OF 10 E. Sworn testimony or discovery in pending litigation with Owner which discloses misconduct or willful refusal by bidder to comply with subject contract or instructions of Owner. F. Failure to have an authorized agent of the Bidder attend the mandatory Pre-Bid Conference, if applicable. G. Bids received from a Bidder who has been debarred or suspended by Owner. H. Bids received from a Bidder when Bidder or principals are currently debarred or suspended by Federal,State or City governmental agencies. 24.2 The following may be cause to reject a Bid or cause to deem a Bid non-responsive or irregular. The City reserves the right to waive any irregularities and any or all formalities: A. Poor performance in execution of work under a previous City of Corpus Christi contract. B. Failure to achieve reasonable progress on an existing City of Corpus Christi contract. Evidence of Bidder's recurring failure to complete an item of work within a timeframe acceptable to the City or in accordance with a City-accepted schedule is evidence of Bidder's failure to achieve reasonable progress under this subsection. C. Default on previous contracts or failure to execute Contract after award. D. Evidence of failure to pay Subcontractors,Suppliers or employees in accordance with Contract requirements. E. Bids containing omissions,alterations of form, additions,qualifications or conditions not called for by Owner,or incomplete Bids may be rejected. In any case of ambiguity or lackof clarity in the Bid,OWNER reserves right to determine most advantageous Bid or to reject the Bid. F. Failure to acknowledge receipt of Addenda. G. Failure to submit post-Bid information specified in Section 00 45 16 STATEMENT OF EXPERIENCE within the allotted time(s). H. Failure to timely execute Contract after award. I. Previous environmental violations resulting in fines or citations by a governmental entity (i.e. U.S. Environmental Protection Agency,Texas Commission on Environmental Quality, etc.). J. Bidder's Safety Experience. K. Failure of Biclder to demonstrate,through submission of the Statement of Exprience,the experience required as specified in Section 00 45 16 STATEMENT OF EXPERIENCE,if that Section is included in the bidding documents. L. Evidence of Bidder's lack of sufficient resources,workforce,equipment or supervision,if required by inclusion of appropriate requirements in Section 00 4516 STATEMENTOF EXPERIENCE. M. Evidence of poor performance on previous Projects as documented in Owner's project performance evaluations. N. Unbalanced Unit Price Bid: "Unbalanced Bid" means a Bid,which includes a Bid that is based on unit prices which are significantly less than cost for some Bid items and significantly more than cost for others.This may be evidenced by submission of unit price Invitation to Bid and Instructions to Bidders 002113-9 IDI Q Minor Street improvements Project,PN E16250, E16251,E16252,E16253 Rev 01 13 2016 ADDENDUM NO. I ATTACHMENT O. 1 PAGE 1001` 10 Bid items where the costs are significantly higher/lower than the costs of the same Bid items submitted by other Bidders an the project. 0. Evidence of Bidder's lack of capacity to perform the Work. Evidence of Bidder's lack of capacity. Evidence of capacity to perform the Work will include a factual review of(i)all remaining work or incomplete work items under any existing city or non-city contract;(ii) ability to perform the Work with remaining sufficient resources,workforce,equipmentand supervision/supervisory staff; (iii)ability in the past to timely complete the same orsimilar work in a good and workmanlike manner utilizing same or similar remaining resources or under the same or similar conditions. Evidence of incomplete work items under any existing City-awarded ID IQ or other contract for similar work may constitute a lack of capacity to perform the Work. END OF SECTION Invitation to Bid and Instructions to Bidders 002113-10 IDIQ Minor Street improvements Project,PN E16250, E16251,E16252,E16253 RevOl 13-2016 Ggeirt1321,1 SIN3113A01:1dIA1 ID IQ ntrioR ET »VROVtMENT Projetic E162S3-Eist IA & E147.52 -Eu) 113 P Orb: Wit2s T113 SIIEET, VICINITY MAP AND SI1EET INDEX MY of CO CHRISTI TEXAS Department of Enciin•ering No. F-3899 t Dr. C Chriii,Tx. 711413 Offl�: 86-1202 Coll: 361.549-4576 rr IQ MIK= sTiturr tAlritai/LMINTS Preirctsi 4162534.4 Re Prelim (IMP -Wort 2A eta/It-Wm ID SCHEDULE OF ESTIMATED QUANTITIES PART I- EAST V7, "FEEDULE OF ESTIMATEID QUANTITIES PART 2 - WEST Aad w- June d,2017 ECS,LLC 5001 Oakmont Dr. Corpus Christi,TX 75413 .e: 1D/IQ Minor Street Improvements Project Part 1 A (EI X2. 3) & 1 B (E162 2 ]Dear Mr. Felix Ocanas, , Raul Ortiz,president of A. Ortiz Construction&Paving Inc., kuri interested in the I Fyear renewal. Due to the rise of labor costs,we request an increase of 4%of the contract amount to meet labor raises. At this time the cost of ina erials have relatively stayed the same and do not see an increase or decrease in material costs. Should you have any further questions or concerns please feel free to contact me at (361)582-2122. espectfaally, Raul Ortiz President 'NCL `UR 102 AIRPORT RD. CORPUS CHRISTI,TEXAS 78405 3611832-2122 FAX 361/363-4163 ID/IQ Minor Street Improvements A.Ortiz Construction&Paving Inc. Project E-16253 East 1A&E16252 East 1B 102 Airport Rd. Corpus Christi,Texas 78407 ITEM DESCRIPTION UNIT ESTIMATED UNIT PRICE EXTENDED QUANTITY AMOUNT Part 1A-A-General(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) Base Of Bid Part 1A 1A-A1 Mobilization/Bonds/Ins/(not to exceed 5%-total bid) LS 1 $35,000.00 $35,000.00 1A-A2 Traffic Control,Residential Streets Day 280 $250.00 $70,000.00 1A-A3 Traffic Control,Arterial Streets Day 93 $500.00 $46,500.00 1A-A4 Ozone Days EA 5 $150.00 $750.00 1A-B1 Seal Coat,per single course SY 1,600 $3.50 $5,600.00 1A-B2 Crack Seal,0-1"wide LF 1,000 $3.00 $3,000.00 1A-B3 Planing(Milling),2" SY 1,600 1,000 to 2,000 SY minimum per Delivery Order $5.50 $8,800.00 1A-B4 Planing(Milling),Additional 1" SY 1,600 1000 to 2,000 SY minimum per Delivery Order $3.50 $5,600.00 1A-B5 Cement Stabilized Base with 4%Cement,existing limestone SY 700 base,3-6",complete in place per SY $17.50 $12,250.00 Pot Hole Crew:Provide a 3-man pot hole repair crew to 8-Hr. 1A-66 include labor,materials,equipment&incidentals Day 57 $1,500.00 $85,559.53 HMAC,Type"D"material for pot hole repair,TxDOT 1A-B7 Standard Specification for Construction Item 340,including Ton 542 $90.00 $48,768.93 SS 1 emulsion for tack coat All-Season Pre-Coated Patching mixture(ASPPM),TxDOT 1A-68 Ton 542 $85.00 $46,059.54 DMS 9202.5,including S51 emulsion for tack coat 1A-B9 Allowance for Unanticipated Street Improvements LS 1 $20,000.00 $20,000.00 1A-610 Subgrade Repair up to 4-6"Depth(lime stabilization 6%) SY 100 $31.00 $3,100.00 1A-B11 Base Repair,Upper 2"Depth (Limestone) SY 3,000 $16.00 $48,000.00 1A-B12 Base Repair,Additional 1"Depth(Limestone) SY 6,000 $8.00 $48,000.00 1A-B13 Surface Treatment Repair Upper 2"HMAC SY 3,000 $23.00 $69,000.00 1A-B14 Surface Treatment Repair Additional 1"Depth HMAC SY 3,000 $13.00 $39,000.00 1A-B15 Subgrade Repair up to 4-6"Depth(lime stabilization 6%) SY 100 $31.00 $3,100.00 1A-B16 Base Repair,Upper 2"Depth (Limestone) SY 2,400 $15.50 $37,200.00 1A-B17 Base Repair,Additional 1"Depth(Limestone) SY 7,000 $7.50 $52,500.00 1A-B18 Surface Treatment Repair Upper 2"HMAC SY 6,000 $25.00 $150,000.00 1A-B19 Surface Treatment Repair Additional 1"Depth HMAC SY 6,000 $13.00 $78,000.00 1A-B20 Subgrade Repair up to 4-6"Depth(lime stabilization 6%) SY 112 $31.00 $3,472.00 1A-B21 Base Repair,Upper 2"Depth (Limestone) SY 6,000 $13.00 $78,000.00 1A-B22 Base Repair,Additional 1"Depth(Limestone) SY 6,000 $8.00 $48,000.00 1A-B23 Surface Treatment Repair Upper 2"HMAC SY 6,000 $23.00 $138,000.00 1A-B24 Surface Treatment Repair Additional 1"Depth HMAC SY 6,000 $13.00 $78,000.00 1A-C1 New ADA Curb Ramp:Concrete Curb Ramps,meeting TDLR SF 300 requirements,complete in place $25.00 $7,500.00 1A-C2 Remove&Replace ADA curb ramp:Removal& SF 300 Replacement of ADA ramps not in compliance w/TDLR $25.00 $7,500.00 1A-D1 Removal&Replacement of Curb&Gutter,complete in LF 1,000 $24.00 $24,000.00 place 1A-D2 Removal&Replacement of driveway approaches,complete SF 1,000 $13.00 $13,000.00 and in place 1A-D3 Removal&Replacement of Sidewalks SF 500 $11.50 $5,750.00 Storm Water Manhole Ring&Cover Adjustment,w/new 1A-D4 Manhole Ring and Cover Assembly w/new Concrete Height Each 5 $750.00 $3,750.00 Adjustment Rings&w/Concrete Collar,complete in place ITEM DESCRIPTION UNIT ESTIMATED UNIT PRICE EXTENDED QUANTITY AMOUNT 1A-E1 Water Valve Box Adjustment w/Concrete Collar,complete Each 5 $250.00 $1,250.00 in place Sanitary Sewer Manhole Ring&Cover Adjustment, 1A-F1 including New Manhole Ring&Cover Assembly w/new Each 5 $750.00 $3,750.00 HDPE Height Adjustment Rings,Stainless Steel Inflow Inhibitor and w/Concrete Collar,complete in place Base Of Bid Part 1B 113-A1 Mobilization/Bonds/Ins/(not to exceed 5%-total bid) LS 1 $25,000.00 $25,000.00 1B-A2 Traffic Control,Residential Streets Day 130 $250.00 $32,500.00 1B-A3 Traffic Control,Arterial Streets Day 130 $500.00 $65,000.00 1B-A4 Ozone Days EA 2 $150.00 $300.00 16-131 Planing(Milling),2" SY 1,000 1,000 to 2,000 SY minimum per Delivery Order $5.50 $5,500.00 113-132 Planing(Milling),Additional 1" SY 1,000 1000 to 2,000 SY minimum per Delivery Order $3.50 $3,500.00 16-133 Cement Stabilized Base with 4%Cement,existing limestone SY 300 $17.50 $5,250.00 base,3-6",complete in place per SY 16-134 Allowance for Unanticipated Street Improvements LS 1 $20,000.00 $20,000.00 16-135 Subgrade Repair up to 4-6"Depth(lime stabilization 6%) SY 100 $31.00 $3,100.00 16-136 Base Repair,Upper 2"Depth (Limestone) SY 1,500 $16.00 $24,000.00 16-137 Base Repair,Additional 1"Depth(Limestone) SY 1,500 $8.50 $12,750.00 16-138 Surface Treatment Repair Upper 2"HMAC SY 1,500 $25.00 $37,500.00 16-139 Surface Treatment Repair Additional 1"Depth HMAC SY 1,500 $13.50 $20,250.00 16-1310 Subgrade Repair up to 4-6"Depth(lime stabilization 6%) SY 100 $31.00 $3,100.00 16-1311 Base Repair,Upper 2"Depth (Limestone) SY 1,000 $16.00 $16,000.00 16-1312 Base Repair,Additional 1"Depth(Limestone) SY 1,000 $8.00 $8,000.00 16-1313 Surface Treatment Repair Upper 2"HMAC SY 1,000 $25.00 $25,000.00 16-1314 Surface Treatment Repair Additional 1"Depth HMAC SY 1,000 $13.50 $13,500.00 16-1315 Subgrade Repair up to 4-6"Depth(lime stabilization 6%) SY 100 $31.00 $3,100.00 16-1316 Base Repair,Upper 2"Depth (Limestone) SY 1,700 $13.25 $22,525.00 16-1317 Base Repair,Additional 1"Depth(Limestone) SY 1,700 $8.50 $14,450.00 16-1318 Surface Treatment Repair Upper 2"HMAC SY 1,700 $23.50 $39,950.00 16-1319 Surface Treatment Repair Additional 1"Depth HMAC SY 1,700 $13.50 $22,950.00 1B-C1 New ADA Curb Ramp:Concrete Curb Ramps,meeting TDLR SF 400 requirements,complete in place $25.00 $10,000.00 1B-C2 Remove&Replace ADA curb ramp:Removal& SF 300 $25.00 $7,500.00 Replacement of ADA ramps not in compliance w/TDLR 1B-D1 Removal&Replacement of Curb&Gutter,complete in LF 1,000 $24.00 $24,000.00 place 1B-D2 Removal&Replacement of driveway approaches,complete SF 1,000 $12.00 $12,000.00 and in place 1B-D3 Removal&Replacement of Sidewalks SF 500 $11.00 $5,500.00 Storm Water Manhole Ring&Cover Adjustment,w/new 1B-D4 Manhole Ring and Cover Assembly w/new Concrete Height Each 2 $750.00 $1,500.00 Adjustment Rings&w/Concrete Collar,complete in place 1B-E1 Water Valve Box Adjustment w/Concrete Collar,complete Each 2 $250.00 $500.00 in place Sanitary Sewer Manhole Ring&Cover Adjustment, including New Manhole Ring&Cover Assembly w/new 113-F1 HDPE Height Adjustment Rings,Stainless Steel Inflow Each 2 $750.00 $1,500.00 Inhibitor and w/Concrete Collar,complete in place Total Base Bid Part 1A Items Amount(Sum of extended Amounts for each Base Bid A Line Item 1A-A1 through 1A-F1) $1,327,760.00 Total Base Bid Part 1B Items Amount(Sum of extended Amounts for each Base Bid B Line Item 113-A1 through 1B-F1) $485,725.00 C Total Base Bid Amount(A and B) $1,813,485.00 Contract Times D I Bidder agrees to reach Final Completion in 365 Days 00 30 02 COMPLIANCE TO STATE LAW ON NONRESIDENT BIDDERS Chapter 2252 of the Texas Government Code applies to the award of government contract to nonresident bidders. This law provides that: "a government entity may not award a governmental contract to a nonresident bidder unless the nonresident underbids the lower bid submitted by a responsible resident bidder by an amount that is not less than the amount by which a resident bidder would be required to underbid the nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located." "Nonresident bidder" refers to a person who is not a resident of Texas. "Resident bidder"refers to a person whose principal place of business is in this state, including a contractor whose ultimate parent company or majority owner has its principal place of business in this state. Check the statement that is correct for Bidder. O Bidder qualifies as a nonresident bidder whose principal place of business or residency is in the State of ® Bidder(includes parent company or majority owner)qualifies,as a resident bidder whose principal place of business is in the State of Texas. The Owner will use the information provided in the State of Texas Comptroller's annual publication of other states'laws on contracts to evaluate the Bids of nonresident Bidders. Bidder: Company Name: A,. i-tiz C'onstruction & Paying Inc,. (typed or printed) By: "wog . • , �, F pJ�/ (siinoturgl attach evidence of authority to sign) Name: Adriana Ortiz (typed or printed) Title: V _ Business address: C'or us Chrisj T , 7 4l 5 Phone: (361) 882-2122 Email: aortiz av sbc lobal.net SECTIONEND OF Compliance to State Law on Nonresident Bidders 00 30 02-1 [Insert Project Name and Number) 11-25-2013 00 30 06 City of Corpus Christi Disclosure of Interest SUPPLIER NUMBER "ro BE ASSIGNED B PURCHASING DIVISION C -of CITY OF CORPUS CHRISTI Com; DISCLOSURE OF INTEREST City of Corpus Christi Ordinance 17112,as amended,requires all persons or firms seeking,to do business with the Ci to provide the following information. Every question must be answered. If the question is not applicable, answer with "NA". See reverse side for Filing Requirements„ Certifications and definitions. COMPANY NAME: A. Ortiz Construction : 1' vil x In P.O.BOX: STREET ADDRESS: 102 Airport Rd, CITY: C orpus f hristi ZIP: mm- FIRM IS: I. Corporation 2. Partnership 3. Sole Owner ❑ 4. Association ® 5. Other ❑ If additional space is necessarDISCLOSURE QUESTIONS ry,pl use the reverse side of this age or attach separate sheet. 1. State the names of each employee" of the Ci of Corpus �hristi having an "ownership interest" constituting 3%or more of the ownership in thea ve named"firm." Narne Job Title and City Department(if known) 1 /, . 2. State the names of each `official' of the City of Corpus Christi having an "ownership interest" constituting 3%or more of the ownership in the above named"firm." Name Title N/A 3. State the names of each"board member"of the City of Corpus Christi having an"ownership interest" constituting 3%or more of the ownership in the above named"firm" Name N/A Board,Commission or Committee 4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi who worked on anmatter related to the subject of this contract and has an "ownership interest" constituting 3° or more of the ownership in the above named"firm." Name Consultant FILING REQUIREMENTS if a person who requests official action on a matter knows that the requested action will confer an economic benefit on any City official or employee that is distinguishable from the effect that the action will have on members of the public in general or a substantial segment thereof,you shall disclose that fact in a signed writing to the City official,emploee or,body that has been requested to act in the matter, unless the interest of the City official or empoyee in the matter is apparent. The disclosure shall also be made in a signed writing tiled with the.City Secretary. (Ethics Ordinance Section -344(d)) CERTIFICATION certify that all information provided is true and correct as of the date of this statement,that I have not knowingly withheld disclosure of any information requested; and that supplemental statements will be promptly submitted to the City of Corpus Christi,Texas as changes occur. Certifying Person: Adriana Ortiz Title: Vice- Presid Irl (Type or Print) /­,i Signature of Certifying I f Date: Person: DEFINITIONS a. "Board member." A member of any board, commission, or committee appointed by the City Council of the City of Corpus Christi,Texas. b. "Economic benefit'. An action that is likely to affect an economic interest if it is likely to have an effect on that interest that is distinguishable from its effect on members of the public in general or a substantial segment thereof. c. "Employee." Any person employed by the City of Corpus Christi, Texas either on a full or part- time basis,but not as an independent contractor. d. "Firm." Any entity operated for economic gain,whether professional,industrial or commercial,and whether established to produce or deal with a product or service, including but not limited to,entities operated in the form of sole proprietorship, as self-employed person, partnership, corporation,joint stock company,joint venture, receivership or trust, and entities which for purposes of taxation are treated as non-profit organizations. e. "Official." The Mayor, members of the City Council, City Manager, Deputy City Manager, Assistant City Managers, Department and Division Heads,and Municipal Court Judges of the City of Corpus Christi,Texas. f. "Ownership Interest" Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent, trust, estate, or holding entity. "Constructively held" refers to holdings or control established through voting trusts, proxies, or special terms of venture or partnership agreements." g. "Consultant."Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the purpose of professional consultation and recommendation. 00 30 06 NON-COLLUSION CERTIFICATION STATE OF TEXAS COUNTY OF NUECES OWNER: City of Corpus Christi,Texas 1201 Leopard Street Corpus Christi,Texas 78401 CONTRACT: Insert Project Name Insert Project Number Bidder certifies that the it has not been a party to any collusion among Bidders in the restraint of freedom of competition by agreement to submit a Bid at a fixed price or to refrain from bidding;or with any official or employee of the Owner as to quantity,quality,or price in the prospective contract,or any other terms of said prospective contract;or in any discussion between Bidders and any official of the Owner concerning exchange of money or other thing of value for special consideration in the letting of a contract. Company Name: A. Ortiz Construction&Paving Inc. (typed or printed) a (signature--attach evidence of authority to sign) Name: Adriana Ortiz (typed or printed) Title: Vice- President Business address: 102 Ai ort Rd. CoD2us,Qhristi, TX 78405 Phone: (361 8m82m-2122 Email. _ �:r��iarr,� lc )oha ).net END OF SECTION Non-Collusion Certification 00 30 06-1 [Insert Project Name and Number) 11-25-2013 Corporations Section ��g 0 Carlos Cascos P.O.Box 13697 �,�� �tt) Secretary of State Austin,Texas 78711-3697 `X Office of the Secretary of State Certificate of Fact The undersigned, as Secretary of State of Texas, does hereby certify that according to the most recent information in the records of this office the following persons are listed as managerial officials for A. ORTIZ CONSTRUCTION& PAVING, INC, a Domestic For-Profit Corporation, file number 60607100. RAUL ORTIZ 102 Airport Road President Corpus Christi Tx - 78405 3205 RAUL ORTIZ 102 Airport Road Director Corpus Christi Tx - 78405 3205 RAUL ORTIZ 102 Airport Road Treasurer Corpus Christi Tx - 78405 3205 ADRIANA ORTIZ 102 Airport Road Vice-President Corpus Christi Tx - 78405 3205 ADRIANA ORTIZ 102 Airport Road Director Corpus Christi Tx - 78405 3205 In testimony whereof, I have hereunto signed my name officially and caused to be impressed hereon the Seal of State at my office in Austin, Texas on March 20, 2015. Come visit us on the internetathttp://Www.sos.state.tx.usl Phone: (512)463-5555 Fax: (512)463-5709 Dial: 7-1-1 for Relay Services Prepared by: SOS-WEB TID: 10251 Document: 597250490003 Corporations Section ��g 0 Carlos Cascos P.O.Box 13697 �,�� �tt) Secretary of State Austin,Texas 78711-3697 `X Office of the Secretary of State I , �.' Carlos Cascos Secretary of State Come visit us on the internetathttp://Www.sos.state.tx.usl Phone: (512)463-5555 Fax: (512)463-5709 Dial: 7-1-1 for Relay Services Prepared by: SOS-WEB TID: 10251 Document: 597250490003 00 52 23 AGREEMENT This Agreement, for the Project Contract Renewal approved on July 10, 2017 is between the City of Corpus Christi (Owner) and A.Ortiz Construction and Paving, Inc. (Contractor). Owner and Contractor agree as follows: ARTICLE 1—WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as: CONTRACT RENEWAL#1 IDIQ MINOR STREET IMPROVEMENTS FY17-PART 1 (Ref E16252/E16253) PROJECT NO. E17048 ARTICLE 2—DESIGNER AND OWNER'S AUTHORIZED REPRESENTATIVE 2.01 The Project has been designed by: ECMS, LLC Felix H. Ocanas,Jr., P.E. 5001 Oakmont Drive Corpus Christi TX 78413 2.02 The Owner's Authorized Representative for this Project is: Ernesto De La Garza, P.E.—Construction Management Engineer City of Corpus Christi—Engineering Services 4917 Holly Rd.,#5 Corpus Christi TX 78411 ARTICLE 3—CONTRACT TIMES 3.01 Contract Times A. The Work is required to be completed within 365 days after the date when the Contract Times commence to run as provided in the Notice to Proceed and is to be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 365 days after the date when the Contract Times commence to run. B. Milestones, and the dates for completion of each, are as defined in SECTION 0135 00 SPECIAL PROCEDURES. (NOT USED) 3.02 Liquidated Damages A. Owner and Contractor recognize that time limits for specified Milestones, Substantial Completion, and completion and readiness for Final Payment as stated in the Contract Documents are of the essence of the Contract. Owner and Contractor recognize that the Agreement—Contract Renewal#1 005223- 1 IDIQ Minor Street Improvements Project E17048(Ref E16252, E16253) Rev 01-13-2016 Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 3.01 and as adjusted in accordance with Paragraph 11.05 of the General Conditions. Owner and Contractor also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty): 1. Substantial Completion: Contractor shall pay Owner$500 for each day that expires after the time specified in Paragraph 3.01 for Substantial Completion until the Work is substantially complete. 2. Completion of the Remaining Work: Contractor agrees to pay Owner$500 for each day that expires after the time specified in Paragraph 3.01 for completion and readiness for final payment until the Work is completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions. 3. Liquidated damages for failing to timely attain Substantial Completion and Final Completion are not additive and will not be imposed concurrently. 4. Milestones: Contractor agrees to pay Owner liquidated damages as stipulated in SECTION 0135 00 SPECIAL PROCEDURES for failure to meet Milestone completions. 5. The Owner will determine whether the Work has been completed within the Contract Times. B. Owner is not required to only assess liquidated damages, and Owner may elect to pursue its actual damages resulting from the failure of Contractor to complete the Work in accordance with the requirements of the Contract Documents. ARTICLE 4—CONTRACT PRICE 4.01 Owner will pay Contractor for completion of the Work in accordance with the Contract Documents at the unit prices shown in the attached BID FORM. Unit prices have been computed in accordance with Paragraph 13.03 of the General Conditions. Contractor acknowledges that estimated quantities are not guaranteed, and were solely for the purpose of comparing Bids, and final payment for all unit price items will be based on actual quantities, determined as provided in the Contract Documents. Contract Renewal Price $ 1,813,485.00 ARTICLE 5—PAYMENT PROCEDURES 5.01 Submit Applications for Payment in accordance with Article 15 of the General Conditions. Applications for Payment will be processed by the OAR as provided in the General Conditions. 5.02 Progress Payments; Retainage: A. The Owner will make progress payments on or about the 25th day of each month during performance of the Work. Payment is based on Work completed in accordance with the Schedule of Values established as provided in the General Conditions. Agreement—Contract Renewal#1 005223-2 IDIQ Minor Street Improvements Project E17048(Ref E16252, E16253) Rev 01-13-2016 B. Progress payments equal to 95 percent of the total earned value to date for completed Work and properly stored materials will be made prior to Substantial Completion. The balance will be held as retainage. C. Payment will be made for the amount determined per Paragraph 5.02.13, less the total of payments previously made and less set-offs determined in accordance with Paragraph 15.01 of the General Conditions. D. At the Owner's option, retainage may be required at a higher percentage rate if progress on the Project is considered to be unsatisfactory. If retainage in excess of the amount described above is held prior to Substantial Completion, the Owner will place the additional amount in an interest bearing account. Interest will be paid in accordance with Paragraph 6.01. E. At the Owner's option, Owner may pay Contractor 100 percent of the Work completed, less amounts withheld in accordance with Paragraph 15.01 of the General Conditions and less 200 percent of OAR's estimate of the value of Work to be completed or corrected to reach Substantial Completion. Owner may, at its sole discretion, elect to hold retainage in the amounts set forth above for progress payments prior to Substantial Completion if Owner has concerns with the ability of the Contractor to complete the remaining Work in accordance with the Contract Documents or within the time frame established by this Agreement. Release or reduction in retainage is contingent upon and consent of surety to the reduction in retainage. 5.03 Owner will pay the remainder of the Contract Price as recommended by OAR in accordance with Paragraph 15.06 of the General Conditions upon Final Completion and acceptance of the Work. ARTICLE 6—INTEREST ON OVERDUE PAYMENTS AND RETAINAGE 6.01 The Owner is not obligated to pay interest on overdue payments except as required by Texas Government Code Chapter 2251. 6.02 The Owner is not obligated to pay interest on moneys not paid except as provided in Texas Government Code Chapter 2252. ARTICLE 7—CONTRACTOR'S REPRESENTATIONS 7.01 The Contractor makes the following representations: A. The Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. B. The Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. The Contractor is familiar with Laws and Regulations that may affect cost, progress, and performance of the Work. D. The Contractor has carefully studied the following Site-related reports and drawings as identified in the Supplementary Conditions: 1. Geotechnical Data Reports regarding subsurface conditions at or adjacent to the Site; Agreement—Contract Renewal#1 005223-3 IDIQ Minor Street Improvements Project E17048(Ref E16252, E16253) Rev 01-13-2016 2. Drawings of physical conditions relating to existing surface or subsurface structures at the Site; 3. Underground Facilities referenced in reports and drawings; 4. Reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site; and 5. Technical Data related to each of these reports and drawings. E. The Contractor has considered the: 1. Information known to Contractor; 2. Information commonly known to contractors doing business in the locality of the Site; 3. Information and observations obtained from visits to the Site; and 4. The Contract Documents. F. The Contractor has considered the items identified in Paragraphs 7.01.D and 7.01.E with respect to the effect of such information, observations, and documents on: 1. The cost, progress, and performance of the Work; 2. The means, methods,techniques, sequences, and procedures of construction to be employed by Contractor; and 3. Contractor's safety precautions and programs. G. Based on the information and observations referred to in the preceding paragraphs, Contractor agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. H. The Contractor is aware of the general nature of Work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. I. The Contractor has correlated the information known to the Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations,tests, studies, and data with the Contract Documents. J. The Contractor has given the OAR written notice of all conflicts, errors, ambiguities, or discrepancies that the Contractor has discovered in the Contract Documents, and the written resolution provided by the OAR is acceptable to the Contractor. K. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. L. Contractor's entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. Agreement—Contract Renewal#1 005223-4 IDIQ Minor Street Improvements Project E17048(Ref E16252, E16253) Rev 01-13-2016 ARTICLE 8—ACCOUNTING RECORDS 8.01 Accounting Record Availability: The Contractor shall keep such full and detailed accounts of materials incorporated and labor and equipment utilized for the Work consistent with the requirements of Paragraph 13.01 of the General Conditions and as may be necessary for proper financial management under this Agreement. Subject to prior written notice, the Owner shall be afforded reasonable access during normal business hours to all of the Contractor's records, books, correspondence, instructions, drawings, receipts, vouchers, memoranda, and similar data relating to the Cost of the Work and the Contractor's fee. The Contractor shall preserve all such documents for a period of 3 years after the final payment by the Owner. ARTICLE 9—CONTRACT DOCUMENTS 9.01 Contents: A. The Contract Documents consist of the following: 1. Specifications, forms, and documents listed in SECTION 00 0100 TABLE OF CONTENTS. 2. Drawings listed in the Sheet Index. 3. Addenda. 4. Exhibits to this Agreement: a. Contractor's Bid Form. 5. Documentation required by the Contract Documents and submitted by Contractor prior to Notice of Award. B. There are no Contract Documents other than those listed above in this Article. C. The Contract Documents may only be amended, modified, or supplemented as provided in Article 11 of the General Conditions. ARTICLE 10—CONTRACT DOCUMENT SIGNATURES One original of the signed Agreement will be required. The sequence of signatures will be completed in the following order: A. CONTRACTOR—Agreement must be signed by a person authorized to bind the firm or company. If Contractor is a Corporation, agreements must be Attested; B. ASSISTANT CITY ATTORNEY for the City; C. DIRECTOR OF ENGINEERING SERVICES; D. CITY SECRETARY for the City Agreement—Contract Renewal#1 005223-5 IDIQ Minor Street Improvements Project E17048(Ref E16252, E16253) Rev 01-13-2016 ATTEST CITY OF CORPUS CHRISTI Digt IN i9 tl JeR Etl ontls � reeecran�cnexas mm c us Dm J fiEtl tls _ Engn 9, c0USl,(( Dlj2017D8D1c82626 0500 Rebecca Huerta J.H. Edmonds, P.E. City Secretary Director of Engineering Services APPROVED AS TO LEGAL FORM: N/A AUTHORIZED Aimee Alcorn-Reed BY COUNCIL 2017.07.31 17:15:49-05'00' Assistant City Attorney ATTEST(IF CORPORATION) CONTRACTOR Matthew MCgIOOnI Digitally signed by Matthew McBroom IVB Date:2017.07.2509:38:09-05'00' A.Ortlz Construction and Paving, Inc. Digitlly sned by Raul (Seal Below) By: Raul Ortiz l IZ Datea2017.07 25 09 35 rtiz 507 05'00' Note: Attach copy of authorization to sign if Title: President person signing for CONTRACTOR is not President, Vice President, Chief Executive Officer, or Chief 102 Airport Rd. Financial Officer Address Corpus Christi, Texas 78405 City State Zip 361/882-2122 Phone Fax aortizpav@sbcglobal.net EMail END OF SECTION Agreement—Contract Renewal#1 005223-6 IDIQ Minor Street Improvements Project E17048(Ref E16252, E16253) Rev 01-13-2016 CERTIFICATE OF INTERESTED PARTIES FORM 1295 1 of 1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2017-240823 A.Ortiz Construction&Paving Inc. Corpus Christi,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 07/25/2017 being filed. City of Corpus Christi Date Acknowledged: Ai.-AlcortrReed 2017.0731 17:15:35-05'00' 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. E17048 IDIQ Minor Street Improvements Nature of interest 4 Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary Ortiz,Adriana Corpus Christi,TX United States X Ortiz , Raul Corpus Christi,TX United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT � I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. AMANDA S MCBROOM Notary Public,State of Texas 4 My Commission Expires tom• July 17,2018 A, p .. Signature of au t sized agent of contracting business entity AFFIX NOTARY STAMP/SEAL ABOVEU1121&Itl Sworn to and subscribed before me,by the said - _ ,this the w 1 h day of 20 17 to certify which,witness my hand and seal of office. Signature of officer adminust 'ing oath Printed name of officer administering oath Title of offic4i administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.883 AC RCJ D CERTIFICATE OF LIABILITY INSURANCE DATE (MMIDD/YYYY) 7/25/2017 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER NAME CT Renee Terrell Higginbotham Insurance Agency, Inc. dba Swantner & Gordon Insurance Agency, LLC PO Box 870 Corpus Christi TX 78403-0870 PHONE 361-561-4237 (A/C Na Frt)• F" 361-844-0101 INC Nol: E-MAIL rterrell@higginbotharn.net 9DBRFss• L INSURER($) AFFORDING COVERAGE NAIC INSURER A:Republic Underwriters Ins Co 24538 INSURED A. Ortiz Construction & Paving, Inc. 102 Airport Road Corpus Christi TX 78405 ORTIZ1 INSURERBTexas Mutual Insurance Company wsuRER c:Ohio Security Insurance Company INSURER D :Endurance American Specialty Ins Co INSURER E : INSURER F 22945 24082 41718 -1850600191 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR. TYPE OF INSURANCE Ab01 INSD SUER' WVD l POLICY NUMBER POLICY EFF POLICY EXP (MM/DD/YYYY) (MMIDDIYYYY) LIMITS A X COMMERCIAL GENERAL LIABILITY CMP564824810 10/29/2016 10/29/2017 EACH OCCURRENCE $1,000.000 CLAIMS -MADE X OCCUR NTED PREM EaorcurTencel $100.000 MED EXP (Any one person) $5,000 PERSONAL & ADV INJURY , $1,000,000 GE 'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2,000,000 POLICY X JECT LOC PRODUCTS - COMP/OP AGG $2,000,000 OTHER: $ C AUTOMOBILE LIABILITY BAS1757462504 10/29/2016 10/29/2017 {Eaaccide[rsl`■ rI $1,000,000 X ANY AUTO BODILY INJURY (Per person) $ OWNED AUTOS ONLY SCHEDULED AUTOS BODILY INJURY (Per accident) $ ^ HIRED AUTOS ONLY X NON -OWNED AUTOS ONLY PR+PERTY sAMAGE (Per accident $ --1 $ D UMBRELLA LIAB OCCUR EXC10005850802 10/29/2016 10/29/2017 EACH OCCURRENCE $2,000,000 X EXCESS LIAB CLAIMS -MADE AGGREGATE $2,000,000 DED I I RETENTION $ $ B WORKERS COMPENSATION AND EMPLOYERS' UABILITY ANY PROPRIETOR/PARTNER/EXECUTIVEN OFFICER/MEMBER EXCLUDED? (Mandatory in NH) If yes, describe under DESCRIPTION OF OPERATIONS below Y / N N / A 0001185671 10/29/2016 10/29/2017 r X STATUTE ER - E.L EACH ACCIDENT $1,000,000 E L DISEASE - EA EMPLOYE $1,000,000 E L DISEASE - POLICY LIMIT $1,000,000 A Equipment Floater CMP564824810 10/29/2016 10/29/2017 Leased & Rented Equip $100,000 1 DESCRIPTION OF OPERATIONS I LOCATIONS ( VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) See Attached... CERTIFICATE HOLDER CANCELLATION City of Corpus Christi 1201 Leopard Street Corpus Christi TX 78469 I SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD AC0 AGENCY CUSTOMER ID: ORTIZ1 LOC #: ADDITIONAL REMARKS SCHEDULE Page 1 of 1 AGENCY Higginbotham Insurance Agency, Inc. NAMED INSURED A. Ortiz Construction & Paving, Inc. 102 Airport Road Corpus Christi TX 78405 POLICY NUMBER CARRIER NAIC CODE EFFECTIVE DATE: ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: 25 FORM TITLE: CERTIFICATE OF LIABILITY INSURANCE General Liability policy includes a blanket automatic waiver of subrogation endorsement that provides this feature only when there is a written contract between the insured and certificate holder that requires it. (Republic Plus+ General Liability Enhancement Endorsement - Form CGRO29 08/14). General Liability policy includes a blanket additional insured endorsement that provides additional insured status to the certificate holder only when there is a written contract between the named insured and the certificate holder that requires such status. (Republic Plus+ General Liability Enhancement Endorsement - Form CGRO29 08/14). General Liability policy includes a primary & non-contributory provision only when there is a written contract between the insured and certificate holder that requires such provision. (Republic Plus+ General Liability Enhancement Endorsement - Form CGRO29 08/14). Auto Liability policy includes a blanket automatic waiver of subrogation endorsement that provides this feature only when there is a written contract between the insured and certificate holder that requires it. (Business Auto Enhancement Endorsement - Form CA 88 10 01/10). Auto Liability policy includes a blanket automatic additional insured endorsement that provides additional insured status to the certificate holder only when there is a written contract between the insured and certificate holder that requires such status. (Business Auto Enhancement Endorsement - Form CA 88 10 01/10). Auto Liability policy includes Pollution Liability - Broadened Coverage for Coverage Autos - Form CA 9948 03/06 and MCS -90 Motor Carrier Policies of Insurance for Public Liability. Workers Compensation policy includes a blanket automatic waiver of subrogation endorsement that provides this feature only when there is a written contract between the named insured and the certificate holder that requires it. (Texas Waiver of our Right to Recover From Others Endorsement - Form WC420304B 06/14). Excess Liability policy follows form of the underlying policies per Excess Liability Coverage Follow Form - Form EXL0203 08/13. General Liability policy includes 30 Day Notice of cancellation to Certificate Holder except 10 day notice for nonpayment of premium as specified. (Texas Changes -Amendment of Cancellation Provisions or Coverage Change - Form CG 02 05 12/04). Auto Liability policy includes 30 Day Notice of cancellation to Certificate Holder except 10 day notice for nonpayment of premium as specified. (Amendment of Cancellation Provisions — Form CA8860 07/12). Workers Compensation policy includes 30 Day Notice of cancellation to Certificate Holder except 10 day notice for nonpayment of premium as specified. (Texas Notice of Material Change — Form WC42 0601 01/94). Project: Contract Renewal #1 IDIQ Minor Street Improvements FY 17 — Part 1 (Ref E16252/E16253) Project No. E17048 ACORD 101 (2008/01) © 2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD A. Ortiz Construction & Paving, Inc. Policy # CMP564824810 COMMERCIAL GENERAL LIABILITY CG R029 08 14 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. REPUBLIC PLUS+ GENERAL LIABILITY ENHANCEMENT ENDORSEMENT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE FORM A. SECTION I- COVERAGES 1. COVERAGE A - BODILY INJURY AND PROPERTY DAMAGE LIABILITY a. Exclusions 1. Exclusion 2.a. Expected Or Intended Injury is deleted in its entirety and re- placed by: a. Expected Or Intended Injury "Bodily injury" or "property damage" expected or intended from the standpoint of the insured. This ex- clusion does not apply to "bodily in- jury" or "property damage" resulting from the use of reasonable force to protect persons or property. 2. Exclusion 2.g. Aircraft, Auto Or Wa- tercraft, (2) is deleted in its entirety and replaced by: (2) A watercraft you do not own that is: (a) Less than 51 feet long; and (b) Not being used to carry persons or property for a charge; 3. Fire, Lightning, Explosion and Sprin- kler Leakage If Damage To Premises Rented To You is not excluded under the policy the following applies: a. The last subparagraph of paragraph 2. Exclusions of SECTION I — COVERAGES, COVERAGE A BODILY INJURY AND PROPERTY DAMAGE is deleted in its entirety and replaced by: Exclusions c. through n. do not ap- ply to damage by fire, lightning, ex- plosion or "sprinkler leakage" to premises while rented to you or CG R029 08 14 temporarily occupied by you with the permission of the owner. A separate limit of insurance applies to this coverage as described in SECTION III — LIMITS OF INSURANCE. b. Paragraph 6. of SECTION III — LIM- ITS OF INSURANCE is deleted in its entirety and replaced by: 6. Subject to Paragraph 5. above, the Damage To Premises Rented To You Limit is the most we will pay under Coverage Afor dam- ages because of "property dam- age' to any one premises, while rented to you or temporarily oc- cupied by you with permission of the owner, arising out of damage by fire, lightning, explosion or "sprinkler leakage". c. Subject to all the terms of SECTION Ill — LIMITS OF INSURANCE, the Damage To Premises Rented To You Limit is the greater of: (I). $300,000; or (II). The amount shown in the Declarations for Damage To Premises Rented To You Limit d. Paragraph 4.b.(1)(il) of SECTION IV — COMMERCIAL GENERAL LI- ABILITY CONDITIONS is deleted in its entirety and replaced by: (ii) That is Fire, Lightning, Explo- sion, "Sprinkler Leakage' or any similar insurance cover- age for premises rented to you or temporarily occupied by you with permission of the owner, Includes copyrighted material of Insurance Services Office, Inc., Page 1 of 6 with its permission 2. COVERAGE C - MEDICAL PAYMENTS Insuring Agreement a. Paragraph 1.a.(3)(b), is deleted in its entire- ty and replaced by: (b) The expenses are incurred and reported to us within two years of the date of the accident; and b. This provision does not apply when SECTION I - COVERAGE C. MEDICAL PAYMENTS is otherwise excluded from this Coverage Part. 3.SUPPLEMENTARY PAYMENTS -COVERAGES AAND B Paragraph 1.b. is deleted in its entirety and replaced by: b. Up to $2,500 for cost of bail bonds required because of accidents or traffic law violations arising out of the use of any vehicle to which the Bodily Injury Liability Coverage applies. We do not have to furnish these bonds. B. AGGREGATE PER LOCATION This Coverage Extension does not apply if CG 25 03 DESIGNATED CONSTRUCTION PRO- JECT(S) GENERAL AGGREGATE LIMIT or CG 25 04 DESIGNATED LOCATION(S) GENERAL AGGREGATE LIMIT are attached to this policy. The limits shown in the Declarations for Each Occurrence, Damage To Premises Rented To You, Medical Expense and General Aggregate apply per "location" or construction project. 1. For all sums which the insured becomes legally obligated to pay as damages caused by "occurrences" under SECTION I - COVERAGES, COVERAGE A BODILY INJURY AND PROPERTY DAMAGE, and for all medical expenses caused by accidents under SECTION I- COVERAGES, COVERAGE C - MEDICAL PAYMENTS , which can be attributed only to ongoing operations at a "location" or single construc- tion project: a. The most we will pay will be capped at $5,000,000, regardless of the number of: (1) "Occurrences"; (2) Insureds; (3) Claims made or "suits" brought; (4) Persons or organizations making claims or bringing "suits"; Page 2 of 6 (5) Locations; or (6) Construction projects. b. Subject to B.1.a. above: (1) The General Aggregate Limit shown in the Declarations applies sepa- rately to each "location" or con- struction project. (2) Any payments made under SEC- TION I- COVERAGES, COVER- AGE A- BODILY INJURY AND PROPERTY DAMAGE for damages or under SECTION (- COVERAGES, COVERAGE C - MEDICAL PAYMENTS for medical expenses shall reduce the General Aggregate Limit for that "location" or construction project. Such payments shall not reduce the General Aggre- gate Limit for any other "location" or construction project. The limits shown in the Declarations for Each Occurrence, Damage To Premises Rented To You and Medi- cal Expense continue to apply to each "location" or construction pro- ject, subject to the General Aggre- gate Limit. 2. For all sums which the insured becomes legally obligated to pay as damages caused by "occurrences" under SECTION I- COV- ERAGES, COVERAGE A -BODILY INJURY AND PROPERTY DAMAGE LIABILITY, and for all medical expenses caused by accidents under SECTION I- COVERAGES, COVERAGE C - MEDICAL PAYMENTS, which cannot be attributed only to a "loca- tion" or ongoing operations at a single con- struction project, any payments made under COVERAGE A for damages or under COV- ERAGE C for medical expenses shall reduce the amount available under the General Aggregate Limit or the Products - Completed Operations Aggregate Limit, whichever is applicable. This reduction is not applicable to any identifiable "location" or identifiable construction project. 3. When coverage for liability arising out of the "products -completed operations hazard" is provided, any payments for damages be- cause of "bodily injury" or "property damage" included in the "products -completed opera- tions hazard" will reduce the Products - Completed Operations Aggregate Limit, and not reduce the General Aggregate Limit. (3) Includes copyrighted material of Insurance Services Office, Inc., CG R029 08 14 with its permission 4. If a construction project has been aban- doned, delayed, or abandoned and then re- started, or if the authorized contracting par- ties deviate from plans, blueprints, designs, specifications or timetables, the project will still be deemed to be the same construction project. C. SECTION II- WHO IS AN INSURED 1. Newly Acquired Or Formed Organization Paragraph 3. a. is deleted in its entirety and re- placed by: a. Coverage under this provision is afforded only until the 180th day after you acquire or form the organization or the end of the policy period, whichever is earlier, 2. Additional insureds a. Owners, Managers, Contractors And Lessors Of Equipment Who Is An Insured is amended to include as an additional insured any person or or- ganization, other than a controlling interest or vendors, you are required by written agreement or written contract or permit to include as an additional insured, but only with respect to liability for "bodily injury", "property damage" or "personal and adver- tising injury" caused, in whole or in part, by: (1) Your acts or omissions in the perfor- mance of your ongoing operations for the additional insured; or (2) The acts or omissions of those acting on your behalf in the performance of your ongoing operations for the addi- tional insured; or (3) Maintenance or use of equipment leased or rented from such additional in- sured(s); or (4) Maintenance or use of that part of any premises leased or rented to you; or (5) Maintenance or use of that part of any premises owned by you; or (6) Maintenance or use of any premises owned by you but leased or rented to others. b. Controlling Interest (1) Who Is An Insured is amended to include as an additional insured any person(s) or organization(s) with a controlling interest in the Named Insured, but only with respect to their CG R029 08 14 liability arising out of: (a) Their financial control of the Named Insured; or (b) Premises they own, maintain or control while the Named Insured leases or occupies these premises. This insurance does not apply to structural alterations, new construction or demolition operations performed by or for such addi- tional insured. However: (a) The insurance afforded to such addi- tional insured only applies to the extent permitted by law; and (b) If coverage provided to the addi- tional insured is required by a con- tract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such addi- tional insured. c. Vendors (1) Who Is An Insured is amended to include as an additional insured any per- son or organization (referred to below as vendor) with whom you agreed under a written contract or written agreement to provide insurance, but only with respect to "bodily injury" or "property damage" arising out of "your products" which are distributed or sold in the regular course of the vendors business. However: (a) The insurance afforded to such vendor only applies to the extent permitted by law; and (b) If coverage provided to the vendor is required by a contract or agreement, the insurance afforded to such vendor will not be broader than that which you are required by the contract or agreement to provide to such vendor. (2) With respect to the insurance afforded to these vendors, the following addi- tional exclusions apply: The insurance afforded the vendor does not apply to: (a) "Bodily injury" or "property damage" Includes copyrighted material of Insurance Services Office, Inc., Page 3 of 6 with its permission for which the vendor is obligated to pay damages by reason of the as- sumption of liability in a contract or agreement. This exclusion does not apply to liability for damages that the vendor would have in the ab- sence of the contract or agreement; (b) Any express warranty unauthorized by you; (c) Any physical or chemical change in the product made intentionally by the vendor, (d) Repackaging, except when unpacked solely for the purpose of inspection, demonstration, testing or the substitution of parts under instruction from the manufacturer, and then repackaged in the original container (e) Any failure to make such inspection, adjustments, tests or servicing as the vendor has agreed to make or normally undertakes to make in the usual course of business in connec- tion with the distribution of the products; (f) Demonstration, installation, servic- ing or repair operations, except such operations performed at the vendor's premises in connection with the sale of the product; or (g) Products which, after distribution or sale by you, have been labeled or relabeled or used as a container, part or ingredient of any other thing or substance by or for the vendor; or (h) "Bodily injury" or "property damage" arising out of the sole negligence of the vendor for its own acts or omis- sions or those of its employees or anyone else acting on its behalf. However, this exclusion does not apply to: (i). The exceptions contained in sub- paragraphs 2.c.(2)(d) or 2.c.(2)(f) of this Coverage Ex- tension; or (ii). Such inspections, adjustments, tests or servicing as the vendor has agreed to make or normally undertakes to make in the usual course of business, in connec- tion with the distribution or sale of the products. (I) Any person or organization from whom you have acquired any prod- ucts, including any ingredient, part or container entering into, accompany- ing or containing 'jour products". 3. Exclusions applicable to all Additional In- sureds: a. This insurance does not apply to "bodily injury", "property damage" or "personal and advertising injury" arising out of the render- ing of or the failure to render any profess- sional services by you or on your behalf but only with respect to any of the following operations: (1) The preparing, providing, approving, or failing to prepare, provide or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or (2) Providing, or hiring independent profes- sionals to provide, engineering, archi- tectural or surveying services in con- nection with construction work you perform. (3) Supervisory, inspection, architectural or engineering activities. Professional services do not include ser- vices within construction means, methods, techniques, sequences and procedures employed by you in connection with your operations in your capacity as a construc- tion contractor. b. This insurance does not apply to "bodily injury", "property damage" or "personal and advertising injury" not caused, in whole or in part, by you or by those acting on your behalf. c. This endorsement does not apply to any rail- road named as an additional insured whether by agreement, contract or permit. d. This insurance does not apply to "bodily injury or "property damage" occurring after leased or rented equipment is returned to the lessor. e. This insurance does not apply to "bodily injury" or "property damage" occurring after: (1) All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the addi- tional insured(s) has been completed; or (2) That portion of "your work" out of which Page 4 of 6 Includes copyrighted material of Insurance Services Office, Inc., CG R029 08 14 with its permission the injury or damage arises has been put to its intended use by any person or organization other than another contrac- tor or subcontractor engaged in per- forming operations for a principal as a part of the same project. f. This insurance does not apply to any "occur- rence" which takes place after you cease to be a tenant in any premises for which any- one has been included as an additional in- sured. g. This insurance does not apply to structural alterations, new construction or demolition operations performed by or on behalf of the additional insured at any premises in which you are a tenant, unless you are performing such operations and are required by written contract or agreement to include the premis- es' owner or manager as an additional in- sured. h. This insurance does not apply to "bodily injury" or "property damage" arising out of the "products — completed operations hazard". This exclusion does not apply to "bodily inju- ry" or "property damage" arising out of "your products" which are distributed or sold in the regular course of the vendor's business, as provided under subparagraph c. Vendors of paragraph 2. Additional Insureds. i. "Bodily injury" or "property damage" occur- ring before the signing of the contract or agreement, or the issuance of the permit, requiring the person or organization to be added as an additional insured. D. SECTION IV- COMMERCIAL GENERAL LIABIL- ITY CONDITIONS 1. Duties in The Event Of Occurrence, Offense, Claim Or Sult Paragraph 2.a. Duties In The Event Of Occurrence, Offense, Claim Or Suit is deleted in its entirety and replaced by: a. You must see to it that we are notified as soon as practicable of an "occur- rence" or an offense which may result in a claim. Knowledge of an "occurrence" or an offense by your "employees" shall not, in itself, constitute knowledge to you unless you, your partners, "executive officers", directors, insurance manager or risk manager shall have actually received notice. To the extent possible, notice CG R029 08 14 should include: (1) How, when and where the "occur- rence" or offense took place; (2) The names and addresses of any injured persons and witnesses; and (3) The nature and location of any inju- ry or damage arising out of the "oc- currence" or offense. 2. Representations The following is added to paragraph 6. Repre- sentations: If you should unintentionally fail to disclose all existing hazards at the inception date of this policy, we will not deny coverage under this policy solely because of such failure. This provision does not affect our right to collect additional premium or to exercise our right of cancellation or non -renewal. 3. Transfer Of Rights Of Recovery Against Others To Us (Waiver of Subrogation) The following is added to this clause: If a written agreement, written contract or per- mit requires that you waive any right of recov- ery against any person or organization we also waive any right of recovery we may have against that person or organization because of payments we make for injury or damage aris- ing out of "your work" for that person or organi- zation. 4. The following are added to SECTION IV - COMMERCIAL GENERAL LIABILITY CONDITIONS: a. Primary insurance — Non Contributing When required in writing by an agreement, contract or permit with any additional in- sured, the insurance afforded to such addi- tional insured is primary. Other insurance listing such additional insured as a named insured in the declarations will apply as ex- cess and not contribute as primary to the insurance afforded by this endorsement. b. Any agreement, contract, lease or permit requiring: (1) You to include any person or organiza- tion as an additional insured; or (2) You to waive your rights of recovery against any person or organization; or (3) That this insurance be primary; Includes copyrighted material of Insurance Services Office, Inc., Page 5 of 6 with its permission must be signed prior to an "occurrence" or offense. 5. The following Condition is added: Liberalization If we revise this Coverage Part to provide more coverage without additional premium charge, your policy will automatically provide the additional coverage as of the day the revi- sion is effective in your state. E. SECTION V — DEFINITIONS 1. Paragraph 9. a. "Insured contract" is deleted in its entirety and replaced by: a. A contract for a lease of premises. However, that portion of the contract for a lease of premises that indemnifies any person or organization for damage by fire, lightning, explosion or "sprinkler leakage" to premises while rented to you or temporarily occupied by you with permission of the owner is not an "insured contract"; 2. The following definitions are added: a. "Location" means premises involving the same or connecting lots, or premises whose connection is interrupted only by a street, roadway, waterway or right-of-way of a rail- road. b. "Sprinkler Leakage" means the accidental leakage or discharge of any fire extinguish- ing or fire suppression substance from an automatic sprinkler system or other auto- matic fire extinguishing system or automatic fire suppression system. It does not include the discharge of any automatic sprinkler or automatic fire extinguishing system or fire suppression system that discharges in response to a fire. Page 6 of 6 Includes copyrighted material of Insurance Services Office, Inc., CG R029 08 14 with its permission COMMERCIAL AUTO CA 88 10 01 10 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BUSINESS AUTO COVERAGE ENHANCEMENT ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM With respect to coverage afforded by this endorsement, the provisions of the policy apply unless modified by the endorsement. COVERAGE INDEX A SUBJECT PROVISION NUMBER ADDITIONAL INSURED BY CONTRACT, AGREEMENT OR PERMIT 3 - ACCIDENTAL AIRBAG DEPLOYMENT 12 AMENDED DUTIES IN THE EVENT OF ACCIDENT, CLAIM, SUIT OR LOSS 18 AMENDED FELLOW EMPLOYEE EXCLUSION 5 AUDIO, VISUAL AND DATA ELECTRONIC EQUIPMENT COVERAGE 13 Q T— BROAD FORM INSURED 1 - BODILY INJURY REDEFINED 21 EMPLOYEES AS INSUREDS (including employee hired auto) 2 EXTENDED CANCELLATION CONDITION 22 EXTRA EXPENSE -BROADENED COVERAGE 10 GLASS REPAIR - WAIVER OF DEDUCTIBLE 15 HIRED AUTO PHYSICAL DAMAGE(including employee hired auto) 6 HIRED AUTO COVERAGE TERRITORY 20 LOAN / LEASE GAP 14 PARKED AUTO COLLISION COVERAGE (WAIVER OF DEDUCTIBLE) 16 PERSONAL EFFECTS COVERAGE 11 PHYSICAL DAMAGE - ADDITIONAL TRANSPORTATION EXPENSE COVERAGE 8 RENTAL REIMBURSEMENT 9 SUPPLEMENTARY PAYMENTS 4 TOWING AND LABOR 7 UNINTENTIONAL FAILURE TO DISCLOSE HAZARDS 17 WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US 19 SECTION II - LIABILITY COVERAGE is amended as follows: 1. BROAD FORM INSURED SECTION II - LIABILITY COVERAGE, paragraph A.1. - WHO IS AN INSURED is amended to include the following as an insured: d. Any legally incorporated entity of which you own more than 50 percent of the voting stock during the policy period. However, "insured" does not include any organization that: (1) Is a partnership or joint venture; or (2) Is an insured under any other automobile policy; or (3) Has exhausted its Limit of Insurance under any other automobile policy Paragraph d. (2) of this provision does not apply to a policy written to apply specifically in excess of this policy. e. Any organization you newly acquire or form, other than a partnership or joint venture, of which you own more than 50 percent of the voting stock. This automatic coverage is afforded only for 180 days from the date of acquisition or formation. However, coverage under this provision does not apply: (1) If there is similar insurance or a self-insured retention plan available to that organization; CA 88 10 01 10 02010 Liberty Mutual Insurance Company. All rights reserved. Includes copyrighted material of Insurance Services Office Inc., with its Permission. Page 1 of 7 (2) If the Limits of Insurance of any other insurance policy have been exhausted; or (3) To "bodily injury' or "property damage" that occurred before you acquired or formed the organization. 2. EMPLOYEES AS INSUREDS SECTION II - LIABILITY COVERAGE, paragraph A.1. - WHO IS AN INSURED is amended to include the following as an insured: f. Any "employee" of yours while using a covered "auto" you do not own, hire or borrow but only for acts within the scope of their employment by you. Insurance provided by this endorse- ment is excess over any other insurance available to any "employee" g. An "employee" of yours while operating an "auto" hired or borrowed under a written contract or agreement in that "employee's" name, with your permission, while performing duties re- lated to the conduct of your business and within the scope of their employment Insurance provided by this endorsement is excess over any other insurance available to the "employee" 3. ADDITIONAL INSURED BY CONTRACT, AGREEMENT OR PERMIT SECTION II - LIABILITY COVERAGE, paragraph A.1. - WHO IS AN INSURED is amended to include the following as an insured: h. Any person or organization with respect to the operation, maintenance or use of a covered "auto", provided that you and such person or organization have agreed in a written contract, agreement, or permit issued to you by governmental or public authority, to add such person, or organization, or governmental or public authority to this policy as an "insured". However, such person or organization is an "insured": (1) Only with respect to the operation, maintenance or use of a covered "auto"; (2) Only for "bodily injury" or "property damage" caused by an "accident" which takes place after you executed the written contract or agreement, or the permit has been issued to you; and Only for the duration of that contract, agreement or permit (3) 4. SUPPLEMENTARY PAYMENTS SECTION II - LIABILITY COVERAGE, Coverage Extensions, 2.a. Supplementary Payments, para- graphs (2) and (4) are replaced by the following (2) Up to $3,000 for cost of bail bonds (including bonds for related traffic violations ) required because of an "accident" we cover. We do not have to furnish these bonds (4) All reasonable expenses incurred by the insured at our request, including actual loss of earn- ings up to $500 a day because of time off from work 5. AMENDED FELLOW EMPLOYEE EXCLUSION In those jurisdictions where, by law, fellow employees are not entitled to the protection afforded to the employer by the workers compensation exclusivity rule, or similar protection, the following provision is added: SECTION II - LIABILITY, exclusion B.5. FELLOW EMPLOYEE does not apply if the "bodily injury" results from the use of a covered "auto" you own or hire SECTION III - PHYSICAL DAMAGE COVERAGE is amended as follows: 6. HIRED AUTO PHYSICAL DAMAGE Paragraph A.4. Coverage Extensions of SECTION III - PHYSICAL DAMAGE COVERAGE, is amended by adding the following: If hired "autos" are covered "autos" for Liability Coverage, and if Comprehensive, Specified Causes of Loss or Collision coverage are provided under the Business Auto Coverage Form for any "auto" you own, then the Physical Damage coverages provided are extended to "autos": a. You hire, rent or borrow; or CA 88 10 01 10 02010 Liberty Mutual I nsurance Company. All rights reserved. Includes copyrighted material of Insurance Services Office Inc., with its Permission. Page 2 of 7 b. Your "employee" hires or rents under a written contract or agreement in that "employee's" name, but only if the damage occurs while the vehicle is being used in the conduct of your business, subject to the following limit and deductible: A. The most we will pay for "loss" in any one "accident" or "loss" is the smallest of: (1) $50,000; or (2) The actual cash value of the damaged or stolen property as of the time of the "loss"; or (3) The cost of repairing or replacing the damaged or stolen property with other property of like kind and quality, minus a deductible B. The deductible will be equal to the largest deductible applicable to any owned "auto" for that coverage. C. Subject to the limit, deductible and excess provisions described in this provision, we will provide coverage equal to the broadest coverage applicable to any covered "auto" you own. D. Subject to a maximum of $750 per "accident", we will also cover the actual loss of use of the hired "auto" if it results from an "accident", you are legally liable and the lessor incurs an actual financial loss. E. This coverage extension does not apply to: (1) Any "auto" that is hired, rented or borrowed with a driver; or (2) Any "auto" that is hired, rented or borrowed from your "employee". For the purposes of this provision, SECTION V - DEFINITIONS is amended by adding the following: "Total loss" means a "loss" in which the cost of repairs plus the salvage value exceeds the actual cash value 7. TOWING AND LABOR SECTION III - PHYSICAL DAMAGE COVERAGE, paragraph A.2. Towing, is amended by the addition of the following: We will pay towing and labor costs incurred, up to the limits shown below, each time a covered "auto" classified and rated as a private passenger type, "light truck' or "medium truck' is dis- abled: a. For private passenger type vehicles, we will pay up to $50 per disablement. b. For "light trucks", we will pay up to $50 per disablement. "Light trucks" are trucks that have a gross vehicle weight (GVW) of 10,000 pounds or less. c. For "medium trucks" , we will pay up to $150 per disablement "Medium trucks" are trucks that have a gross vehicle weight (GVW) of 10,001 - 20,000 pounds However, the labor must be performed at the place of disablement. 8. PHYSICAL DAMAGE- ADDITIONAL TRANSPORTATION EXPENSE COVERAGE Paragraph A.4.a., Coverage Extension of SECTION III - PHYSICAL DAMAGE COVERAGE, is amend- ed to provide a limit of $50 per day and a maximum limit of $1,500 CA 88 10 01 10 82010 Liberty Mutual Insurance Company. All rights reserved. Includes copyrighted material of Insurance Services Office Inc., with its Permission. Page 3 of 7 9. RENTAL REIMBURSEMENT SECTION III - PHYSICAL DAMAGE COVERAGE, A. COVERAGE, is amended by adding the following: a. We will pay up to $75 per day for rental reimbursement expenses incurred by you for the rental of an "auto" because of "accident" or "loss", to an "auto" for which we also pay a "loss" under Comprehensive, Specified Causes of Loss or Collision Coverages. We will pay only for those expenses incurred after the first 24 hours following the "accident" or "loss" to the covered "auto." b. Rental Reimbursement will be based on the rental of a comparable vehicle, which in many cases may be substantially less than $75 per day, and will only be allowed for the period of time it should take to repair or replace the vehicle with reasonable speed and similar quality, up to a maximum of 30 days. c. We will also pay up to $500 for reasonable and necessary expenses incurred by you to remove and replace your tools and equipment from the covered "auto". d. This coverage does not apply unless you have a business necessity that other "autos" avail- able for your use and operation cannot fill. e. If "loss" results from the total theft of a covered "auto" of the private passenger type, we will pay under this coverage only that amount of your rental reimbursement expenses which is not already provided under Paragraph 4. Coverage Extension. f. No deductible applies to this coverage. For the purposes of this endorsement provision, materials and equipment do not include "personal effects" as defined in provision 11. 10. EXTRA EXPENSE - BROADENED COVERAGE Under SECTION III - PHYSICAL DAMAGE COVERAGE, A. COVERAGE, we will pay for the expense of returning a stolen covered "auto" to you. The maximum amount we will pay is $1,000. 11. PERSONAL EFFECTS COVERAGE A. SECTION III - PHYSICAL DAMAGE COVERAGE, A. COVERAGE, is amended by adding the following: If you have purchased Comprehensive Coverage on this policy for an "auto" you own and that "auto" is stolen, we will pay, without application of a deductible, up to $600 for "personal effects" stolen with the "auto." The insurance provided under this provision is excess over any other collectible insurance. B. SECTION V - DEFINITIONS is amended by adding the following: For the purposes of this provision, "personal effects" mean tangible property that is worn or carried by an insured." "Personal effects" does not include tools, equipment, jewelry, money or securities. 12. ACCIDENTAL AIRBAG DEPLOYMENT SECTION III - PHYSICAL DAMAGE COVERAGE, B. EXCLUSIONS is amended by adding the follow- ing: If you have purchased Comprehensive or Collision Coverage under this policy, the exclusion for "loss" relating to mechanical breakdown does not apply to the accidental discharge of an airbag. Any insurance we provide shall be excess over any other collectible insurance or reimbursement by manufacturer's warranty. However, we agree to pay any deductible applicable to the other cov- erage or warranty. 13. AUDIO, VISUAL AND DATA ELECTRONIC EQUIPMENT COVERAGE SECTION III - PHYSICAL DAMAGE COVERAGE, B. EXCLUSIONS, exception paragraph a. to exclu- sions 4.c. and 4.d. is deleted and replaced with the following: CA 88 10 01 10 @2010 Liberty Mutual Insurance Company. All rights reserved. Includes copyrighted material of Insurance Services Office Inc., with its Permission. Page 4 of 7 Exclusion 4.c. and 4.d. do not apply to: a. Electronic equipment that receives or transmits audio, visual or data signals, whether or not designed solely for the reproduction of sound, if the equipment is permanently installed in the covered "auto" at the time of the "loss" and such equipment is designed to be solely operated by use of the power from the "auto's" electrical system, in or upon the covered "auto" and physical damage coverages are provided for the covered "auto"; or If the "loss" occurs solely to audio, visual or data electronic equipment or accessories used with this equipment, then our obligation to pay for, repair, return or replace damaged or stolen property will be reduced by a $100 deductible. 14. LOAN I LEASE GAP COVERAGE A. Paragraph C., LIMIT OF INSURANCE of SECTION III - PHYSICAL DAMAGE COVERAGE is amended by adding the following: The most we will pay for a "total loss" to a covered "auto" owned by or leased to you in any one "accident" is the greater of the: 1. Balance due under the terms of the loan or lease to which the damaged covered "auto" is subject at the time of the "loss" less the amount of: a. Overdue payments and financial penalties associated with those payments as of the date of the "loss", b. Financial penalties imposed under a lease due to high mileage, excessive use or ab- normal wear and tear, c. Costs for extended warranties, Credit Life Insurance, Health, Accident or Disability Insurance purchased with the loan or lease, d. Transfer or rollover balances from previous loans or leases, e. Final payment due under a "Balloon Loan", f. The dollar amount of any unrepaired damage which occurred prior to the "total loss" of a covered "auto", g. Security deposits not refunded by a lessor, h. All refunds payable or paid to you as a result of the early termination of a lease agreement or as a result of the early termination of any warranty or extended service agreement on a covered "auto", i. Any amount representing taxes, j. Loan or lease termination fees; or 2. The actual cash value of the damage or stolen property as of the time of the "loss". An adjustment for depreciation and physical condition will be made in determining the actual cash value at the time of the "loss". This adjustment is not applicable in Texas. B. ADDITIONAL CONDITIONS This coverage applies only to the original loan for which the covered "auto" that incurred the loss serves as collateral, or lease written on the covered "auto" that incurred the loss. C. SECTION V - DEFINTIONS is changed by adding the following: As used in this endorsement provision, the following definitions apply: "Total loss" means a "loss" in which the cost of repairs plus the salvage value exceeds the actual cash value. A "balloon loan" is one with periodic payments that are insufficient to repay the balance over the term of the loan, thereby requiring a large final payment. CA 88 10 01 10 @2010 Liberty Mutual Insurance Company. All rights reserved. Includes copyrighted material of Insurance Services Office Inc., with its Permission. Page 5 of 7 15. GLASS REPAIR- WAIVER OF DEDUCTIBLE Paragraph D. Deductible of SECTION III - PHYSICAL DAMAGE COVERAGE is amended by the addition of the following: No deductible applies to glass damage if the glass is repaired rather than replaced 16. PARKED AUTO COLLISION COVERAGE (WAIVER OF DEDUCTIBLE) Paragraph D. Deductible of SECTION III - PHYSICAL DAMAGE COVERAGE is amended by the addition of the following: The deductible does not apply to "loss" caused by collision to such covered "auto" of the private passenger type or light weight truck with a gross vehicle weight of 10,000 lbs or less as defined by the manufacturer as maximum loaded weight the "auto" is designed to carry while it is: a. In the charge of an "insured"; b. Legally parked; and c. Unoccupied. The "loss" must be reported to the police authorities within 24 hours of known damage. The total amount of the damage to the covered "auto" must exceed the deductible shown in the Declarations. This provision does not apply to any "loss" if the covered "auto" is in the charge of any person or organization engaged in the automobile business. SECTION IV - BUSINESS AUTO CONDITIONS is amended as follows: 17. UNINTENTIONAL FAILURE TO DISCLOSE HAZARDS SECTION IV- BUSINESS AUTO CONDITIONS, Paragraph B.2. is amended by adding the following: If you unintentionally fail to disclose any hazards, exposures or material facts existing as of the inception date or renewal date of the Business Auto Coverage Form, the coverage afforded by this policy will not be prejudiced. However, you must report the undisclosed hazard of exposure as soon as practicable after its discovery, and we have the right to collect additional premium for any such hazard or exposure. 18. AMENDED DUTIES IN THE EVENT OF ACCIDENT, CLAIM, SUIT, OR LOSS SECTION IV - BUSINESS AUTO CONDITIONS, paragraph A.2.a. is replaced in its entirety by the following: a. In the event of "accident", claim, "suit' or "loss", you must promptly notify us when it is known to: 1. You, if you are an individual; 2. A partner, if you are a partnership; 3. Member, if you are a limited liability company; 4. An executive officer or the "employee" designated by the Named Insured to give such notice, if you are a corporation. To the extent possible, notice to us should include: (1) How, when and where the "accident" or "loss" took place; (2) The "insureds" name and address; and (3) The names and addresses of any injured persons and witnesses. 19. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US SECTION IV - BUSINESS AUTO CONDITIONS, paragraph A.5., Transfer of Rights of Recovery Against Others to Us, is amended by the addition of the following: If the person or organization has waived those rights before an "accident" or "loss", our rights are waived also. CA 88 10 01 10 02010 Liberty Mutual Insurance Company. All rights reserved. Includes copyrighted material of Insurance Services Office Inc., with its Permission. Page 6 of 7 20. HIRED AUTO COVERAGE TERRITORY SECTION IV - BUSINESS AUTO CONDITIONS, paragraph B.7., Policy Period, Coverage Territory, is amended by the addition of the following: f. For "autos" hired 30 days or less, the coverage territory is anywhere in the world, provided that the insured's responsibility to pay for damages is determined in a "suit', on the merits, in the United States, the territories and possessions of the United States of America, Puerto Rico or Canada or in a settlement we agree to This extension of coverage does not apply to an "auto" hired, leased, rented or borrowed with a driver. SECTION V - DEFINITIONS is amended as follows: 21. BODILY INJURY REDEFINED Under SECTION V - DEFINTIONS, definition C. is replaced by the following: "Bodily injury" means physical injury, sickness or disease sustained by a person, including mental anguish, mental injury, shock, fright or death resulting from any of these at any time COMMMON POLICY CONDITIONS 22. EXTENDED CANCELLATION CONDITION COMMON POLICY CONDITIONS, paragraph A. - CANCELLATION condition applies except as fol- lows: If we cancel for any reason other than nonpayment of premium, we will mail to the first Named Insured written notice of cancellation at least 60 days before the effective date of cancellation. This provision does not apply in those states which require more than 60 days prior notice of cancella- tion. CA 88 10 01 10 02010 Liberty M utua IInsurance Company. All rights reserved. Includes copyrighted material of Insurance Services Office Inc., with its Permission. Page 7 of 7 POLICY NUMBER: CMP 5648248 10 COMMERCIAL GENERAL LIABILITY CG 02 05 12 04 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. TEXAS CHANGES - AMENDMENT OF CANCELLATION PROVISIONS OR COVERAGE CHANGE This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART OWNERS AND CONTRACTORS PROTECTIVE LIABILITY COVERAGE PART POLLUTION LIABILITY COVERAGE PART PRODUCT WITHDRAWAL COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART In the event of cancellation or material change that reduces or restricts the insurance afforded by this Coverage Part, we agree to mail prior written notice of cancellation or material change to: 1. Name: 2. Address: * SEE BELOW SCHEDULE 3. Number of days advance notice: 30 ** Information required to complete this Schedule, if not shown above, will be shown in the Declarations. * ANY CERTIFICATE HOLDER WHO IS REQUIRED BY WRITTEN CONTRACT WITH THE NAMED INSURED TO BE ADDED AS AN ADDITIONAL INSURED TO THE NAMED INSURED'S GENERAL LIABILITY CERTIFICATES ARE ON FILE WITH YOUR AGENT. ** EXCEPT 10 DAYS IN THE EVENT OF CANCELLATION FOR NON PAYMENT OF PREMIUM CG 02 05 12 04 ©ISO Properties, Inc., 2003 Page 1 of 1 0 COMMERCIAL AUTO CA 88 60 07 12 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. AMENDMENT OF CANCELLATION PROVISIONS Any term or provision of the Cancellation Conditions of the policy or any endorsement amending or replac- ing such Conditions is amended by the following: If you have agreed in a written contract or written agreement to provide a person or organization notice of cancellation we agree to the following: a. Provide 30 days prior written cancellation notice to such person or organization for reasons other than nonpayment of premium, but only if we are provided with a schedule of persons or organizations with whom you have agreed to provide notification more than 30 days before the cancellation is to take effect. For purposes of this endorsement, knowledge of the agent as to the persons or organizations requesting notice of cancellation is insufficient to invoke our duty to provide notice of cancellation unless the identity of the persons or organizations is provided directly to us in accordance with the terms of this endorsement. Failure to provide notice to a person or organization in accordance with the terms of this endorsement shall not extend the effective date of the cancellation or otherwise affect cancellation of the policy as to any insured CA 88 60 07 12 © 2012 Liberty Mutual Insurance Includes copyrighted material of Insurance Services Office, Inc.,with its permission Page 1 of 1 TexasMutuar Insurance Company WORKERS' COMPENSATION AND EMPLOYERS LIABILITY POLICY WC420304B Insured Copy TEXAS WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in Item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury arising out of the operations described in the Schedule where you are required by a written contract to obtain this waiver from us. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. The premium for this endorsement is shown in the Schedule. Schedule 1. ( ) Specific Waiver Name of person or organization ( X ) Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. 2. Operations: ALL TEXAS OPERATIONS 3. Premium: The premium charge for this endorsement shall be 2.00 percent of the premium developed on payroll in connection with work performed for the above person(s) or organization(s) arising out of the operations described. 4. Advance Premium: INCLUDED, SEE INFORMATION PAGE. This endorsement changes the policy to which it is attached effective on the inception date of the policy unless a different date is indicated below. (The following "attaching clause" need be completed only when this endorsement is issued subsequent to preparation of the policy.) This endorsement, effective on 10/2912016 at 12:01 a.m. standard time, forms a part of: Policy No. 0001185671 of Texas Mutual Insurance Company effective on 10/29/2016 Issued to: A ORTIZ CONSTRUCTION & PAVING INC Premium: NCCI Carrier Code: 29939 PO Box 12058, Austin, TX 78711-2058 1 of 1 {800) 859-5995 I Fax (800) 359-0650 I texasmutual.00m ih/Le Authorized Representative 10,26/2016 WC 4203049 TexasMutualr Insurance Company WORKERS' COMPENSATION AND WC 42 06 01 Insured Copy EMPLOYERS LIABILITY POLICY TEXAS NOTICE OF MATERIAL CHANGE ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in Item 3.A. of the Information Page. In the event of cancellation or other material change of the policy, we will mail advance notice to the person or organization named in the Schedule. The number of days advance notice is shown in the Schedule. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. 1. Number of days advance notice: 30 2. Notice will be mailed to: Schedule THE CITY OF CORPUS CHRISTI 1201 LEOPARD ST. CORPUS CHRISTI TX 78401 This endorsement changes the policy to which it is attached effective on the inception date of the policy unless a different date is indicated below. (The following "attaching clause" need be completed only when this endorsement is issued subsequent to preparation of the policy.) This endorsement, effective on 1012912016 at 12:01 a.m. standard time, forms a part of; Policy No. 0001185671 of Texas Mutual Insurance Company effective on 10/29/2016 Issued to: A ORTIZ CONSTRUCTION & PAVING INC Premium: NCCI Carrier Code: 29939 PO Box 12058, Austin, TX 78711-2058 1 of 1 (800) 859-5995 I Fax (800) 359-0650 I texasmutual.com 44.€ Authorized Representative 10i26(2016 WC 42 06 01 00 6116 PAYMENT BOND BOND NO. 4401066 Contractor as Principal Name: A.Ortiz Construction and Paving, Inc. Mailing address (principal place of business): 102 Airport Rd. Corpus Christi, TX 78405 Owner Name: City of Corpus Christi, Texas Mailing address (principal place of business): Engineering Services 1201 Leopard Street Corpus Christi, Texas 78469 Contract Project name and number: Contract Renewal #1- IDIQ Minor Street Improvements FY 17 Part 1— Prosect E17048 'Ref E16252/E16253) Award Date of the Contract: July 10, 2017 Contract Price: 51.813,485.00 Bond Date of Bond: JULY 26, 2017 (Date of Bond cannot be earlier than Award Date of Contract) Surety Name:FOCI INSURANCE COMPANY Mailing address (principal place of business): 2435 N. CENTRAL EXPWY, SUITE 1000 RICHARDSON, TEXAS 75080 Physical address (principal place of business): SAME Surety is a corporation organized and existing under the laws of the state of: FLORIDA By submitting this Bond, Surety affirms its authority to do business in the State of Texas and its license to execute bonds in the State of Texas. Telephone (main number):972-338-3394 Telephone (for notice of claim): SEE ATTACHED Local Agent for Surety Name: HIGGINBOTHAM INSURANCE AGENCY Address: 500. N. SHORELINE BLVD., SUITE 1200 CORPUS CHRISTI, TEXAS 78401 Telephone: 361-883-1711 Email Address: memoore@higainbotham. net The address of the surety company to which any notice of claim should be sent may be obtained from the Texas Dept. of Insurance by calling the following toll-free number: 1-800-252-3439 Payment Bond Form — Contract Renewal #1 E17048 (E16252/E16253) IDIQ Minor Street Impr 006116-1 7-8-2014 Surety and Contractor, intending to be legally bound and obligated to Owner do each cause this Payment Bond to be duly executed on its behalf by its authorized officer, agent or representative. The Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally to this bond. The condition of this obligation is such that if the Contractor as Principal pays all claimants providing labor or materials to him or to a Subcontractor in the prosecution of the Work required by the Contract then this obligation shall be null and void; otherwise the obligation is to remain in full force and effect. Provisions of the bond shall be pursuant to the terms and provisions of Chapter 2253 and Chapter2269 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter to the same extent as if it were copied at length herein. Venue shall lie exclusively in Nueces County, Texas for any legal action. Contractor as PrincipaI Signature: Name: Rau 1 OC 7 Title: pr#. s icI2 nT Email Address: Oar fi zpci v(sbe9 /a tail our .J - Surety Signature: a�� Name: MAR EA, N Title: ATTORNEY IN FACT Email Address: memooxe@higginbotham . net (Attach Power of Attorney and place surety seal below) zfz,.:277, END OF SECTION Payment Bond Form — Contract Renewal #1 E17048 (E16252/E16253) IDIQ Minor Street Impr 006116-2 7-8-2014 FCCI INSURANCE GROUP More than a policy. A promise. GENERAL POWER OF ATTORNEY 10-043237 Know all men by these presents: That the FCCI Insurance Company, a Corporation organized and existing under the laws of the State of Florida (the "Corporation") does make, constitute and appoint: Aaron Endris; Mary Ellen Moore; Tracy L Gingras; Alicia Grumbles; Sherri Collins; Gwendolyn Johnston; Jack L Henry; Michael R Simon; Tricia Balolong; Tracy L Miller; William Mitchell Jennings; James R Reid Each, its true and lawful Attorney -In -Fact, to make, execute, seal and deliver, for and on its behalf as surety, and as its act and deed in all bonds and undertakings provided that no bond or undertaking or contract of suretyship executed under this authority shall exceed the sum of (not to exceed $5,000,000): $5,000,000.00 This Power of Attorney is made and executed by authority of a Resolution adopted by the Board of Directors. That resolution also authorized any further action by the officers of the Company necessary to effect such transaction. The signatures below and the seal of the Corporation may be affixed by facsimile, and any such facsimile signatures or facsimile seal shall be binding upon the Corporation when so affixed and in the future with regard to any bond, undertaking or contract of surety to which it is attached. In witness whereof, the FCCI Insurance Company has caused these presen s to be signed by its duly authorized officers and its corporate Seal to be hereunto affixed, this 22ND day of September , 2011 . yJP POCF Crai hn n, President LL= SEAL •.x Thom . Koval Esq., EVP, Chie 3J Officer, FCCI nsur ce Company ,,,, Gov ment Affairs and Corporate Secretary FCCI Insurance Company Attest: State of Florida County of Sarasota Before me this day personally appeared Craig Johnson, who is personally known to me and who executed the foregoing document for the purposes expressed therein. ARLENE CUEMAN Notary Public, State a Florida MyComm. No Sept. 25, 2016 Notary Public My commission expires: 9/25/2016 State of Florida County of Sarasota Before me this day personally executed the foregoing document for the My commission expires: 9/25/2016 appeared Thomas A. Koval, Esq., who is personally known to me and who purposes expressed therein. ARLENE CUEMAN Notary Public, State or Florida My Comm. Expires Sept. 25, toss No. Notary Public CERTIFICATE I, the undersigned Secretary of FCCI Insurance Company, a Florida Corporation, DO HEREBY CERTIFY that the foregoing Power of Attorney remains in full force and has not been revoked; and furthermore that the February 24, 2011 Resolution of the Board of Directors, referenced in said Power of Attorney, is now in force. 1.10NA3592-NA-04. 9114 Dated this 26TH day of snT,v 2017 Thoma Koval, Esq., EVP, - Legal Officer, Gov r ent Affairs and Corporate e tary DocuGard #04546 contains a security pantograph, blue background, heat -sensitive ink, coin -reactive watermark, and microtext printing on border._ „„s,,,vFSM1,P �e '%H MEAT CS ti IMPORTANT NOTICE To obtain information or make a complaint: You may call FCCI Insurance Group's (FCCI)* toll-free telephone number for information or to make a complaint at 1-800-226-3224. You may also write to FCCI Insurance Group Compliance Department e-mail at StateComolaintsc fcci-aroup.com. For Claims, you may write to FCCI Insurance Group Claim Department e-mail at newclaimefcci-arouo.com. You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at 1-800-252-3439. You may write the Texas Department of Insurance: PO Box 149104 Austin TX 78714-9104 Fax: 1-512-475-1771 Web: htto://www.tdi.state.tx.us E-mail: ConsumerProtection(tdi.state.tx.us PREMIUM OR CLAIM DISPUTES Should you have a dispute conceming your premium or about a claim you should contact FCCI first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR BOND This notice is for information only and does not become a part or condition of the attached documents. *The FCCI Insurance Group includes the following insurance carriers: Brierfield Insurance Company, FCCI Advantage Insurance Company, FCCI Commercial Insurance Company, FCCI Insurance Company, Monroe Guaranty insurance Company, and National Trust Insurance Company. 1 -BD -TX -21690 -NTP -11-12 Page 1 of 1 Copyright 2012 FCCI Insurance Group. 00 6113 PERFORMANCE BOND BOND NO. 4401066 Contractor as Principal Name: A.Ortiz Construction and Paving, Inc. Mailing address (principal place of business): 102 Airport Rd. Corpus Christi, TX 78405 Owner Name: City of Corpus Christi, Texas Mailing address (principal place of business): Engineering Services 1201 Leopard Street Corpus Christi, Texas 78469 Contract Project name and number: Contract Renewal #1 IDIQ Minor Street Improvements FY17 Part 1— Project No. E17048 (Ref E16252/E16253). Award Date of the Contract: July 10, 2017 Contract Price: $1,813,485.00 Bond Date of Bond: JULY 26, 2017 (Date of Bond cannot be earlier than Award Date of the Contract) Surety Name: FCCI INSURANCE COMPANY Mailing address (principal place of business): 2435 N. CENTRAL EXPWY, SUITE 1000 RICHARDSON, TEXAS 75080 Physical address (principal place of business): SAME Surety is a corporation organized and existing under the laws of the state of: FLORIDA By submitting this Bond, Surety affirms its authority to do business in the State of Texas and its license to execute bonds in the State of Texas. Telephone (main number):972-338-3394 Telephone (for notice of claim): SEE ATTACHED Local Agent for Surety Name: HIGGINBOTHAM INSURANCE AGENCY Address: 500. N. SHORELINE BLVD., SUITE 1200 CORPUS CHRISTI, TEXAS 78401 Telephone: 361-883-1711 Email Address:memoore@hicrcrinbotham,net The address of the surety company to which any notice of claim should be sent may be obtained from the Texas Dept. of Insurance by calling the following toll-free number: 1-800 252-3439 Performance Bond — Contract Renewal #1 E17048 (Ref E16252/E16253) IDIQ Minor Street Impr 006113-1 7-8-2014 Surety and Contractor, intending to be legally bound and obligated to Owner do each cause this Performance Bond to be duly executed on its behalf by its authorized officer, agent or representative. The Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally to this bond. The condition of this obligation is such that if the Contractor as Principal faithfully performs the Work required by the Contract then this obligation shall be null and void; otherwise the obligation is to remain in full force and effect. Provisions of the bond shall be pursuant to the terms and provisions of Chapter 2253 and Chapter 2269 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter to the same extent as if it were copied at length herein. Venue shall lie exclusively in Nueces County, Texas for any legal action. Contractor Signature: Name: Title: Email Address: N as Prin al Surety Signature: Si g,�� >02,14. 2t u I ()if Name: MAR LEN MOORE Pr iS ►bi t- Title: ATTORNEY IN FACT QW' fr pctv0 sbo3 /o bit e cr Email Address:memoore@higginbotham. net ,= 'l (Attach Power of Attorney and place surety seal below) • / END OF SECTION Performance Bond — Contract Renewal #1 E17048 (Ref E16252/E16253) IDIQ Minor Street Impr 006113-2 7-8-2014 FCCI INSURANCE GROUP More than a policy. A promise. GENERAL POWER OF ATTORNEY 10-043237 Know all men by these presents: That the FCCI Insurance Company, a Corporation organized and existing under the laws of the State of Florida (the "Corporation") does make, constitute and appoint: Aaron Endris; Mary Ellen Moore; Tracy L Gingras; Alicia Grumbles; Sherri Collins; Gwendolyn Johnston; Jack L Henry; Michael R Simon; Tricia Balolong; Tracy L Miller; William Mitchell Jennings; James R Reid Each, its true and lawful Attorney -In -Fact, to make, execute, seal and deliver, for and on its behalf as surety, and as its act and deed in all bonds and undertakings provided that no bond or undertaking or contract of suretyship executed under this authority shall exceed the sum of (not to exceed $5,000,000): $5,000,000.00 This Power of Attorney is made and executed by authority of a Resolution adopted by the Board of Directors. That resolution also authorized any further action by the officers of the Company necessary to effect such transaction. The signatures below and the seal of the Corporation may be affixed by facsimile, and any such facsimile signatures or facsimile seal shall be binding upon the Corporation when so affixed and in the future with regard to any bond, undertaking or contract of surety to which it is attached. In witness whereof, the FCCI Insurance Company has caused these presen s to be signed by its duly authorized officers and its corporate Seal to be hereunto affixed, this 22ND day of September , 2011 . Attest: Crai hn n, President FCCI nsur ce Company Thom . Koval Esq., EVP, Chie Officer, Gov ment Affairs and Corporate Secretary FCCI Insurance Company State of Florida County of Sarasota Before me this day personally appeared Craig Johnson, who is personally known to me and who executed the foregoing document for the purposes expressed therein. ARLENE CUEMAN Notary Pubic. State of Florida My Comm. Expires Sept. 25, 2016 No. EE 213092 Notary Public My commission expires: 9/25/2016 State of Florida County of Sarasota Before me this day personally appeared Thomas A. Koval, Esq., who is personally known to me and who executed the foregoing document for the purposes expressed therein. ARLENE CUEMAN Notary Public, State of Florida My Comm. Fires Sept. 25, 2016 No. EE 213092 Notary Public My commission expires: 9/25/2016 CERTIFICATE I, the undersigned Secretary of FCCI Insurance Company, a Florida Corporation, DO HEREBY CERTIFY that the foregoing Power of Attorney remains in full force and has not been revoked; and furthermore that the February 24, 2011 Resolution of the Board of Directors, referenced in said Power of Attorney, is now in force. 1-10NA-3592-NA•04, 9/14 Dated this 26TH day of ,TT1T.Y 2017 Thoma Koval, Esq., EVP, - Legal Officer, r ent Affairs and Corporate et, tary DocuGard $04546 contains a security pantograph, blue background heat -sensitive ink, coin -reactive watermark and microtext printing ori; borde o"`00� IMPORTANT NOTICE To obtain information or make a complaint: You may call FCCI Insurance Group's (FCCI)* toll-free telephone number for information or to make a complaint at 1-800-226-3224. You may also write to FCCI Insurance Group Compliance Department e-mail at StateComplaints(a?fcci-grouq.com. For Claims, you may write to FCCI Insurance Group Claim Department e-mail at newclaim@fcci-oroup.com. You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at 1-800-252-3439. You may write the Texas Department of Insurance: PO Box 149104 Austin TX 78714-9104 Fax: 1-512-475-1771 Web: htto://www.tdi.state.tx.us E-mail: ConsumerProtection(c(c�tdi.state.tx.us PREMIUM OR CLAIM DISPUTES Should you have a dispute concerning your premium or about a claim you should contact FCCI first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR BOND This notice is for information only and does not become a part or condition of the attached documents. *The FCCI Insurance Group includes the following insurance carriers: Brierfield Insurance Company, FCCI Advantage Insurance Company, FCCI Commercial Insurance Company, FCCI Insurance Company, Monroe Guaranty Insurance Company, and National Trust Insurance Company. 1 -BD -TX -21690 -NTP -11-12 Page 1 of 1 Copyright 2012 FCCI Insurance Group.